HomeMy WebLinkAbout2019-03-25 PACKET 06.2.STAFF REPORT CASE: ICUP2019-013 ITEM: 6.2 PUBLIC MEETING DATE: 3/25/19 TENTATIVE COUNCIL REVIEW DATE: 4/17/19 APPLICATION APPLICANT: Danner Inc. REQUEST: An interim conditional use permit to allow grading of 500,000 cubic yards on approximately 54 acres of land to prepare the Apache site for future development. SITE DATA LOCATION: Northwest corner of U.S. Highway 61 & CSAH 19 (Keats Avenue) ZONING: AG -2, Agricultural, and R-4, Low Density Residential GUIDED LAND USE: Mixed Use LAND USE OF ADJACENT PROPERTIES: CURRENT GUIDED NORTH: Res. & Ag. Low & High Density Res. EAST: Parks Park & Open Space SOUTH: Highway 61 Highway 61 WEST: Commercial Commercial SIZE: 54 Acres DENSITY: N/A RECOMMENDATION Approval, subject to the conditions stipulated in this staff report. Cottage Grove COTTAGE GROVE PLANNING DIVISION � here Pride and Prosperity Meet Planning Staff Contact: John M. Burbank, Senior Planner; 651-458-2825; iburbank(o)_cottagegrovemn.gov Application Accepted:. 2/27/2019 60 -Day Review Deadline: 4/28/2019 City of Cottage Grove Planning Division • 12800 Ravine Parkway South • Cottage Grove, MN 55016 Planning Staff Report Danner, Inc. — Apache Site Grading Permit Case No. ICUP2019-013 March 25, 2019 Proposal Danner, Inc. applied for an Interim Conditional Use permit (ICUP) for the ability to grade and excavate approximately 500,000 net cubic yards of earth materials from approximately 38.42 acres of land located northwest of Keats Avenue and East Point Douglas Road, known as the Apache site. The grading plan proposes the following: • Installing/repairing erosion control early in May 2019 • Start grading operations in May 2019 • Grading to follow proposed phasing plan. • Removing trees and brush in conjunction with the grading phases. • Stockpiling various dirt materials and hauling material off-site. • Screening dirt material and stockpiling the material on-site. • Loading dirt materials onto trucks and hauling the material off-site. A copy of Danner, Inc.'s grading plan dated February 2, 2019 is attached. =1=1� 5 SITE R> F'I vs. Por€A Aa. _ ;. Location Map Review Schedule Application Received: February 15, 2019 Application Deemed Complete: February 27,2019 Planning Commission Meeting: March 25, 2019 60 -Day Review Deadline: April 28, 2019 Tentative City Council Meeting: April 17, 2019 Planning Staff Report — ICUP2019-013 Danner, Inc. — ICUP for Apache Grading Permit March 22, 2019 Page 2 of 8 Planning Considerations Background Since 2009, Danner Inc. has operated similar grading and export activities on this property and the 6.7 -acre property directly south of the proposed 38.42 -acre Apache site. Resolutions 2009- 102 and 2010-108 regulated this activity and still are in effect. Both properties are under the same ownership and share a common access point onto East Point Douglas Road. The previ- ous grading and extraction process resulted in the removal of approximately 600,000 cubic yards of material from 32.5 acres of the site. The current planning application request is for the next phases of the project needed to continue to grade and extract material, fine tune current graded areas, and establish building pads with elevations suitable for future commercial and high density housing development. Grading Operations Grading on the 38.42 -acre site will begin in the southeast corner. As Danner begins to excavate into this hillside, much of the grading activity will occur on the 6.7 -acre parcel. Materials will be stockpiled on this smaller parcel and hauled away as the material is needed for off-site construc- tion projects. As more material is needed, Danner will continue excavating northward and west- ward into the hillside on the Apache site. The phasing plan is shown below. r' P -7 ACRES ACRESz ` ASk-4 . .;�II t �. � �� � �fllyl. l�� ._--•�1 1 4 �ti 4 l N irrs rho ti � w,rarina s� I+ Ill+�f! rl�: tti `Jf A t � f I 1 www art v r Pmi +l l t11,114111l1 d 1 1 til � � c �r 1f !fl j l ti— __�4 � f t ` til +iY `�`• w ' _ _ '• I 111 1l 1 � � � �' 111" l Y `�.__ Il:t r I ge �.i �,. 4}}441 �jF� 1 � r '= „�y�l = `. '! • � ti `��"—���1`1 � �� d 4 � . w-„ � � L t� � `� `n�`- s_ �11Y4�/'N+ fTite 4R•4e. �� � l' - � n9- a 38.4 -Acre Apache Site Phasing Plan Planning Staff Report — ICUP2019-013 Danner, Inc. — ICUP for Apache Grading Permit March 22, 2019 Page 3 of 8 Grading Plan The previous grading activities on the site established a vegetated sloped berm/buffer along Keats Avenue for the purpose of screening the grading activities from public view. This buffer will remain under the proposed grades. The finished grade elevations will increase as the site is graded to the north. As proposed, grade elevations for Phases 1 through 3 have a low elevation of 878 feet above sea level and a high elevation of 892 feet above sea level. ,— � orlon � � l'• _ I ` � 1r r Q fWr r 4 1 r 1 f r — d r r _ Grading Plan Tree Inventory A tree inventory dated April 13, 2009 was completed for the Apache parcel. A total of 374 trees are proposed to be removed in all three phases. The tree species and trunk caliper size for each tree was included in this inventory. This information will be used to calculate the tree mitigation requirements when the site is developed in the future. Future Development The application material includes a concept detail showing future pad development of the site. It is included below. Planning Staff Report — ICUP2019-013 Danner, Inc. — ICUP for Apache Grading Permit March 22, 2019 Page 4 of 8 Proposed Commercial Pad Concept Plan from Applicant On February 20, the City Council approved a grant application to the Washington County CDA for the master planning of the Shoppes at Cottage View area. The purpose of the master plan will allow for the City to market the site at various economic development related events. The Shoppes at Cottage View is a "gateway" into the community and the City wants to ensure that the site is planned appropriately for the future. The City will work with Danner Inc. and the property owner to ensure that the final grading plan matches the adopted master plan for the Shoppes at Cottage View. .. STH.-.�- AEUITIM tiFp�—� Fit --- -- - I ____ �----------------------------------------------------- ____________________________________________ ...-.i HIGH GERSIM RE51C4iPA1 (I5.4 ACRES ' W 10.1-20 UNIM ACRE In 0 4Gvo r NEPiLAL CAMPUS o A ACRES x rpm h{ Q rr' Y j � C2L€CTOR R0.4G IL T r W 2 J r � r ae Ld yrs r # v1 a r wI- j o r rr P Q� � •� I rr a ° PCZ ueo+nE nIEA.TExt .��q (10+ SCREENS) 71.5 ACAES 2 ACRES i / PCIS ACRES j � 1M1 r f �P� PnSr F9 >w I 1.d ACR Esq g� E ARNARG7G r �n Br 4• i��o-a t r Proposed Commercial Pad Concept Plan from Applicant On February 20, the City Council approved a grant application to the Washington County CDA for the master planning of the Shoppes at Cottage View area. The purpose of the master plan will allow for the City to market the site at various economic development related events. The Shoppes at Cottage View is a "gateway" into the community and the City wants to ensure that the site is planned appropriately for the future. The City will work with Danner Inc. and the property owner to ensure that the final grading plan matches the adopted master plan for the Shoppes at Cottage View. Planning Staff Report —|CUP2O1Q-013 Danner. Inc. — |CUP for Apache Grading Permit March 22.2O1Q Page 5nf8 LA.'4DFCjF..4A Proposed Master Plan Concept Planning Staff Report — ICUP2019-013 Danner, Inc. — ICUP for Apache Grading Permit March 22, 2019 Page 6 of 8 Erosion Control and Stormwater Management The City's consulting engineer, Bolton & Menk, reviewed the application and provided comment in the attached letter from dated March 21, 2019. Summary A, The phased grading/excavation on the site has occurred since 2009 with no negative issues identified by the City. The proposed grading establishes the road bed elevations for the future Ravine Parkway and the Cottage View Drive. Removing dirt now should reduce some of the grading costs for future development on the Apache parcel. r The final grading plans will be required to match the approved small area land use and transportation study adopted by the City. Recommendation That the Planning Commission recommend to the City Council approval of an Interim Conditional Use Permit to allow the continued grading of the Apache site as proposed on the grading plan dated February 2, 2019, as prepared by Pioneer Engineering, subject to the following conditions: 1. The grading permit shall expire on April 1, 2026, or upon rezoning of the property. 2. The site shall be restored by June 1, 2026, with ground cover elevations and slopes approved by the City Engineer. 3. An as -built survey of the final site grades shall be provided to the City prior to the release of any financial guarantees. 4. The conditions of Resolutions 2009-102 and 2010-108 shall be complied with. 5. A financial guarantee, in the form of a cash escrow or letter of credit, of 150 percent of erosion control costs, necessary site restoration, and street sweeping must be posted with the City before a grading permit is issued. 6. The City has the authority to revise the grading permit if on-site conditions or changing conditions make the original grading permit ineffective. The City may suspend or revoke a grading permit whenever the permit is issued in error or on the basis of incorrect infor- mation being supplied or is found to be in violation of any local, state, or federal ordi- nance or regulation. The City will provide written notice of the intent to suspend or revoke the permit based upon the above criteria. 7. Finished grades shall have a minimum topsoil of at least four inches. Planning Staff Report — ICUP2019-013 Danner, Inc. — ICUP for Apache Grading Permit March 22, 2019 Page 7 of 8 8. All exposed soils resulting from grading activities must be seeded within 10 days of the completion of the active site grading activity. The City may approve an extension of this deadline, but in no case shall site restoration be delayed beyond October 1. 9. Any grading which creates erosion or sedimentation problems, flooding, ponding, and/or negatively alters water drainage must be corrected by the land owner or operator. 10. Temporary basins may be required as part of erosion and sediment control during con- struction operations. The duration of the basins is dependent upon the time of excavation and re -vegetation of the site. 11. Land shall be developed in phases of workable size such that adequate erosion and sedi- ment control measures can be provided as construction progresses. The smallest practi- cal area of land shall be exposed at any one period of time. 12. For soil stockpiles greater than 10 cubic yards, the toe of the stockpile must be at least 30 feet from any road or drainage channel. Erosion from stockpiles shall be controlled by placing appropriate barriers around the pile as necessary to contain sediments. If these measures do not adequately control the erosion, the piles shall be stabilized by mulching, vegetative cover, tarps, or other means. Any stockpile that is intended to be left over winter must have a temporary vegetative cover established and adequate sediment con- trol measures surrounding its perimeter by October 31. 13. A temporary rock pad entrance must be installed at all points where vehicles exit and must be constructed prior to commencement of grading activity. The rock pad is to be maintained to accommodate continuous removal of mud from vehicles. The rock pad must meet design criteria, standards, and specifications found in the MPCA publication "Protecting Water Quality in Urban Areas." 14. The landowner or operator must sweep East Point Douglas Road as needed to remove any sediment and/or debris that may accumulate due to vehicles and equipment entering and exiting the site. The City may require street sweeping within 24 hours of verbal or written notification. If the street is not swept, the City will clean the street and bill the owner or operator, as determined by the Public Works Director. 15. Corrective action and landscape restoration for erosion or sedimentation problems on neighboring properties, or any location other than the permitted site, must commence within 24 hours of written or verbal notification. 16. Burying organic material or construction debris is prohibited. 17. Site grading activities cannot occur between 7:00 P.M. and 7:00 A.M. 18. The landowner and operator must allow City staff to enter the site to inspect the erosion and sediment control measures required by the permit. 19. Bituminous/asphalt materials are prohibited from being buried or temporarily stockpiled on the property. Planning Staff Report — ICUP2019-013 Danner, Inc. — ICUP for Apache Grading Permit March 22, 2019 Page 8 of 8 20. Prior to grading, all trees to be preserved must be field identified and grading limits cor- doned with a suitable barrier such as snow fencing by the applicant and verified by City staff. The barrier shall be located to coincide to the extent practicable with the drip line of trees to be preserved. 21. The tree inventory dated April 13, 2009, will be included in the review process and tree mitigation requirements will be imposed on the future development of this site. 22. Access from Keats Avenue (CSAH 19) is prohibited. 23. Crushing rock and other materials is prohibited. 24. Comments in the Bolton & Menk letter dated March 21, 2019, shall be addressed prior to issuance of the grading permit. 25. Uncontrolled stormwater or sediment runoff from the site is prohibited. Runoff from the site shall not have negative impacts to neighboring properties or right-of-way. Any damage caused to neighboring property or right-of-way as a result of stormwater runoff shall be repaired by the applicant. Prepared by: John M Burbank, AICP Senior Planner Attachments: Grading Permit Application Grading Plan Dated February 2, 2019 Tree Inventory dated April 13, 2009 Bolton & Menk Letter dated March 21, 2019 02/14/2019 12:10 FAX 763 571 3823 herringer companies Q0001/0001 Cottage Crowe Community Development Department 12800 Ravine Parkway South Cottage Grove, MN 55016 www.cottaa_ge rovemn.gov GRADING PERMIT APPLICATION Building Division Telephone: 651-458-2804 Fax: 651-458-2897 E -Mail: buildinci@ggttagegrovemn.00v Grading Site Address/Development Name Property Identification Number (PIN) No Know Address 12202721310009, 2202721420002, 2202721430006 Property Owner Contact Name (if dMerent) T Apache Chief Theater Co Gerry Herringer " Mailing Address E -Mail Address 5210 Central Ave NE, Columbia Heights MN 55421 cheeryco@msn.com Preferred Telephone #: 763-571-8177 Fax #: 763-571-3823 - Name of Firm Preparing Grading & Erosion Control Plan Contact Name (If ci ffermt) Pioneer Engineering Nicholas Polta Mailing Address E -Mail Address 2422 Enterprse Drive, Mendota Heigfhts MN 55102 npoita@pioneereng.com Preferred Telephone #: 651-251-0607Fax#: 651-6$1-g4g8 Grading Contractor Contact Name (if Merert)Cont-actor License No. Danner Inc. Marley Danner Mailing Address E -Mail Address 843 Hardman Ave, So St Paul MN kellyr@dannerinc.com Preferred Telephone #: 651-450-0803 Fax #: 651-450-9076 Description of Work: Prepare Site for future development Cubic Yards to be Moved: Estimated Value of Grading Work: +1-500,000 Grading Plan Date: Erosion Control Installation Date: 2-15-19 5-1-19 Grading Start Date: Site Grading Completion Date: 5-15-19 12-31-25 Building Construction Start Date: Site Restoration Completion Date: NSA In Phases Submit the foliowina documents: ❑ A site plan showing the dimensions and acreages of the site to be graded. ❑ Four (4) sets of the final grading plan showing original and final contours of the site. ❑ Four (4) sets of the erosion control plan showing all erosion control measures to be installed and maintained during and following grading operation. ❑ NPDES permit information (if required). Acknowledurnent and Signature: The undersigned hereby agrees all work will be done in accordance with ordinances of the City of Cottage Grove (City Code Title 10-5-8), the requirements of • the City of Cottage Grove Engineering Division, and the Minnesota Construction Site Erosion and Sediment Control Planning Handbook. Signature of ttpllce Signature of Property Owner. Date: 1511 Date Division Approval: Engineering Division Approval: Date: E Name: Date: Permit Fee: ptance by City: APACHE MINING PERMIT COTTAGE GROVE, MINNESOTA 9 WT P o „ L KPU 9 �„ 0 ,, , I OCATION MAP - / SHEET INDEX 1. COVER SHEET 2. LEGEND — 3. CONCEPT SITE PLAN 4. PHASING PLAN 5. OVERALL GRADING PLAN XING PLAN 10. EROSION CONTROL PLAN n i i 11-12. DETAILS PI$NEERneerIng 14. Know what's below Call before you dig. TOPOGRAPHIC SYMBOLS E` A cTlory 0 E�� 0 � T IT vas sTaRxl o oLE � • M[TER ucnr Poi[ o � C] �. T T PND MPRK 0 8 corvsFavnnary T oEDouOUs TREE mNlf£ROVS TREE Q R / BusH EROSION & SEDIMENT CONTROL ••••••• • � � � � � � � � • —o-o-o-o-o-o-o-o-o-o-o— ■ � �� � � � � � � � STANDARD EROSION CONTROL HEAVY—DUTY EROSION CONTROL SECONDARY EROSION CONTROL FENCE EROSION CONTROL AT BACK OF CURB -��������} TREE FENCE TEMPorenreY olveresloN DITCH l®� v cATCR BASIN INLET PROTECTION STRAW BIO ROLLS ROCK BERM —» PMANENT SUMPEU RIP RAP PER ANENT ENERGY DIS (PATER GE LOCATION �--�� GRAVEL CONSTRUCTION ENTRANCE TEMPORARY OUTLET FLOATING SKIMMER BASIN ACCESS 89 SLOPE MAI. STABILIZED EMERGENCY OVERFLOW STEEP SLOPE 3:1 (N: VJ (33.3%7 OR STEEPER GRADE CURB LEGEND q+gcsi �� 0. 08.3 PT.0. STOP = OP OF CURB ELEVATION FOR SURMOUNTABLE CURB HOp QURMOU N ELEVATION BLE CURB FOR B616UCURBL )ENATION = IRA OF URB ELE TION (TIP OUT GUTTER) ��1 a85F =BITUMINOUS ELEVATION CONTROL BLANKET Iiil ii lii l ii l Til UPLAND/NATURAL AREA SEEDING MNDOT CATEGORY PER PLAN TOPOGRAPHIC SYMBOLS E` A cTlory 0 E�� 0 � T IT vas sTaRxl o oLE � • M[TER ucnr Poi[ o � C] �. T T PND MPRK 0 8 corvsFavnnary T oEDouOUs TREE mNlf£ROVS TREE Q R / BusH EROSION & SEDIMENT CONTROL ••••••• • � � � � � � � � • —o-o-o-o-o-o-o-o-o-o-o— ■ � �� � � � � � � � STANDARD EROSION CONTROL HEAVY—DUTY EROSION CONTROL SECONDARY EROSION CONTROL FENCE EROSION CONTROL AT BACK OF CURB -��������} TREE FENCE TEMPorenreY olveresloN DITCH l®� v cATCR BASIN INLET PROTECTION STRAW BIO ROLLS ROCK BERM —» PMANENT SUMPEU RIP RAP PER ANENT ENERGY DIS (PATER GE LOCATION �--�� GRAVEL CONSTRUCTION ENTRANCE TEMPORARY OUTLET FLOATING SKIMMER BASIN ACCESS 89 SLOPE MAI. STABILIZED EMERGENCY OVERFLOW STEEP SLOPE 3:1 (N: VJ (33.3%7 OR STEEPER GRADE CURB LEGEND q+gcsi �� 0. 08.3 PT.0. STOP = OP OF CURB ELEVATION FOR SURMOUNTABLE CURB HOp QURMOU N ELEVATION BLE CURB FOR B616UCURBL )ENATION = IRA OF URB ELE TION (TIP OUT GUTTER) ��1 a85F =BITUMINOUS ELEVATION ABBREVIATIONS A ALGEBRAIC DIFFERENCE '2N REEIRE B -e 0 IV I BI BV BUTTERFLYR VALVE FLIlEl ENS BOC BACK OF CURB BEE BASE FLOOD ELEVATION BMP BEST MANAGEMENT PRACTICE LAEANIERIAG CL CENTER LINE RATED —L CBPLENAUT R CATCMIT HBASINMANHOLE FEDU 111 COP CLEAN OU1D METAL PIPE HAND FILE CS CURB STOP DID DUCTILE RON PIPE N SO or E LP OREVATION V -N lUIINKLEl FES FLARE DGEND SECTION FLA ED END IECT N ER F—F FACE TO FACE FM F0 CEMAIN NATIRAL SAI GB GRADE BREAK HP HIGH POINTE HYD IT ANT HWL HIGH WATER LEVEL NV Ic RR EFFICIENT LENGTH CG LF LOWEST FLOOR a LCUKEDI Lo LowfsT oPENINCM OUID NO HE I POINT H MANHOLE HEIT FILE PC POINT OF CURVATURE PCC POINT OF COMPOUND CURVATURE PI POINT OF INTERSECTION SELLAID RNE PVF POINT OF PRO PONT OF REVERSE CURVATURE PVC POINT OF VERTICAL CURVATUREPOLYVINYL CHLORIDE PIPE B -C FILE CURB R, GUTTER AI POOR PN POINT OF VERTICAL INTERSECTION RCP REINFORCED CONCRETE PIPE ROW RIGHT OF WAY SSWR SANITARY SEWER STA STATION SWPPP STORM WATER POLLUTION PROTECTION PLAN TNH TOP NUT HYDRANT T P PICAL WO WALKDUM AIN LOT INFORMATION (TIPIGAL SECTION NOT TO ACPLE) FEN OFF NAGE & nuT a90 CEAGEGENT ELEVATION IND Q3 ELOCK No. LIGHT (IEE RE OU RED) ' LOAS,T NO.FILED T1111 ELEVATION R LOE LK a OR i LI ® LOT CORED NER N SOE WALKOUT N OUT FN — — 5T PAST ACTED ACCESS PI$NEERne�ng �e s ry,N„T, ww IV -11 LEGEND D4NNER INC. APACHE TdINEVG PERTdIT LEGEND UTILITY LINES EX Si NG PROPOSED FUTURE DESCR PT ON O • OO SANITARY MANHOLE SANITARY SEWER (SANITARY & WATE RM AIN PLANS) -->--- SANITARY SEWER (STORM SEWER PLANS) Fu Fu FORCE MAIN � HYDRANT C� N 69 GATE VALVE D � •& � CURBCSRTOP WATERM AIN (SANITARY & WATERM AIN PLANS) WATERM AIN (STORM SEWER PLANS) � ® � BEEH AS BASIN O O ® STORM MANHOLE ® ® ® CONTROL STRU CTURf ---->r----> —N»— —FE—EF— STORM SEWER (STORM SEWER PLAN SJIN PLANS) �»� cuLVERT --------------------- PE RAE G P[rer PErer P[reF P[rer I --------------------- of of of of SOLID DR AIN TI LE SER N CE CASING e a e a e e UNDERGROUND ELECTRIC LINE 9 9 9 9 9 9 UNDERGROUND FIBER OPTIC LINE Pero Pero Pero UNDERGROUND PETROLEUM N PIPELINE UNDERGROUND ND TEL EPN ONE LINES v v v UNDERGROUND ZEEP VISION LINE on on on on OVERHEAD UTILITY LINES SITE LINES EXISTING PROPOSED FUTURE DESCRIPTION SURMOUNTABLE CURB & GUTTER EDGE OF BIT UMIN OUS ER YELLOW PAVEMENT STRIPING (SINGLE/DOUBLE) WNITE PAVEMENT STRIPING (SINGLE/DOUBLE) PHASE LINE — — — CE NTERLINf 2' CONTOUR LINE a x so TO' CON DUR LINE _ _ --------- BASIN OUTLET LINE BASIN HIGH WATER LINE PROPOSED SPOT ELEVATION EMERGENCY OVERFLOW ---------- — .. � � — — ofuNEATED / PRoaosfo wETLANo LINE /WWYWY\ /WWYWY\ /WYWWY\ TRff ALINEBUF FEF FEMA FLOODPLAIN BOUNDARY z z FETAININC WALL CE (BA RE) FEN Cf (CHAIN LINK) ❑ U ❑ U [] U FENCE (wood) T � coNSERvnnoN AREA SIGN � T Wf iLAND BUFFER SIGN W TYPE III BA RICADE 4�+ — + STREET SIGNS PEDESTRIAN RAMP SURVEY LINES FX S7 N(' PROPOSED F T RF BOUNDARY ON — — F W A Y LOT LINE ----------- ----------- ----------- EASEMENT --------------------- _ ----------------- ____ SET BACK LINE SECTION LINE HATCH PATTERNS GRAVEL SURFACE � wETLANo DBITUMINOUS SURFACE � WETLAND UPLAND BUFFER CONCRETE SURFACE � WETLAND I ATION RIP RAP � PERMANENT TURF RESTORATION SELECT BACKFILL MATERIAL PERMANENT WET BASIN SE E GING EROSION 5TH „I -IT- IT-ADDITION ADD ION / ----------------------------------- `----- ----------------- --- -------------------------------------- -------� - - j HIGH DENSITY RESIDENTIAL (15.4 ACRES) � 10.1-20 UNITS ACRE LLJ � POND / MEDICAL CAMPUS Q- / 29 ACRES AH COLLECTOR ROAD / � 1.7 ACRES / Z Q (n cl Hs ol Cn Q / of Ed ol 00 / Q- MOVIE THEATER / (10+ SCREENS) / POND 2 ACRES 11.5 ACRES / eso ,\ OND e 2PACRES (1.8 s excer*ion FAST FOOD � T �s ACRES 2.0 ACRES PHARMACY � o eo Ioo zoo GRAPHIC SCALE IN FEET PI$NEER � /\ e D4NNER INC. APACHE h11NING PERNIIT CONCEPT SITE PLAN - s`3 �, sn s .�.� s -s °T1 mTrAcn yr �nnvesorn � or 12. 5TH „„ -ITI- ADDITION o \ v � � v � � � � SE PHASE THREE MAX 7 ACRES + � r � \ V v� S E SEVEN \ PHASE EIGHT \ \ ��� PHASE \ MAXIMUM SIZE \ MA%IMUM SIZE PHASE FOUR �� MAXIMUM SIZE -�� / A \ \ +/-6 CRES IT�V��--��V �IIIII �� vv IIIC\i I III \ \ \11 I III I�r \/-7 vim_ I '1 ✓ 3 g' MAXIMUM SIZE- ACRES _ IIII�IIIII� �i T PHASE NINE ��'✓1� \ `MAXIMUM SIZEI l III I��I, IMAXIMUM v l—/% �%E f PHASE SIX Irr\\ n \ +/-5 A \FES I II 1 SIZE SAN\ 1 +� 6 ACRES I 1 \ �Z� `� • \\ ^` �•� ��� �/ /. )) J 1 < PHASE ONE CC -) PHASE FIVE 1 ` 1 /� I X I� ^ �T�f _MAXIMUM SIZE MAXIMUM SIZE / (X \-5 ACRES I I �I 1 +/-7 ACRES IYI v�v � •. �� �N� °E� � I I it -� � � 7 _ I 1 ��'I I v @�vF ���T��I llII I _ s \11/e \AVI Jf ��� ����A ... s�T Rc_ o o v T �s .v NA / �T— FEI � vv \ H' v� (v of qtp 1 Z O �_ V, eJa o5,y 50 100 �0 GRAPHIC SCALE IN FEET PI$NEER \ \ •� \ \ /\ ,42Z I,11,lpl-1w,. D4NNER INC. APACHE NIINING PERK ITT x.19 PHASING PLAN - urs vT mnvesorn 4 oP 1� —- L STH �o�Ewaao ,TI —IT— ADDITION 6 sib 6 6 v 9 s i77- 8! / 7 I i _ s 1 J �3 PI$NEER \ \ GRAPHIC SCALE IN FEET �u aG�sn, ti,N„u "" Qo ;, x.19 D4NNER INC. APACHEcn ING PERhIIT - <= OVERALL GRADING mTrAh11Nyr �nnvesorA 5 / C\ 1 SEE SHEET � e� � / s ( � o r aha � � �� -, m � �� f � � � �_ • /� / sEC. 22. / / TEMP POND E �• ,=�'�'�.... OUTLET: 838.0W� I / o / / TEMP FES I to,y INV: 838.0 8, � iii � % -- -- � � -- ••• — � ✓� / — _. r—_-= —_ _ TEMP FES f T fg� NV 836.0\�_/ 'r% a-- �/ GRAPHIC SCALE IN FEET n "" D4NNER INC. APACHE h11NING PERhIIT u ax�sn, wN„u po,=.v3. , GRADING PLAN - urs m�r C v� mn 11s 6 I 12 ......... .. ...... 6� �6 �6- 0 v� A a9� ........... I ` \ \\ / ✓Q \\ \ I'I\�✓//III / /� /,�/ \ %//// s\ 1 looi PIONEER ne�,zg �EE, s ��PE,� s�A�E �N FEET w,. "" D4NNER INC. APACHE MINING PERMIT GRADING PLAN - urs v�mnvesorn J I 1 PIUVCVVUUU / Irl AUUI IIUIV ADDMON sa LJ Q I 9 9 9 9 - 6T e Po _ I I I ` 0 I, P • I / � \ � \ \ I \ \ � I I � \�� \ \ _ \\\ rte, \ _✓ � :� 1 0 26 ba GRAPHIC SCALE IN FEET PI$NEERnee,*�g �u ax�sn, wN„u po, ,�,�. , w,. "" x.19 GRADING PLAN D4NNER INC. APACHE NIINING PERK ITT - urs vE mRSESOTA 8 °P I` COTTAGEGEO Sff SHffi 8 A �\ TEMP FES EMP POND W OUTLET: 826.0 h �•�� T�\\\�\� ^` 830` _ \ m \ ✓ \\ - 822 _ 870 (( l / I a \ 4 TEMP FES N V: 824.0 ( p � �\ � �• TEMP PC OUTLET: XC'PTION C sgs � MND �J°/c� O oFo �� 011- qy \ _ / 4'���_ TEMP i � �TqT O ���-- L � ea�_ _--_ =_ate :_—_ fir-asa—r^ r' —INV. F T o \ . — e o za ea GRAPHIC —LE IN FEET PI$NEERneering u ax�sn, 5521 p o,,,�. "" „. x.19 D4NNER INC. APACHE MINING PERN[IT 11A GRADING PLAN - urs mTrrcn v7 mnvesorn 9 oP I� 5TH � ADDITION L — — — —— -- �" RIIH-11D 7TH ADDITION D a o � RHT�TRTao,,� r�NZ, F Tao l 71 EROSION CONTROL PLAN LEE / LEGEND I R// OF, Ns;AL,DaE'oRETsAART oR ERADING OF sE / PERIMETER EROSION STARCTONOF GRATROL FENCE: / INSTALL BEFORE D NG /—o-o-o-o-o-� SECONDARY EROSION CONTROL FENCE. TO BE INSTALLED IS HOURS AFTER / COMPLETION OF GRADING. ' IAT DS EL DSSPEATE RP IF TALERNM AN NN 24E H0 D / RS AFTER CONNECTIONTOA SURFACEWATER. / —>>>>} TEMPORARY DRAINAGE DITCH / ROCK BERM, INSTALL WITHIN 7 DAYS OF GRADING COMPLETION OR BEFORE 1S7 / RAINFALL EVENT WHICHEVER IS FIRST wsTALL w;a €RoDAA 100F GRA L ET. DAYS NTRoowcRNK 0 60 1�0 CTION ATCH BASIN INLETPROTECTION GRAPHIC SCALE IN FEET D 4NNER INC. APACHE TdINING PERK ITT 10 w I7, mTrAcc ,�nnvEsorn i Es(ILT NCE7. aNFRRCRNOP.AFNTRNRPRAIR, MFNTs P To BE El IVIA UTEACRE BE .HEA sRIPPEo. ILEIN 'Ell SIGN ONCE 111. FILL, 1 11 UP PUTS' A IS TIE NEED FOR I llUllANCE IF ... GNP " TIE VERDE .. .. 11EE A OIL GREG WHEN A '=N AS' NA"AVDNNNl' "ADNN.' OPERA' ON 10 'EMPORARI SEDIMENT BASIN DEIGNED FEES 1PED FAILIDDEALLIZE ALL EXPOSED VOIL AREAS, INCLUDING STOCKPILES CTABILIZAlIQN MUST BE INITIATED I A TIE TIE AN ED ILA 3 'HE CONIPAC To FAA PEIMANENTLI 11 TEMPIIAILI IEAlEl IN AN' 11 STAN L ZE DENUDED AREAS AND STOCKPILES SPUN TIME FLAME LISTED IN EROSION CMPLE T E %N N GCON APTEI,TIAN _CALENDAI DAIS AFTER TOP C2NSFNUC0�N AANC."QLASICEIAS�EID�STIA'�.L�LZA��'N.N'S�N'TT SECURED ON TE M PlIA R' 'TOCKPLES ITTI I T SIN CANT SILT C AT SIR "`AN A CAME DENT IPA" NO FEE FLAMES REIM TTEEI MUST CIA PLETE STAB ILZAT IN 11 ALL E x PlIED SOL AREAS ITI N ISO FEET OF TIE I TIE IT11M PCHE A 'ID'ITION "EVENNTTN MANLAIEAI ANIALL APE A CEAIAN TRAINED, WATEA DOE GNP FLAT BEGIN L. THE PE WATER A ITT N ED ... A .. N S THE BE AT FILED FEE �R PREVIGHTION AND SEDIMENT CONTPOL BMPS BEFORE AND DURING CONSTPUCTION AN `CPMANCNT DTCHES OR "ALS 'T A S IF— CNNETN' TO A SU"AC` AREA 'STUP"D PC "ADN' AT AN' "N FEE AND TO ""PECORARI PER NEEDMUlNMGNTUllElT EU'LIA'ATIRREMULCI. TACKIFIER, POLIAGRILAMIDE OR SIMILAR EROSION PREVIGHTION PRACTICES PCENT I I DOE' OF TIEEE BLIND SIIT BE 01 Fll 101 PIPE XMITEIBIAl IINAT11ITIN lA ` A EIM TTEE ' MUST PR- RE TE ME IIA" UP PERMANEN T ENERII D ISAPAT IN AT ALL P BE OTTLETS STITIN 11 ID111 A AMC A REFER TO EROSION AN A IEDMENT CONTROL PRACTICE' DEFNE' N THE MICA B OFF ED OVION AND SEDIMENT CONTROL PLANNING HANDBOOK, I lElMTTEll MUST 11UN.LIll SIRIMEOP 1OLT11L ..IS ON ALL ESON.APIRINT lEVBETEll IF T `E ATE ADD s ES (BMA's) sHA DENT AREAS IF TI ESTETHATDRAINAN'SURFACEWATER,ALL N Up EPA TON 'PAR AND A 'TUONANOE PATCH DOME o DUN "C' A' "ECK DAM' AND TEMPo'APl ALT PONDS MAI BE INSTALLED AS 'ED ENT A NTI PC AIT�G I OMAN- ClUlS N THE 111C011 APIA THE' SHALL BE MAINTAINED JNTIL 2 IF DOWNFRACEN1 SEDMENT FEANTRGLI ARE DECEILIDADED, BASED ON FORECIENT FAILURE OR EXCESSIVE MAINTENANCE CONSTRUCTION IS COMPLETED AND THE POTENTIAL FOP EROSION HAS PASSED. `EOU'EB ENT, FARM TT.. VUT ONTALL A D A T OPPAL C IF FAA EN T IED .. T `A)T'0O`AE7'l`AG EUGE ARA, AGED U)`= N ' ` A A I INTO IS TE A GTE GEFNDT A NI AS A. N _UCT C N PRISON ESSEX AND UNEXPECTED OR I TEMP.IAll RE PERMANENT DRAINAGE DITCHES AND SEDIMEN T BAN' D EGNED A' PART OF A SEDIMENT XONTAINMEN F SEASONAL CONDITIONS DICTATE, THE PERMITTEE SHALL ANTICIPATE THAT MORE 515TEM DECIDE 5EDMENT IONTIOL PIAITGEI OFF I A' AD PlOPIATE FAR GTE AGNDTAN, `MPG W "'N A EN T I ` L IN HE A A AT'N SLT CUPTAN 'LAC" N THE WATER , NOT A SEDIMENT IONTIAL PEP TO SATISTI ITEM 9 2 EXCEPT WHEN E,pCNI=Rl OF THTE WG`FFKoNA ON A MHOPELINE OR BELOW WATERLINE IMMEDIATELI AFTER 5HORT TEIM IAN 'FRUIT ON ACTIVTI N THATAlEA 'E'MT'EE TV A " I AND ABIEFE THE A N MUM lElI IEMENTI ITIIN ON THE PLANS THAT ` E ` El ' MUST "CF= L ALLIl'IFEBBEN�IF 'OPTMOL No%aR coNMnllc EMTH NAT u�o eo In EES MUST INSTALL AN UPLAND PERIMETER mNrROL PRAOF CE IF EXPOSED SOILS ST LL DRAIN TO A MAI RE N DEEP D TO PoVFE F",LV, PROTECTION AT WATER ANN SOL AITNTTE A SUCH AS FAR NG A, , PC PAIGAGE OF VEHICLES, IMMEDIAIELI AFTER THE SHORT-TERM ACTIVIT, s THE IH GRT_ TERM ACTVITI A NOT .MPLETE ALL TREES NIT L ITED F RE REMOVAL STAL L BE PROTECTED DID NOT 'RE PAT E A P" A TTIES MUST 1PITTIT ALL ITOOM IRAN �TLFTI UlNTlAAPFollAlAlHAlGMPS F�CFTNI CNINSTIUCTIIN UNTIL THE' E ENUD. EN T RUTH IN THE DO , L UP 'OPT ED UP A 0, ITT N FREE 11OT11T ON FEPOl EST ABLGH PERMANENT COVER AN ALL AREAS PC EN L N A HE LET THE PE MIT FEES ON THE IJISDICTONAL AUTHINHI PERMITTEES MUST DOCUMENT TH E NEED To, REMOVAL N THE WPPp 8 WHEREIN POSSIBLE PRESENCE THE EXISTING TREES. CLASS AND OTHER VIDGETATICE I lEll TTEII lUIT 11011E IILT FEDIE 01 OFFER EFFEITI IE11111T IOITIOLI AT TIE RARE OF ITICKULEI 01 TIE COVER TO HELP FILTER RUNOFF DOWNGRAD ENT PER METE, 9 PERMITTEE5 MUST LOCATE 5TOCKPILE5 OUT51DE OF N AlUPAL BUFFERS OR AURFACE WATEPG INCLUDING STOPMESETEP 0o ER7 u11NICANCIS SUCH AS CUBA AND (SITTEP SlITEMS UN LESS THERE A A "PASS N PLACE "' THE ST'PmWATEP .All- BLADE LEAVE A AUFFIll MOUAI TO DINIMPE EROSION ST ON ONTO PAVED PADS 'THN THE STE 11 PEIMTTEEI MUST USTALL TEMPORAL' IEDMEN T ' EDMENT BASINS AS BEGUN ED N 'EATON " OF PEMTHICLI A 10 TEMPORAL' SEED SHALL BE DONE N AC Go RDAN RE TO END OF ... . ... C AN' AHEAD OF T��MIZTEE SWILESECEPAITATN RE ITA EL, A FAN WLL OCUP 11MITTIII DUIF IEPTI AT OF N CA_ UP E.UPPMENT USE TO A o OF •EIIAL AND DISK INCH USED N PLACE ON APR, C VED E 8 'AL , LIFE I FERTILIZER, 10 -IS -2 A RX ASIA LBS RE, ACRESTALLED TO 4 PERMITTEES MUST PRESERVE AFIRSTNATUALBUFFERBUFFERNFEA"BLE ON SITE. PROVIDE REDUNDANT BEo. (DOUBLE) HE ARTH CONTROLS AT LEAST A FEEL APART UNLESS LM TED BI LA OF OF A OF N A El A 10 GEIMBNEN T XF RESTORATION SHALL BE DONE IN ACCORDANCE -H mNUEFU 2111 AD ' All UP TO ` OFF DI TV' El A A ... F HEO UftF' 'HE A E AS0,lLSW TIE 1IDGEEIGONCE 11APPELI ITOIM DNAIIN IGNIIT NO OF N L E TS AND DIED A EN F CA A NI"PRIELIERTONG FED RTI OF E DUST DOCUMENT THE R CRAIG A THE AWPPP SHEET PILING 15 A REDUNDANT PERIMETER CONTR OIL IF INITALLEED"NTLEEANNE1 THAT BE A,N, UP T SET 'O'E'A" 'T' DEC ... OR SETTLEMENT OF THE FLOC PRIDR 10 DISCHAPCE 1NDU/OR BE RE C DEWATERING AND SURFACE DRANAGE ND IED RALUD11­7 LET OR SEGMANT-LADIN WATERS PLATED TO DEWAT"N' OR BASIN DANN' To A H'D"SEEDED WTH TACKIDER MULCH PEPMITTEES MUST NOT USE MULCH. TEMPORAL' 11 PEIMANENT IEDMENT SPIN IN 'HE PROTECT ATE UNLESS INFEA11LE PEIMTLEEI PAT DEWATEI TO LIDIN.ULCI, LPIKIFIRI, lOLIAI­ 01 111LAR EIOVOI IFFIBOTION SPFACE 'AT", , THE, VAALL, CHECK TO I COUP, AD, C LATE TIGATRINT TA A I�IW OlATNolEA AlNIBIMEN`TAN2`N BRAIN "ACT'ES WTUN AN PORTION OF THE NORMAL WETTED PERESTE, IF A CINDTINI ILLNIT RESULT F `oM D 'CHA"E F RE IM ITE E' CANNOT D 'CHA IFIE T IT ATE TEMPORAL' 01 PERMANENT DIANAGE DITCH 01 1 WALE SECTION WITH CONTING , 5 CHIP To ENTERING A UF DOE WATER, IEINTTEES SUIT TREAT T WITH All FAR VALE RACE PLOT THAT TIE DINITAINE SLOPE OF GREATER THAN 2 PERCENT DIE A NOT ADVERIEL I AFFE CT THE ' ULF ACE WATE' ON DOWNSTREAM PROPERTIES THE 'O'TAT" "ALL ` EMOIS ALL IFULE ADD IDIUMEOP TIACKED ONTO EXISTING SIT TABLE FILTRATION DEM " PRTR TO DSHARE STREETS AND PAVED AREAS I REIM TTEE , MUST D 'CHA, ISE ALL RSATEI FROM DERAFTEGNI PC 1XIAN-DIVINING A OF MONNIC MAINAPI THNATUD'CE1 NOT CAUSE EROSION OR SCOUR N THE MMI 'ATE GCNT' OF DSCHA'GE POINTS AN N INDA . D, 11 F SLOWING DIST BECOME S A NUSANCE THE CONTRACTOR SHALL APPLI WATER IT, OF D'NHAAAE PC N TI THAT CAUSES AINFOANT ADVERIE MPACT o WELL A FROM A TAN I TFUC, To ALL COULATFUCTEFN AREAS P IMMIEEDIATTETEG"PUSE FILLEIV WITH PAIPARAll WATEI, TIE' AUIT PAUL TIE AIKWA" TIAFEHIE AWAIANOI IRIOSAL, RETURN THE BACKWASH -TER TO THE lEXINNX OF THETREATMENT PROCESS 01 INCORPORATE THE BACKVARSH WATEP INTO THE THE SITE IN A RN THAT IT AVE 4 ((EI OR PT INSALLaO IF SHALL ALL BEEN EDED AND MULCHED ANETI ON IF THE I TE 11ADNI OR EAToN'D SILT FENCENT`EE E o. _DOES SA GJOR MGN EooNs NOT CwsE ERos oN. NES THE ITE A M(PELFDAIS A MEAAFTER FINAL ESITE RSTABILIZASTILLTION IS UAELEAST ENSUREONCE TDAYS DURING ACTIVE CON TRU TON AN Nn THIN 24 HOURS AFTER A RAI FALL EVE NT CGR� AT ER THAN ACHIEVED OR AFTER THE TE SURES ARE NO LONGER NEEDED. R 5, (NOT -EE, F INSPECTION.) SPECIFIED, DOCUMENTATION MUS BE RECORDED AS REOUIRED. (SEEMPCA NPDE5 PERMIT ALL PER ANENT ST R P TTT.4-TLL SS "NOT ER TIME FRAME MUIS PC ACTOES L. A SEVEN T CAN AENTRATED F LAW ,CUR RING OVER THE SOL PROVIDE LGHT TRACKED CEOPMENT TO CONSTRUCT AREA 11 F NALG ' ADS THE A REAS E 1ILLITIO1 11EVEITIFF 1APPAGElEIT DEIIIIEI INFILTRATION/FILTRATION BASINS. TOPSOIL PLACEMENT AND4 HAZARDOUS MATERIALS MIST BE SlOkD AND DISPESED BE PER RLP C A, PEQuIREmENTS.6 SANITARI WASTE MUST BE ITI DSCHARGE OR SPILLED CHEM CALS MUST BE TANDL ED AND REPORTED PER A A A A PECUIREMENTS ADEGUAIE SUPPLIESF EXTERNAL WASIN. OF 10OATINITION V�EACNFE'lPXDUIT BE LIMITED TO A REFINED AREA OF TIE SITE IND.FF SUIT BECONFINED AND WASTE P"PERLI D 'P OVER IF NO ENGINE DE11EASI NO ' ALL - ON STEREQUIREMENTS PI$NEERneering PILI COMPACTED BACKFILL DIA -�I 0.5 DIA GRANULAR MATERIAL - MNDOTSPEC.3199.2.8.1 DW24 BUT -� **= BEDDING DW3 WIDE. NOT LESS THAN 3" DIA+24" MIN. LOOSELY PLACED / UNCOMPACTED MATERIAL. INSTALLATION TYPE 1 DW = OUTSIDE DIAMETER OF PIPE FIT I� COMPACTED BACKFILL F 3 - -' GRANULAR MATERIAL H m - MNG OT SPEC. 3199.2.8.* DIA/24 BUT BEDDING DW3 WIDE. NOT LESS THAN 3' DIA+24 MIN LOOSELY PLACED/ UNOGHI—ED MATE— INSTALLATION TYPE 2 DIA = OUTSIDE DIAMETER OF PIPE DN _TU COMPACTED aACKFRL DW24 BUT * ** =BEDDING DW3 WIDE. NOT LESS THAN 3" DIA 24" MIN LOOSELY PLACED / UNCOMPACTED NATIVE TRENCH MATERVLL, INSTALLATION TYPE3 DIA=ouTSIDE DWMETER OAF. PL_PE STANDARD DETAILS P Cottage Iv FOUNDATION S BEDDING CTro� METHODS FOR RCP A DIP f COTTAGE GROVE, MINNESOTA BED2 BED -2 STEEL FENCE POST (T -POST), EISTAILL BUD MINIMUM 5' LONG, 6' MAXIMUM SPACING. DIA. LCENl LNEGETTING OR A GOOTEOULE BAD. \_ STAKE I.LB. TENSILE) PER POST I l� CO[YaQ¢ STANDARD DETAILS DITCH CHEIXS TO FACE AWAY / MONOFILAMENT GEOTIXTILE FABRIC PER MNDOT TABLE FROM FABRIC INI COTTAGE GROVE, MINNESOTA ERO 11 PI NEER,:e�� MACHINE SLICE FROMM FABRIC. PBRIG F STEEL FENCE POST (T -POST), MONOFIIAMENI GEOTEXTILE FABRIC PERMNDOTTABIE I MINIMUM 5' LONG, 6' MAXIMUM SPACING. ATTACH FABRIC TO POSTS WITHMTNIMUM3ZIP TIES I.LB. TENSILE) PER POST POST NOTCHES IN TOP 8" OF FABRIC. / TO FACE AWAY / MONOFILAMENT GEOTIXTILE FABRIC PER MNDOT TABLE FROM FABRIC / M86-1 (MACHINE SLICED). POST NOTCHES TO MACHINE SLICE FROMM FABRIC. PBRIG F HE-12" DEPTH (PLUS C' FLAP) TRENCH MUST BE COMPACTED BY DIRECTION OF / EIGHT EQUIPMENT PRIORTO PLACEM ENT OF STEEL POSTS. SURFACE FLOW_ OF SURFACE ROW ,,,,,ON 29" MINIMUM POST EMBEDMENT NOTE: HEAW-DUTY SILT FENCE INSTALLATION METHODS SHOULD BE USED WHEN DIRECTED BY THE CITY. STANDARD DETAILS Cottage MACHme ILMI, SILT FENCE `F B "Rr Gro we FA"` oav COTTAGE GROVE, MINNESOTA ERO-1 SUaFpCE j PPNE�p R0 L5- MINIMUM DEPTH WOODCHIPS-18"MINIMUM DEPT ,UGp 00 u- .0. C O C=i��o(� WASHED ROCK OR IC [) OO—Ull PER SPECIFICATIONS18' 1 NiMUM J 10pM MINIMUM CUT OFF BERM TO WA TO MINIMIZE RUNOFF FROM SITE NOTES: 1. FILTER FABRIC SHALL BE PLACED UNDER ROIX OR WOODCHIPS TO STOP MUD MIGRATION THROUGH R00(. 2. ENTRANCE MUST BE MAINIAINED REGULARLY TO PREVENT SEDIMENTATION TRAIXING. i7LE� COttag¢ STANDARD DETAILS RAN corvC ETION ANDMODOAN� ROCK AND WOODQIIP COTTAGE GROVE, MINNESOTA Pah. T ERO-12 I STEEL FENCE POST(T-POST), MINIMUM 5- LONG, MONOFIIAMENI GEOTEXTILE FABRIC PERMNDOTTABIE I 6' MAMMUM SPACING. I 3886-t (HAND INSTALLED). / ATTACH FABRIC TO POST WITN INSTOP POST NOTCHES TEN4LE) PER POST 8" / OF FABRIC. TO FACE AWAY FROM FABRIC FABRIC W THE TRENCH, / BACKFILL WITH NATURAL SOIL,ANDCOMPACT WITH % LGHTEQUOFTH PRIORI, PLACEMENT OF THE PoSTS. DIRECTION OF / SURFACE FLOW_ 6" 24- MINIMUM POS EMBEDMENT MANDARD DETAILS Cottage HASTINSTALLED SILT FENCEerzurzr Grove COTTAGE GROVE, MINNESOTA ER0�2 TRACKED EQUIPMENT OURIM PERMEN CREATE GROOVES \4�G.,[Y�•/ rvE.N. RTO SLOPE DIREcnON NOTE: ALL SLOPES WITH A GRADE EQUAL TO OR STEEPERTHAN 3:1 REQUIRE SLOPE TRACKING. SLOPES WRH A GRADE MORE GRADUAL THAN 3:1 REQUIRE SLOPE TRACKING IF THE STABILIZATION METHOD IS EROSION CONTROL BLANKET OR H�HY((D�RROOMULCH. COttagO STANDARD DETAILS X0""90" Grove SLOPE TRACKING r COTTAGE GROVE, MINNESOTA ER0'13 ,. ANCHOR TRENCH (SEE DETAIL AND NOTES BELOW) —RIA P END301NTS MINIMUM OF 6" AND STAPLE OVERLAP AT 1 5' INTERVALS. STAPLE DENSITY SHALL BE A MINIMUM OF 3USHAPED R, LONGINDINAL 11 GAUGE METAL STAPLES PER MINIMUM OF 6" SQUARE YARD (THIS NwT VARY AS DIRECTED BY THE CKV) ANCHOR TRENCVi / VTO3' 1 DIG 6 X 6 TRENCH 2 IAT BLANKET IN TRENCH i 3 STAPLE AT 1.5' INTERVALS 6 9 BACKFILL WITH NATURALS OIL AND COMPACT 5 BIANKET LENGTH SHALL NOT EXCEED 100' _ 6. f WITHOUT AN ANCHOR TRENCH \ TT STANDARD DETAILS Cottage ERo51oN CONTROL BIANKETz "ar Grove INSTALLATION r COTTAGE GROVE, MINNESOTA E01 PI$NEERe nming u.uew� w."ww® wmanmm (65n fi81�1914 Mmdom Hei�tv,MNSSr91 RRaTE�adroEE� TREE PRtlrECITON FENCE OEf A W FRa,�arraNRam (D Area of trees removed (^ Area of trees tagged but not removed Tree Inventory Summary Total Trees Total Inches Size of Tree Category 112 779 Conifer, 12' to 24' ht 29 374 Conifer, 24' or hi her 122 1136 Hardwood, 6" to 20" 3 70 Hardwood, 21" to 30" 9i) 1828 Softwood, 12" to 24" 6 235 Softwood 24" or grealer 3 164 Specimen Tree 3T4-1 4586* 1 Grand Total * Once grading is complete, remaining trees will be located and inventory adjusted a . rallal ..e Im � ree aed�dar �m9ory 29r�._.oM 6arACnM.91R,_aConkrNC-Wkw2P 54]0 _ 5 nes iae,m., me �m90r~ a9 >Re Pe 5]BO Red GNn M1 54]3 54)1 6 ) Red Cedar Fed Cedar T,9a 6ttl�l TreeT9� Rale= 5,ae�m9o� Is I,I , � Conk 5301 ,5 a - m Ca9v _.... _ Cskr - Un 5382 I. d3 0. iCeda M1 11 tj A U dw lY 2' M -_ A U k 12 2 M1t 8/31 Ume'q 8]32 klaclmarY LC lRrdwood fi 8]33 Petl k Hardu:aod - __ 8]31 J Red Oak 6 m20' 6 0.ed Cala Bmre tlw Be IY M ofiwwtl 12 29" _e4 I. Red Ceb- Con I M1_. Ped A Conde l2 2 M1_. 5386 Ped _ Cm M1 M 538) 6 2m3 M 53� 2 R 1 ehr Cm 21 fer 1g_ e -5- _ ---- A Cnrvb, H m 39 M E Softwmd 12"mN ,Ha _ .-Lm- .731 � _ - 8]39 0.M r on le etl Cctlar Petl Cedar tI 5 8]1J e 10 _ ---92-_ _- 8148 6 Rd C9tlarIt _Slat 5- -- --RM fNar'--v_-_ A Cmikr 13 m24 It Conifer t2 E_SOTvood, l2'm1 590] 5988 12 BoaNda- ��eldx Boxlda- 0)M Ped wNr b l2 mN M1! 0]45 --Ped r A Con_fx12 ro 24' M1t -_ 0 Cedar A Unb 12 3 It 5391 2 y11if �M 5392 3 - Red C 4 ` I or M1yMr. 539] 10 rw". Boxtltls Bonghr ReO 0-Con 9or N'gMr 5399 Bfi Ped Caiar A -Unfw l2 m24 M1r -- A- Conifer, l2'm29'M1[ 5992 3312 eorelder PorcIM 0198 _tlmary C FHrtAvoad 6 2 8]99 9i _HadbeoY --_._ __. _.-C_.l6rdvxtl,6 b20" 4 Ce�r A-Cmifer 12 111 . 218]50 •4- Um�woil _ la 5396 0.N Ce3a ___ a Conikri9'ar HgM1er 539] e Ped CaW A-Unlfer, l2'm29'M �.".._�.__.._. Hacldaany Yardvood, 6' m 20" Is 118 _Red 85 38922 Red Cedar BConifa'x9'arp� 2 _Red T� Irt Gen kr� 4 M h VMr BoielOer alkwmd 13"m24" Sdtwmtl 29" dI53 - _Red t" ,_ M 0 ) ) 5399 C W ebck rdxooy 6" -,I -24 -ht qCanilw�l2'm24'k 5502 5509 _0.tW Cwtr econi 3a ar k9ker 5901 6 Pedrr• -_---- A-Con IYmN'M 5903 5 Ped Cala A-Con fer. l2 mE9'M1! Red Cedar Retl Cedar 8155 9 RM Calar _ -ferr 9 It - - 5505 __ 5903 aed cwA A mor M Il 2111 291 7 Ped Cetiv - A Conifer 12 5508 0252 8 0.etl Oak C l9rdwaod,6 m20"-- B25H 9 Red Cedar nib 13 m 29 M1! &ack ^MwvoW, l2"m2_ W69 - _Bn Oak _ 16rdwmd 61020" a]61 l0 Ped (rek C - Hankvootl, 6" It, W c 29 eWronwaN 5908 13y 1312,8 Bo<tld SORw eq u grea�r 5909 --Ped Cekr_._ -B _Cmlkr, 39'aFmnw -Saftwaotl Iz" 12" m 24". oRwaod O m24^ 51 16rdwoad, 6" m 20' __ 544] SMO -- Boeeldw 12 Borelda - 59]0 6 m Pel Cedar A- Conifer, l2' 29'k 5911 ] Rai P UrEa 12 b 4 M 0]68 Ekn F SaIMOW 39 a am Is 39" AUnifw, l2'm29'M Rai F CKrdwdy"m 20" 5914 _. H 8158 7 E sabem, i2• emewe. m z9" em -"d.r am -- 1 59U 5965 _Ped Poi Cads Poi Cedes A Uni(wr 12' m z4' M A Un x9'M - ..-_9 8R _ �sder scRwarl 12'm29" MM 5915 Red A ConBw, t2 m N k N16 20 --Pell 6aF 591] I -Con mzrnc- H 5541 13,13�11,7 _- -- 13 8114 13 - - - _- - Bottlder S--,11-4- __ - cwmi 2 29" 8»5 19 fattl r _ E-SaftwgW 12 5523 Is 5918 b M1 M 54]9 �ad rAvoal 5430 0 i RM Onk Red Oak _ Mardwoed, 6"ro420' _ 16rdxa'tI, GG"m2o 5526 "" Red Char x l2'm24'M1[ _-l6rdvwd, 6"ro20" 552> 5530 kBNwaal, 6' m 20° 59]3 U__ BmveNv aTvmE, l2' 2m 5-- 9 ry _- CrdveM 6 m z0" Be ¢ottlder Softwood, 6"m20" C-HaNwood. 6"m2o° 5531 6 el® 10 _ R_etl U6 C 1brArmf, 6" m 20' olMootl�li"m29' __ Ummrodd - saew9Pd N" tr a, r _ o" 16rdwmd m2V 5533 5929 _ _._..ReJ DaF ---___. OKI A 12 __ _Bad RwI WF C-WrgvaM, 6'm20' Sal> Bxk Qw C-HarAvool,6'roi0'� 4 11 ib 29'M A-CenOer 12'm29'n[ Is E-saftwaotl�ll"mz9 ___ �k oak C-1Rrdnooq fi'm 20" _ _ -- E- Softwood 12 19 Cmikr l3'm29'M C-IBrdwoatl 6'm20" 5928 _ Pd Cedu A -Unlb, 13'm29'M1[ 5929 - 10 Bad C-1BNwood, __ _ _ Umamwaod Ped fedar Red dor 5930 ) Petl IRF rdwaod 6' m 20' 5558 l0 ) _-- Red Pedal UnOer 12 39 M 054 0]91 13-SdIw�12'm 8x92 12 uaB As n E_ sd[wcW 12 m39" 5931 5 - A-Un 34H Bad c-1¢rdwam,6 m 5939 2 Rctl WN C lbrMaad 6° m N. 5935 Bad; pcary, _.__ C rerAvwd fi'm20' 5561 b 24"B»1 Rea oar tD Badrnemy ._ _ dxd 6'm30 Br55 13 Qwk� Ren ______ a"Td 12"m29" _ 591fi 5 A Unger, 12 m N M 593] e _ Red Oak C-Wrdwam, 6"m20" 11'. 2'M Units 12 29' M UNkr 12'm29'n[ 0 - - _- c5 IBM Mrm4, 6" _ A -Unikr 12'm29'M C-19rAvaad 6"m20' . 10 Bareldw Oak f-BNMaotl 12"b29"_ C-F6rdnoel 6"m20 - -9 Nr Oak _ --14Nwood, 6"b30"- 5939_ 1> Faulds F-SWlw90 12"m34' Unger 2 _. 29 M 5911 Green A9� .. _._ karMr _ _Ped Gew�ewn E SOMracd, E SomraoL H lsndwgm 6mm zD• _ 8199 ) kHtlmc C-IBNwOOd, b"ro30'- BBoO t0 Bad Ole C IBrdwaotl, 6" m _ _ _ 8001 30,32 BV Oak iaMmen Tree 8002 3321 _3 Ok & IX Oerry -- 34 Rn k D -29J o• 1,4 _ Con fed 12 t,14 .111 6 712 Is 17Baas - Uls 6 11 11 BB 6 G e n Asn C-IRrdwal6"mio'- BW 12___ Poaeltler- E-soawvod l2'm24' 8717 1 eWe 12 Rn Oak -1. C 16rMuaiy6 my 167 BB]9 ll Rn Uk C-Hartwad, 6"m20' Red Oak C-IRrdrvatl fi"m20"_ I 857l 4 -1 68011 10 Red Wk 16rAwotl 6" m 20- - fi _ C-16r3rvatl, fi"b20" 88 4 ) _87M 7 add 1 C-Hardxcai 2tl' C=reaiw4od 20"... O-lRrdwoad 30 - SOM1wwi, 12" m z9" l¢ PI$NEER�;, e �Bn�a�"z u'isv2B -°°�A _ TREE LIST D3ANNER INCpINC. APACHE PARCEL TDk z PAlll�b@MP OTn S50x5 C'O]"1'AGEGROVE, hONNF501'A a . rallal ..e Im � ree aed�dar �m9ory 29r�._.oM 6arACnM.91R,_aConkrNC-Wkw2P 54]0 _ 5 Red Cedar M, l2 m29 M1[ 54]3 54)1 6 ) Red Cedar Fed Cedar = niy1Y m29 M A -ft, IY 24 M 59>5 59Jfi 5 5 Retl Cetla ReI CsR A U dw lY 2' M -_ A U k 12 2 M1t ]I 6 0.ed Cala Bmre tlw Be IY M ofiwwtl 12 29" 59% 1 e 0.d Cedar Butt der _ ---- A Cnrvb, H m 39 M E Softwmd 12"mN 5982 -- - etl Cctlar Petl Cedar nf_e'rl m24M UNfs 12 m z4 M1r 5 8]1J e 10 _ ---92-_ Retl Char Conifer t2 E_SOTvood, l2'm1 590] 5988 _ 1312 BoaNda- ��eldx Boxlda- _ -sdM'ood l3 _ f�SaRwood 12°b29' -Softwood O" m 24" 5189 ]a Boxtltls Bonghr -_ softwood, l2" m 24" 5992 3312 eorelder PorcIM saftwaod 12"m29" - 812 29" B19B •4- Um�woil _� m N'H 5996 12,10 1910 h VMr BoielOer alkwmd 13"m24" Sdtwmtl 29" 599J 5990 ) ) Red P1Cetlar -,I -24 -ht qCanilw�l2'm24'k 5502 5509 10 Red Cedar Retl Cedar _ B-GnRv 29'aM1'ler B-Cmiler N'orM1 5505 __ Bittkkr _ A - Unger O 24'k -_- aftwaod O"m24' 5508 ]fi &ack ^MwvoW, l2"m2_ SM3 c 29 eWronwaN A-M E-So6waoq 12'm29' -Saftwaotl Iz" 12" m 24". oRwaod O m24^ _ Poi CNa �-• P iCeda ASOAwood, __ 544] SMO -- Boeeldw 12 Borelda - -- l2' m E-SORwgotl, l2"m24'- - f Sofiwooq 12 m 29" 5950 5451 .xeldc IB S6B13SOYAvaod, 0.�Nre 39" AUnifw, l2'm29'M 5453 - 5454 5 Poi Cedes 4 Cedes A r�mi M _ _ -AUnfw, l2mN M' 59U 5965 _Ped Poi Cads Poi Cedes A Uni(wr 12' m z4' M A Un x9'M _ Petl Ce6r Petl CeGr 30913 Codonwootl ---- _ Igfer_ FASoOwood N'e 39rearer a . rallal ..e Im � ree aed�dar �m9ory 29r�._.oM 6arACnM.91R,_aConkrNC-Wkw2P 54]0 _ 5 Red Cedar M, l2 m29 M1[ 54]3 54)1 6 ) Red Cedar Fed Cedar = niy1Y m29 M A -ft, IY 24 M 59>5 59Jfi 5 5 Retl Cetla ReI CsR A U dw lY 2' M -_ A U k 12 2 M1t ]I 6 0.ed Cala Bmre tlw Be IY M ofiwwtl 12 29" 59% 1 e 0.d Cedar Butt der _ ---- A Cnrvb, H m 39 M E Softwmd 12"mN 5982 -- - etl Cctlar Petl Cedar nf_e'rl m24M UNfs 12 m z4 M1r 5 8]1J e 10 _ ---92-_ Retl Char Conifer t2 E_SOTvood, l2'm1 590] 5988 _ 1312 BoaNda- ��eldx Boxlda- _ -sdM'ood l3 _ f�SaRwood 12°b29' -Softwood O" m 24" 5189 ]a Boxtltls Bonghr -_ softwood, l2" m 24" 5992 3312 eorelder PorcIM saftwaod 12"m29" - 812 29" B19B •4- Um�woil _� m N'H 5996 12,10 1910 h VMr BoielOer alkwmd 13"m24" Sdtwmtl 29" 599J 5990 ) ) Red P1Cetlar -,I -24 -ht qCanilw�l2'm24'k 5502 5509 10 Red Cedar Retl Cedar _ B-GnRv 29'aM1'ler B-Cmiler N'orM1 5505 __ Bittkkr _ A - Unger O 24'k -_- aftwaod O"m24' 5508 ]fi &ack ^MwvoW, l2"m2_ -- 9 _ Boslda 6 -Saftwaotl Iz" 12" m 24". oRwaod O m24^ 5532 5515 12 Bad Red Oak E SORxa� 4 E S-1, 12 m24" B1Y] 5 0.etl Cedar _ Me 12 m 29 M Asoftwooq SSl) ]J Ulmnwwm 12 m 39" aRward H 0503 E-Saftwmd, l2"m29' E_5aftwmdyll"m29' _ Red GyAr (oNb, 12'm24'M1[ A - -ft, 2m29M dRvmd 12"m24" _- -- RM Cedar Red Oak N' M Unna- O 5523 6 RM Onk Red Oak _ Mardwoed, 6"ro420' _ 16rdxa'tI, GG"m2o 5526 ) Red Char x l2'm24'M1[ _-l6rdvwd, 6"ro20" 552> 5530 6 9 Ped Oak-19ardwood Ped Oak 6"m20" C-HaNwood. 6"m2o° 5531 6 Ped Wk Petl Oak _ o" 16rdwmd m2V 5533 _ 5 Red CaWr A Conifer 12 m29'k -5�md12'm24' _ -aTvaq r"m29" 4 PNUdar ib 29'M A-CenOer 12'm29'n[ 5550 0.N fedar Cmikr l3'm29'M C-IBrdwoatl 6'm20" 5559 -5556 __ _ _ Umamwaod Ped fedar Red dor E-Saftwoatl 12'm24" A-Unifer 13 29'M1t _ B^Con�24'or FigMr 5558 l0 ) _-- Red Pedal UnOer 12 39 M 054 Bmekkr N Jtlw A-Unikr l2 29'n[ 5561 Rea oar z9' nl A-Unifw 4 29'M _ 0.M Cedar RM Cedar Units 12 29' M UNkr 12'm29'n[ Asn _ A -Unikr 12'm29'M C-19rAvaad 6"m20' . 10 Bareldw Oak f-BNMaotl 12"b29"_ C-F6rdnoel 6"m20 8593 05% 0 13 _Ped Gew�ewn E SOMracd, E SomraoL H lsndwgm 6mm zD• a . rallal ae Cn3 29r�._.oM 6arACnM.91R,_aConkrNC-Wkw2P Deal Arn _ _ ral6'm212'm340"8%112"m29"202] 12m219UlmlrvrmH2_„_12120]-124"m29'12'm29'tl, J"1104 -CmM1"kr0638,6,5r q U O 9 M Bfi39 108 RM Cetlar Retl Cedar Retl Cedar - _-- - A-UMs 'M 0 -Con kr`w_ngMr A-Unb 34 M 863fi � Red Cesar - _ - Conifer 29' M1f 8638 13 ]2108 0690 0692 Zack 5 8]1J e 10 _ ---92-_ ®ark _ Sark Clem( fimm920' _ C F6rMrood, 6"ro20' B1R 0123 15,15 foM>lrn'ood Imnwootl aRwood 29'w9reamr f SoBwood, O b 2q" 0126 f SMM�13"m24' Urfe,Q mz9k Bvreklw - oltwmd,_12"m29" a8wood tl _- 814] l3 _______ Cotmmvm9 BSaRwood 112 ^m29" B19B 1333 Um�woil -- all"m39" ®ack 0.80 Oak 6"m20' Il BaIXEm F6rtwoof 6mm 20' o0wooq O” m 29° Bl 8159 8665 > - ----_ BadC BmNtls CS l6rdwood, 6'm20' E-Shcw9od H"b29° 8]55 20 fbulde BUFelda E -Softwood 12"m24" Iad Bxk rdwor'tl6 m20' rdxocd 6"mea' rn mm2q"0• m za Gswlw� 6m f 819 efi]9 &ack Iz z9" f C lmrdwwd 6'ro 20" x_016_9__ 9 Bad Bad _ _,___ W Mvru1 6' m 20" C-16rdwooq 6'm20" 8165 8166 1% 1t� a Bad Red Oak C-Wrdwodi, 6'm30' C 1Rrdvonl m C 16rMrootl fi B1Y] B gad Avootl m 01% 0 Bad Badrn C kRrdwmd,6 m30' -rerawem 6'mz_ 0503 E-Saftwmd, l2"m29' E_5aftwmdyll"m29' imd odor mNb, l2' m N' nc A - -ft, 2m29M dRvmd 12"m24" _- -- &ttlCer eorsida- -.. - _ Ped W� -- - E-SCAwooy l2"ro 19n -- 0510 - Hardwad. fi'b3o" Red Udar Retl Cedar -Red Unify O m 29' of C-lRrdwao;fii A-Unikr 12'm29'M 5 Char-- Retl Cetlar Un0e 12 m39'nf UnOw IY m 24' M1f _ 35 Red Wk Red Oak �0 afevocd ll' Red Uk C-1HrdwoMl6°m20" oTvrc-013"mN" - M1 Poi Noe adwood, l2'm24' _ -aTvaq r"m29" 4 Ped Ceder kr 12'm29'M Ped Char Poi Cedar m 39' M1[ Cmew 29'ar M1' _ 8590 r 8591 16 fi 10 PMCNar Petl Cedar R H Lahr 9-UnOw 24'orn AConder 12 m29 M_ B Undw 24 or n ler 0542 8594 l0 ) _-- RM Char B ConOw 29 ar M1 Mr ASoftwrwd 054 Bmekkr N Jtlw H"m _ Wreider B'nNder ood. l2"m1 -oHwcotl t2 _ 0.M Cedar RM Cedar Rw 29"orbM19M- RetlCetlar Red Cetlar =-Unller ll'm29'M1[ CnnOw, 12' m 29' M1[ 10 Red Char 0 CanBw 2q oro Mr 8593 05% 0 13 Red Cetlar EaMds A-Unifw LY m29'M aliwootl 12'mN _ 16 m 0.al0ak Red Cetlar a0wmd 12'mN° _CS 16rdvood 6'm20" Conikr 2a' or M1- M1er a . rallal 29r�._.oM 6arACnM.91R,_aConkrNC-Wkw2P fk E-SOXwood 1Il865r-rAM1rrConM12m2_M1=t0tor -CmM1"kr0638,6,5r q U O 9 M Bfi39 108 RM Cetlar Retl Cedar Retl Cedar - _-- - A-UMs 'M 0 -Con kr`w_ngMr A-Unb 34 M 863fi � Red Cesar - _ - Conifer 29' M1f 8638 Red Calor Red Uk A-Un8v 12'm31'M k0rdwm3, 6'm20" 0690 0692 Zack C IRrAvmdy6_ li'm29'M 8644 Backer Wrdwadd 6"m30' aTvmyl2"m29" 862] 9 ®� __ C Hardwaui, 66ro3o" 8640 li -_� Itlw RLCaiar f SMM�13"m24' Urfe,Q mz9k Ofi99.1 0.ctl Cedar _ Re 14 ar M1_4gher Bader roNvacd, fi'm20" � Krdw¢d.fi m2tl' _ _ ®ack 0.80 Oak 6"m20' 0663 _ m_ Bmeka BxkCM1my fCSakxood�lY'm29" C -Hardwood 6 8665 > Bad C �rArxd 6"m20' _ ? 2-- xk c' 8 6 Iad Bxk rdwor'tl6 m20' rdxocd 6"mea' 061E 19 R ilk rdxodlr 5"b20' f CfioMrood E9 efi]9 &nets ®0.ed -5dlwaod 12" m 29" E C-lRNwgcd fi' m 20" 86]5 12 8682 5 8689 Oak Retl CeRr ® �_ C - l@ 6'm20" A -Unit 12'm24'k C=l6Mrvaod 6'b20" 8686 8688 0 BackOvry 1Rrdwooq 6°mE0" CSolpvood %88 Bxk� 12"m24" 8691 -c -- f-SaMood 12"big' lhrdwwtl, fi" Sark Civ Rel Oakw C-l¢rtxocb 6"m30' C - IBrdr:ooJ 6"m20' _ 0]CB 8m 0m E-Saftwmd, l2"m29' E_5aftwmdyll"m29' Red Cedar A - -ft, 2m29M dRvmd 12"m24" _- -- Reil Oa� _ [5% -SOTvWrll6m _ Ped W� Krdxo-'A, 6'b20' C - H,rtAvwd, fi' F. Wk Hardwad. fi'b3o" Ped Oak Rel Cedar C-lRrdwao;fii A-Unikr 12'm29'M Retl Oak C-IRrdwood fi'bltl _ 35 Red Wk Red Oak C-16Nwaoq 6'b20" C-1@nlxooq 6"m2tl' _ Red Uk C-1HrdwoMl6°m20" oTvrc-013"mN" - Pvv� _ -aTvaq r"m29" 9n oak lNrlLe DSlRrdwmi 21'm30' Hardw QBOLTON & MENK Real People. Real Solutions. MEMORANDUM Date: March 21, 2019 To: Ryan Burfeind, PE From: Brent Johnson, PE Subject: Danner Inc. Apache Mining Permit City of Cottage Grove Project No.: N15.103963 2035 County Road D East Maplewood, MN 55109-5314 Ph: (651) 704-9970 Fax: (651) 704-9971 Bolton-Menk.com A submittal for the Danner, Inc. Apache Mining Permit Project was received March 13`', including a Phasing and Grading Plan (2/15/19) by Brian Molinaro of Pioneer Engineering. The following comments relating to stormwater are provided: Rate Control: Peak flow rates after development shall not exceed pre -development peak flow rates for the critical 2 -year, 10 -year, and 100 -year recurrence interval precipitation events. Please submit a hydrologic analysis for existing and proposed conditions. Use 24-hour NOAA Atlas 14 Precipitation events for rate control analyses and pond storage design. NPDES Construction Stormwater Permit: As this project disturbs more than 1 acre, an NPDES Construction Stormwater Permit and SWPPP will be required. Part of the project area drains less than 1 mile to Ravine Lake which has an EPA -approved impairment for nutrients. The impairment is considered to be construction related and requires additional best management practices (BMPs), site stabilization within seven (7) calendar days after the construction activity ceases in that portion of the site, temporary sediment basins for areas with five (5) or more acres disturbed at one time, and may also require SWPPP review by the MPCA. H:\COTT\ Others\Draft Danner Inc Apache Mining Permit Stormwater Comments Memo March 20 2019.docx Bolton & Menk is an eaual 0000rtunity emolover.