Loading...
HomeMy WebLinkAbout2019-12-16 PACKET 06.1.STAFF REPORT CASE: ZA2019-050 & PP2019-051 ITEM: 6.1 PUBLIC MEETING DATE: 12/16/19 TENTATIVE COUNCIL REVIEW DATE: 1/15/20 APPLICATION APPLICANT: Donnay Homes REQUEST: A zoning amendment to rezone 28.84 acres of land from AG -1, Agricultural Preservation, to R-5, Medium Density Residential, with a PUD, Planned Unit Development. Donnay Homes also applied for a preliminary plat to be called Woodward Ponds that would create a residential subdivision con- sisting of 164 townhome units in 39 buildings and 4 outlots. SITE DATA LOCATION: Generally located north of Military Road and a quarter mile west of CSAH 19 (Keats Avenue) ZONING: AG -1, Agricultural Preservation GUIDED LAND USE: Medium Density Residential LAND USE OF ADJACENT PROPERTIES: CURRENT GUIDED NORTH: Agricultural Parks/Open Space EAST: Rural Residential Medium Density Res. SOUTH: Low Density Res. Low Density Res. WEST: Agricultural Parks/Open Space SIZE: 28.84 Acres DENSITY: 5.69 units per acre RECOMMENDATION Approval, subject to the conditions stipulated in this staff report. Cottage Grove COTTAGE GROVE PLANNING DIVISION � here Pride and Prosperity Meet Planning Staff Contact: Emily Schmitz, Senior Planner; 651-458-2874; eschmitz(o-)_cottagegrovemn.gov Application Accepted:. 10/30/2019 60 -Day Review Deadline: 12/29/2019 City of Cottage Grove Planning Division • 12800 Ravine Parkway South • Cottage Grove, MN 55016 Planning Staff Report Woodward Ponds Planning Case Nos. ZA2019-050 & PP2O19-051 December 12, 2019 Proposal Donnay Homes is requesting approval for a zoning amendment and preliminary plat on 28.84 acres of land located north of Military Road and west of Keats Avenue. The current zoning of the parcel is AG -1, Agricultural Preservation; the developer is proposing a zoning change to R-5, Medium Density Residential with a PUD, Planned Unit Development, allowing for flexibility in development requirements. The plat for this residential subdivision is proposed to be called Woodward Ponds and will consist of 164 residential lots for tri-plex, four-plex, and row townhomes. 4_! �-- -� 7.i ST Sf,, - Location Map Review Schedule Application Received: October 30, 2019 Application Accepted: October 30, 2019 Planning Commission Meeting: December 16, 2019 60 -Day Review Deadline: December 30, 2019 60 -Day Review Deadline Extension: February 28, 2020 Tentative City Council Meeting: January 15, 2020 Planning Staff Report —Woodward Ponds Case Nos. ZA2019-050 & PP2019-051 December 16, 2019 Page 2 of 28 Background Site Conditions The 28.84 -acre site is made up of four separate parcels, as indicated below: Parcel 2 & 3 Knutson Kotnour Tree Farm Parcel! 1 Property Watershed District L t} Parcel4 Kaiser x Existing Property Owners/Conditions There are single family homes on two of the four parcels. The remainder of the parcels consist of tilled farm fields and wooded buffers. The proposed site abuts the approved Stoneybrook Villas development (not under construction) to the southeast, the Knutson tree farm to the northeast, and the Eastridge Woods development to the south. Ravine Parkway extends across the north side of the project area. Planning Considerations Plan Review The dates of the plan set utilized for this review were submitted by Pioneer Engineering and are dated 10/28/2019. Planning Staff Report —Woodward Ponds Case Nos. ZA2019-050 & PP2019-051 December 16, 2019 Page 3 of 28 Conformance to the East Ravine Master Plan The proposed Woodward Ponds preliminary plat is located within Neighborhood One North of the East Ravine Master Plan. The Plan indicates this area, in the north portion of Neighborhood One near Cedarhurst Mansion, to be focused for medium and high density residential and to align with the proposed commercial node at 70th Street and Keats Avenue. Land Use and Zoning The property is guided for Medium Density Residential in the current 2030 Comprehensive Plan and the proposed 2040 Comprehensive Plan. No changes in land use are proposed with this development. 2040 Future Land Use The property is currently zoned AG -1, Agriculture Preservation. The requested rezoning from AG - 1, to R-5, Medium Density Residential, would be in accordance with the long-term growth plan for these parcels. Medium Density Residential allows for 4-10 units per acre density. The proposed preliminary plat and the land use map from the City's Future Vision 2040 Comprehen- sive Plan are consistent in the following ways: • The Future Land Use Map in the Future Vision 2040 Comprehensive Plan identifies the future land use development of the applicant's property for medium density residential land uses. The _i City Boundary — — — Major Future Roadways Agriculture Preserve Rural Residential Low Density Residential ` Medium Density Residential Y' - High Density Residential Commercial ' Mixed Use ® Mixed Use within 300" of Arterial Roadways Industrial f �• `' - Public/Semi-Public Agricultural W Parks/Open Space Golf Course Transition Planning Area Open Water Street and Rcilrood Right -of -Way The property is currently zoned AG -1, Agriculture Preservation. The requested rezoning from AG - 1, to R-5, Medium Density Residential, would be in accordance with the long-term growth plan for these parcels. Medium Density Residential allows for 4-10 units per acre density. The proposed preliminary plat and the land use map from the City's Future Vision 2040 Comprehen- sive Plan are consistent in the following ways: • The Future Land Use Map in the Future Vision 2040 Comprehensive Plan identifies the future land use development of the applicant's property for medium density residential land uses. The Planning Staff Report —Woodward Ponds Case Nos. ZA2019-050 & PP2019-051 December 16, 2019 Page 4 of 28 developer is proposing attached four-plex and tri-plex buildings and row townhome lots for the property, which is consistent with the City's Future Vision 2040 Comprehensive Plan. • Trail and sidewalk connections are proposed and acceptable to the City. • The proposed private street is consistent with City standards, if approved by the City Council. • The proposed preliminary plat and grading plan are consistent with the medium density residen- tial land use designation for this area. Preliminary Plat The preliminary plat, as proposed, depicts a logical development of a viable property given the adopted performance standards of the zoning district. The proposed plat consists of 164 units which equates to a density of 5.69 units per acre-, aligning with the Comprehensive Plan guidance of 4-10 units per acre. f 1LEW 91 P p5' R -�,� rf� �PJ• `\�_ �\'/,'/r ill / AKSIR 200 A R ,fir f � (� � ! �•aEE • �.. Preliminary Site Plan Planning Staff Report —Woodward Ponds Case Nos. ZA2019-050 & PP2019-051 December 16, 2019 Page 5 of 28 Neighborhood Meeting The developer (Donnay Homes) and builder (M/I Homes) held a neighborhood meeting on November 5, 2019. Notice of the neighborhood meeting was sent to surrounding property owners within 500 feet of the project area. The intent of the meeting was to give neighboring property owners the opportunity to ask questions and present concerns they might have to the developer in the early planning stages of the proposed project. Multiple property owners within the surrounding area attended the neighborhood meeting. Below is a summary of the comments, questions, and concerns received: • Concern related to increase in traffic. • Request for additional stop signs to be provided at intersections. • Request for additional screening along the Historic Military Trail Corridor. • Concern related to the Historic Military Trail Corridor pedestrian crossings. Zoning Development Standards The development performance standards of the requested zoning district classifications are detailed below. Lot Development Performance Standards Standard Proposed Zoning R-5 Woodward Ponds R-5/PUD Minimum Lot Area _ 2,705 Avg sf (four and tri-plex) 1,600 Avg sf row townhomes Minimum lot width 60 feet 40-24 feet Minimum side yard setback House 7.5 feet 7.5 feet Minimum front yard setback 30 feet 20 feet Minimum rear yard setback 35 feet 30 feet Corner lot setback 20 feet 20 feet Maximum Principal structure height 35 feet 35 feet Maximum lot coverage Impervious Surfaces 40 percent 40 percent Lot widths are proposed between 24 and 40 feet with an average between 1,376 square feet and 3,337 square feet of lot area. A reduced front yard setback will allow for additional greenspace along the rear yards of the buildings, specifically along Ravine Parkway, and reduce the total amount of impervious surface within the development. Homeowners Association A homeowners association (HOA) will be created for the Woodward Ponds development. This HOA will be responsible for all yard maintenance on each lot and outlot and snow removal on sidewalks, driveways, and the private streets. The HOA will also be responsible for maintaining, repairing, and/or replacing the concrete curb and gutter of the private street (Street C). The water, sanitary sewer, and storm sewer utilities beneath the roadway and within drainage and utility easements will be the City's responsibility for maintenance and/or repair. Planning Staff Report —Woodward Ponds Case Nos. ZA2019-050 & PP2019-051 December 16, 2019 Page 6 of 28 The declaration of covenants for this HOA will also include private regulations regarding parking, exterior storage, landscaping improvements, etc. Density The density of the proposed Woodward Ponds development is 5.69 units per acre. The density range for the Medium Density Residential Land Use District is four to ten dwelling units per acre. The proposed development meets the Comprehensive Plan standards. Transportation Access to the development is proposed through two planned connections from the Eastridge Woods development, as well as a planned connection on the north side to Ravine Parkway. When Eastridge Woods was developed, Jocelyn and Joliet Avenues were constructed as street stubs with the intent to extend them as development continued. Jocelyn Avenue and Joliet Avenue will be continued across the Military Trail Corridor into and through the Woodward Ponds develop- ment. The developer will be responsible for the removal of the temporary turnaround and barri- cades at the end of Jocelyn Avenue and removal of the barricades at the end of Joliet Avenue within Eastridge Woods as part of the street connections. Joliet Avenue is proposed as a through street and will allow for ingress and egress to Ravine Parkway. Joliet Avenue is proposed as a neighborhood collector street allowing for the easy flow of traffic through both developments between 70th Street and Ravine Parkway. Since Joliet Avenue is being extended through Woodward Ponds, an additional stop sign is necessary at the 66th Street and Joliet Avenue four-way intersection within the Eastridge Woods development. Only one sign exists today on 66th Street for traffic heading northwest toward Joliet Avenue. The additional stop sign will be for traffic heading southeast toward Joliet Avenue from Jocelyn Avenue. Traffic sign- age would also be required within Woodward Ponds development per the City's sign policy and Minnesota Manual for Uniform Traffic Control Devices (MMUTCD). �i T 1+1 Woodward Ponds - - Pedestrian crossing sign - stop signs age and stripping at trail crossings �6fiTCTS 1+1 Eastridge W66ffs . — — _I Alk., Stop sign to be added �4 a - - i Existing stop sign Traffic and Pedestrian Control Signage — Eastridge Woods Planning Staff Report —Woodward Ponds Case Nos. ZA2019-050 & PP2019-051 December 16, 2019 Page 7 of 28 a; -- ------------- 12 ---------- - t7 -1 "k 41 ` 'ri t i eB eu f/. 7Z I Required stop I sign Locations Traffic Control Signage — Woodward Ponds The design of Joliet Avenue is proposed to be consistent with the Eastridge Woods development and will maintain a 36 -foot width, face-to-face, with a 66 -foot right-of-way. One 22 -foot wide pri- vate Street (Johansen Avenue South) is proposed. The remainder of the streets are proposed at 28 -foot wide public streets, face to face. Public right-of-way is required to be platted for the public roadways at a minimum of 60 feet. Being one of the streets has been proposed as a private street, repaired and maintained by the HOA, the City Engineer/Public Works Director has accepted this street design. "Street A" as indicated on the preliminary plat shall be called 65th Street South from the southeast corner to the cul-de-sac. Once the street turns north, it will be called Jody Avenue South. The privately maintained "Street C' shall be called Johansen Avenue. All street names must be labeled on the final plat. At such time the Stoneybrook Villas development is constructed, 65th Street will continue through to access to Keats Avenue. a f1 l,l t BASN WO a; -- ------------- 12 ---------- - t7 -1 "k 41 ` 'ri t i eB eu f/. 7Z I Required stop I sign Locations Traffic Control Signage — Woodward Ponds The design of Joliet Avenue is proposed to be consistent with the Eastridge Woods development and will maintain a 36 -foot width, face-to-face, with a 66 -foot right-of-way. One 22 -foot wide pri- vate Street (Johansen Avenue South) is proposed. The remainder of the streets are proposed at 28 -foot wide public streets, face to face. Public right-of-way is required to be platted for the public roadways at a minimum of 60 feet. Being one of the streets has been proposed as a private street, repaired and maintained by the HOA, the City Engineer/Public Works Director has accepted this street design. "Street A" as indicated on the preliminary plat shall be called 65th Street South from the southeast corner to the cul-de-sac. Once the street turns north, it will be called Jody Avenue South. The privately maintained "Street C' shall be called Johansen Avenue. All street names must be labeled on the final plat. At such time the Stoneybrook Villas development is constructed, 65th Street will continue through to access to Keats Avenue. Planning Staff Report —Woodward Ponds Case Nos. ZA2019-050 & PP2019-051 December 16, 2019 Page 8 of 28 j/' ! �r tl 10 / s g% / ASIN Soo 1, OUTLOT A r ' 1 J].I [1 4 `17 II 10 t� Sd ti 20 21122 23k 4� 73 74 271. 2bI T9 3 s' �AVCRLt! Jocelyn Avenue South * _ 4 . 'let r ttMMW a' casa>t� �otmW ftnh OI,TLOT C BASIN 2DO Pfs 0 Street Names All assessment waiver conditions from the Ravine Parkway assessment must be met, and fees paid prior to the release of the final plat for recording. Parking The City's Zoning Code requires no less than two parking spaces provided per unit within a multi- family development. The proposed plan provides two spaces per unit within the driveway access- ing each unit. Driveways are proposed to be 35 feet in length from the back of the curb to the garage. This allows for 21 feet to the edge of the sidewalk, which provides ample room for the parking of two vehicles without interfering with sidewalk traffic. Additional parking is also required for multi -family developments at 1.5 spaces per 10 dwelling units. This equates to 24 parking spaces required as guest parking for the proposed 164 dwelling units. The developer has proposed 26 spaces, thus meeting the City's Zoning Code standard. Planning Staff Report —Woodward Ponds Case Nos. ZA2019-050 & PP2019-051 December 16, 2019 Page 9 of 28 Trails and Sidewalks The 16 -foot right-of-way between the back of the curb and the property line for each parcel allows for the required sidewalk connections along each street within the development. Sidewalks will be required to extend from the existing sidewalk stubbed at both Joliet Avenue and Jocelyn Avenue. A five-foot sidewalk is also proposed along Street A (65th Street South), which will stub at the property line abutting the Stoneybrook Villas development. A temporary turnaround will be re- quired to be installed at this location until such time Stoneybrook Villas develops and 65th Street South is extended. Proposed Sidewalk Connections As a part of this development, the remainder of Military Road will be required to be removed from Joliet Avenue southeast to Keats Avenue. This will also include removal of the existing pork chop and restriping of Keats Avenue at the Keats Avenue and Military Road intersection. The remainder of the Historic Military Trail Corridor will be installed during this project and will connect to the existing trail at 70th Street and Keats Avenue. This portion of trail will be required to remain within the platted right-of-way. At each pedestrian crossing over Jocelyn and Joliet Avenues, street light- ing has been reviewed to ensure visibility. The crossings are required to be appropriately striped and signed. Planning Staff Report —Woodward Ponds Case Nos. ZA2019-050 & PP2019-051 December 16, 2019 Page 10 of 28 ase ik, ^�V,'wn ,enc,. -•S � ?� .. _ M be r Road section _ ¢ � "- to be removed - repiacedwith Historic Ac r Miliary Trail Historic Military Trail Corridor Stormwater Management Plan Storm sewer will be extended from streets within the development to the stormwater basins pro- posed along the north side of the development as well as the basin in the southeast corner. The proposed basin areas require access points, which are to be a minimum of 20 feet wide to allow for maintenance of the infrastructure in the future. Stormwater Infrastructure Planning Staff Report —Woodward Ponds Case Nos. ZA2019-050 & PP2019-051 December 16, 2019 Page 11 of 28 The preliminary stormwater management plan and wetland delineation was submitted and re- viewed by the City's engineering staff, and their comments are included in a plan review letter dated November 14, 2019. The developer's engineering consultant will continue to work with the City Engineer and SWWD to address stormwater storage basins and drainage. Grading As with all new development projects, site grading is necessary to provide on-site stormwater detention, street and building pad elevations, and drainage swales for routing surface water runoff to appropriate storm sewer systems. Each building pad will be graded above the street elevation and at least three feet above the ordinary high-water elevation for stormwater basins. As noted on the preliminary grading, drainage, and erosion control plan, silt fence will be installed along the perimeter of the grading limits. Part of the grading requirements for the site includes construction of the required ponding for the site. These ponds will be platted in outlots that will be owned and maintained by the City. The preliminary grading plan was reviewed by the City's engineering staff, and their review com- ments are included in the November 14, 2019, memorandum. Additional grading review will be required upon submittal of final grading and utility plans for the site. Utilities These properties are located within the Metropolitan Urban Service Area (MUSA) and have public utilities available at Joliet Avenue on the south. This location was stubbed for continued develop- ment at the time Eastridge Woods was developed. Utilities are also available on the north side of the property at the connection to Ravine Parkway. Utilities will be required to be stubbed at the Knutson property line and the Bloomquist property line (Stoneybrook Villas). This will require an easement be secured by the developer from both property owners to allow water and sewer infrastructure to be stubbed approximately 20 feet onto each property. These locations will allow for future connections to be made without disruption to completed construction on the Woodward Ponds parcel. A temporary turn -around will also be required at the end of "Street A" until such time the street continues through the Bloomquist prop- erty during construction of the Stoneybrook Villas project. It shall be the responsibility of the developer to secure the temporary utility easements from neighboring property owners. The cost of removal of the temporary cul-de-sac for future road extension on the Bloomquist parcel (to the east) will be the responsibility of the developer at such time the Bloomquist parcel develops. This cost will be required in advance of the future extension as a part of the Woodward Ponds Devel- opment Agreement. The installation of the on-site utilities, roads, and supporting infrastructure will be privately de- signed and constructed to meet City specifications. The Engineering memo dated November 14, 2019, addresses the connections for the project. Drainage and utility easements are required over all HOA outlots, including private "Street C," allowing access to public infrastructure. The overhead power lines that are currently servicing the two residences remaining along this portion of Military Road will be required to be removed as a part of the project. The developer should work with the utility company to remove the existing overhead lines. If the infrastructure is required to support an existing use, the lines would be required to be undergrounded. Planning Staff Report —Woodward Ponds Case Nos. ZA2019-050 & PP2019-051 December 16, 2019 Page 12 of 28 13 24 35 In:7:r.r1 p 70 31 BLO: 20.63 INV,. 897.01. 1 L_- t3�o: Knutson property — 1 Ia1V:9E} sts.ts /� RIM:91S,8a 9subbed utility location , . INV, 907.23 BLU 1175 RIM' 921 73 8001.50 INV: 910 S FRIM: 921.91 143LD:11.00 IIvv: 9• ") 91 rrrwrrr Temporary Utility Stub Location (Knutson property) Temporary Utility Stub & Temporary Turn Around Location (Stoneybrook Villas/Bloomquist Parcel) p.. Stubbed utility location -for future connection to 'JJ devel- opment,or Bloomquist property Temporary Utility Stub & Temporary Turn Around Location (Stoneybrook Villas/Bloomquist Parcel) Planning Staff Report —Woodward Ponds Case Nos. ZA2019-050 & PP2019-051 December 16, 2019 Page 13 of 28 Tree Preservation and Landscaping City Code Title 11-6-19 requires completion of a tree inventory (all qualifying trees) for the entire project area. The completed inventory indicating all qualifying trees on the site and whether they are to be removed or saved as a part of the proposed project has been provided. The inventory requires replacement of 82 caliper inches, which are being removed in excess of the permitted 35 percent removal threshold for a project of less than 10 units per acre. This requires installation of deciduous trees at a replacement rate of one tree equals 2.5 replacement inches or a coniferous tree at a replacement rate of 2 inches per foot (six foot minimum). City Code Title 11-6-5 requires a minimum amount of landscape plantings to be installed as a part of development projects within the City. These required plantings include boulevard trees, building perimeter plantings, and landscape requirements. The applicant has proposed 417 trees in their landscape plan dated October 30, 2019. The total number of trees required to be planted on the site is 649; a difference of 138 trees. The developer will be required to pay in lieu of planting the required trees at a rate of $375.00 per tree or would be permitted to plant additional trees along the Historic Military Trail Corridor or within another city open space area as approved by the Parks Director. The below table indicates the required plantings for the proposed project: Required Plantings Calculation The City Forester is reviewing the proposed landscape plan to ensure tree locations do not inter- fere with utility infrastructure, pond access routes, hydrants, traffic signage, and street lighting, and that it aligns with the City's preferred tree species list. The developer is required to comply with the City Forester's recommendations for any tree species and location. The submitted landscape plan indicates the existing buffer of mature trees along the Historic Mil- itary Road Trail Corridor will be preserved as a part of the development. Additional new plantings will be installed on the Woodward Ponds side of the trail corridor as well to ensure a future buffer, which is required when a multi -family development abuts a single-family residential development. The developer is aware of the concerns of the visual impact on neighboring property owners to the south and are proposing additional landscape screening that will reduce the impact to those residents. The Developer will also be encouraged to maintain the vegetative buffer between the property owner to the east and clear any scrub brush and overgrowth as necessary to provide a manicured buffer. Shrubs will be required to be planted as landscape surrounding each building at a rate of five plants per dwelling. Irrigation will also be required in all landscaped areas throughout the project area to the back of curb. All plantings and trees within the outlots and throughout the site, as well Landscape Boulevard Requirements Mitigation Trees Total Required Proposed Preserved Qualifying Trees Difference Coniferous 1 PEA uli Yt 164 119 4� 0 164 Ornamental i per unit 164 115 -1=i a 16a Overstory 1 per 40 linear feet of perimeter f ~5,019 feet) 82"12-5 di, ler unit ; 21 193 138 125 32 164 Shrubs 5 per unit 82.0 820 820 Required Plantings Calculation The City Forester is reviewing the proposed landscape plan to ensure tree locations do not inter- fere with utility infrastructure, pond access routes, hydrants, traffic signage, and street lighting, and that it aligns with the City's preferred tree species list. The developer is required to comply with the City Forester's recommendations for any tree species and location. The submitted landscape plan indicates the existing buffer of mature trees along the Historic Mil- itary Road Trail Corridor will be preserved as a part of the development. Additional new plantings will be installed on the Woodward Ponds side of the trail corridor as well to ensure a future buffer, which is required when a multi -family development abuts a single-family residential development. The developer is aware of the concerns of the visual impact on neighboring property owners to the south and are proposing additional landscape screening that will reduce the impact to those residents. The Developer will also be encouraged to maintain the vegetative buffer between the property owner to the east and clear any scrub brush and overgrowth as necessary to provide a manicured buffer. Shrubs will be required to be planted as landscape surrounding each building at a rate of five plants per dwelling. Irrigation will also be required in all landscaped areas throughout the project area to the back of curb. All plantings and trees within the outlots and throughout the site, as well Planning Staff Report —Woodward Ponds Case Nos. ZA2019-050 & PP2019-051 December 16, 2019 Page 14 of 28 as the vegetated areas up to the back of curb on Ravine Parkway and the Historic Military Trail Corridor, will be required to be maintained (mowed) by the homeowner's association. Park Land and Open Space A minimum of 10 percent of developable area shall be required to provide residents with public recreation facilities including parks and open spaces as a part of development projects per City Code Title 10-4-3. The City's Comprehensive Plan does not guide a portion of this project area for future park and open space-, therefore, no park dedication land is required. The developer would be required to pay a park dedication fee in lieu of dedicated lands for open space. The Comprehensive Plan guides for a large City park on the north side of Ravine Parkway pro- posed to be called Glacial Valley Park. The proposed park will include ball fields, ice rink, basket- ball courts, and a soccer/football field. The proposed development would have access through sidewalk connections to this future park. J Glacial Valley Park Master Plan 1 I HPa SCKc L SOCCWFOOTBAIL! LACWSSF FIELD 'S I LAWNI SN ATE AIIA �"" OVERHEAD PMERLINE EASEMENT PI: YC SkELT€E', T,P.` U SroxwwarEn 61 SPACES n Puw To. ❑ p EAsT RAVINE PARtwAY �7 SOF79MJL€rTu \ L FW PAWN FACam€S & RESTH S MOND %1 rIIGN Access from Glacial Valley Park to Woodward Ponds Planned Accessible Park (north of development) The applicant has also verified the development aligns with City Code Title 11 -9E -5B, which al- lows for only 40 percent of the total area of the project to be covered with structures, driveways, streets, and other impervious surfaces in order to maintain a balanced development. This project, as proposed, has approximately 39 percent of the site covered by impervious surfaces. This pro- vides no less than 60 percent of the project site to be green open space. The project also provides for far greater than the required 400 square feet of open space per dwelling-, approximately 3,616 square feet of open space per dwelling. Planning Staff Report —Woodward Ponds Case Nos. ZA2019-050 & PP2019-051 December 16, 2019 Page 15 of 28 Area Charges and Development Fees Area charges and related development fees for this project will be based on the acreages shown on the final plat. These fees and charges will be accurately adjusted based on the final plat layout and be provided in the development agreement. All fees and charges will be memorialized within the development agreement. Payment to the City will be required at the time the development agreement is fully executed by the City and Developer. Architecture M/I Homes is proposing multiple attached products within the Woodward Ponds development. The products will consist of attached four-plex and tri-plex buildings as well as row townhome products. As shown below, the four-plex and tri-plex products will line the north portion of the development along Ravine Parkway. This will continue to provide for the single-family structure feel along the Parkway as well as a large buffer setback with the ponding abutting the Parkway. One of the four and tri-plex products is a two-level structure with a basement creating a single- family dwelling feel. Proposed Four and Tri-Plex Buildings M/I Homes has proposed attached tri-plex and four-plex style buildings that have not yet been offered in any of their Minnesota projects but is currently featured in their Chicago housing mar- kets. Each unit is proposed with a double garage and living space ranging between 1,782 to 2,231 square feet and priced between $345,000 to $385,000. The proposed architectural materials in- clude a variety of vinyl lap, shake, and board -and -batten as well as greater articulation to the roof lines and elevations to provide a quality visual appeal. Elevations are included below for a two- story building as well as basement products. These products are proposed along the Ravine Parkway (north) side of the development to maintain the single family visual from the Parkway. f ��r�l.ueyL r. FA ji � 0 �i ♦ 4 .'�o'i � d Proposed Four and Tri-Plex Buildings M/I Homes has proposed attached tri-plex and four-plex style buildings that have not yet been offered in any of their Minnesota projects but is currently featured in their Chicago housing mar- kets. Each unit is proposed with a double garage and living space ranging between 1,782 to 2,231 square feet and priced between $345,000 to $385,000. The proposed architectural materials in- clude a variety of vinyl lap, shake, and board -and -batten as well as greater articulation to the roof lines and elevations to provide a quality visual appeal. Elevations are included below for a two- story building as well as basement products. These products are proposed along the Ravine Parkway (north) side of the development to maintain the single family visual from the Parkway. Planning Staff Report —Woodward Ponds Case Nos. ZA2019-050 & PP2019-051 December 16, 2019 Page 16 of 28 Ellis Fielding Cortland Tri-Plex Front Elevation Cortland Fielding Ellis Tri-Plex Rear Elevation Planning Staff Report –Woodward Ponds Case Nos. ZA2019-050 & PP2019-051 December 16, 2019 Page 17 of 28 .G' J im■1m1— Cortland Fielding Ellis Tri-Plex Rear Elevation – Basement _J r Cortland Fielding Fielding Four-Plex Rear Elevation Ellis Fieldin3 Fielding Cortland Four-Plex Front Elevation Ellis Planning Staff Report —Woodward Ponds Case Nos. ZA2019-050 & PP2019-051 December 16, 2019 Page 18 of 28 Cortland Fielding Ellis Four-Plex Rear Elevation - Basement M/I Homes will also propose a portion of the development as row-townhomes towards the west and southwest. These units will be front loaded off both public and private streets. Each building will have between four and six units. Each unit is proposed to be approximately 1,700 to 2,100 square feet in size with a minimum of 240 square foot garage space. These products are proposed to range from $280,000 to $313,000. Proposed Row Townhomes Planning Staff Report —Woodward Ponds Case Nos. ZA2019-050 & PP2019-051 December 16, 2019 Page 19 of 28 Woodward Ponds Townhomc, M/I Homes Product — Front Loaded (Row Townhomes) Fencing Any fencing proposed on lots along Ravine Parkway will be required to be uniformly designed with uniform color. Any proposed fencing as a part of the development would require long-term maintenance by the HOA. The developer has communicated with the neighboring property owner (Knutson Tree Farm) to the east. Mr. Knutson has indicated his concerns related to potential trespassing onto his parcel with the development so near his property line. The developer and Mr. Knutson have agreed that the developer will install wrought iron fencing along the property lines abutting Mr. Knutson's prop- erty. The fencing would be installed on his property, and therefore, future maintenance will be his responsibility. Public Hearing Notices Public hearing notices were mailed to 80 property owners who are within 500 feet of the proposed subdivision and published in The Bulletin on December 4, 2019. Recommendation That the Planning Commission recommend that the City Council approve the following two actions: A. A zoning amendment to change the zoning of property located north of Military Road and West of Keats Avenue from AG -1, Agricultural Preservation, to R-5, Medium Density Residential with a Planned Unit Development (PUD) B. A preliminary plat for a residential subdivision to be called Woodward Ponds, which will consist of 164 attached unit lots for multi -family townhomes. Approval of the preliminary plat is subject to the following conditions: Planning Staff Report —Woodward Ponds Case Nos. ZA2019-050 & PP2019-051 December 16, 2019 Page 20 of 28 General Development 1. The developer and builders must comply with all city ordinances and policies except as may be modified by agreement of the developer and City staff. 2. All grading, drainage, erosion control, and utilities must conform to the final plans approved by the City Engineer. 3. The applicant receives appropriate building permits from the City, and permits or approvals from other regulatory agencies including, but not limited to: South Washington Watershed District, Minnesota Department of Health, Minnesota Department of Natural Resources, and Minnesota Pollution Control Agency. 4. The Developer shall incorporate into the final plat the recommendations, requirements, and evaluations noted in the Bolton & Menk memorandum dated November 14, 2019, subject to modifications that are agreed to by the developer and City Engineer. 5. Existing irrigation along Ravine Parkway within and adjacent to the Woodward Ponds development shall be maintained by the HOA. 6. All conditions of the Ravine Parkway assessment waiver must be addressed at time of sale of the property and prior to the recording of a final plat. 7. The developer shall install a sidewalk connection to the Eastridge Woods neighborhood existing sidewalk along Jocelyn Avenue and Joliet Avenue. Platting, Land Dedication, and Easements 8. All assessment waiver conditions from the Ravine Parkway assessment must be met and fees paid prior to the release of the final plat for recording. 9. The final plat and the City's approval of the final plat are subject to additional conditions that will be listed in the City resolution approving the final plat and included in the develop- ment agreement. 10. The final plat must be recorded with the Washington County Recorder's Office before any building permit can be issued. 11. The developer must enter into an agreement with the City of Cottage Grove for the com- pletion of the public improvements required by City ordinances. Once the development agreement is completely executed and all cash deposits and payments are paid to the City, the City will release the final plat to the developer for recording at the Washington County Recorder's Office. 12. Common mailboxes meeting the approval of the local postmaster are required. Construction and Grading 13. A grading permit and financial guaranty is required prior to approval of grading activity related to the project. Planning Staff Report —Woodward Ponds Case Nos. ZA2019-050 & PP2019-051 December 16, 2019 Page 21 of 28 14. Prior to Council review of the final plat, the developer must submit for staff review and approval a final construction management plan that includes erosion control measures, project phasing for grading work, areas designated for preservation, a rock construction entrance, and construction -related vehicle parking. All emergency overflow swales must be identified on the grading and erosion control plan. 15. A pre -construction meeting with City staff and the contractor must be held before site work begins. The contractor will provide the City with a project schedule for the various phases of construction. 16. Erosion control devices must be installed prior to commencement of any grading activity. Erosion control shall be performed in accordance with the recommended practices of the "Minnesota Construction Site Erosion and Sediment Control Planning Handbook" and the conditions stipulated in Title 11-6-12, Erosion Control During Construction of the City's Subdivision Ordinance. 17. Upon completing site grading, four copies of an "As -Built" survey for the site grade eleva- tions must be submitted to the City. An electronic file of the "As -Built" survey must be submitted to the City Engineer. Lot Performance Standards 18. The architectural standards of the homes shall be consistent with the following: a. The minimum finished floor area for the four and tri-plex units are 1,782 square feet to 2,231 square feet. The minimum for the row townhome product is 1,700 square feet to 2,100 square feet. b. The minimum attached garage floor area for dwellings shall be 240 square feet for all multi -family dwellings. c. Architectural design is required on all four sides of the principal structure. d. The minimum roof pitch for the main roof slope is a 6/12 pitch. e. Windows, doors, and garage doors must have a low or no maintenance trim on all four sides of the dwelling. f. Architectural materials must be varying on the front fagade of the principle structure (shakes, board and batten, accent siding, shutters, window boxes, etc.). 19. Additional home styles and floorplans that meet the intent of the PUD may be offered sub- ject to administrative review and approval from City staff. 20. If fencing is installed with the project area, it must be constructed of the same design, materials, and color throughout the development. Planning Staff Report —Woodward Ponds Case Nos. ZA2019-050 & PP2019-051 December 16, 2019 Page 22 of 28 21. Wrought iron fencing shall be required to be installed along the property line of Mr. Knutson's property. Maintenance of the fencing shall be the responsibility of the property on which the fence is installed. Utilities 22. The Developer is responsible for providing the necessary easements and costs associated with road and utility improvements serving the site. All drainage and utility easements, as recommended by the City Engineer, must be shown on the final plat and dedicated to the City for public purposes. 23. The water utility plan shall conform to the City's water supply and distribution plan. 24. The sanitary sewer utility plan shall conform to the City's sanitary sewer comprehensive plan. 25. All stormwater designs shall meet the intent of the City's Surface Water Management Plan and the SWWD water management plan. 26. The developer must make all necessary adjustments to the curb stops, gate valves, and metal castings to bring them flush with the topsoil (after grading). 27. The Developer is responsible to obtain a temporary easement agreement with the Bloomquist parcel to the southeast for installation of a temporary cul-de-sac at the "Street A" stub to provide for emergency turnaround. Utilities must be stubbed into the easement secured from the Bloomquists. 28. The Developer is responsible to obtain a temporary easement from the Knutson property to the east for the extension of water main and sanitary sewer approximately 25 feet onto the Knutson property for future development connection. Streets 29. The street name for "Street A" shall be 65th Street South to the cul-de-sac, then it shall be labeled as Jody Avenue South. "Street C" shall be labeled as Johansen Avenue South on the final plat. 30. The City's curb replacement policy must be complied with during home building. A bitumi- nous wedge shall be maintained on the street until 90 percent of the homes are constructed in any phase or in three years. Landscaping and Irrigation 31. Irrigation systems installed within City right-of-way are solely the responsibility and risk of the developers, or individual. The City is not responsible or liable for any damage or costs related to installation, damage, or replacement of lawn irrigation systems placed in the boulevard as a result of City use of or future changes in the right of way. The HOA is responsible for the maintenance of the irrigation system up to the back of curb throughout the development including Ravine Parkway. Planning Staff Report —Woodward Ponds Case Nos. ZA2019-050 & PP2019-051 December 16, 2019 Page 23 of 28 32. All proposed tree locations on the proposed landscape plan shall be reviewed and ap- proved by the City Forester. Deciduous trees should be located a minimum of 5 feet off any utility pipe. Coniferous trees shall be located a minimum of 15 feet off any utility pipe. No trees shall be located within a storm pond high water level or within the pond access routes. Trees shall not be located so as to interfere with hydrants, street lighting, and traffic signage. 33. The City Forester will mark the location where boulevard trees must be planted and ap- prove the tree species to be planted. The final landscape plan must be reviewed, coordi- nated, and approved by the City Forester. 34. The Developer is responsible for establishing the final grades, topsoil, and seeding of all the lots, outlots, and boulevards within the subdivision. 35. The Developer shall pay $51,750 for required trees to be planted or plantings shall be installed within City open space locations as approved by the Parks Director. Surface Water Management 36. The lowest opening ground elevations of all structures shall be a minimum of two feet above the emergency overflow elevation, and three feet above adjacent pond high water levels. 37. All emergency overflow swales must be identified on the grading and erosion control plan. Each fall while home building is occurring, emergency overflow elevations shall be sur- veyed to ensure the emergency overflows are properly graded and maintained. Onsite Infrastructure Improvements 38. A street lighting plan must be submitted by the developer and approved by the City Engi- neer. 39. The developer must place iron monuments at all lot and block corners and at all other angle points on property lines. Iron monuments must be placed after all site and right-of-way grading has been completed in order to preserve the lot markers for future property owners. 40. The developer is responsible for the cost and installation of public land boundary markers at the corners of private properties abutting Outlot A and B. The boundary markers are $115 per marker and are to be picked up at the Cottage Grove Public Works facility. The boundary markers must be installed before a building permit is issued for the lot that abuts the recommended marker location. The actual number of park boundary markers will be determined once the final boundary configuration for Outlot A are determined. 41. The developer shall contact the electric, telephone, gas, and cable companies that are authorized to provide service to the property to ascertain whether any of those utility pro- viders intend to install underground lines within the development. 42. The developer is responsible for all street maintenance; upkeep and repair of curbs, boule- vards, and sod; and street sweeping until the project is complete. All streets must be main- tained free of debris and soil until the subdivision is completed. The developer hereby Planning Staff Report —Woodward Ponds Case Nos. ZA2019-050 & PP2019-051 December 16, 2019 Page 24 of 28 agrees to indemnify and hold the City harmless from any and all claims for damages of any nature whatsoever arising out of developer's acts or omissions in performing the obliga- tions imposed upon developer by this paragraph. 43. The developer will provide to the City copies of test results, suppliers, subcontractors, etc., relating to the work to be performed by the developer. The developer agrees to furnish to the City a list of contractors being considered for retention by the developer for the perfor- mance of the work described in the development agreement. 44. The developer is responsible for the control of grass and weeds in excess of eight inches on vacant lots or boulevards within their development. Failure to control grass and weeds will be considered a developer's default and the City may, at its option, perform the work and the developer shall promptly reimburse the City for any expense incurred by the City. 45. Developer is responsible to require each builder within the development to provide a rock entrance for every house that is to be constructed in the development. This entrance is required to be installed upon initial construction of the home, but a paved driveway must be completed before the City will issue a certificate of occupancy for that property. See City Standard Plate ERO-12 for construction requirements. The water service line and shut-off valve shall not be located in the driveway. 46. Developer will be required to conduct all major activities to construct the public improve- ments during the following hours of operation: Monday through Friday Saturday Sunday 7:00 A.M. to 7:00 P.M. 9:00 A.M. to 5:00 P.M. Not Allowed This does not apply to activities that are required on a 24-hour basis such as dewatering or bi-pass pumping, etc. Any deviations from the above hours are subject to approval of the City Engineer. 47. The developer shall weekly, or more often if required by the City Engineer, clear from the public streets and property any soil, earth, or debris resulting from construction work by the developer or its agents or assigns. All debris, including brush, vegetation, trees, and dem- olition materials, shall be properly disposed of off-site; burying construction debris, trees, and other vegetation is prohibited. Burning of trees and structures is prohibited, except for fire training only. 48. The Developer grants the City, its agents, employees, officers, and contractors' permission to enter the site to perform all necessary work and/or inspections during grading and the installation of public improvements by the developer. 49. Upon acceptance of the public improvements by the City Council, all responsibility for the improvements must be assumed by the City, except that the developer is subject to a one- year warranty on the construction of the improvements from the time of acceptance by the City of all public improvements. Planning Staff Report —Woodward Ponds Case Nos. ZA2019-050 & PP2019-051 December 16, 2019 Page 25 of 28 50. The City will not have any responsibility with respect to any street or other public improve- ments unless the street or other public improvements have been formally accepted by the City. Upon completion of the improvements, the Developer may request, in writing, their acceptance by the City. This request must be accompanied by proof that there are no outstanding judgments or liens against the land upon which the public improvements are located. Upon the City's receipt of a written request for acceptance from the Developer, the City Engineer will conduct a final inspection of the public improvements and will furnish a written list of any deficiencies noted. The City Engineer will base the inspection on com- pliance with the approved construction plans, profiles and specifications, as required by the city ordinance. Upon satisfactory completion of all construction in accordance with the approved plans, profiles, and specifications, as certified by a registered engineer in the State of Minnesota, and receipt of reproducible record drawings and satisfactory test re- sults, the City Engineer will notify the developer in writing of the City's approval of the public improvements and schedule the request for acceptance for review by the City Council. 51. Upon completion of the work, the Developer shall provide the City with a full set of as -built plans for City records and transmitted to the City in a DWG Autocad format and pdf format. Developer must also furnish the City with a pdf format of the final plat and four prints of the recorded plat. If the Developer does not provide as-builts, the City will produce them at the developer's expense. 52. The developer is responsible for completing the final grade on all lots and ensuring all boulevards and yards have a minimum of four inches of organic topsoil or black dirt on them. Placement of organic topsoil or black dirt, sod, and shrubs must not be transferred to homeowners. 53. Notwithstanding any other provision of this resolution to the contrary, the City will issue building permits for up to two (2) model homes on lots acceptable to the City upon Devel- oper's compliance with the following requirements: a. Approval of a building plan and survey by the Chief Building Official. b. Presence of a paved road within three hundred feet (300') and presence of a fire hydrant within one thousand feet (1,000') of the model home(s). c. An unobstructed gravel surface road extension from a paved street surface to the pro- posed model home's driveway. d. No certificate of occupancy for such model homes shall be issued until all typical requirements for such issuance have been met. e. Final plat has been recorded. 54. No additional building permits beyond the model permits will be issued until such time as adequate public utilities, including street lights and streets, have been installed and deter- mined to be available to use. The City will require that the utilities, lighting, and street sys- tem have been constructed and considered operational prior to issuance of any building permits in the development. Also, the City must have all the necessary right-of-way and/or easements needed for the property to be serviced. Planning Staff Report —Woodward Ponds Case Nos. ZA2019-050 & PP2019-051 December 16, 2019 Page 26 of 28 55. The Developer acknowledges in the development agreement that prior to the construction of the improvements, site conditions, access to paved roads, and fire hydrants will be sub- standard and will not be optimized until the improvements are completed. To the fullest extent permitted by law, Developer agrees to indemnify the City, its officers, employees, agents and others acting on its behalf and to hold them harmless and defend and protect them (with counsel of the City's choosing) from and against any and all loss, damage, liability, cost, and expense, specifically including attorneys' fees and other costs and ex- penses of defense, which result from, or otherwise arise in connection with any actions, claims or proceedings of any sort caused by or arising from the construction or use of the model homes by Developer or its contractors, employees, agents, or assigns, prior to the improvements being completed. Such claims shall include, but not be limited to, claims that the model homes could not be accessed properly or in a timely manner by fire equipment and/or police or emergency vehicles due to road or site conditions or claims based on lack of proximity to fire hydrants or lack of adequate fire protection. Although indemnification shall cease for claims arising after the improvements are completed and accepted, indem- nification obligations for claims arising prior to the completion of the Improvements shall survive the termination of the agreement. 56. Adequate dumpsters must be on site during construction of streets, utilities, and houses. When the dumpsters are full, they must be emptied immediately or replaced with an empty dumpster. The developer is responsible to require each builder to provide an on-site dump- ster to contain all construction debris, thereby preventing it from being blown off-site. It is the responsibility of the developer to ensure no debris blows on or off site. 57. Adequate portable toilets must be on-site at all times during construction of utilities, road- ways, and houses. At no time shall any house under construction be more than 250 feet away from any portable toilet. Toilets must be regularly emptied. 58. After the site is rough graded, but before any utility construction commences or building permits are issued, the erosion control plan shall be implemented by the developer and inspected and approved by the City. The City may impose additional erosion control re- quirements if it is determined that the methods implemented are insufficient to properly control erosion. 59. All areas disturbed by the excavation and back -filling operations shall be fertilized, mulched, and disc anchored as necessary for seed retention. Time is of the essence in controlling erosion. If the developer does not comply with the erosion control plan and schedule, or supplementary instructions received from the City, or in an emergency deter- mined at the sole discretion of the City, the City may take such action as it deems appro- priate to control erosion immediately. The City will notify the developer in advance of any proposed action, but failure of the City to do so will not affect the Developer's and the City's rights or obligations. If the developer does not reimburse the City for any costs of the City incurred for such work within thirty (30) days, the City may draw down the letter of credit to pay such costs. 60. The Developer is responsible for erosion control inspection fees at the current rates. If the developer does not reimburse the City for the costs the City incurred for such work within thirty (30) days, the City may draw down the letter of credit to pay such costs. Planning Staff Report —Woodward Ponds Case Nos. ZA2019-050 & PP2019-051 December 16, 2019 Page 27 of 28 61. Dust control measures must be in place to prevent dust and erosion, including, but not limited to daily watering, silt fences, and seeding. The City Engineer may impose reason- able measures to reduce dust at the site. 62. The Developer shall comply with the 1991 Wetlands Conservation Act, as amended. 63. It is the Developer's responsibility to keep active and up to date the developer's contract and financial surety (e.g. Letter of Credit, etc.). These documents must remain active until the developer has been released from any further obligation by City Council motion received in writing from the City Engineer. 64. The Developer must provide to the City an irrevocable letter of credit for on-site improve- ments to ensure that the developer will construct or install and pay for the following: a. Paved streets b. Concrete curb and gutter c. Hard surface driveways d. Street lights e. Mailboxes f. Water system (trunk and lateral) and water house service stubs g. Sanitary sewer system (trunk and lateral) and sanitary house service stubs h. Storm sewer system i. Street and traffic control signs/signals j. Shaping and sodding drainage ways and emergency overflows in accordance with the drainage development plan approved by the City Engineer k. Adjust and repair new and existing utilities I. Trails and sidewalks m. Erosion control, site grading and ponding n. Surveying and staking o. Stormwater basin, and open space boundary markers p. Landscaping These improvements are all in conformance with City approved plans and specifications and will be installed at the sole expense of the developer in conformance with Title 10, Chapter 5 of the City Code; or if in lieu of the developer making said improvements, the City proceeds to install any or all of said improvements, under the provisions of Chapter 429 of the Minnesota Statutes, the City Council may reduce said Letter of Credit by the amounts provided, upon the ordering, for those public improvements so undertaken. The Letter of Credit must have the same expiration date as the Developer's contract. Planning Staff Report —Woodward Ponds Case Nos. ZA2019-050 & PP2019-051 December 16, 2019 Page 28 of 28 The bank and form of the security is subject to the reasonable approval of the City. The security shall be automatically renewing. The term of the security may be extended from time to time if the extension is furnished to the City at least forty-five (45) days prior to the stated expiration date of the security. If the required public improvements are not com- pleted, or terms of the Development Agreement are not satisfied, at least thirty (30) days prior to the expiration of a letter of credit, the city may draw down the letter of credit. The City may draw down the security without prior notice for any default of the Development Agreement. The minimum amount for this financial guarantee will be included in the devel- opment agreement. 65. The Developer must post a cash escrow with the City's Finance Director to cover engineer- ing, legal, and administrative costs incurred by the City. If this non-interest-bearing account balance becomes deficient, the Developer must deposit additional funds. This must be done before final bonding obligations are complete. This escrow amount will be included in the development agreement. 66. The Developer must post a cash escrow with the City's Finance Director to cover engineer- ing costs and other City services, expenses, and materials provided in reviewing and pro- cessing of the final plat, including but not limited to staff time, legal expenses, office and field inspections, general inspections, and all other city staff services performed. This es- crow amount will be included in the development agreement. 67. Temporary parking during construction shall be permitted on only one side of the street. Prepared by: Emily Schmitz Senior Planner Attachments — Preliminary Plat — Preliminary Civil Drawings — Engineering Review Memorandum 11/14/2019 M1%\Lai IIII1� UNDERGROUND UTILITIES CALL 48 HOURS BEFORE DIGGING GOPHER STATE ONE CALL TWIN CITIES AREA: (651) 454-0002 RN, TOLL FREE: 1-800-252-1166 PIONEERengineering WOODWARD PONDS P.U.D. PRELIMINARY PLAT COTTAGE GROVE, MINNESOTA COVER WOODBUR'Y \ SITE SHEETINDEX COVER SHEET ................................... 1.10 LEGEND SHEET .......... 1.20 EXISTING CONDITIONS 2.10 PRELIMINARY PLAT ........ 3.10-3.11 PRELIMINARY SITE PLAN .... .................. 4.10 PRELIMINARY SANITARY & NVATERMAIN PLAN - 5.10 PRELIMINARYSTORM PLAN - - - - - - - 5.20 PRELIMINARY LIGHT & SIGNAGF PIAN 5.30 PRELIMINARY GRADING PLAN .. 6.10-6.12 PRELIMINARY EROSION CONTROL PLAN - - - - - 620 PRELIMINARY SEEDING PLAN 6.30 A GRDING DETAILS ............. 6.40-6.41 PRELIMINARY STREET PROFILES .. 7.10-7.12 CITY DETAILS 8.10-8.1 1 PRELIMINARY LANDSCAPE PLAN ................ LI PRELIMINARY TREE PRESERVATION PLAN .. TI -2 R.AVIKE PARKWAY LLC I V= ARD PONDS LEGEND UTILITY LINES EXISTING PROPOSED FUTURE DESCRIPTION o • SANITACv MANHOLE -->---> —) )— > > SANITARY $EWER (SANITARY & WATERMAIN PLANS) CRI: > > > > SANITARY SEWER (STORM SEWER PLANS) Fu Tu FN FORCE MAIN HYDRANT n� GO N D4 p T'r P REDDUER CURB 57OP WATERMAIN (SANITARY & WATERMAIN PLANS) ATE --1---I WATERMAIN (STORM SEWER PLANS) m ® IN CATCH BASIN ® ® 0 BEEHIVE O • ® STORM MANHOLE p ® ® FLARED END SECTION ® ® ® CONTROL STRUCTURE STORM SEWER (SANITARY & WATERMAIN PLANS) STORM SEWER (STORM SEWER PLANS) - - - - - ______________________ CULVERT PERFORATED DRAINTILE SOLD RAIN TLE SERVICE e e OF E I e e e e Pero CASING UNDERGROUND ELECTRIC LINE E UP DER OF' UNDERGROUND GAS RPIPELINELIN P UNDERGROUND 7E LEPN OHE LIN ES NE UNDERGROUND 7ELEVISION LINE OVERHEAD UTILITY LINES Ae, �o Ae„olUND SITE LINES on on on Dn EXISTING PROPOSED FU7U Rf DESCRIPTION SURMOUNTABLE CURB AF GUTTER B -STYLE CURB A GUTTER RIBBON CURB A GUTTER ED YELLOWFPAVEMENTUS7RIPING (SINGLE/DOUBLE) WHITE PAVEMENT STRIPING (SINGLE/DOUBLE) PHASE LINE CENICE LNE I 1,0NNTODUR LINE - - -------------------- - --- - -- ----`-- BASIN OUTLET LINE BASIN HIGH WATER LINE PROPOSED SPOT ELEVATION EMERGENCY OVERFLOW --------- /YVYYYWYI — - - — /WYWWYI — - - — /WYWWY\ DRAINAGE FLOW ARROW DELINEATED / PROPOSED WETLAND LINE WETLAND BUFFER TREE LINE FEMA FLOODPLAIN BOUNDARY RETAINING WALL FENCE (BARBED WIRE) FENCE LINK) K A Y K & F & F U U U ❑ U U (CHAIN FENCE (WOOD) ¢ 8 t W CONSERVATION AREA SIGN WEILANDBUFFERSIGN TYPE III BARRICAO E LIGHTLE —+ —+ NS PEDESTRIAN RAMP SURVEY LINES EXISTING PROPOSED FUTURE DESCRIPTION — — ----------- -- — BOUNDARY RIGHT OF WAY LOT LINE EASEMENT E SECTION LINE ----------- -- -- ---- -- HATCH PATTERNS GRAVEL SURFACE WETLAND BITUMINOUS SURFACE WETLAND UPLAND BUFFER CONCRETE SURFACE WETLAND M171GATION RIP RAP PERMANENT TURF RESTORATION SELECT BACKFILL MATERIAL PERMANENT WET BASIN SEEDING EROSION CONTROL BLANKET ilii l Til lii l ii.I UPLAND/NATURAL AREA SEEDING PRO' CAIEGORK PEP PLAN PIONEERengineering IS ACTION APATIED EVE DAHEI LL g LL IS RD AT— O OLE IAT Ll. SIIINULEI HEAD 0 UVANIFIRI ELECHIC .I •NAHUIAL Al ACTED FILL ROLE A FDUNN PON PREQ HUDIAL AND MARK OF PAT ®IDNTAH POINT IS FLAI PILE 1111 HOLE DOLLARD8 OST WONREROJI TREE 0 IIIIN /aUN ROCK CONSTRUCTION ENTRANCE INSTALL BEFORE START OF GRADING PERIMETER EROSION CONTROL FENCE. • • • INSTALL BEFORE START OF GRADING SECONDARI EROSION FE NCE - - - - - - — COMP LE TIONA OTO BE I ST ITF GRAED ”DIN GUIT A I AFTER EROSION CONTROL AT BACK OF CURB. 70 BEINSTALLED AFTER COMPLETION OF CUR UCTIDN SUM PED BRIP RAPT PERMANENT ENERGY nF7Ee coNNecrIONLTO nlIIRFAce wn7ER. STAR L SEE I (FLEXAMA7- SEE SHEET 23) RFLOW ws,ALL wnr� ERoopN CONTROL BLANKET ET. COMPLETI NI IN CATCH BASIN IE NLET PR07ECTION OBE INSTALLED ED FORE GRAoING S O CATCH GAIN INLET PROTECTION TO BE IMINOUS NSTALLED AFTER 157 LIFT OF A IT U CATCH BASIN INLET PROTECTION ®� TO BE INSTALLED WITH CATCH BASIN GRATE. STRAW BIO ROLLS INSTALL W17HIN 7 DAYS OF GRADING COMPLETION OR BEFORE 157 RAINFALL EVENT SUCHEVEP 15 FIRAT ROCKDITCH CHECK. INSTALL WITHIN 7 DAYS OF GRADING COMPLETION OR BEFORE 1ST RAINFALL EVENT WHICHEVER IS FIRST +-M-+�-M- TREE FENCE ABBREVIATIONS A ALGEBRAIC DIFFERENCE B -B BACK 70 BACK BV BUITERFLYVALVE BEE BASE FLDOD ELEVATION BMP BE57 MANAGEMENT PRACTICE G CENTER LINE ASCATCHBASIN CBMH CATCHBASIN MANHOLE IPE CHIP C=GOAUTED METAL OF C C, C RB STOP BIP DUCTILE IRON PIPE Di DRAINTILE EL/ELEV ELEVATION EOF EMERGENCY OVERFLOW EE EDISTING S FLARED END TION F FACE To ACE FOR CEMAIN FM GB GRADE BREAK AND GROUND PC A E VALVE HP HGHPONT HID HDPANT HOT HIGH WATER LEVEL INV INVERT KCURVE COEFFICIENT LF LDIIST FLOOD LO LOOKOU7 LO LOWEST OPENING LP LIQUID PETROLEUM LP LOW PWNT .IT MANHOLE PCC POINT OF COMPOUNDS CURVATURE PI POINT OF INTERSECTION R PROPERTY LINE PRC POINT OF REVERSE CURVATURE PVT p PVC POINT OF VERT CAL CURVATURE PVC POLYVINYL CHLORIDE PIPE PVI POINT OF VERTICAL INTERSECTION R RADIOS R RAMBLER 1c, R BF A ASW SANITARY SEWER STA STATION STRMSTORM SEWER SOLD P STORM WATERPOLLUTION. PROTECTION PLAN. INH O7 HYDRANT TYRTYPICAL WM WATER MAIN WG WALKOUT LOT INFORVATION uTIUT GPD AD 0 EA ELEVATION FVuND O BLOCK N0. El£VATION LOT Na SHE HEIGHTHOUSE TIPEI OF REOVIREDJH U LO Lo OR sPLI RECOMMENDED SLgtSIDE LOOKOUT AIDE F L07D ELCI " --__— s"'D—sDE waLKouT K auT -- ST IECT CURB LEGEND NJTll"IA = FOR SIT RMOUNTAE LE CORE 0, FUMAA (OR SROUNI TV OUT FOR MER ECURBVATION GUTTERLINE ELEVATION E7 (TIP OUT G15 UTTER) 070625 BITUMINDUS ELEVATION .......... 41 OF WIN° 450,bbl I, Az, R ,-Ka I5.1 s"w 1 ✓ /�/ i �;- jl//I i�,�� /a✓ .J / � � � L_ X11" � i'� / i/ / /l '/� � �— /'� � i I , a -j 1 1 +6 y 1 _Nae°t51a"w/ zza.b �l /0 1-------- L M ------------ GRAPHIC SCALE IN FEET PIONEERengineering `i;ma 71,111 11 `n iNn9 no e ; �. s9e,, (E< 1 IE , , /1) ,1 leclo e,(1). r — (17) lr) 11 lulicl P,m to <a "d,� �l gym. ad a� U<sb� Ad—) —d `g ,Ie EXISTING CONDITIONS I RAVINE PARKWAY LLC I12.10 oP 20 WOODR ARD PONDS I aid, �c 'SITE% o) " a=, aoz111eee ne �o, �,�a, o and acre SECTION 3, TWP. 27, RGE. 21 < s ION MAP LOCATICALE DoE, ow��lo 11. HII 11- 11-01 41l 1.111 11 IRIIA, 21 -111.1 lltol-- LEGEND : fwa aid ,e(< 1Qa 911, oA, —le < ,nog ego es say a, o, =,a,m ma��a�e 111 14 let to De— a, w�sa<,< sa s , 3� <o./.�� IN -0 11, EIII 111 1-1-11 Zo ,ee as"d"o�e ,�ae « . 9 1 « a1.-1 < 9 0, M A, I— `i;ma 71,111 11 `n iNn9 no e ; �. s9e,, (E< 1 IE , , /1) ,1 leclo e,(1). r — (17) lr) 11 lulicl P,m to <a "d,� �l gym. ad a� U<sb� Ad—) —d `g ,Ie EXISTING CONDITIONS I RAVINE PARKWAY LLC I12.10 oP 20 WOODR ARD PONDS I 45 5a9 canaBl OUTLET A i,�s ac E� ouTLOT a ----------------------- COMMON LOTS"MEN; ER—L 0 ,a 4214 m 15 v III 13 12 2117 sE IF 11 Q P 9` i 87 'N ^665'TTT_ - �P5 ry6h e ° 43 mw m44 45 m46 e 47 T ry85„IF 85' 7°6 42 T a 48z §,I' 2715 IF�a 84,3,6 8 41 `71, s4 49z 16 IF „N;z IF F 8317 90771 IF _ IF 401 508 8217 e 916> a OT COMMON L81IF,92 "6E 38g III ILL I LFT 1. 5280� �s A ^93,ne III A, 63 79 ^ 94 s> 2e1 ^ 96 T> 77 356 1717 57 °,. a 56 °IF � T zE zIF 586' T " 7541 345 59 �z, ° 74 FIF IF IF X177 10 9 80 X71 � GOA ' 450 COMMON LOT COMMOLI III 9 / (v e 70 J DRAINAGE AND UTILITY 7.87 ACRES EASEMENTS ARE SHOWN THUS: 164 sa 2 TOTAL OUTLOT AREA 4.06 // SITE emdl-Id, 10 n 16 IMLiTI11 IF)� 450 STREET PIONEERengineering 1111� III \ 20 177 104 113 ' " of rAMMON LOT ;r "105 -� °' 'si°M s 114 10B 16 ,', 115Q IF ° �107jt1 �� X116°'IIS, IF i5 ° 108 X117 4 66_ \\ 118• IF COMMON LOT COMMOLI III 9 / (v e 70 J Azo A ^O a IF ^ ti9 7.87 ACRES NUMBER OF LOTS 164 NUMBER OF OUTLETS 2 TOTAL OUTLOT AREA 4.06 ACRES NUMBER OF COMMON LOTS 16 17 18 19 20 21 22 23 24 25 26 27 26 29 30 31 STREET PIONEERengineering 1111� III \ 20 177 104 113 ' " of rAMMON LOT ;r "105 -� °' 'si°M s 114 10B 16 ,', 115Q IF ° �107jt1 �� X116°'IIS, IF i5 ° 108 X117 4 66_ \\ 118• IF w D a Mme:T otn I -I Idi-Id o1 the 11.1 SECTION 3, TWP, 27, PGE, 21 T LOCATION MAP No SCALE sowd��i ora„e, oT 1-11, 1 Towed o zT L, s 11 —1, —11,F., de,leel 47 41 N 11 N 22 1, EF11 0 1121,11 1111 111 11, ,Inl 41 ear Mntn. oe on ,neLnNu9'T2y rye �� Y ae os now a,onimnee. vagi 11e NOIII 41N reet ,nveo,. 110 1 1 ,ne (20 n. aie oao, P1. Tow�mp I 11—— 1271 .9a da, 1 5.201 Tees oT - - L1711m Tee, .1,de Eos, Ha E.,iE`v' �,i41 a e�rn,1 .)1T N , (11)de I IF a.�Tm '= so.nl,,�i (121IF)- 1 a4T woiea m ,na ,9HN 4T M4N e4m 4° u,° s4�u,°°r e da. n4ro.a°e m TOTAL GROSS AREA COMMON LOT COMMOLI III 9 / (v e 70 J Azo A ^O a IF ^ ti9 w D a Mme:T otn I -I Idi-Id o1 the 11.1 SECTION 3, TWP, 27, PGE, 21 T LOCATION MAP No SCALE sowd��i ora„e, oT 1-11, 1 Towed o zT L, s 11 —1, —11,F., de,leel 47 41 N 11 N 22 1, EF11 0 1121,11 1111 111 11, ,Inl 41 ear Mntn. oe on ,neLnNu9'T2y rye �� Y ae os now a,onimnee. vagi 11e NOIII 41N reet ,nveo,. 110 1 1 ,ne (20 n. aie oao, P1. Tow�mp I 11—— 1271 .9a da, 1 5.201 Tees oT - - L1711m Tee, .1,de Eos, Ha E.,iE`v' �,i41 a e�rn,1 .)1T N , (11)de I IF a.�Tm '= so.nl,,�i (121IF)- 1 a4T woiea m ,na ,9HN 4T M4N e4m 4° u,° s4�u,°°r e da. n4ro.a°e m TOTAL GROSS AREA 28.84 ACRES TOTAL LOT AREA 7.87 ACRES NUMBER OF LOTS 164 NUMBER OF OUTLETS 2 TOTAL OUTLOT AREA 4.06 ACRES NUMBER OF COMMON LOTS 5 TOTAL COMMON LOT AREA 9.27 ACRES TOTAL RIGHT OF WAY AREA OF LOCAL STREETS 5.28 ACRES RIGHT OF WAY AREA OF MILITARY ROAD 217 ACRES GROSS DENSITY 5.69 LOTS/ACRE NET DENSITY (EXCLUDES MILITARY ROAD) 615 LOTS/ACRE 34s 59 \ \ 32�' 661 \\/ 75 6 °, cry1771 1o Ap^97\�� 5 ^^98sr,.. Ih a n 62s "63z 66 67 T, L410 74 99 �k• X7317 ^ tOQ e 109 1777 �MMON Lo. ae `i os 114' 1155 "2 �108� X117°° 118' COMMON LOT AW —17 11 557 ov ry, 225 a OUTLOT B *oven oe m,mb7Me4§�Ze LL ° 3 ss„r �h0° ST�� 45 F� , oP �O� �IL � ------- -------- el, L11� v I v v I v ,PHIC SCALE IN FEET \ PIONEERengineering SECTION 3, TWP. 27, RCE 21 LOCATION MAP NO SCALE DRAINAGE AND UTILITY EASEMENTS ARE SHOWN THUS: t�---__J____— s slA.ry. � I SECTION 3, TWP. 27, RCE 21 LOCATION MAP NO SCALE DRAINAGE AND UTILITY EASEMENTS ARE SHOWN THUS: t�---__J____— i ------------------- - i jJ ------------------------------------ 1 / -'Z t3 1415 16 1] 18 40o s12P}3 24 25 oEµPLN 28v 9 30 31 + E, — Il o 46 I 65 86 41 ' BASIN 506 _ /f uKE(rvPl —L (T") 3334 / Y 2 OUT LDT c � \�-,� BASIN 200 I I \,/ I PROPOSEDP.O.D.LONE\OREQCIREMEN-1'S SETBACKS wuK Lv0 FRONT ti' j' SIDE S 3 CORNER 20' � E ,c i� REAR 30' MIN. LOT DEPTH 125' \\, i MIN. LOT SI%P- 8,125 SP �a `k Tuarv,wourvo j LOTISI II AT 65 I ' 1RUN�e1rl11nac 47 eaq LOT NV DTH AT FRONT 70SETBACK ADJACENT TO' s8 _+ ----------.----------------- ------- ---------------------------------.— --�---.------------�—� \� —----------.---------.--------------. RAVING PARKWAY— — — t4 � 44 PIONEER-gineering BaPF s aU FEET RAVINE PARKWAY LLC 1 O nD ARD PONDS ,,4"2,Z ax�sn, ti,N PRELIMINARY SITE PLAN 4.101F 21 PIONEERengineering NOTES: W ALL SANITARY SEWER PIPE SHALL ADHERE TO THE FOLLOWING; -LESS THAN 18' DEPTH = 8' PVC SDR 35 50 100 -GR - 28' DEPTH = 8" EVC SDR 26- 6 �O -GREATER THAN 28' DETERMINED BY DESIGNER 2 ALL WATTS SH N PIPE SNH ALL BE DIP EXCEPT LEAD S INTO HYDRANTS SHALL BE 6" DIP UNLEE SS OF ER!MSE NOTED GRAPHIC SCALE IN FEET ------------------BLD I-- A', D„ s6 IN neve o/ A _^---• -------------------- OUTLOT _----.--— - - --J,� i6 z'� " —I NI R �f / fNN E163,4,93 voo. IF 11 ALA 111 I. IFILLAIIIIN IL S i A VIV 4Ci344/ ./IN VLj4 All v s I INA 11 INV 111 4 60 4 / Nv.5aseo /ELD, 12 � ' 6 IIS 21 INV 111 11 954)g� a\ 56 ELD IM, INV >—ml 121 ra9/ h 9B 1 N 6 T �4. {� 1 11D 60 I ' sn v aos os.ss V 111 1161 j 11Pq CS eL 6t04 Q= q s S BLO68 75 NI 9 �ca,ANI- gs� 114 64 ��40J E INEE1711"ll 0 INA91 3 21 \]P -All./ ��\ OUTLOT C \\\� \ \ I I art VOL-1 242 ACIFI INBIE�\ sBLI NV6 13 34. 2J�13ILN 6s .5s 3334 P11- \ N 65 53 \ 3 EE 61 a,g9 6 E M, 11�,Nv.e a 6 � 0 NEE4 _ _ —__ _ — _ _— — _ _— - --— — — --- — _ --- _ — -- _— --— _ --- — _ _— _ _ --- _ __— _ _ 414 44 &W21 141 5071 � \ \ \ NOTES- 1 OTESALL sT6arn sWIPE SHALL BE RCP UNLESS07HE 6iHERWISf NOTED 50 100 10. PIONEERengineering PGAA1 l,-, FEET R.AVIKL PARKWAY LLC WOODW ARD PONDS 21Z ax's6, ti,"„ PRELIMINARY STORM SEWER PLAN 5.20 or 21 i — ---------- ------ I -— r J „«nam %✓ OUTLDT A --- - —• ----------------------- ---- -------------- —__—� ----_ _---- ---- Iw I I j iz st za zs zs LIGHT REET LICH' IT EET LIGHT a .� ao os as ai I Ei L n cvPT� ° �6ASIN soo srrepET E11T Tre, ITIEE; vvPT v �sTREE e(ITTIl I LITT gse II SIGNAGE LEGEND R� sz f. e s' T OL R1-1 S 36x36" t ( EEY ucni --OUT 1 u1z3 1 LOT C II �\\ L� \\\ re _ 127 BASIN 20D 2 �✓ .\ � a9�� I I I s E 1111 "\ l [vp_i.ta� W11 3PEDESTRIAN ED'-3 CROSSING 30"x30" i i � r tsT ioo , \ tst � tso R� \ i NOTES: 1. STOP SIGNS AND POSTS �TVPE 11 III INSTALLED BY CONTRACTOR 2 STREET NAME SIGNS AND POSTS --_TTAGE �_— _—_—_ a<.arel(Tvv.7 taa � lo\ \ TO BE LLED By I GROVE PUBLIC WORKS _-- __— _— _—__ _— —_ _—_ _—__— _-- II _ - _—__—__—__—._—__—__—_.—__—__—_—__—__—._—__—__—_ PARKING SIGNS TO __—_—_. 3. BE INSTALLED BY CONTRACTOR I I � I I I \ 50 100 10. PIONEERengineering PGRASCALE IN PRELIMINARY LIGHT & SIGNAGE RAV NE PARKWAY, LLC R'OODWARD PONDS 5.30 ()IF 21 .�reax�snnti�N�,�t PLAN �z z.,tP�soT,. i ----- ---------� Z -- \\ — Ilia i 1 \lig � /� % ✓r /j j1� � VVV 1 \— o� � \ 1111 \I i l � i1I nQf 1 _ l —————-----—————— _ \ I d \ e — _ I ' 1 `'°a ��\ •;\ 1_ \ I / `Iii �� • J,6 0 BUILDING REQUIREMENTS a 1 \ POND ADJACENT i_OT3_ S iP LOW OPENING 3'+HWL 2 + EOE 7�, P��1 V �1v�CiR YdeCYl LOCAL G1NTs: LOW OPENING L'+POF cenexlc scnl.e IN ee>•;T az� nc �u ax�sn, nw„z/ c=, RAVINE PARKWAY LLC. WOODR ARD PONDS e o PRELIMINARY GRADING PLAN - mrTran vesor,� 6.10 >P 21 ZZ i —N /500 �\j/ ous2es=a99.a IFIL,FA,Ios b� 89 o L I 3 f i i I PIONEERengineering /9oa /moi r® T --& LOT A ---- - L912— j ` soy soG rG s� 44 45 /46 E.a r 1 ."my 94D �38 aws~ \ _ \ s.....°.......... fF�- 10' SEE SHEET 6.12 RR a c P �a� 86a I aB7�ary Tr.—rr- E� 84R' RR89 ry a o 8 3 g o� w1 9 $ xP j / x� fF�- 10' SEE SHEET 6.12 \nTn � � d I C/ C � l \ / V— 3 1 y BUILDING RE UIREAIE_NTS POND ADJACENT LOTS. . / LOWOPENBNICi +1 WL 2'+LOT LOCAL LOW POBNTS. LOW OPEN LIC F, EOF 1\9zq\ W ? 922--- o zs eo Ioo GRAPHILGRAPHIL S�i RR a Tr.—rr- \nTn � � d I C/ C � l \ / V— 3 1 y BUILDING RE UIREAIE_NTS POND ADJACENT LOTS. . / LOWOPENBNICi +1 WL 2'+LOT LOCAL LOW POBNTS. LOW OPEN LIC F, EOF 1\9zq\ W ? 922--- o zs eo Ioo GRAPHILGRAPHIL S�i -922�r� LL) Eo `z.o ensN zoo s OR Vo2-is42nc l \� 4` ��/. APV v�\ ss of �``�s3 9 ^ 73 ''� •� j / � 90 ��� ��\ \ c ��� 'z.�38 sad 4 0V A sso5C's°, g \ 2,7 BUILDING REQUIREMENTSC POND 1DSICLTT LOTS : �\ 1,✓\\\\ '� { LOW OI'FN[NG 3'+HWI_ z'+eoF \ i 1 V �v LOCAL L()IVPOMTS: PT�NF tq R �y�e \\ I.OW OPFNING 1'+P.OP (�\\ \\ \ �„\ ��• GRAPHIC SCALE IN FEET 1 l�lvl� 6" "' R.AVIne PARKWAY LLC �OODW ARD PONDS y PRELIMINARY GRADING PLAN 6.12 oP 21 LEGEND ROCK CONSTRUCTION ENTRANCE INSTALL BEFORE START OF GRADING PERIMETER EROSION CONTROL FENCE. INSTALL BEFORE 57ART OF GRADING OIL FENCE COMPLETION A OF GRADING LLER IEUR AFTER EROSION CONTROL AT BACK OF CURB, TO BEINSTALLED AFTER COMPLETION OF CURB CONSTRUCTION. SUMPED RIP RAP PERMANENT ENERGY DI SAPATER. INSTALL WITHIN 24 HOURS CONNECTION 10 A SURFACE WATER REDOT CAT 3 EROSION CONTROL BLANKET. INSTALL WITHIN 7 DAYS OF GRADING COMPLETION Fl TO BASIN INLET PROTECTION TO BE INSTALLED BEFORE GRADING BEGINS O CATCH BASIN INLET PROTECTION OF BILUMINOU STO BE ED AFTER QST LIF �. CATCH BASIN INLET PROTECTION TO BE NSTALLED BA5IN GRATE. WITH CATCH LrIMPLETION O T RAINFALL EVENT WHICHEVER 15 FIRST NA oDAYS OF OO 5T RAINFALL EVENT WHICHEVER IS FIRST 50D OUTLOT C BASIN 200 S SEEDING NOTES: \ USE TEMPORARY SEED HIS 22-111 FOR PONDS AND OPEN SPACE TO STABILIZE \ 9B OUTIDE 0'NAT"SEEDN' MINNESOTA STATE DATESEED MIXTURES. 22-111 L 30.5 LE PER ACRE \ G _ oh APPROVED EQUIVALENT DOUBLE SEED RATE FOR DORMANT SEEDING --�-- - --- AFTER NOVEMBER1ST. MULCH SHALL BE MNDOT TYPE 1 L 2 TONS PER ACRE OR APPROVED \ \\ EQUAL AND DISK ANCHORED IN PLACE OR APPROVED EQUAL. MINIMUM 907 COVERAGE OF T SURFACE AREA DISTURBED. \ v • PE 1 FERTILIZER, 1�t0-20 @ 200 LBS PER ACRE. \ OPEN SPACE AREAS TO BE SEEDED WITH. MINNESOTA STATE SEED MIXTURE \ 35-621 (DRY PRAIRIE SOUTHEAST) OR EOUIVALENT \ ®INFILTRATION BASINS AND POND ABOVE NWL TO BE SEEDED WITH MINNESOTA \ STATE SEED MIXTURE 33-262 (DRY SWALE/POND) OR EQUIVALENT. SEE \ GRADING PLANS FOR MORE -RESORTED MANAGEMENT DETAILS \ PERMANENT SEEDING AREAS TO BE SEEDED WITH MINNESOTA STATE SEED \ \\\\\ MIXTURE 25-141 (AIESIC GENERAL ROADSIDE) PIONEERengineering '42Z 11,„u , �„N„ Tt ww - PRELIMINAR Scientific Name R.I.(Ib/.c) OPEN SPACE AREAS - - - - - NATIVE DRY PRAIRIE SOUTHEAST (STATE SEED MIX 35-621 FORMERLY U6) ��an on on OUTLOT C BASIN 200 S SEEDING NOTES: \ USE TEMPORARY SEED HIS 22-111 FOR PONDS AND OPEN SPACE TO STABILIZE \ 9B OUTIDE 0'NAT"SEEDN' MINNESOTA STATE DATESEED MIXTURES. 22-111 L 30.5 LE PER ACRE \ G _ oh APPROVED EQUIVALENT DOUBLE SEED RATE FOR DORMANT SEEDING --�-- - --- AFTER NOVEMBER1ST. MULCH SHALL BE MNDOT TYPE 1 L 2 TONS PER ACRE OR APPROVED \ \\ EQUAL AND DISK ANCHORED IN PLACE OR APPROVED EQUAL. MINIMUM 907 COVERAGE OF T SURFACE AREA DISTURBED. \ v • PE 1 FERTILIZER, 1�t0-20 @ 200 LBS PER ACRE. \ OPEN SPACE AREAS TO BE SEEDED WITH. MINNESOTA STATE SEED MIXTURE \ 35-621 (DRY PRAIRIE SOUTHEAST) OR EOUIVALENT \ ®INFILTRATION BASINS AND POND ABOVE NWL TO BE SEEDED WITH MINNESOTA \ STATE SEED MIXTURE 33-262 (DRY SWALE/POND) OR EQUIVALENT. SEE \ GRADING PLANS FOR MORE -RESORTED MANAGEMENT DETAILS \ PERMANENT SEEDING AREAS TO BE SEEDED WITH MINNESOTA STATE SEED \ \\\\\ MIXTURE 25-141 (AIESIC GENERAL ROADSIDE) PIONEERengineering '42Z 11,„u , �„N„ Tt ww - PRELIMINAR 0 INFILTRATION BASIN AND POND ABOVE NWL DRY SWALE/POND (STATE SEED MIX 33-262 FORMERLY W4) Common Name Scientific Name R.I.(Ib/.c) Rat.(kglh.) %Of Mix Seedal sg ft ®� (by weight) nodding wlid rye Elymus canadensis ®® 0.40 9.09% 7.64 slender wheMgmss Elymus frachycaulus 4.00 0.40 9.10% 10.15 Virginia wlid rye EI mus as'- 2.50 2.80 5.61% 3.85 fowl bluegrass Poa Palustris 1.60 1.79 3.64% 76.50 big bluestem Aaziang.. il-mfi 1.50 1.60 3.40% 5.50 �Syphywdah- Be�cham0annia hne �� 1.60 3.42% 27.80 fringedbrome Brom.. cfli- 1.50 1.88 1A4 % 6.05 Indian mss 50 bastrum...R. I. 1.66 3.40% 6.60 switchgrass Panlcum vi atum0.40 0.45 0.91% 2.05 Grasses Subtetal 18.50 20.74 42.03% 145.94 blue vervain We-hesteta 0.10 0.11 0.23% 3.50 ur le pnin. clover DI RII 0.09 0.10 0.21 % 0.50 Canada tick trefoil Desmotlium canadense 0.09 0.10 0.21% 0.19 Early Sunflower Helfo sis helianthcides 0.09 0.10 0.20% 0.20 blI..... Rudbeckia h- 0.07 0.08 0.1]% 2.49 arch milkweed Ascle las 1n0amafa 0.06 0.07 0.13% 0.10 Forbs Subtotal 0.50 0.56 1.15% 6.98 Oats Avena safiva 25.00 28.02 56.82% 11.14 CoverCro Subtotal 25.00 28.02 56.82% 11.14 Total 94.00 49.32 100.00% 160.06 Purpose: Temporarilyflooded awalasin egdcu1Nrel..-ings. Planting Ara.: Tallgrass Aspen Parklands, Prairie Parkland, and Eastern Bm.dleaf Forest Pmvinces. Mn/DOT Districts 2(west), 38, 4, Metro, 6, ] & 8. Drgram plantings E. -In B-di-af lomat P -In .. ... I.ding I.Id ... d Hills ..1I MWDOT 0 INFILTRATION BASIN AND POND ABOVE NWL DRY SWALE/POND (STATE SEED MIX 33-262 FORMERLY W4) Common Name Scientific Name R.I.(Ib/.c) Rat.(kglh.) %Of Mix Seedal sg ft (by weight) nodding wlid rye Elymus canadensis 4.00 0.40 9.09% 7.64 slender wheMgmss Elymus frachycaulus 4.00 0.40 9.10% 10.15 Virginia wlid rye EI mus as'- 2.50 2.80 5.61% 3.85 fowl bluegrass Poa Palustris 1.60 1.79 3.64% 76.50 big bluestem Aaziang.. il-mfi 1.50 1.60 3.40% 5.50 Al merican .ou h ra Be�cham0annia hne 1.50 1.60 3.42% 27.80 fringedbrome Brom.. cfli- 1.50 1.88 1A4 % 6.05 Indian mss 50 bastrum...R. I. 1.66 3.40% 6.60 switchgrass Panlcum vi atum0.40 0.45 0.91% 2.05 Grasses Subtetal 18.50 20.74 42.03% 145.94 blue vervain We-hesteta 0.10 0.11 0.23% 3.50 ur le pnin. clover DI RII 0.09 0.10 0.21 % 0.50 Canada tick trefoil Desmotlium canadense 0.09 0.10 0.21% 0.19 Early Sunflower Helfo sis helianthcides 0.09 0.10 0.20% 0.20 blI..... Rudbeckia h- 0.07 0.08 0.1]% 2.49 arch milkweed Ascle las 1n0amafa 0.06 0.07 0.13% 0.10 Forbs Subtotal 0.50 0.56 1.15% 6.98 Oats Avena safiva 25.00 28.02 56.82% 11.14 CoverCro Subtotal 25.00 28.02 56.82% 11.14 Total 94.00 49.32 100.00% 160.06 Purpose: Temporarilyflooded awalasin egdcu1Nrel..-ings. Planting Ara.: Tallgrass Aspen Parklands, Prairie Parkland, and Eastern Bm.dleaf Forest Pmvinces. Mn/DOT Districts 2(west), 38, 4, Metro, 6, ] & 8. DI -5 (SILT FENCE). C FIMENT BASIN, BASH TO BE 1.1 EFFACER ITT", OF AREA STRIPPEI. CLEAN EMP BASIN ILL 1'0, =I'E O1,11_1�1 Al HEMADIED MEN' PAN' FULL FIAT P,AA, E,GGA ""IM"T ON GO THE IlPll 41D III 1IT4114T 116 THE PS OF G"I FEE ADD To CDMP'ET' HUGE G`5`o`A` IN RUFFIG THE TIME 11.1111A El THE PIIBT THIS QJAIF POENNINC H NIRDDA RMPA, A RE IN FINDS MOF BE U5TAllIP AS AAADUG OCCOPA I LOT SPICIA ASIA ITTL STAFF BE SAILIGID ONTO OECOUDFLAT 111 11 CIIIHIP 11 CIIIHI I ES FEEL PIMIRTS AH- ON THE PLANE THAT MIT .1 IDIDID H. PIOEFER IIIECTIME PROTECTED A, TG ER UNOFF RPENOICULAR Ta NE SLOPE. DI ADD AID NOT RACK BLAIE_ LEAVE A SURFACE "HION I U41 PEPS11 "M IF IS MUTICTO 5-1 51 MUDS' TOP' I � 2 HONG PIN AIDE OR APPIOMED IQFHl ADD DIE A INTO, IR TIRE 1 1 211 NAI, All 1111 11 —SPIRIT To" "'T"T" AN ITT BE FINE I IIIIINSIll 1110 MIDI' 1171 1 1171 ITT 21 OF ALI PE FER IUZER, o No/oR I ERo NBA. PER ACRE AN DCATID ON To' FOODS SOAY' BE 0411 OU ASHxLHAAEDEaN ISIDED AND MULOIIF T OFED AITT'ND s FGRIFFINErvcE snsAL rvsxLEA AGO E DtpiP vorvos. Avs] TOIT' T' (ION EI. APRIL CER NE A T AL ITS ATABFIATON A ACHIIIA OR AFTER THE TEMPORA'C MEAAUREA m1 NaUDE ALI T IANT P SIEMENT AND NFLTHATory/FL1 UPNreAO DGA Ns [AREAS REOV RNc LODSE 11 N ­l LOT BENCHING DETAIL NO SCALE PIONEERengineering I THE CON HE ACTOR TOR IT I PLEMEN TCON SHIFT' AN IT TATEFE BOUGED EOTIiEIc�wNH ancs. sTrxfs, sIIcns. WAFENCE. EAci aNIFmE ofvELOIL PMENT BE PERMANENTIL, FN TEMPOG AD L, 'EAED SO AN, P"T'N I THE HE AND OIL NOT EoME TO, � PERIOD EN IF BE LAE�A -0 5 CONNECTED TO IF OLPFACE PAUEl MIT 1 7 GAIN TOE, PER, NILID PC AIDE CORE, EPCFMED OIL AREA, GULF A FIVITTLIE ILVPE TO A CHIB AND IITTEI �'A INLET, IIIIN�PIE PHIL, ­ AFTER 111TE. THAT A111111EI TV A 111FIlE SPHEI FOR RFT 1 4 5 IF I OUT LE TV SHE L BE PESO PER WHO CONNECT } TEMPORARY OR PERMANENT ENERDY MANDATED SOLID 2A HOIRS OF VINNECT IN TO A ", FAIE PASTE, AMENDED L`L`pE' 'To S- AND/ RYAl 110 -ON THE ERDEIDN CDNTHOL PLAN_ MR olMPos SN�:EA. DH STHEH APPIRIO METHOD E, TOE TURNS OF IEDMENT CINTIOL PEACTCES MAF BE ADITUOTED TO ACCOMMODATE "'FET TERM ACT ITHEI ACHATI IS NOT COMPLETE ITIOS, DINHEI S N"AC OR MOST TA OR 'EMP". RY (IR PERMANEM) SEO NENTATIN BASKS OAERE TEN OR EDGE ACRES C DAT FwATrnNRE AN�OS RRAfF TURA NAD `MON LDGT ON ANo/I, AS SIONM ON THE EROS ON CONTROL PLAIN, WEAT IN SHOT BE P AITTAFFIED TV AN APPIOIED 'ED SENT PAN I IN To I IS A IE IT 'TE WHENEVE, A.. IT I IF TIE PATER 1ANNEFT SE FININFRIOED TO A AGAIN PIIII TV ENTEIING FILE AFOIFAIE WATO IT SUIT BE IDEA 0 I TOE CONTRACT OR MOST " OUT SOMEONE 10 NIPEIT THE IINITIEFUCTIN SHE VICE Ell' IE 'EN AS I', EA IFEN1110AT I ANO SOLD CO HALF' AFTE, A 'A NFILL EENT AT SCALE, I, AN 0 REDUI REMEN SIN 21 00111 A(NOTE LL PLICAL JURISDICn DN MAv RIDEQUIRE A MDRE FREQUENT EDINTERVAL OF INSPECTFOB Ns IrvcwEs UNLENDESS ANOTHETHER'ET TIME FRAME IS SPIIII AT 'C LEIsco( RFITE MPGA NPDES P[RMnIFLDIVF Sjrvo lorvs x Ess EI PAT FEE VARIE 10 o s� �=OPENING FINISHED GROUND ELEVATION PER PLAN VARIES PAD GARAGE ELEVATION PER PLAN a A V VARIES VARIES A FIE FINISH GRADEIES AT 09 HOLO 'oPsolL dpi r N SUBGRADE GRADING GRADE 7LSCA SLAB -ON -GRADE (TYPICAL SECTION NOT TO SCALE) LLSTREETECTION A OF 11 PAD W VARIES 10' 3S 25 FINISH GRADE GAR GE ELEVATION PER PLAN GRADING GRADE IF IS' 10' VARIES VARIES E LOWEST OPENING 3Y PC TOPSOL a 2,E'. MN 'IF _ SUBGRADE F o a GRADING GRADE .� .....:' o- C1 L PER PLAN OWES' FLOOR 5' BASEMf NT FLOOR SEE TOP RAL STREET SECTION FIN SHED GROUND ELE NATION PER PLAN LOOKOUT (TYPICAL SECTION NOT 70 SCALE) VARIES 1G A PAD 2f FINISN GRADD E GA AGf ELE VA' ON PER PLAN GRADING GRADE 1f �iG�VARIES VARIES FN SH GRADE MIN. OPSOLLOEW OWES�G I PERSSUBGRADEw XAN RAD NGR GRADE SEE TYPICAL rti-PV 11 WALKOUT STREET SECTION FINISHED GROUN PLAN (TYPICAL SECTION NOT ') SCALE) I< A FINISH GRADE �� GRADING GRADE SELECT BACKFILL_ AL MATERA .,. T DOWN O'OPSOL � TT LECT x �BACKFLL MA ERAL / SUBGRADE �MATf RIAL ��-t \\ \.. \T \ \ \\/ \/\\//rn\%%���%//��////\//\�//////i\//:l ti \ \ \ u j j FISH OROOND ,T. .\ may\ :;;:;:;;:;• ):)::):)::: ..: I. � S`-°C4S"P UNSUITABLEMA�e RI � NON-SELECT CO.PACTED PAC KFILL MATERIAL SOIL uNOlsruaeeo SOIL yuNOISruRREo i �. o �ia SU B GRAD E IN IN CORRECTION (TYPICAL SECTION NOT 70 SCALE) LOWOPENING STOOP ELEVATION GRAD"k- ELEVATION --SO GRADING GRADE 1.T BELOW LOW OPENING ELEVATION GRADING GRADE SL CED VARIES M --ABONTFRONT GRADE ELEVATION IMEIIENAY COO -CIA ICI 112 MAINT. NBENCH INFILTRATION BASIN PONDING/TREATMENT BASIN (SEE CITY µ 8' —15) DETAIL STO PNIL' WATER LEVEL 0 OUTLET ELEIS V� 10 ENWI EV PER PLAN +A q, r � [ ATR MUCH OUTLET ELEV WL DU 2.0' ON—SITE CLAYEY MATERIAL THAT MEETS UNIFIED HAVE AT CLASSIFICATION 309 PASSINGCTHE g200 SIEVANDEMU T 6 AIN LINER TO END OF AQUATIC BENCH STORM WATER BASIN SECTION (TYPICAL SECTION NOT TO SCALE) 'PAT' PER ARATE PER IS" TALL "I IR TALL NO .P=A OPENING I NV 916 P 1 36 E INV�V. i9ED ENING PRECAST CONCRETE SLAB BASE POND OUTLET CONTROL STRUCTURE OCS-2DD PIONEEReragineering t�N5V_ NV XI�ASSD V 89 �{ 6.5o E '�P'ICCAIT OCNI SLAB BASE POND OUTLET CONTROL STRUCTURE OCS-6DO SEED WITH MN SEED MIX NATIVE OPEN DEPTHREQUIRED TO DRAIN SEED WITH 'MN SEED MIX 33-262 N 0 HOURSORLESSATDPMWATEP sou TH & WEST UNDISTURBED, UNCOMPACTED� INSITU SOIL Vu859 O N S TE SAND z l 7 4 i 159 ORGANIC LEAF COMPOST IIA —III SCARIFY BOTTOM 12 8' BEERIRE PLACING AM NEE D SOILS INFILTRATION FACILITY CROSS SECTION INFILTRATION BASIN CONSTRUCII TEI CONSTRUCTION SEQUENCING 1. INSTALL SILT FENCE AND/OR OTHER APPROPRIATE EROSION CONTROL DEVICES TO PREVENT SEDIMENT FROM LEAVING OR ENTERING THE PRACTICE DU RINGU CONSTRUCTION.E BEFORE IT 2 ALL BE IN AN' 11 GIAE ENT OISTUMBN CACTIVITY BEANS 3, PERFORM CONTINUOUS INSPECTION5OFEROSIONCONTROL PRACTICES. 4 INSTALL UTILITIES (WATER SANTARY SEWER —CTRc PHONE FIBER OPTCETC) PRIOR TO SETING FINAL GRADE OF RETENTION DEVICE. 5. ROUGH GRADE THE SITE, DO NOT USE RETENTION AREA AS TEMPORARY SEDIMENT BASINS 6 PERFORM ALL OTHER SITE IMPROVEMENTS SEED AND MULCH ALL AREAS AFTER D STURBANCE. UPON STAB L IAT IN IF CINTI BUTINO DIAINAIS AREA 120. I_ EENTMAND MULCH AT AND EA ANENT EROSION CONTROL PRACTICES 11, REICMOVE TEMPORARY EROSION CONTROL DEVICES AFTER THE CONTRIBUTING DRAINAGE AREA IS ADEQUATELY VEGETATED. GENERAL NOTES I. IN THE EVENT THAT SEDIMENT IS INTRODUCED INTO THE BMP DURING OR IMMEDIATELY FOLLOWING EXCAVATION. THIS MATERIAL SHALL BE REMOVED FROM THE PRACTICE PRIOR TO CONTINUING CONSTRUCTION. 2 GRADINGOF RETENTION DEVICES SHALL BE ACCOMPLISHED USING LOW—COMPACTION EAST IT 'M OUIPMENT TOPREVENT INDEILY NG 10 Ll 3 ALL SUB MATERIALS BELOW THE SPECIFIED BI ORETENTON DEPTH (ELEVATION] SHALL BE 4 STRQCTIQN TEST s ON NFILTRATION BAST SHALL BE EOUIREO. BASIN SHALL FILLED WITH WATER TO A MINIMUM DEPTH OF SIX INCHES (6') AND THE TIME TO DRAIN MUST BE DOCUMENTED. THE RICE CREEK AND COON CREEK WATERSHED DISTRICTS MU57 BE NOTIFIED PRIOR TO TESTING TO OBSERVE THE RESULTS. I, _... DESSALK wree e w ER n eLass s ONICIT SAL, L MN(DjETO twusxFoj ON C TOP Sp A airv0 c 'S ryc) (mwElvoc] IS— S sTHP sues a'wEu+irvc wuresc (3,c) (mmw... PAVEMENT ' E CT s vaE mss " ' m rest (T. c) (mwE ;PI A " class s wT'xEcn�E RISE T.1 OHIHIP uuESTINE) M' F -F TYPICAL STREET SECTION o� r G RIIN ROUND 150 1;000 PROPOSED GRADE 940 935 930 925 920 915 910 905 900 940 935 930 925 920 915 910 905 900 STREET C PV STA: 1+6434 PVI ELEV: 919.61- N: 72.42 LVC 9000LEC IGH PT, STA 1+55.2 PVI STA 4410.11 PVI ELEV'. 919.10 K: 90.00 90.00 - IGH PT, ST -A 4+00.0 PVI STA: 6+30,09 PVI ELEV: 919.31 K: 85.82 LVC, 90,00 -- - P HIGH PT ILIO -All ._-- ----o HIGH PT ELEV. 918.9gV 0, AGH-PT.STA''6+321 HIGH PT ELEV: 919.1 P m TA: 340 PV K 7: 91880 K: 22.17 s > J.-.. -..-5 rn PVI STA: 5+00.00 Pv ELEv: w 85.89 LEC. 90.00 --� m m - a LVC 90.00 OW PT. STA: 372 LOW PT ELEV: 918.7 918 - OW PT. SLA: 4+97. 94 o LOW PT ELEV: 918.70 _.. _._os0`e iaw �i... _6: is°•e 'aw - os,_.. aw aw 055% _.. 0 0' .5 °e PROPOSED GROUND GRADE w 0400 STREET D 0450 1400 1450 2400 2450 3400 3450 4400 4450 5400 5450 E, w 6400 6450 7400 STREET E ED PV- o43o6T._. PVI ELEV: 922,38 K: 80.00' _ _. _.. _._ PVl STA 0450W PN ELEV, 922.74 K: 16.00 VC 00 HCH FIT,.sA os2o0 o� r G RIIN ROUND 150 1;000 PROPOSED GRADE 940 935 930 925 920 915 910 905 900 940 935 930 925 920 915 910 905 900 STEEL FENCE MOST (T -POST), MINIMUM 5' LONG, 6' — ATTACH FABRIC TO PoSTS WITH MINIMUM 3 ZIP TIES MAXIMUM SPACING. (50 LB. TENSILE) PER MOST / IN TOP 8" OF FABRIC. MONOFILAMENT GEOTEXTIIS MOST NOTCHES — 3886-1 (MACH ME SLICED). FROM FA RVICY � NAEFUNE SLICE / 8"-12" DEPTH (PLUS A' HAP) FROM FABRIC. TRENCH MUST BE COMPACTED BY LIGHT EQIPMENT PRIOR TO PLACEMENTOF STEEL - STS.24"MINIMUM ` BACKFILL WITH NATURAL SOIL, AND COMPACT WITH IF IND. / PLACEMENT OF THE POSTS. j LIGHTEQUIPMENTPRIORTO DIRECTION OF SURFACE FLOW _ " Il' MINIMUM POST EMBEDMEN SHIN SLIC DDDICTI Cottage M STANDAR SILTFENCE GIOVe �*•^^�,^p°"°u COTTAGE GROVE, MINNESOTA 'ON ERO-1 , WOODEN LATIN SHALL BE 2" X 4" HORIZONTAL EDSECURTLYM7HEE MEMUNOTOPTNUOU3 AROUND TOP AND BOTTOM. POST MEMBER FASTENED IT) EAQI POST FAARM USING 2-20D COMMON NAZIS " 2X 4'RX 2.5'LONG / MONOFILAMENT GEOTEMILE WOOD POSTS, 8 % FABRIC A5 PER MNDOTTABIE REDD. 3886-1(MACHINESUCED). ADDITIONAL 8-30"OF FABRIC / T\ FLAP AT BOTTOM OF BOX 8-30"FABRIC RAP BURY PREVENT UNDERWA 1 1/2 W ROCK L BEEP 11 WIDE NO ES: CONTRACTOR SHALL CONSTRUCT SILT BOX TO FIT AROUND THE INLET -URE WITH 6" MINIMUM CILEk CE TO EDGES OR OF S7 STRUCRIRE. SILT MO To S;A PLACED EVEN "'A'STRUCTUs° eE1nw REOPENING. TOP OF SILT Box TO EXTEND 118" MINIMUM ABOVE EXISTING GRADE. 1/ I� Cott��DARD DETAILSFEll zo e `x®GrOVEage INLET PROTECTION SILT BOX FOR BEEHIVE CASTING COTTAGE GROVE, MINNESOTA °ah ERO-10 PIONEERene-neer-ng STEEL FENCE PoST(T-POST), MINIMUM S'LONG, MONOFIIAMENTGEOTEXTILE FAB RIC PER MNOOTTABLE 6' MAXIMUM SPACING. / 3886-1 IN— INSTALLED). �ATTALH FABRIC TO POST WITH MI . SOroLBPa° TENIMUM R3ERPTI6(IN / rvsaE) PoST OF FABRIC. POST NOTCHES TO FACE AWAY / FROM FABRIC. % / TAY FABRIC IN THE TRENCH, FTHE OVERFLOW OX 1111 ` BACKFILL WITH NATURAL SOIL, AND COMPACT WITH IF IND. / PLACEMENT OF THE POSTS. j LIGHTEQUIPMENTPRIORTO DIRECTION OF SURFACE FLOW _ I 6 24" MINIMUM ro EMBEDMENT STANDARD DETAILS a"1 GQttagO HAND INSTALLED SILT FENCE J GIDve COTTAGE GROVE, MINNESOTA ERO-2 GILT FENCE INBTULATI. NEIrF_ / F � eMOR DLOW T"STAMI ,IRI °MN OTHE TDAG NG DIMUM AT FS 'VETH AN ANG" OF 45 T / Q1. FILL a�„ INSTALL PLO MG. IN1B11. LENS RA.TE_. �Cottag STANDARD DETAILS NY G[OVe DITCHQIECKS FFEote 11 `^^^^•' LCOTTAGE GROVE, MINNESOTA ^�.E ERtrll ANCHOR TRENCH (SEE DETAIL ANO NOTES BEL(W) SILAPLE DENSTFF' SNA -1- BEA M 'ULES lEl SQUARE YARD CTHISAMAY VARY AS DIRECTED BYE aT�. RNTR I'll) 3' 1 Nr DIG 6 X 6' TRENOH 2. IAV BLANKET IN TRENCH 3. STAPLE AT 1.51NTERVALS 6 4. BACKFILL WITH NATURAL SOIL AND COMPACT ./ 5. BLANKET LENGTH SHALL NOT EXCEED 100 WITHOUT AN ANCHOR TRENCH \, j STANDARD DETAILS Cottage ERosIONmN Ro01ANKEr Grove LAS COTTAGE GROVE, MINNESOTA .A mcs.ro�c ER0N5 wood FDRSIR. MINIM DEIrtl �OPFH�U�G 8"? WASHED ROCK OR J oC Jy ooDGLIPSLIRM N a.�i sP C[FICAnOrvs � flN�L1w G O� MINIMUM CUTOFF BERM TO J TO MINIMIZE RUNOFF FROM SITE I ZIP FABRIC SHALL BE PLACED UNDER ROCK OR WODDCHIPS TO ­ MUD MIGRATION LHRM.H ROCK. EN—CE MUST BE M—TAUNED RED­ PREVENT SEDIMENTATION TRACKINGTO Cottage oNSTRNUI— NENT:,NaS Gmve L RocKANDw000wlP ' COTTAGE GROVE,EMINNESOTA ERO-12 CURB NG OVERFLOW IS Y, OF THECURB BOX -tlE1GFT NOTE: USE WIMCO ROAO DRAIN CG -2301 CG -3290 -VB (DEPENDING ON CASTING TYPE) HIGH FLOW INLET PROTECTION CURB AND GUTTER MODELS, OR CITY APPROVED EQUAL. DEFLECTOR PLATE FTHE OVERFLOW OX 1111 IF IND. OVERFLOWATTOP LO / CRFEFFERASSEMENI DMFE7ESSEMR,BLY I/ DIAMETE SO"OATGLOWDPOINT HIGH-FLOW FABRIC Cottage STANDARD DETASLSDOR °- GIOVC IEBAN INSERT�TCH y J �"'m .• COTTAGE GROVE, MINNESOTA, �eszw.o.o ERO-9 UNDISIURBEDVEODATON l TPACNED EQUIPMENT �(J� TREADS CREATE GROOVES + ~ PERPENDICULAR TO SLOPE DIRECTION. NNOTE: ALL SLOPES WITH A GRADE EQUAL TO OR STEEPER THAN 3:1 REQUIRE SLOPE TRACKING. SUDDIS WITH A GRADE MORE GRADUAL THAN 3'.1 REQUIRE SLOPE TRACKING IF THE STABILVATION METHOD IS EROSION CONTR0. BIANKEf OR HVDROMULCH. STBNERDDDE TRACKING Grove l L COTTAGE GROVE, MINNESOTA ` ERO-13 USE �• USE 2 TIE BOLT FASTENERS PER ]FROM FRO INSTALL AOR T 60° / `TGM OUTSIDE OF PIPE. \ N STORM SEWER SHALL BE RCP ANCHOR BOTH SIDES. TRASH GUARD SIZING PPARS H IP11 E 31ga 3..-0.BS ISOMETRIC oe iii• g. 6" e• 3i SEE CITY PLATE NO. STC -12 AND —3 DR RIPRAP PLACEMENT. STANDARD DETAILS rmau� GOttage FLARED END SECTION AND l Grove TRASH GauaD � COTTAGE GROVE, MINNESOTA L9211 RESIDENTIAL_28' F -F. RAN R W 30'- 30' GRAVEL BASE (100% C... rvBxnIRE(,C) LIMESTONE) zsPW�°33a�9.s�aNGOCJPSE 0" TYPE SP 9.5 WEARING COURSE MIXTURE (3, C) (SPWEA330CJ -8" CLASS S AGGREGATE BASE UN% CRUSHED LIMESTONE SUBGRADE EXCAVATION AND AGGREGATE BACKFILL AS THICKNESS REQUIRED) NEER (IF NECESSARY, 12 -MIN. UIC DEIFNIll oN RfsIDNTUL(zei) COTTAGE GROVE, MINNESOTA STR�1 PIONEERengineering RIPRAP AREA B-5 D Q R 5 12" 11' 15' T 36" 19' 15' 11' 59" 3' 98" 20' 16' 1 25' 22' 3' (15 MEN.) ._...... .__ __.__.__._ D CY GLADEPTM 12"T029" 15 T020 CL.3 3' 2]" TO 33" 20 TO 25 CL.] 3' 36"T048" 25 T038 CL.3 3' Z'' 54'• AND UP 22 AND UP CLA 4• / - (ONE ORBIC YARD IS APPROX. 2,800 LBS.J %l 2' 3' til RIPRAP EXTEND FA--j SECTION A -A FABRIC TYPE IV U ENDS -ION tilRIPRAP �GEOTEXTILE SECTION B FABRIC TYPE IV STANDARD DETAILS Cottage RIPRAP AT FLARED ENO SECTION Grove AL' A"""^�^°•" em�^'v ��� COTTAGE GROVE, MINNESOTA STO-12 0'�� fi0' L 2� T' TYPE 5�MEI �j UPAry oRTM�cH rvoT FXISISNG Sl1TE1 WIDTH. CUL-DE1. Cottage N TOM -RAR TDUDRN4RAouN Gmve ° COTTAGE GROVE, MINNESOTA PahD' 1 STR J BPWRTY/OOLOT LINE SKIMMER MAINTENANCE BENCH SAFET'/ AQUATIC VEGETATION BFNCF SIDE SLOPE PROFILE SIDE WITHIN HUGE S ONDER OUTLET PIPE 10;,'�� TYPICAL BE NCH DETAIL WITHIN POND BOTTOM. 10OF SKIMMER OUTLET OPERTY/oULUOTLLNE HWL MAINTENANCE eN01 SAFETY / AQUATIC VEGETATION BNCF NOI— U 1, PONOBOTTOM TYPICAL BENCH DETAIL STANDARD DETAILS Cottage TYPICAL BENCH DETAIL l Grove auaa COTTAGE GROVE, MINNESOTA STO-18 HYDRA III 9 .EES NAME/ LADE SIGN E fi •�� _ 29 RADIUS (TYPCAL)— SIILSTOP SIGN PERTY LUE,w C 3 R CL R EJAdLS ivPIcITY ANDTRDLi K"'O Co Cage Grove NS °'•re rne.."a+^�°""v"^' COTTAGE GROVE, MINNESOTA .s :Tzze owc STR-28 E PROVIDE 4 -1/2" SS ANCHOR BOLTS` FIAT STEEL BATS @ 4" O.C. NO PERPENDICULAR SUPPORT BARS •) OUTER RING / 69-1 DR STRUCTURES LESS THAN —DIPPED GALVANIZED GRATE IN 2 SECTION S WITH HEAVY DUTY HINGES / IETO SUPPORT 25D LBS/5F AND BE AGE TO REMOVE ONE SECTION FOR E TD STEPS BV —LNG NUTS HIGH SIDE FROM TWO ANCHOR BOLTS SUBMIT ID SHOP DRAWINGS TO ENGINEER FOR 1 REVIEW PRIOR LL FABRICATION MANHOLE — BE PLACED SO THAL NTION IS RPNDINWi TO THE BPR HOLE STEPS, NEENAH R398ll OR EQUAL, 16'• ON CENTER. ALUMINUM STEPS APPROVED. E W) ae• DIa.R TOP F s•uoa is•sD >48" DIA. 12'• OR 24" SEE / 0 SCHEDULE FOR E0. SPECIFIC STRUCNBE. ELEV_=MIXxr — — NWL HOLE FOR -DIA. ELEV.=X%l(.X 1' RCP SKIMMER 15' OPENING.DOGHOUSES MUST BE GRO�DBOTHINSIDE � 553 � 2' OUTSIDE OF kI`�� AND ST.—. 6" O � AR E AGGREGATE BAIXHLL (MNCOTSPEC. 3149,11 MOD.) STANDARD DETAILS CGrottoveage STgrypARD SKIMMER STRUCTURE COTTAGE GROVE, MINNESOTA STO.16 z� DF ROADLo..X (. CUB, HEX.fBSQ.) (DMcx GF_ eua:) 8'0' 1/2"X6"GPLVANIZ BOITS PS ° }/IGARRWGE,HIX.ORSQ.) x911 1 IX. GROUNI „,f J'� 1 1 1 NawNAL� / ^ 8•'x6'-0• e• s ER CHAD EL POSTS —PAR" WEIGNTHTO 3 L85/FT NOTES: 1. THE PLACEMENT OF THE BARRICADE SHALL BE 1 -"FROM THE END OF THE BITUMINOUS ROAD WITH THE BARRICADE CENTERED ON THE ROADWAY FAQNG THE ROW OF TRAFFIC. BARRICADES SHALL BE PLACED WITH MAXIMUM 6• SPACING AND SHALL SPAN ENTIRE ROPDWAY WIDTH. 2. ONLY ONE "END OF ROAD MARKER" REQUIRED PER STREET. STANDARD DETAILS PEaMANENT BA--E COIta$e ,� C� Gm We J COTTAGE GROVE, MINNESOTA :U�rew STR-32 SAVED r1\ PLANT SCHEDULE KEY COMMON NAME/SLIE, name ROOT QUANTITY INSTRUCTIONS NORT TMAPLE/A-1 —1 1EELFEE KENIEE/4111G lad Nolc- 25 BIB 1 } EPE.M.N TAGKBERFI/Cllll= 011 1—Ift GRNLESS HONEYLOCUSI/GlEdit Sia Niocalt— 25 BFB 23 NORTHERN PIN OAK/Ou c- palustris 2.1 BFB NTRV LINDEN/Tllo -11-11 Se BFB I 0 SIENNA GLEN MAPLE/A­ s N.1.111 S1.11. GI., 25 BIB 23 ®SIGAI MAPLE/A­ saccno ,-, out oin 25 BIB 24 RIVER I CH/Betula 12 BIB 28 QBLACK HILLS SPFUCE/Pl­C R&B 72 0 WHITE PINE/Pit AT—,' G BIB 47 E- TREES Q SPRING SNOW CRAR/­­29 ®S FIFE AB/Mol 1.5' B&B SUGARTYME CRAB/Md- 'S,g Tv JAPANESE TREE LILAC/Sy,l,, 1 5 BIB 24 LANDSCAPE NOTES: PROPOSED UNITS: 164 PROPOSED TREES: 417 OVERSTORY: 183 ORNAMENTAL:115 EVERGREEN: 119 EACH UNIT WILL HAVE A MINIMUM OF 5 SHRUBS MITIGATION REQUIREMENTS: 96 CATEGORY B TREES SEE TREE PRESERVATION PLAN FOR DETAILS TOTAL CATEGORY B TREES PROPOSED: 302 �0 GRAPHIC SCALE IN FEET PIONEEReV-neering AREA A.I. 6 e 914 CONIFEROUS TREE PLANTING DETAIL �;GdS mwtt op', DECIDUOUS TREE PLANTING DETAIL ..� E1,14 C11, M. . Total qualifyingtrees: 218 e) qualifying trees to be saved $ 13160' *Trees noted as hazard,decoy, poor health, or partially dead a re excluded from calculations r Allowed removal: SOY. of 218 qualifyingtrees=109 trees Tree,m6e removed131 TREE IDENTIFICATION PROVIDED BY: Removal over threshold:22 trees Remova: KEN ARNDT. SR. FOREST ECOLOGIEST. CWD MIDWEST NATURAL RESOURCES, INC. Trees Removed: SEE LANDSCAPE PLAN FOR PROPOSED TREES Conite rs 12-24':17 /J / Conifers24-50':67 Hardwood 620": 10 Hardwood 20 30": 4 y1) �� e t III wool 11-24":22 x 2743 TO BE SAVED / vr, — =TREE Softwood 24"+: ] X 2744 = TREE TO BE REMOVED Specimen (dec tree 30"+ or conifer 50'+):4 o MitigaClC Requirementfor 22 removed Trees' 1. 41,e ment trees wil be mitigated with 6 Category B trees or 3 CategoryA trees per tree removed Mitigation: 24 Category B trees or 12 Category A trees (or an equivalent combination) �j 1. 18 Conifers over 24'will be mitigated with 4 Category B trees or 2 Category A trees per tree removed. Mitigation: 72 Category Btrees or 36 Category A trees (or an equivalent combination) f ,, L Totalmitieatianreguired: 96CateeowBtreesor48CateeorvAtreesloreguivalentcambinatianl Category A: Not less than or 12' conifer 2.5"deduous Category B: Not less than 2.5"decidous or 6'conifer TREE PROTECTION DETAIL oma'' f� . _ 1-1 11— EE 1Er1EI III o NSN.r 1.aNIT o «�oN To camcer°,N° w° ov°aNr�To,1c MnTTa1nls . as 1P�uncT TREE PRESERVATION NOTES \ \ p �1 �✓ — 0 �� - - - �� noRAARE . ANa .aEE PRo.« oNMEQ R6 s. OE ao ,E I 111 111 LINE 11E1 �r IN' TIEEI 11E T rE 111r) • nn �� o T�T�en1eeT< ae P-EMTNT o E-IM- s -ow IN TNTMTaTT �11a eNare MED TNT TePre�seN er,NT roN rT�Ne Aeaea� aaNT aP N a Nr 11E ar a w�rT a� � - ReM air s Te —1s Te ✓ / ` ``/ WMM�.A GRAPHIC SCALE IN FEETO - v�([xravn�oas Mu} HnYf A NON Toric TREE MDUNo oREssNG YNTn THfN ON o[ LOPMEM s ES f PIONEEReneneering (6F5.1) )est-vta °"" RAVINE PAR -AY, Li.c WOODWARD PONDS Ve o,a - TREE PRESERVATION PLAN Tl of 2 PIONEERengfneering 11wnimSPmame RE I.ignt REMOVE 'Hite sprue. ��n nmght 2711 1 wn-msPmCe mnmgnt WM1Tesprua lmbeight 2711 10 Wh�lm sprnco 10 n netgnt 13 wi i btesPmce beget wmtespruLe mnelgnt wh-msprum inn.ight REMOVE blte spruce Helm wh�0", 30 1h,,Rht ght REMOVE wnme sp'C'mne��ignt Pn 1 Ell 011 SIR SildviceraMaplce jor decRav along trunk P 273E R2 REMOVE 211 22 benan ME Pino m ain night sibcrian Elm M1msPruce I. ELL - - Whire Spruce lin nelight ITLE 2741 11 WEmsprum in night Wnite SPmce 1. ELL M1te5prure negnr 1 1 FRROVI Whim spruce lin night REMOVE ELL WM1ile Spruce lin helELL White Spmce REin I. ELL REEMOVE LL E­ Rcd 1ZaP �in ncignt RE OVE 1713 17 Aed Pine in -1. ght Rod Pi pc lin night REEMOVE Rcd 1—in ncignt REMOVE Rcd Pinc lin ncignt 2719 14Rcd Pinc in nci M1[ Red Pince 'in M1e ELL ME Pine in night 11 RILL 1 301 1. ELL 2761 12 Red Pine n neigh[ ght 2. Ell- p SAVE oradopEleue Spruce g REMOVE ztrd Ll C.Ilorad. Blue Spruce �IREMOVE n netgnt 1 hlight REMOVE REMOVE orad. Elle RE,—orad. Elle Spruce 11 ELL .lad. Bl ue Spruce �����in 1-111 EMOVE t, C.1—d. A- Sp,- 25 1, �Ight SAVE t SAVE orad. Elle S16 Pru orad. Bl ue Spruce ��In ne�lgn[ .md. Bwapm� in n.ignc men2716 2627 13,12,12 eederPlem - 11 nsnle REMOVE Asn 12 M, g 2632 34set eri Elle l, SAVE VVE 32 — REMOVE whmospmc. 35 nneight 17 whims m in nei nt V.E 17 h. REEE­ n:nle orad. Bete Sprue h, ght .ad.B-SPmc mneigh< ht RedePmeb h, ght 1155 11 oad. Blue Spru inneignt 2556 22 oaao Bwo Sp innoight SAVE — 15 2117 22 R'etleCed EEm in neigM1t 26ER6 EELS 12 12 S. 11, MIP I REMOVE White Sprucc in nci 1ht SAVE 21 S.1— M.pl� REMOVE 216 A WM1i[c Sprucc in ncignt g 2.1 31 Ell t, SpIll, 30 h� ght SAVE SbenanaElem Whim Spruce iWh n nei ghL Siberian Elm WniteSpmce inneignt 12 S. M -P REMOVE OTT Wh t. SpIlL. 30 1 A, ght REMOVE Iver 2654 11 Iver 2568 13 White Spruce in neigM1t 2115 17 Maple Ivor a o "61 16 White Sprucc in neigM1t Siberian ElmSAVE 2117 17,1112 M1lte Spmce 35 h. ght SAVE 13 —MOPS 1h hte Spce 30 n nei ght SAVE White Spruce in hei ght 2663 11 . "I MIP � SAVE C.oad. Blue Sprue in nei ght REMOVE d—, at base ad. Bl C.u e Spruce in nei ghtEMOVE 11 ver REMOVE 2661 12 sfl'­M.pl� III IFFE 21;3 26,12 Maple S -1 12 1led P 3o lnbei ght g PREMOVE Ceda—MIPle SEE REMOVE 25�36 1414 12 12 12 xElder along trunk Ell —tl.rav _SAVE oadoEll e5 P g sibELL Blu eS p Retl Pltle g -3 11Black Walnuta 21 S. M -P 2R 1 p a26SE REMOVE 2 31 11 VEI MILE 2111 14,12 x Eldcr g—REMOVE '2 MLp 2199 14171 111, ART M -P e 14 xe1 bM R MOVE 1, xElder S 2691 24 Wh12 -[c Fl -in nci Rh[ Vle 2693 In Whlt� P- 3S I ght Asn toral E1111 a[ bas. REMOVE -POOR 2 . 12 g HER 22 SIR" Ml REMOVE B'IavckeWalpnut 13 Ell- 26 in R Cetlar1p Rede6P3 gIAV ELLin ncignt269S oaao Ewe Sp�rm g -VTE C'.I.ad.Bluc Sprucc ED n h, ht SASE 2616 1E oad Elle Sp oaE. Elle Spruru P g' RE S. IIIM.p SP I I. ght SAVE t. 1 h to ppetl 21 in Wite SPBluce ip hei ght 2623 22,22 Ell— Ml 270) RE White Spruce i 1M1t ip ne26 REMOVE 12 Blackr 21 P 11 eight WM1��ita Sppruce in h21� 1711 1 RE lWh,t. P g ht """ RAVINE PARKWAY, LLC WOODWARD MAFIJE —VIE M­HESOTA 55369 COT—ROVE PONDS '(6F5.1) 311 o,a - TREE PRESERVATION PLAN T2 of 2 OnIn BOLTON & MENK Real People. Real Solutions. MEMORANDUM Date: 11/14/2019 To: Ryan Burfeind, PE From: Mike Boex, PE Subject: Woodward Ponds Plan Review City of Cottage Grove, MN Project No.: N14.119528 2035 County Road D East Maplewood, MN 55109-5314 Ph: (651) 704-9970 Fax: (651) 704-9971 Bolton-Menk.com This memo summarizes the review of both grading documents and street & utility documents submitted by Pioneer Engineering, dated 10/28/19 (received 10/30/19). Sheet 1.10: 1. Identify any benchmarks and horizontal and the vertical datums used on the project. 2. Note that the City of Cottage Grove's Standard Specifications for Street and Utility Construction shall govern for all improvements on the project. Sheet 2.10: The existing bituminous turnaround at Jocelyn Avenue Bay is not depicted. Please depict anticipated removal items within the plan set. This turnaround area and existing barricades will need to be removed. In addition, the temporary hydrants will need to be identified and salvaged or removed as a part of the connection to the existing water system. Sheet 4.10: 4. Military Road and associated driveways and drainage culverts should be removed from Joliet Avenue to County Road 19. This section of Military Road should then be replaced with a bituminous trail, consistent with the segment northwest of Joliet Avenue. The trail location should be adjacent to the existing trunk sanitary sewer manholes in order to provide access. The southbound right turn lane on CSAH 19 should be restriped to eliminate this movement; Pioneer should coordinate with Washington County accordingly. The northbound left on CSAH 19 should remain in place, and a small section of Military should remain as a turnaround for vehicles to head south to the Cedarhurst Mansion. 5. The developer should work with the utility companies to remove existing overhead lines along Military underground adjacent to the proposed plat. The Street B island should be designated as an Outlot to be owned and maintained by the home owner's association (HOA), and it should include a blanket drainage and utility easement over it. a. The cul-de-sac should be generally consistent with City standard detail STR-4, including: H:\C0TT\N14119689\1_Corres\C_To Others\119689 Plan Review 2019-11-14.docx Bolton & Menk is an equal opportunity employer. Woodward Ponds Review Page: 2 i. A 28' face to face dimension shall be maintained around the island. The island size should therefore be reduced. ii. The right-of-way should have a 65' radius when landscape islands are present. This should result in a 15' boulevard behind back of curb. iii. B618 curb and gutter should be used on the center island. 7. Joliet Avenue should remain 36' face to face as it connects to Ravine Parkway, please modify the existing intersection accordingly. 8. It is preferred that the permanent street section of Street A be constructed to the eastern plat line and the temporary cul-de-sac be located on the adjacent property and encompassed by an easement. In addition, public utilities (sewer and water) should be extended beyond the permanent street section for future connection. 9. The private street between Joliet Avenue and Street A shall be a minimum width of 22' face to face and signed for no -parking on both sides of the street. 10. The sidewalk connection from Street A to Jocelyn Avenue does not have a receiving ramp to the north. Please propose a method to direct and receive pedestrians to the sidewalk on the north side of Jocelyn Avenue. 11. Jocelyn Avenue should be stubbed east of Joliet Avenue for a future extension. Permanent barricades and future street extension signs should be provided per City standard details STR-31 and STR-32. a. Due to this street extension, east -west pedestrian ramps should be provided along the north side of Jocelyn Avenue at Joliet Avenue. 12. Future Street extension signs per detail STR-31 should be added to the barricades at the end of Street A. 13. Identify park/open space marker installations on the plans. The City's parks department will provide locations. 14. Clarify if a monument sign for the development is proposed and where it will be located. If desired, it should be located on HOA property. 15. Provide horizontal alignment/curve information for review. Sheet 5.10: 16. Final plans will require plan and profiles of utilities to understand utility cover across the length of pipe, crossings, and clearances between crossings. Plan sheets should be presented at a 50 - scale or larger. 17. Please show service information on each lot (wye station, curb box elevation, sewer elevation at upstream end of service, top of riser elevation if applicable). 18. PVC pipe classes for public sanitary sewer are listed in Note #1. Please determine the maximum cover over each pipe run and label the proposed pipe class on the plans. 19. Note #2 should be revised as there is 12" watermain depicted on Joliet Avenue. 20. Please note that butterfly valves are required on 12" watermain per city standard detail WAT-4. Valve locations will be reviewed when plans are submitted at a suitable scale and additional notes call out all applicable watermain improvements. Botton & Menk is an equal opportunity employer. Woodward Ponds Review Page: 3 21. If common areas are to be irrigated please identify where irrigation services will be necessary per City standard detail SER -12. Additionally, please provide an irrigation plan such that conduit crossings of the public streets, if required, can be identified (and minimized) on the plans. 22. Design the restrained length of the dead-end water main and label it on the plans. 23. Please pothole and provide documentation verifying the existing sanitary sewer pipe elevation under Ravine Parkway to ensure the proposed sewer system will serve the area north of Ravine Parkway. 24. 8" sanitary sewer and watermain stubs should be extended to the east at the Jocelyn/Joliet intersection to pick up future development to the east. These utility stubs should extend beyond the permanent pavement section and easement should be obtained beyond the plat if necessary. 25. Add stationing to the utility plans for reference. ShPPr 1; ?n. 26. Final plans will require plan and profiles of utilities to understand utility cover across the length of pipe, crossings, and clearances between crossings. Pipe sizes and materials (including class of pipe) shall be labeled. Plan sheets should be presented at a 50 -scale or larger. 27. Provide 3' minimum cover over storm pipe in the street and 2' min cover in greenspace. Profiles with pipe sizes identified will clarify if cover requirements are met. 28. Minimize storm pipe behind the curb where possible. For example: a. The pipe from CBMH-632 to CBMH-631 does not appear to be contained within right-of- way. If CBMH-539 is not needed for drainage (it's at a high point), consider converting it to a storm manhole and repositioning sewer and water such that the storm sewer can be primarily within the roadway. 29. The first storm structure upstream of a stormwater basin and within the street shall be a sump structure per city detail STO-6 (e.g. CBMH-512). 30. Make STMH-501 an overflow structure per city standard detail STO-18. Revise the grading around the structure such that the rim (low edge of grate) is at or just above the 100 -yr HWL of Basin 500, and at least a foot below the 904.5 EOF. a. Due to the adjacent boulevard grading along Ravine Parkway, it appears that the low portion of the adjacent boulevard is approximately 905.5. Please revise Basin 500's 905.0 EOF over the trail to be 1 -foot below the boulevard (904.5). Sheet 6.11 should therefore be updated accordingly and the trail removal and replacement limits may need to be adjusted slightly to maintain a 5% maximum trail grade. 31. A storm sewer structure schedule shall be provided which identifies structure diameter, casting, applicable City Detail Plate number, and special notes such as sump depth if applicable. 32. Identify the access route for Basin 200 on the plans, located over the pipe from CBMH-544 to the pond. The maintenance bench on both Basin 200 and 500 should also be hatched or otherwise identified. 33. Add stationing to the utility plans for reference. Botton & Menk is an equal opportunity employer. Woodward Ponds Review Page: 4 ShPPt 53(1 34. A street lighting plan will be required with the final plans that depicts the following. a. Residential lights should be approximately 200-250 feet apart located between multi- family buildings and at street intersections. b. Streetlights should be located along the sidewalk side of the street. c. Feed point cabinet locations and source of power should be identified on the plan. d. Identify wire sizes on the plan. Wire to be placed in conduit (1.5 -inch minimum NMC). 35. Make the following changes to the streetlight locations: a. Add a streetlight at the back side of the Street B cul-de-sac/eyebrow. Add an additional streetlight near the east plat line on Street A. Empty conduit from the last light to the plat line should be provided for future extension. Depict the existing streetlight at the Jocelyn Avenue Bay and 66th Street Intersection as well as the existing light at the end of the existing temporary turnaround on Jocelyn Avenue. Make a note to relocate the existing streetlight at the end of the temporary turnaround to the Military Road trail crossing. Conduit should be extended from the current streetlight location to the new location adjacent to the trail. The distance between the Jocelyn Avenue Bay/661h Street streetlight and the new streetlight at the trail will be approximately 300 -feet. Eliminate the proposed streetlight by lot #1. The distance between the new streetlight at the trail and the proposed streetlight by lot #6 will be approximately 300 -feet. d. Depict the existing streetlight at the Jocelyn Avenue and 66th Street Intersection as well as the existing light at the end of Jocelyn Avenue. Make a note to relocate the existing streetlight at the end of Jocelyn Avenue to the Military Road trail crossing. Conduit should be extended from the current streetlight location to the new location adjacent to the trail. The distance between the Jocelyn Avenue/66th Street streetlight and the new streetlight at the trail will be approximately 300 -feet. Eliminate the proposed streetlight behind lot #70. The distance between the new streetlight at the trail and the proposed streetlight at the Street A/Jocelyn Avenue intersection will be approximately 250 -feet e. Remove the proposed light at the southwest corner of Joliet Avenue and Ravine Parkway since a street light is already present at the intersection. 36. In accordance with the City's sign policy, stop signs should be removed at the following locations: a. Street A at Jocelyn Avenue b. Street Cat Jocelyn Avenue c. Street C at Street A 37. Due to the extension of Joliet Avenue, a stop sign should be added on 66th Street for vehicles traveling southeast approaching Joliet Avenue. 38. The mid -block pedestrian ramp location should be marked with both a W11-2 and W16-713 sign, please make the appropriate addition to sign 3 in the signage legend. Botton & Menk is an equal opportunity employer. Woodward Ponds Review Page: 5 a. Please move the pedestrian crosswalk signs immediately behind the crosswalk such that signs don't block pedestrians for approaching traffic. b. Revise the marked crosswalk to 12" white ground -in poly -preform crosswalk lines. Sheet 6.11: 39. All EOF elevations should be labeled on the plan. 40. It is preferred to create an EOF between buildings at Jocelyn Avenue at the low point near station 4+00. The EOF should be at an elevation of approximately 913.6 and direct stormwater to Basin 500. 41. Some building pad elevations appear to be missing, for example at lots 10-12. 42. Additional spot elevations should be provided on the grading plan to clarify right-of-way elevations near building pad corners and elevations adjacent to the public outlots where applicable. 43. Intersection details to clarify drainage patterns and grades shall be submitted for all street intersections. 44. It appears a 5% maximum longitudinal grade is planned on the trail to Ravine Parkway. Please label the grade on the plans for clarity. 45. The berm width between Basin 500 and the infiltration basin should be a minimum of 10' for access and should be labeled as such. Sheet 6.12: 46. The minimum grade of greenspace areas is 2%. Please ensure areas meet the 2% minimum requirement. In particular, the northwestern side of Basin 200 does not appear to be 2% between the 920 and 918 contours. 47. Verify all lots have low opening and adjacent grades labeled, for example lot 136 is missing. 48. Lots 109-110 appear to be 6 -inches higher than lots 111-113, please confirm if this is the intent. 49. The developer should consider grading and drainage improvements along existing Military Road such that the City can effective maintain the corridor. For example, the area of Military Road adjacent to lots 141-164 is nearly flat. Please evaluate grading modifications and providing additional storm leads and structures from CBMH's 635-637 to pick up drainage. Sheet 6.30: 50. Identify the depth and type of material that will be placed in the Street B island (e.g. landscape rock). Sheet 6.41: 51. To avoid confusion, the outlet structure grate should specifically reference the grate on city detail STO-16, and it would be preferred that the visual representation and notes from STO-16 be displayed on this sheet. 52. The existing section of Joliet Avenue between Military Avenue and 70th Street has B618 curb and gutter. B618 curb and gutter should therefore be extended on Joliet Avenue north to Ravine Parkway, except for the portion with direct driveway access. Therefore, D428 curb and gutter Botton & Menk is an equal opportunity employer. Woodward Ponds Review Page: 6 should be provided from the catch basin near station 3+00 up to the parking lot radius north of lot 109. 53. On Joliet Avnue, revise the pavement section to provide two lifts, 3" SPWEB330C and a future 1.5" SPWEA330C. 54. The existing portion of Jocelyn Avenue north of 66th Street has B618 Curb and gutter. When the temporary turnaround is removed, B618 curb and gutter should be extended to the Military Road trail crossing. Once north of the trail, the typical curb can transition to D428. An additional typical section should be provided showing the station ranges of each curb type, and curb changes should be labeled in plan view somewhere within the plans. 55. In general note #4, remove the references to Rice Creek and Coon Creek watersheds and replace with "the City of Cottage Grove." Sheet C7.10-7.12: 56. Vertical curves should be designed for stopping sight distance. Minimum K values of 19 (crest) and 37 (sag) should be evaluated. Sheet C8.10-8.11: 57. Add the following city detail plates to the plans: a. Sanitary sewer manholes (SAN -1 and SAN -2) b. Concrete hydrant pad (WAT-9). c. Hydrant (WAT-1) d. Gate valve (WAT-3) and butterfly valve (WAT-4) e. Dead end water line (WAT-8) f. Services (SER -1) g. Irrigation service, if applicable (SER -12) h. Storm sewer structures (STO-4, STO-5, STO-6, STO-7, STO-9) i. Pond benching detail (STO-15) j. Overflow structure (STO-18) k. Future Road Extension Sign (STR-31) I. Permanent barricade (STR-32) m. Streetlight (LGT-2) and concrete base (LGT-7). The need for additional details will be reviewed during final plan submittal/detailed design. 58. Curb ramps in the public right-of-way shall be constructed per MnDOT standard plan 5-297.250. Consider adding these documents to the plans. Sheet L1: 59. The City Forester will review the landscape plan for details related to tree species and planting locations. In general, the following restrictions should be applied to the plan: a. Deciduous trees should be located a minimum of 5' off any utility pipe Botton & Menk is an equal opportunity employer. Woodward Ponds Review Page: 7 b. Coniferous trees should be located a minimum of 15' off any utility pipe c. No trees should be located within a storm pond HWL d. No trees should be located within a storm pond's 20' access route i. Due to the proposed pond access, the tree near CBMH-544 should be removed. ii. Trees should not be planted on the berm/access route between Basin 500 and the infiltration cell. 60. Please depict all surface features such as traffic signs and streetlights on the landscape plan to help identify potential conflicts. a. Some trees are currently shown directly over hydrants and will need to be relocated. Stormwater: 61. HydroCAD: a. The HydroCAD simulations of existing and proposed conditions include existing ponds 10013, 200P, 300P and 400P and proposed ponds 10013 and 300P that all are simulated to start empty at elevations ranging from about 2 feet to 5 feet below the outlet structure crests. To be conservative, the 100 -year 24-hour precipitation event should be reanalyzed with these ponds starting at a pool level equal to the outlet structure crests so that the 100 -year highwater elevations and outflow rates not under predicted due to an assumption that these depressions will be dry before a simulated flood b. Please note that digital copies of the final version stormwater models and shapefiles or CAD drawings of existing and proposed drainage areas are to be submitted to the City once the review and revision process is complete. 62. Rational Storm Sewer Design: a. Storm sewer should be sized to a 5 -year rational method design. Submit rational method design calculations for the storm sewer system. Please submit a drainage map for each catchment. Include individual pipe segment velocities with calculations for review. The City Surface Water Management Plan requires that: "Trunk facilities should be analyzed and designed to accommodate the 100 -year ponded discharges plus 5 -year rational flows from areas that enter the trunk to be carried to the next storage area downstream.." The storm drain design downstream from OCS 200 will need to be sized to carry the 100 -year discharge from Pond 200P (10.2 cfs). Update these pipes in the rational table. The storm drain downstream from OCS 500 will need to be sized to carry the 100 -year discharge from Pond 500P (13.1 cfs). Include this pipe segment in the rational table. iii. Extend the Storm Drain from CB -637 to the property line for future connection to storm near off-site pond 100P. Size this pipe and those downstream to carry the 100 -year discharge from off site pond 10013 of about 11 cfs. Include this pipe in the rational table. Botton & Menk is an equal opportunity employer. Woodward Ponds Review Page: 8 iv. Include the future 100 -year discharge of about 10 cfs from the Off-site Pond 300P in the storm drain capacity at CB -568 and downstream. Update these pipes in the rational table. 63. Volume Control: a. A design infiltration rate of 0.8 inches/hour has been recommended in the geotechnical report and is consistent with the MPCA Stormwater manual design rate for SP soils. A note on Sheet 6.41 states: "Post construction test on infiltration basin shall be required...." i. The Surface Water Management Plan indicates: At the discretion of the City Engineer, post -construction testing of infiltration/filtration rates within stormwater basins will be required, or post -construction records of water level measurements within stormwater basins will be required, to verify that design infiltration/filtration rates and drawdown periods will be met." b. Pipe sizes and elevations are not shown between the NURP Pond 500P and the Infiltration Basin. Please add the pipe sizes and elevations to the plans. c. A skimmer structure should be installed at the outlet from NURP 500P pond to the infiltration basin to prevent debris, organics, trash, hydrocarbons, oil & grease from entering the infiltration basin. Skimmer structures are proposed at the outlets of the NURP ponds (200P and 500P). d. Clay Liner. Sheet 6.41 indicates 2 feet of on-site clayey material that meets unified soil classification GC, SC, CH, or CL and Must have at least 30% passing the #200 sieve. i. The City standard is to place a 1 -foot minimum clay liner along pond bottom up to pond NWL. Liner shall have a maximum permeability of 1x10-6 cm/s with a minimum 15% passing the #200 sieve. e. The infiltration basin detail on Sheet 6.41 includes a 1 -foot thickness of soil media with a composition listed as 15% Organic Leaf Compost, 85% Onsite Sand. For a more successful vegetation establishment, the City recommends providing a Filter Topsoil Borrow (MnDOT 3877.2G) consisting of 70% sand (meeting the gradation requirements of 3126 "Fine Aggregate for Portland Cement Concrete") and 30% Grade 2 Compost (MnDOT 3890). Lower compost levels have typically proved difficult when establishing vegetation in basins. 64. Rate Control a. The HydroCAD models have starting pool elevation issues to resolve, so please revise and update the rate control analyses when the models are updated. 65. Freeboard: a. For backyard and side -yard conveyance and temporary ponding areas, there must be at least 1 foot between the overland overflow elevation and the low adjacent grade elevation of the adjacent structure. Botton & Menk is an equal opportunity employer. Woodward Ponds Review Page: 9 b. Pond Freeboard standards: For stormwater facilities with emergency overflows, the low adjacent grade elevation for all new structures must be a minimum of 3 feet above both the peak surface water elevation for the 100 -year precipitation event and 2 feet above the emergency overflow elevation of any immediately adjacent new stormwater basin. i. Adequate freeboard is not provided from the Pond 500P (not 2 feet above 500P EOF). ii. Adequate freeboard is not provided from the Pond 200P (not 2 feet above 200P EOF). 66. NPDES Construction Stormwater Permit: As this project disturbs more than 1 acre, an NPDES Construction Stormwater Permit and SWPPP will be required. Botton & Menk is an equal opportunity employer.