HomeMy WebLinkAbout2019-03-25 PACKET 06.1.STAFF REPORT CASE: CUP2019-012
ITEM: 6.1
PUBLIC MEETING DATE: 3/25/19 TENTATIVE COUNCIL REVIEW DATE: 4/17/19
APPLICATION
APPLICANT: Verizon Wireless (VAW) LLC, dba Verizon Wireless
REQUEST: A conditional use permit to allow installation of wireless telecommunica-
tions equipment on/at the West Draw Water Tower. The proposal includes
a temporary pole/antenna support structure and a permanent installation
on the water tower.
SITE DATA
LOCATION:
ZONING:
GUIDED LAND USE:
6950 Meadow Grass Avenue South
Planned Unit Development
Parks and Private Open Space
LAND USE OF ADJACENT PROPERTIES:
CURRENT
GUIDED
NORTH:
Park & Open Space
Park & Open Space
EAST:
Residential
Med. Density Res.
SOUTH:
Park & Open Space
Park & Open Space
WEST:
Residential
Low Density Res.
SIZE: N/A
DENSITY: N/A
RECOMMENDATION
Approval, subject to the conditions stipulated in this staff report.
Cottage
Grove COTTAGE GROVE PLANNING DIVISION
�
here Pride and Prosperity Meet
Planning Staff Contact: Emily Schmitz, Senior Planner; 651-458-2874; esc h m itz(o-)_cottageg rove m n. gov
Application Accepted:. 2/27/2019 60 -Day Review Deadline: 4/26/2019
City of Cottage Grove Planning Division • 12800 Ravine Parkway South • Cottage Grove, MN 55016
Planning Staff Report
Verizon Wireless, LLC — Conditional Use Permit
Planning Case No. CUP2019-012
March 25, 2019
Proposal
Verizon Wireless, LLC has applied for a conditional use permit (CUP) to install six antennas on
top of the City's Meadow Grass water reservoir structure located at 6950 Meadow Grass Avenue
South. The proposal is a result of the City's request to terminate the applicant's existing lease
allowing for the antennas and equipment to be located on the communications tower at the former
Cottage Grove City Hall location. A new agreement with the City permitting Verizon to lease space
on the Meadow Grass water reservoir will also require City Council approval in addition to the
2019 CUP.
Installation of the proposed antennas would allow for continued coverage of Verizon Wireless
service within the Cottage Grove area. Verizon plans for installation of the permanent communi-
cations equipment at the site prior to August 15, 2019, although, if additional time is needed to
meet all regulatory standards, a temporary communications site may be installed. The location
map is shown below:
i
,!•` � T4,
._
OA,
• v
44 a
Review Process
r�
f
6950 Meadow Grass Avg 5
74th Street S
Location Map
Application Received: February 27, 2019
Acceptance of Completed Application: February 27, 2019
Tentative City Council Date: April 17, 2019
60 -Day Review Deadline: April 26, 2019
Planning Staff Report
Verizon Wireless, LLC — Planning Case No. CUP2019-012
March 21, 2019
Page 2 of 7
Planning Considerations
Ordinance Criteria
The City's Electromagnetic Communication Facilities ordinance requires a conditional use permit
for antennas and related wireless transmission facilities. Approval is subject to the provisions of
the zoning ordinance and any conditions required by the City.
When reviewing conditional use permits, the Planning Commission looks to City Code Title 11-2-
9F; Criteria for Issuance of Conditional Use Permits, as the guiding doctrine for review. This
section states that in granting a CUP, the City Council shall find that:
1. The use will be in conformity with the City's Comprehensive Plan and with the purpose, intent
and applicable standards of this Title.
2. The use shall be located, designed, maintained and operated to be compatible with the existing
or intended character of that zoning district in which it is located.
3. The use shall not depreciate values of surrounding property.
4. The use shall not be hazardous, detrimental or disturbing to present and potential surrounding
land uses due to noises, glare, smoke, dust, odor, fumes, water pollution, vibration, general
unsightliness or other nuisances.
5. The use shall generate only minimal vehicular traffic on local streets as defined by the transpor-
tation element of the Comprehensive Plan. The use shall not create traffic congestion, unsafe
access or parking needs that will cause inconveniences to the adjoining properties.
6. The use shall be served adequately by essential public services, such as streets, police, fire
protection and utilities.
7. The use shall not create excessive additional requirements at public cost for public facilities and
services and shall not be detrimental to the economic welfare of the City.
8. The use shall preserve and incorporate the site's important natural and scenic features into the
development design.
9. The use shall cause minimal adverse environmental effects.
10. The use shall not adversely affect the potential development of adjacent vacant land.
The City's Technical Review Committee reviewed this application under those criteria. The Com-
mittee found that the CUP criteria could be met, and the conditional use permit for Verizon
Wireless, LLC could be approved subject to conditions.
Verizon's application complies with City ordinance regulations. Installing six additional antennas
to the mounting platform on top of the water reservoir structure will not significantly change the
appearance of the reservoir's top.
Planning Staff Report
Verizon Wireless, LLC — Planning Case No. CUP2019-012
March 21, 2019
Page 3 of 7
Equipment Storage and Antennas
The communications tower at the former City Hall location (7516 80th Street South) was con-
structed in 1998. Verizon Wireless has had a lease with the City for their antennas at this location
since approximately 2014. The City has requested early termination of the lease for the antennas,
which requires decommissioning and relocating the Verizon equipment. The former City Hall is
planned for redevelopment and demolition of the building would take place during the summer of
2019.
The six antennas would be located on the guardrail of the approximate 150 -foot water reservoir.
The antenna equipment would be installed on galvanized steel pipes and would extend approxi-
mately eight feet above the guardrail. The antenna size would be similar in size to the existing
antennas currently located on the guardrail. Wireless communications equipment from other com-
panies currently exists on the reservoir. Additional equipment storage cabinets would be installed
and located at grade level within the water reservoir and would not be visible.
An illustration is shown below of Verizon's antenna array mounted on the platform on top of the
ground water reservoir:
Water Tower Elevation
Planning Staff Report
Verizon Wireless, LLC — Planning Case No. CUP2019-012
March 21, 2019
Page 4 of 7
LOS= EOiUIP604r SPACE
PSL' _Wr� EQUIPMENT CABSE S
PLACED AT GRADE LEA1
STAIR
EXIUflK ELECTL EQUIPMENT—
MOUNTED ON ETn4nNC rELO BOARD
DOPER TO BELOYI—\
rN ROOF IFLOOR PLA
SC,SA_E: 3732" - 1- 6 s -.• �'
-----"1
1
IXISTING EQUIPMEW
� SHELTELTER. i
(EY OTHERS)
I �
I I
I I
" EDMWG EOUIPMEW
SHELTER
[6Y OTHERS} {
I 1
L ----------.--J
Antenna Array
I—MbPOM AMR[Rd1N6 FONFR FROM
TO PROPOSED
d' •rf
PW= DETER SOC10
woum O EH EOMMG
FF/FRAU
f
r
r r
—s�--PRDP'OSEV FM FROM
!• HAN AaE PULL KK AT TLO.YI
TO PROPOSED EQUIPIGNT
CAEINETS. G.C. TO VIfM
E LONG UNUSED CWDWT
TO ENTER TONFR
PROPOSEDPOWER FRAM
----PROPOSED ANTEiBi+<S AND
E3UlPNW YNKM ON
VETiliCil GkLY. SID. PIPE TO
E`er GLUJU Ri! SYSMA
EXISTING ANTENNAS AIC
EOUIP6E I WUNTED ON
EXISnK GUARDRNL SYSTEM
F.O. BOX
D E711C TOWER EASE W/ FLUTES
NORTH
The applicant has indicated installation of temporary equipment may be necessary at the Meadow
Grass site. Depending on the timing of State and Federal regulatory considerations, permitting
processes, contractor and construction schedules, and weather, Verizon may be required to install
a temporary site near the southwest corner of the property until installation of the permanent
equipment has been completed. The area would be approximately 440 square feet and would be
contained by a chain-link fence. Equipment within this area include exterior cabinets and an ap-
proximate 102 -foot monopole tower to support the temporary antennas. The applicant's goal is to
have the permanent equipment operating at the Meadow Grass location prior to decommissioning
the equipment at the old City Hall site, although the temporary site may be in place for up to 24
months.
Planning Staff Report
Verizon Wireless, LLC — Planning Case No. CUP2019-012
March 21, 2019
Page 5 of 7
z
} �urem uva
o/ swrsxnc nsmc
NORTH
ENLARGED SITE PLAN
BC:ALE: Altfi' _ �'-a'
iar.c .�a
in i
aid a
R xv�onuis
4&7 I0.
miwrx nnm�n qr
Proposed Temporary Equipment
Aerial photos of the site are shown below:
0.V IG<
3N d
View from North
r
I
!
I
I
}
M
%
I
I
I
I
I
'
PADP —
I
I
I
NORTH
ENLARGED SITE PLAN
BC:ALE: Altfi' _ �'-a'
iar.c .�a
in i
aid a
R xv�onuis
4&7 I0.
miwrx nnm�n qr
Proposed Temporary Equipment
Aerial photos of the site are shown below:
0.V IG<
3N d
View from North
Planning Staff Report
Verizon Wireless, LLC — Planning Case No. CUP2019-012
March 21, 2019
Page 6 of 7
W
View from South
K
�K
Potential temporary
communications site
�
Utilities
Private and public utility services are available in this area, but no changes are necessary for the
installation of the new antennas or equipment building.
Public Hearing Notices
The public hearing notice was mailed to 160 property owners who are within 500 feet of the site
on March 13, 2019 and published in the South Washington County Bulletin on March 13, 2019.
Recommendation
That the Planning Commission recommend to the City Council approval of Verizon Wireless,
LLC's request to install four antennas on top of the City's Meadow Grass water reservoir as shown
on Verizon's site plan prepared by Design 1 dated December 13, 2018 and subject to the following
conditions:
All applicable permits (i.e., building, electrical, mechanical) and a commercial plan review
packet must be completed, submitted, and approved by the Building Official, Fire Marshal,
and Public Works Director prior to the commencement of any construction activities.
2. Applicant must submit as -built drawings to the City upon completion of the installation.
3. The applicant continues to work with the Public Works Department in finalizing the lease area.
Planning Staff Report
Verizon Wireless, LLC — Planning Case No. CUP2019-012
March 21, 2019
Page 7 of 7
4. Applicant must comply with the terms and conditions of the Lease.
5. The applicant must schedule a pre -construction meeting with the Public Works Director
and City Engineer before work can begin.
6. Advertising on the antennas or equipment building is prohibited.
7. Outdoor storage is prohibited.
8. Color and sample materials for all cables, antennas, mounting brackets/braces, and equip-
ment must be submitted to the Public Works Director for final approval prior to issuance of
the building permit. City -specified manufactured colored coaxial cable will be required
(painted coaxial cable will not be accepted).
9. No significant change in the use or design of the antennas may be made without consent of
the Public Works Director. Minor modifications to service or use may be considered if such
changes will not cause the antennas to violate the performance standards set forth in the City
Codes or the conditions of this conditional use permit.
10. Utilities must be installed underground as approved by the Public Works Director.
11. The applicant must restore turf areas damaged by construction of the temporary communi-
cations site by providing a minimum of four inches of topsoil and seeding and watering of all
disturbed areas. Seed mix shall be approved by the Public Works Director.
Prepared by:
Emily Schmitz
Senior Planner
Attachments:
— Permanent Communications Site Sketch
— Temporary Communications Site Sketch
VERIZON WIRELESS
"MIN COTTAGE HILLSIDE"
PERMANENT COMMUNICATIONS SITE
SITE SKETCH
RECEIVED
FEB 278 2019
CITY OF COTTAC;E GROVE
EXISTING BITUMINOUS DRIVE
EXISTING TREE EDGE
I
EXISTING LINE OF CUT GRASSY I
PROPOSED 20'-0' (WIDE)
ACCESS/UTILITY RIGHT OF WAY
EXISTING WATER TOWER -
m m m
mm m
I I�
mmmm
I I
I I m m m m
\ mmmm
i
m m m EXISTING CUT LAWN
m m m m
mlmm
PROPOSED EQUIPMENT SPACE
INSIDE TOWER 1
(9'-0'+/- X 10-6' +/-) \
EXISTING TREE (TYPICAL)
I mmmm
EXISTING LINE OF CUT GRASS
mmmm
EXISTING NATIVE GRASS
EXISTING OVERHEAD UTILITY LINES
I
'+ PROPERTY LINE (APPROXIMATE)
mmmm
cT 9
7<!f • �Ytb;
EXISTING CONDITION
2
(BIRDSEYE VIEW)
ol
LESSEE 5'-0' (WIDE)
UTILITY EASEMENT (UNDERGROUND
ELECTRICAL)
LESSEE 10'-0' (NIDE)
UTILITY EASEMENT (UNDERGROUND
FIBER) (FINAL ROUTE T.B.D.)
F)
CITY OF COTTAGE GROVE
)III
mmmm
J
70TH STREET SOUTH
mmmm
NORTH
SITE PLAN
GRAPW SW
SCALE: 1" = 140'-0"
g 0
;
PROJECT: 20181872091
cn
rtI z
MIN
VERIZON
DESIGN L
COTTAGE HILLSIDE
WIRELM'RECEIV
MEADOW GRASS AVE S
10001 BUSH LAKE ROAD
7J VALLEVV EY RDAD
EDEN PRAIRIE, MN 65541
m'
k�
w
COTTAGE GROVE, MN 55016
BLOOMINGTON, MN 55438
(612)720-0052 _�
(952) Wa-91M
WIAMMIONI ERC011
LI
CITY OF COTTAGE GROVE
PROPOSED EXTERIOR EQUIPMENT CABINETS
PLACED AT GRADE LEVEL
EXISTING STAIR
EXISTING ELECT'L EQUIPMENT
MOUNTED ON EXISTING TELO BOARD
u
UP
II IIIIIIII
— !d-i=I-4
PROPOSED UNDERGROUND POWER FROM
_ EXISTING TRMSIFOPoAER TO PROPOSED
METER SOCKET
0
INS
1 I
1 / I EXISTING EQUIPMENT
SHELTER �I
I�P (BY OTHERS)
I I �
II b I
OPEN TO BELOW --\
II 2
II
I
� I
I I
EXISTING EQUIPMENT
SHELTER
I (BY OTHERS) I
L— — — — — — — — — — — J
ROOF/ FLOOR PLAN mme w \
SCALE: 3132" = 1-0" 5'-4•
i
i �
\ ` ; i
�� PROPOSED PETER SOCKET
MOUNTED ON EXISTING
H -FRAME
PROPOSED FIBER FROM
HAND/HOLE PULL BOX AT R.O.W
TO PROPOSED EQUIPMENT
CABINETS. G.C. TO UTILRE
EXISTING UNUSED CONDUIT
TO ENTER TOWER
PROPOSED POWER FROM
METER SOCKET TO
PROPOSED EQUIPMENT
CABINETS G.C. TO UTILIZE
EXISTING UNUSED CONDUIT
TO ENTER TOWER
PROPOSED ANTENNAS AND
EQUIPMENT MOUNTED ON
VERTICAL GALV. STEEL PIPE TO
EXISTING GUARDRAIL SYSTEM
EXISTING ANTENNAS AND
EQUIPMENT MOUNTED ON
EXISTING GUARDRAIL SYSTEM
/--
F.O. BOWL
.0. EXISTING TOWER BASE W/ FLUTES
NORTH
Fri
w
10
rn �cl)Lo
N J LL.I Z
=Q ui
G7
°D w
o (n��
N QLUv
UX00
Lu3z
U2°
SS -2
EXISTING OBSTRUCTION LIGHT TO BE RAISED
ANTENNA f-
64. AGL6ft 10
PROPOSED ANTENNAS AND EQUIPMENT�� CENTERS 160.0NF� G h
MOUNTED ON VERTICAL STEEL PIPE
EXISTING ANTENNA
(BY OTHERS)
EXISTING WATER TOWER
EXISTING VERTICAL LADDER
EXISTING ACCESS TUBE
EXISTING PAINTERS RING
r --------J;
i
PROPOSED HYBRID CABLE
y (INSIDE TOWER)
EXISTING STEEL STIFFENERS
r;
I c rA Nc ,
F1 EXISTING VERTICAL LADDER
I
C�
I
EXISTING CONDENSATION TARP
I
EXISTING EQUIPMENT SHELTERS
------------------"-
(BY OTHERS)
I I
I I
I I
I I
I I
I I
EXISTING MEZZANINE
Ii t
-------------—-- —
EXISTING STAIR—==1=------------------- --------------J
I
EXISTING O.H. DOOR
,
PROPOSED EQUIPMENT CABINETS
7 /
RECEIVED
IXI1X IX /
EXISTING ACCESS DOOR
FEB 212019
r7-\_ ELEVATION
SCALE
SCALE: 1" = 20'-0°
,
= I ,Jr: COTTAGE GRO
0 0
<
f
PROJECT: 20181872091
�Z
m *
MIN
VERIZON
DESIGN
�'
j
COTTAGE HILLSIDE
WIRELESS
W
MEADOW GRASS AVE S
10801 BUSH LAKE ROAD
EN PRAE,AN 9973 VALLEY VIEW 5OAD 55341
DIRI
m
COTTAGE GROVE, MN 55016
BLOOMINGTON, MN 55438
(5121720-0052
(952)903.9m
vAw.oesroNiEp.con,
VERIZON WIRELESS
"MIN COTTAGE HILLSIDE"
TEMPORARY COMMUNICATIONS SITE
SITE SKETCH
RECEIVED
FEB 112019
CITY OF COTTAGE GROVE
EXISTING BITUMINOUS
DRIVE
I
I
I
- - EXISTING TRANSFORMER
PROPOSED CONDUIT W/
POWER FROM TRANSFORMER
\ TO PROPOSED
METER SOCKET MOUNTED
/ ON E>MNG H -FRAME
EXISTING H -FRAME
PROPOSED METER SOCKET
MOUNTED ON E%IS TING
H -FRAME
EXISTING i \\
EASEMENT
1 ( I I PROPOSED EXTERIOR EQUIPMENT CABINETS------VJ4----r45
1 I
I I PROPOSED 21'-0" X 21'–T PRECAST
EDUNDATION SYSTEM
1
1 PROPOSED 100'-0- (HIGH) STEEL TOWER W/ ANTENNAS
1
1
1 PROPOSED UNDERGROUND FIBER FROM
11 —EXISTING CUT LAWN --\, R.O.W T EQUIPMENT COMPOUND
ROUIE TO BE
1 EXISTING EDGE OF CUT ( ) /
I I GRASS _ SITE PLAN GRAPHIC SCALE
1 SCALE: 1" = 20'-0" o 1 10• 20'
I
lw_
NORTH
UI
III
U) o
rn
U)U-)
N - � W Z
I-
=Q�
Wcco>
o
0
Qqa
N
0 ~OLLI
0
LLJ F- 0z0Wo
aU�U
SS -2
WATER%// TOWER
\\
EXISTING ANTENNAS AND
EQUIPMENT MOUNTED TO
GUARDRAIL (BY OTHERS)
11 I
I I
OQ
10'-0" DRIP EDGE
l
II
F.O. EXISTING TOWER
`
/
I
EXISTING TOWER BASE
I
/ /
��-PROPOSED TEMP CONDUIT W/
/ POWER FROM METER SOCKET
\
i
I MOUNTED ON EMM+
H -FRAME TO PROPOSED LLC.
- -
41'-0'
/ AT TEMP. PMENT
COMPOUND
-LESSEE 20'-0' WIDE ACCESS/UTILBY
EASEMENT
1 ( I I PROPOSED EXTERIOR EQUIPMENT CABINETS------VJ4----r45
1 I
I I PROPOSED 21'-0" X 21'–T PRECAST
EDUNDATION SYSTEM
1
1 PROPOSED 100'-0- (HIGH) STEEL TOWER W/ ANTENNAS
1
1
1 PROPOSED UNDERGROUND FIBER FROM
11 —EXISTING CUT LAWN --\, R.O.W T EQUIPMENT COMPOUND
ROUIE TO BE
1 EXISTING EDGE OF CUT ( ) /
I I GRASS _ SITE PLAN GRAPHIC SCALE
1 SCALE: 1" = 20'-0" o 1 10• 20'
I
lw_
NORTH
UI
III
U) o
rn
U)U-)
N - � W Z
I-
=Q�
Wcco>
o
0
Qqa
N
0 ~OLLI
0
LLJ F- 0z0Wo
aU�U
SS -2
i
/ � 10'-0" DRIP EDGE
PROPOSED TEMP.
UTILITY LINE
II
I PROPOSED LESSEE
PREMISES
I EXTENT OF CLEAN ROCK
0/ GEOIEXNLE FABRIC
I
--r% —% —X —i —i —% --%
%
I
r-- - - --- --- - --,
I i
1 I
i I
i I I
EQUIP.
till
I �
PROPOSED TEMPOm_"/ I
PRECAST FOUNDATION
X- X- i� Y
ENLARGED SITE PLAN
SCALE: 3/16"= 1'-0"
PROPOSED (LLC.)
MOUNTED TO H -FRAME
—PROPOSED CHAIN-LINK
FENCE
—PROPOSED ICE SHIELD
BaOS
CABINETS
—PROPOSED TOWER
—PROPOSED DIST.
BOXES AND RRU'S
AND SUPPORTING
EQUIPMENT MOUNTED
ON CALK STEEL
H -FRAME
y�
e
NORTH
GRAPIC SME
o z' -e• a' a•
LIGHTNING ROD
T.O. LIGHTNING ROD
107.0' AGL
T.O. MONOPOLE
7n 1AGI.
ANTE
CENTERLINE OF ANTENNAS
98.0' AGL
PLATFORM KIT
PROPOSED ANTENNA
100'-0• (HIGH)
GALV. STEEL.. MONOPOLE
TOWER
--INTERIOR CABLE ROUTING
CABLE PORT
EXTERIOR CABINETS
PRECAST FOUNDATION SYSTEM
FENCE
Ir/
T.O. FOUNDATION
� 20 AGL .
0.0' AGL `-
ELEVATION GRAPHIC SC&E
2 SCALE: 1/16" = 1'-0" a ie•
e
OW.0Z
ZN
Y 2 o
Zo
Y, 2 -nN
W
L mR
-8
p�/+Y
0 m
Ill
rl ��
O
0)JU)10
CD JW
N =Q�
00
aoo rwn >
N
~~o(D
0 0It Wo
CL U2c)
m
DATE: 12.11.
SS -3
.64