HomeMy WebLinkAbout2019-05-29 PACKET 06.3.STAFF REPORT CASE: PP2019-021
ITEM: 6.3
PUBLIC MEETING DATE: 5/29/19 TENTATIVE COUNCIL REVIEW DATE: 6/19/19
APPLICATION
APPLICANT: City of Cottage Grove
REQUEST: A preliminary plat for Glengrove Industrial Park 8th Addition, which will
create one industrial lot and two outlots.
SITE DATA
LOCATION:
ZONING:
GUIDED LAND USE:
North of 100th Street and West of 9900 Jamaica Avenue
1-2, General Industry
Industrial
LAND USE OF ADJACENT PROPERTIES:
CURRENT
GUIDED
NORTH:
Industrial
Industrial
EAST:
Agricultural
Industrial
SOUTH:
Agricultural
Industrial
WEST:
Agricultural
Industrial
SIZE
41.16 acres
RECOMMENDATION
Approval, subject to the conditions stipulated in this staff report.
Cottage
Grove COTTAGE GROVE PLANNING DIVISION
�
here Pride and Prosperity Meet
Planning Staff Contact: Emily Schmitz, Senior Planner; 651-458-2874; esch m itz(o-)_cottageg rove m n. gov
Application Accepted:. 5/1/19 60 -Day Review Deadline: 6/30/19
City of Cottage Grove Planning Division • 12800 Ravine Parkway South • Cottage Grove, MN 55016
Planning Staff Report
Glengrove Industrial Park 8th Addition — Preliminary Plat
Planning Case No. PP2019-021
May 29, 2019
Proposal
The City of Cottage Grove applied for a preliminary plat for Glengrove Industrial Park 8th Addition,
which will subdivide approximately 41.16 acres of land into an 18.66 -acre industrial lot and two
outlots; Outlot A will be 19.13 acres and Outlot B will be 3.37 acres. Renewal by Andersen's
existing parcel and the additional 18.66 -acre parcel would allow for construction of an approximate
350,000 square foot building. Outlot B will be a part of a stormwater basin that is part of the overall
stormwater drainage system for properties in the Glengrove Industrial Park 4th, 5th, 6th, 7th, and
proposed 8th Additions. Outlot A in Glengrove Industrial Park 8th will likely be subdivided in the
future as additional development occurs.
The property is located between 97th Street and 100th Street, east of Hemingway Avenue and
west of Jamaica Avenue. A location map is shown below:
0
Review Process
' Proposed X7.43 acre p 7rcel aAr�
an approximate 350,000 scluare
Foot manufacturingloflice building
and future expansion
f �v
will
Location Map
Application Received: May 1, 2019
Acceptance of Completed Application: May 1, 2019
Tentative City Council Date: June 19, 2019
60 -Day Review Deadline: June 30, 2019
Planning Staff Report — Planning Case No. PP2019-021
Glengrove Industrial Park 8th Addition Preliminary Plat
May 29, 2019
Page 2 of 4
Planning Considerations
Site Characteristics
The majority of the proposed site is relatively flat and is currently used for cropland. Windbreaks
comprised of mature coniferous and deciduous trees and volunteer brush of varying species bi-
sects the property. This portion of the windbreak would be removed for building construction. Site
plan review and variance applications have been filed by Renewal by Andersen/Opus, and the
public hearing is scheduled for the May 29, 2019, Planning Commission meeting. A 2016 aerial
photo of the site is shown below:
2017 Aerial Photo
Comprehensive Plan
The future land use in the City's Future Vision 2030 Comprehensive Plan for this area is Industrial.
The proposed 2040 Future Land Use Map continues to show this area of the Cottage Grove
Business Park as an industrial land use designation. The proposal to subdivide the 41.16 -acre
industrial parcel into one lot and two outlots is consistent with the future land use plan. The prop-
erty is in the Metropolitan Urban Service Area (MUSA).
Preliminary and Final Plat
The parent parcel for the proposed Glengrove Industrial Park 8th Addition is approximately 41.16
acres of land that is legally described as Outlot B of Glengrove Industrial Park 7th Addition. The
Glengrove Industrial Park 7th Addition was subdivided in 2018. At the time that Glengrove Indus-
trial Park 6th Addition was platted, all the public right-of-way for Hemingway Avenue, 100th Street,
and 97th Street were dedicated to the City. Re -platting Outlot B in Glengrove Industrial Park 8th
Addition will not require any additional land dedication for right-of-way purposes. The proposed
preliminary plat provides drainage and utility easements that are necessary to adequately serve
current and future development in this area. The proposed plat would also require two new access
points off 100th Street. The City's traffic engineer has reviewed the request and required right turn
lanes be installed at each of the access points. The preliminary and final plat for Glengrove
Industrial Park 8th Addition is shown below:
Planning Staff Report — Planning Case No. PP2019-021
Glengrove Industrial Park 8th Addition Preliminary Plat
May 29, 2019
Page 3 of 4
Preliminary/Final Plat for Glengrove Industrial Park 8th Addition
Outlot B in the Glengrove Industrial Park 8th Addition is required to be deeded to the City without
cost to the City for regional ponding purposes.
Utilities
The City's sanitary sewer and water service stubs are available in the Cottage Grove Business
Park and can easily be extended to the Renewal/Opus development in the future. All existing
easements south of 97th Street and north of 100th Street will be vacated at the June 5 and June
19 City Council meetings. Public drainage and utility easements required by the City Engineer
and Public Works Department are shown on the preliminary and final plats. All City utilities in this
vicinity provide the necessary capacities to serve this 41.16 -acre parcel.
Stormwater Management Plan
A stormwater basin exists north of the parent parcel. This basin is the stormwater management
system for this area of the Cottage Grove Business Park; other drainage and utility easements
will be platted along parcel boundaries. These easements are consistent with the City's Subdivi-
sion Ordinance regulations and are accepted by the City Engineer and Public Works Department.
�_TLEI�T I (1 a E L`TI' TRIAL PARK 8TH ADDITICY—N � ���� E z���
UKAWN MAP
I it
I
-T
L v 8
U L 1: .. F.
i
rl
SF EET 2 OF 2 SFI SETS
Preliminary/Final Plat for Glengrove Industrial Park 8th Addition
Outlot B in the Glengrove Industrial Park 8th Addition is required to be deeded to the City without
cost to the City for regional ponding purposes.
Utilities
The City's sanitary sewer and water service stubs are available in the Cottage Grove Business
Park and can easily be extended to the Renewal/Opus development in the future. All existing
easements south of 97th Street and north of 100th Street will be vacated at the June 5 and June
19 City Council meetings. Public drainage and utility easements required by the City Engineer
and Public Works Department are shown on the preliminary and final plats. All City utilities in this
vicinity provide the necessary capacities to serve this 41.16 -acre parcel.
Stormwater Management Plan
A stormwater basin exists north of the parent parcel. This basin is the stormwater management
system for this area of the Cottage Grove Business Park; other drainage and utility easements
will be platted along parcel boundaries. These easements are consistent with the City's Subdivi-
sion Ordinance regulations and are accepted by the City Engineer and Public Works Department.
Planning Staff Report — Planning Case No. PP2019-021
Glengrove Industrial Park 8th Addition Preliminary Plat
May 29, 2019
Page 4 of 4
Public Hearing Notices
Public hearing notices were mailed on May 16, 2019, to 28 property owners who are within 500
feet of the site. In addition, the public hearing notice was published in the South Washington
Bulletin on May 15, 2019.
City Department Review
Representatives from various City Departments, other agencies, and utility companies were pro-
vided a copy of the preliminary plat. Comments or recommendations from any of these groups
will be reported to the City Council for their June 19, 2019, meeting.
Recommendations
That the Planning Commission recommends to the City Council approval of the Glengrove Indus-
trial Park 8th Addition preliminary plat, subject to the conditions listed below:
1. The final plat shall include easements of all public and private utility lines serving all planned
development of the parent parcel.
2. A prorated combined area charge fee in the amount of $451,809 shall be paid at the time of the
recording of the final plat.
3. Renewal by Andersen submits as -built drawings to the City upon completion of the all utility
systems.
4. Concrete aprons for the two access drives shall be constructed per City requirements.
5. The grading and erosion control plan for the site must comply with NPDES II Permit require-
ments. Erosion control devices must be installed prior to commencement of any grading activ-
ity. Erosion control must be performed in accordance with the recommended practices of the
"Minnesota Construction Site Erosion and Sediment Control Planning Handbook" and the con-
ditions stipulated in Title 10-5-8, Erosion Control During Construction, of the City's Subdivision
Ordinance.
Prepared by:
Emily Schmitz
Senior Planner
Attachments:
Preliminary/Final Plat
A01 M01"M.II /1=10111111.`1I0M"I' 1m1s"MCa0 I&�IIY[:SM011101 [YlY[[I]\I
ON Ip "",db g ms, L.P., a 11 -1 -lima p ne p, eowners of the loll g —b P iPm tlP rtne p, Minnesota limi[etl
Outlot N, GINNIN-1INou ION, PAPK nN -NNUON,actorRdgI. Ibb dId p tI—C—h,dNmn munN. Minnesota.
ANIF—I Penewal by Antlerson LLC, a Mmne50ta li.—liabilitym Idy,tee owners -h—l—, tlesaibetl p,ope,y'
Lott, Blodc 1,GINNIN-1 Nou STFwt PAFK ITN AooRION,acmr rig 1. MeremdId p II—C Wasbingmn County, Minnesota
Pm
tls�b ,
E�nnm=oev PmAuthn,ty.Ipubll=bntly�,pn,Itelntlpnit=
Puntle,tbellw=nfMnne=ntLfeenwne,=nftbefnllnw g
out1n11,GININ-1NotlSTKIAtPA1111AIITION,Iccn, g Ibb dIdP the,enfwl=bngnnEnu .Mnne=ntl.
plIlIdI,GINNIN-1INIISIONINAKKgTIAooITIONIntltlnbe ydIRIIIIthetl,I g tlutl eI=emen
tlgetl — — — . y ,tlnnGlentlen g e=tlentnfwAGfl,m=.In=.I
nwletlgea s. Ken v. General Plrtne, Hunan
Th, n:I=hnnwletlgea bem,eme - v of— — — by mnn GlIndInn, nN,UGene,Il 1—IT nn dbhSf f
by=eIII III P111 PIIPIII'd d
III PIIN
DRAFT
Th,, 2M,bvKu��ello.�Ilve,�nn,t�cen�etlInd su y
Ihnw e==w e,enf=I —n—b 1-1 pIbnIAut n,ty,Ipubl=bntlypnllt=untle,tl,ellw=IMnne=ntI
g g oev P nIAld-Uy
nwletlgetl d 1, -2oT�bv Mv,nnl,le,Pre,,dnl,Intllennoe,
wem,ean,nrmeon ge mvee=nnnm�=oev P ntAlnbnnty.o belalmrme g ,nvee=nnnm�=oev P nt
Aumo"w
boa=nv Panv. ba: �useam tlei,Ar
maene �tl`
eP,esen',Cdif1g1-1.h, dI
al orrce�nanet�,P�,a�,Ibd �n b al
Ygnbd n—I by tle,:nn ur, I Mmnemtl I ... Iba l�Ib�oty �mPlny,
Th nwletlgetl e by Alan eeml=b Usnln1bbGes enI,
a,�e g n�ce,ana P e=, rv. new v aesnn ur,a M�nnesn�Ilm�r�a l�ae�l�a=nmPam, nn behSfIIbb mpiny�
CITY OF COTTAG E GROVE APP ROVAL
Th,, pIIIof GLEININ-1IN ou TP IAL PAFK KTIAIITIN,w etl bytbeII, Councll IIIory of—Ige Grove, Minnesota, Id dIy
S 2L
wI,h nA.n Cluny Su,veyn,
COUNTY All UITOR/TREASURER
211
wam�n n aunty Aumm,/T,ea:u,e,
Put,
COUNTY RECORDER
e erciry that : n,,umerrt wl:re..ra in Id, Yffbbd aunt, ae�r er o,re�r on y
.Intl wl: v nmetl ,n wl:mgenn Founya d'L
—hln nCnunty gec=me,
SHEET 1 OF 2 SHEETS
GLENGROVE INDUSTRIAL PARK 8TH ADDITION
LEGEND ,iryrtt11— IT, SITE
G 1�Guaz 4MI
2
LOCATION MAP
NOT TO SCALE
SECTIONS 20, 21, 21 & 29, TOM SHIP 27 NONLEH, RANGE 21 MST
J- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - LI
77 7S,
ILI _4"7 LS J-11
ILI #11—
m DRANAGE S, LLLLY 1ASE—T
'L " T
OUTLOT B
NW29 2 L w25o.1
"HTLANLI '01'00TA'B6LG'LNlIII ILI 41-1
S 89-48-39" 1400.02 A, 'LH
A, . . . . . . . . . . . . . . . 7 - - - - - - - - - - - - - - - - - - — - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - -
o
- - - - - - - - - - - - -
OUTLOT A 6 21 T 1 IIARAIE I
_LTILILY IIII.ENT
-�j
LOT
B L 0 C K i
LISRAA I ITILITY AS11.
NIITIAAL OL
'TLI
'l—POPLLSLS'IG-1
IISLIT-
T IF GLE ILI—
'IS
�NIIRI. LINI L
T ------------------------- -----------------
- -_-
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
N 89'48'39" 12150.58 9'51'41"W;9
Ell—Il
PEI D111--
IF LLLH LIL-E �_F I.—IN
So IF 2"'
I INII 111TION 21 SE IR
IF 111, 21, TIP, 21 1 21 T 21, 1, 21
11 IIINII OF 5�`IP 21. 1, 21
", A,
SHEET 2 OF 2 SHEETS
T.111111EIIAE-1 101TON &I—j—