Loading...
HomeMy WebLinkAbout2020-01-27 PACKET 06.5. STAFF REPORT CASE: ZA2019-063 & PP2019-064 ITEM: 6.5 PUBLIC MEETING DATE: 1/27/20 TENTATIVE COUNCIL REVIEW DATE: 2/19/20 APPLICATION APPLICANT: D.R. Horton, Inc. – Minnesota REQUEST: A zoning amendment to change the zoning of 14.4 acres of vacant land from AG-2, Agricultural, to R-5, Medium Density Residential; and a preliminary plat for 82 lots and associated outlots for the creation of an attached housing multi-family development. SITE DATA LOCATION: Southeast corner of 65th Street & Century Avenue/Geneva Avenue ZONING: AG-2, Agricultural GUIDED LAND USE: Medium Density Residential (2040 Comprehensive Plan) LAND USE OF ADJACENT PROPERTIES: CURRENT GUIDED NORTH: Agricultural Low Density Res. EAST: School School SOUTH: Public Property Public Property WEST: Newport Residential Newport Res. SIZE: 14.4 acres DENSITY: 7.64 units per acre RECOMMENDATION Approval, subject to the conditions stipulated in this staff report. COTTAGE GROVE PLANNING DIVISION Planning Staff Contact: John M. Burbank, Senior Planner; 651-458-2825; jburbank@cottagegrovemn.gov Application Accepted: 12/2/19 60-Day Review Deadline: 1/25/20 120-Day Deadline Extension 3/25/20 City of Cottage Grove Planning Division  12800 Ravine Parkway South  Cottage Grove, MN 55016 Planning Staff Report High Pointe Planning Case No. ZA2019-063 and PP 2019-064 Zoning Amendment and Preliminary Plat January 27, 2020 Proposal D.R. Horton, Inc. – Minnesota has filed an application for a zoning amendment to change the zoning of 14.4 acres of vacant land located on the southeast corner of 65th Street and Century Avenue/Geneva Avenue from AG-2, Agricultural, to R-5, Medium Density Residential; and a pre- liminary plat for 82 individual zero lot line residential lots, 1 common area lot, and 4 outlots for the creation of a multi-family townhome development. Location Map Planning Staff Report – ZA2019-063, PP2019-064 High Pointe – Rezoning and Preliminary Plat January 27, 2020 Page 2 of 20 Preliminary Plat Review Process Application Received: November 26, 2019 Acceptance of Completed Application: December 2, 2019 Tentative City Council Date: February 19, 2020 60-day Review Deadline: January 25, 2020 120-day Review Extension Deadline: March 25, 2020 Background A Concept Plan Review for High Pointe was reviewed by the Planning Commission on August 26, 2019 and approved by the City Council on October 2, 2019. The approved concept plan included 98 attached residential townhome units arranged in 18 buildings on 14.4 acres of land. During the public hearing for the proposed project, there were concerns voiced about density, buffering, ac- cess, traffic, and the intersection conditions at 65th Street and Geneva Avenue. As a result of some of the concerns raised, staff met with the City of Newport to discuss the access, traffic, and intersection conditions. One of the actionable items resulting from the discussions is the planned provision of sanitary sewer and water services into Newport to serve the Ten-E Packaging Ser- vices property via this subdivision project. The company, which is at the southwest corner of 65th Street and Geneva Avenue, has a failing septic system. This action will require an intercommunity utility service agreement and a comprehensive plan amendment to be processed by the City of Newport. Planning Staff Report – ZA2019-063, PP2019-064 High Pointe – Rezoning and Preliminary Plat January 27, 2020 Page 3 of 20 Engineering Considerations The Civil plan set that was reviewed by the City’s Consulting Engineer is dated December 26, 2019, which is attached to this report. Also attached is the Engineers Comment Memorandum dated January 13, 2020. Planning Considerations Property Characteristics The site currently consists of a single-family residential structure, detached accessory structures, wetlands, agricultural land, and woodlands. It is expected that many of these site features will be cleared to allow for development that is consistent with the planned land use and zoning. Site Orthophoto Planning District This property lies within the West Draw portion of the community. The West Draw Master Plan was adopted in 1996 and included the impetus for the City’s tree preservation ordinance, and the planning policy related an emphasis on a stronger interconnected park and trail system. Both these actionable items were involved with the planning process for this project. For this project, the guiding land use document is the 2040 Comprehensive Plan. Planning Staff Report – ZA2019-063, PP2019-064 High Pointe – Rezoning and Preliminary Plat January 27, 2020 Page 4 of 20 Land Use and Density The submitted 2040 Comprehensive Plan guides the property for Medium Density Residential, which includes land use densities of 4.1 to 10 units per acre. The proposed development will provide 5.76 units per acre gross density, and 7.64 units per acre net density; thus, the develop- ment’s density is consistent with the 2040 Comprehensive Plan. 2040 Future Land Use Map Excerpt Zoning The property is currently zoned AG-2 Agricultural, and the applicant is requesting a zoning amend- ment to R-5, Medium Density Residential, to be consistent with the planned land uses found in the 2040 Comprehensive Plan. Current Zoning Map Zoning Performance Standards The design of the subdivision is consistent with the performance standards established for the R- 5 zoning district. The front yard of the residentially developing lot is 66th Street per the ordinance criteria. The front yard setback on Lots 23 to 26 did not meet the minimum 30-foot front yard setback on the initial plan submital. Modifications to the project plat were made on January 23, 2020 and will be required to be incorporated into the final plat and final civil construction plan sets. A detail of the modification is included below. Planning Staff Report – ZA2019-063, PP2019-064 High Pointe – Rezoning and Preliminary Plat January 27, 2020 Page 5 of 20 Plat Modification Detail Architecture The subdivision will include buildings with elevations similar to what is shown below and in a variety of colors. Each unit will have a garage sized at 494 square feet which is meets the City’s minimum garage size for multi-family residential products. Proposed Exterior Elevation Detail Site Information Tree Preservation/Mitigation A tree inventory and mitigation plan were submitted with the development application materials. The tables below identify the tree replacement calculations and the planned mitigation replace- ment schedule. Planning Staff Report – ZA2019-063, PP2019-064 High Pointe – Rezoning and Preliminary Plat January 27, 2020 Page 6 of 20 Based on the tree mitigation calculation and a 26-tree overplanting credit, the required tree miti- gation fee is $131,850.00. The Developers Agreement shall specify the terms of the payment of this fee. The fee calculation formula is included below. Tree Mitigation Fee Table Landscaping The proposed landscaping for the development meets the City’s Zoning Ordinance requirements (City Code Title 11-6-5). It is also recommended that the Homeowner’s Association (HOA) for the townhome development be required to maintain the landscaping and irrigation to the back of the curb or edge of the roadway. Planning Staff Report – ZA2019-063, PP2019-064 High Pointe – Rezoning and Preliminary Plat January 27, 2020 Page 7 of 20 Landscaping Plan As requested during the concept plan review, the area along Geneva Avenue is heavily land- scaped for screening purposes. A detail of that area is shown below. Geneva Avenue Landscaping Buffer Detail Surface Water Management As outlined in the attached engineering review memo dated January 13, 2020, the submitted Surface Water Management Plan is incomplete. The final civil plan submittal shall reflect the changes as identified in the memo. Planning Staff Report – ZA2019-063, PP2019-064 High Pointe – Rezoning and Preliminary Plat January 27, 2020 Page 8 of 20 Stormwater Drainage Areas The wetland buffers identified with the submittal meet the watershed district requirements and are shown around the delineated wetlands below. The minimum width of the average 50-foot wide required buffer is 25 feet. The Watershed District approved the wetland delineation dated September 6, 2019. Wetland and Buffer Detail Planning Staff Report – ZA2019-063, PP2019-064 High Pointe – Rezoning and Preliminary Plat January 27, 2020 Page 9 of 20 Transportation Access and Right-of-Way All the streets within the subdivision are private and will be privately constructed and maintained. The internal private drives connect to 66th Street, which is a local street directly south of the property. This roadway provides traffic connections for the site to the minor collector, 65th Street, via Geneva Avenue and Goodview Avenue, which are local streets. Based on the design of the existing roadways surrounding the subdivision, no negative traffic issues are anticipated. Project Access Location Detail The proposed preliminary plat shows the inclusion of the additional right-of-way that was noted as being required for public dedication during the concept plan review for the project. A detail from the right of way dedication locations is included below. Right-of-Way Dedication Location Detail Staff has had discussions with the City of Newport regarding possible improvements to the inter- section at Geneva Avenue and 65th Street, including the possibility of vacating the northern public right-of-way leg of the intersection. Washington County commented that no additional right-of-way is needed on the south side of 65th Street. Public right-of-way easements are required to be dedicated to the City over any publicly designed trail or sidewalk improvements that are con- structed on private property. Planning Staff Report – ZA2019-063, PP2019-064 High Pointe – Rezoning and Preliminary Plat January 27, 2020 Page 10 of 20 Parking The zoning ordinance requires at least 2 spaces per dwelling unit in multi-family residential dis- tricts. Additional spaces for visitor parking shall be provided based on the development charac- teristics and anticipated demand for visitor spaces as determined by the City, or additional parking spaces for visitor parking shall be provided based on 1.5 spaces for every 10 units. The first metric is met with the driveways for the individual units, which have a minimum design of 16 feet wide by 22 feet in length. The on-street parking metric is satisfied with the provision of 18 on-street parking spots (12 required). A detail of the designated parking spots is included below. Visitor Parking (18) City staff is requiring that parking be prohibited on both sides of the private roads, and that both sides of all the private streets be posted as no parking. Environmental Assessment Worksheet (EAW) The proposed project does not trigger an environmental review prior to development. Utilities and Area Charges Public utilities are available to the site and are detailed below. Area charges will be required to be paid with the final plat for the property. Utilities were installed in 2017. They have been reviewed and are sized appropriately for medium density development. Planning Staff Report – ZA2019-063, PP2019-064 High Pointe – Rezoning and Preliminary Plat January 27, 2020 Page 11 of 20 Existing Location Detail Open Space City Code requires a minimum of 400 square feet of open space per residential unit, which is met with the planned open space calculation of 3,989 square feet per unit. The applicant is proposing to construct a private HOA controlled dog park on Outlot A as one of the available recreational amenities for the new neighborhood. Only one of the three outlots, Outlot B, in the preliminary plat will be dedicated to the public. HOA Private Dog Park Location Planning Staff Report – ZA2019-063, PP2019-064 High Pointe – Rezoning and Preliminary Plat January 27, 2020 Page 12 of 20 Park Dedication State Statute and the City’s Subdivision Ordinance allow for park dedication fees of up to 10 percent of the developing property or a cash fee payment in leu of land dedication. There is no usable area in the outlot above the high water elevation, so no dedication credit is given. The 2020 cash park dedication rate for townhomes is $2,550 per unit. Based on the existing public open space areas adjacent to the project, the City’s Technical Review Committee recommended a cash dedication in lieu of land dedication. A detail of surrounding Parks and Trails is below. Sidewalks and Trails Public sidewalks and trails are required with the development. It is recommended that as a com- ponent of the platting process for development of this site that the missing link sidewalks and trails identified in red, orange, and blue below be installed as a component of the project. Those in- stalled internal to the project property lines will be required to be privately maintained. Planning Staff Report – ZA2019-063, PP2019-064 High Pointe – Rezoning and Preliminary Plat January 27, 2020 Page 13 of 20 Sidewalk and Trail Detail Public Hearing Notices The public hearing notice was mailed to property owners within 500 feet of the project and included residents from Cottage Grove and Newport. It was published in The Bulletin and mailed to the adja- cent neighbors on January 15, 2020. Recommendation That the Planning Commission recommend that the City Council approve a zoning amendment to change the zoning of 14.4 acres of vacant land located on the southeast corner of 65th Street and Century Avenue/Geneva Avenue from AG-2, Agricultural, to R-5, Medium Density Residen- tial; and approve the preliminary plat for High Pointe, which includes 82 residential lots, 1 common area lot, and 4 outlots for a multi-family townhome development. General Development 1. The final plat, covenants, Homeowners Association, and required land conveyance deeds and other development documents for the subdivision shall be recorded with Washington County. 2. Development of the property will require the submittal and review of a final plat application. 3. Outlot B shall be dedicated to the City. Planning Staff Report – ZA2019-063, PP2019-064 High Pointe – Rezoning and Preliminary Plat January 27, 2020 Page 14 of 20 4. The address and street names for the site shall follow the Washington County street naming convention. 5. The developer must abide by the conditions stipulated in Resolution 2019-113, which ap- proved the High Pointe concept plan. 6. The developer and builders must comply with all City ordinances and policies. 7. The developer and builders must comply with all city ordinances and policies except as may be modified by agreement of the developer and City staff or as conditions outlined in the approved Development Agreement. 8. The civil construction plans shall be modified to reflect the comments found in the project review memorandum from Bolton & Menk, Inc. dated January 13, 2020. 9. The streetlight poles and luminaries will be the City standard streetlight with LED luminaries. 10. The final plat and declaration of private covenants must be recorded with the Washington County Recorder’s Office before any building permit can be issued. One townhome model permit may be issued if the final plat is recorded and there is a Class 5 access route to all permitted model units. No certificate of occupancy shall be issued to said units until they are connected to public utilities and the first lift of asphalt on the roadway is installed. 11. The units in the building shall have a minimum percentage of brick and stone as follows: a. 4-unit buildings – 24% b. 5-unit buildings – 27.5% c. 6-unit buildings – 30% 12. Residential lot boundary marker(s) must be installed before a Certificate of Occupancy can be issued for the residence on that residential lot. For lots constructed between November 1 and May 1, a Certificate of Occupancy can be issued, and the escrow retained until installation of the markers is confirmed. 13. The applicant shall receive appropriate permits (building, grading, right-of-way) from the City, and permits or approvals from other regulatory agencies including, but not limited to Washington County, the South Washington Watershed District, Minnesota Department of Health, Minnesota Department of Natural Resources, and Minnesota Pollution Control Agency. 14. All monument signs must comply with the City’s Sign Ordinance and only be placed on private property. 15. The Developer shall incorporate the recommendations, requirements, and evaluations noted in the Bolton & Menk memorandum dated January 13, 2020, into the final plat subject to modifications that are agreed to by the developer and City engineer. Planning Staff Report – ZA2019-063, PP2019-064 High Pointe – Rezoning and Preliminary Plat January 27, 2020 Page 15 of 20 16. The final plat for High Pointe will not be processed for approval until the outstanding 65th Street Deferred Assessment Waiver is paid in full, totaling $133,493.64. Platting, Land Dedication, and Easements 17. The submittal of the final plat and the City’s approval of the final plat are subject to addi- tional conditions that will be listed in the City resolution approving the final plat and included in the development agreement. 18. The dimensions of each lot must be verified on the final plat, and a list containing the square footage for each lot must be provided to the City. 19. The developer must enter into an agreement with the City of Cottage Grove for the com- pletion of the public and private improvements required by City ordinances. Once the development agreement is completely executed and all cash deposits and payments are paid to the City, the City will release the final plat to the developer for recording at the Washington County Recorder’s Office. 20. The developer shall prepare a warranty deed to convey fee ownership of Outlot B to the City of Cottage Grove and record the deed once the City has inspected the required im- provements proposed on the outlot. Once the City has accepted the improvements and the developer has removed any silt fence, erosion control devices, and ground vegetation has matured within these outlots and is accepted by the City, the developer shall prepare a record plan for the outlot. A copy of the recorded plan must be submitted to the City. The warranty deed shall be recorded at Washington County Recorder’s office once the outlot is accepted by the City. Construction and Grading 21. All grading, drainage, erosion control, and utilities must conform to the final plans approved by the City Engineer. 22. Prior to the submittal of the final plat application to the City, the developer must submit for staff review and obtain approval of a final construction management plan that includes erosion control measures, project phasing for grading work, areas designated for preser- vation, a rock construction entrance, and construction-related vehicle parking. 23. A pre-construction meeting with City staff and the contractor must be held before site work begins. The contractor will provide the City with a project schedule for the various phases of construction. 24. Upon completing site grading, four copies of an “As-Built” survey for the site grade eleva- tions must be submitted to the City. An electronic file of the “As-Built” survey must also be submitted to the City Engineer. 25. A detailed surface water management plan meeting City and SWWD requirements and addressing the January 13, 2020 engineering comments shall be submitted with the final plat. Planning Staff Report – ZA2019-063, PP2019-064 High Pointe – Rezoning and Preliminary Plat January 27, 2020 Page 16 of 20 26. Before the site is rough graded, and any utility construction commences or building permits are issued, the erosion control plan shall be implemented by the Developer and inspected and approved by the City. The City may impose additional erosion control requirements if it is determined that the methods implemented are insufficient to properly control erosion. 27. The wetland buffer areas shall be protected during grading and construction, and the devel- oper shall install permanent wetland buffer delineation markers upon the completion of grading and re-establishment of the disturbed areas on the site. 28. The Developer may start rough grading of the lots before the plat is filed, if a Minnesota Pol- lution Control Agency (MPCA) Construction Storm Water Permit has been issued and the City has been furnished with a cash escrow or letter of credit in the minimum amount specified in the approved development agreement and obtain a grading permit from the City. 29. Before final financial guarantees are released, a certificate signed by a registered engineer must be provided. This certificate will state that all final lot and building grades are in conform- ance to the grading and drainage development plan(s) approved by the City Engineer. 30. All stormwater management infrastructure shall be owned and maintained by the HOA. The developer and HOA shall enter into a stormwater maintenance agreement with the City for all stormwater management within the site. Park Dedication 31. Prior to the recording of the final plat, a cash in lieu of land dedication fee of $2,550 per unit shall be paid to the City for deposit in the Park Trust Fund. 32. The developer or HOA may install private fences, play equipment, swing sets, sand boxes, or other recreation items on Outlot A or any other common area, but not in Outlot B or in any wetland buffer. 33. If the HOA desires a more regular maintenance of Outlot B, the HOA shall prepare a maintenance plan and submit it to the Cottage Grove Public Works Department for review and approval and assume the costs of the additional maintenance. There are no park ded- ication credits for Outlot A. 34. All retaining walls shall be located on private property. 35. All retaining walls with a grade change greater than 30 inches that is within 36 inches of a trail or sidewalk shall be fenced on the top with fencing that meets the City’s fencing stand- ard detail sheet (rod iron fence), or the approval of the Community Director. Landscaping 36. A letter of credit amounting to 150 percent of the landscaping estimate and irrigation sys- tems should be submitted to and approved by the City. Upon completion of the landscaping improvements, the owner shall, in writing, inform the City that said improvements have been completed. The City shall retain the financial guarantee covering the landscape im- provements for a period of one year from the date of notice, to ensure survival of the plants. Planning Staff Report – ZA2019-063, PP2019-064 High Pointe – Rezoning and Preliminary Plat January 27, 2020 Page 17 of 20 No building permit shall be issued until the required financial guarantee has been received and accepted by the City. Lot Performance Standards 37. All setbacks shall be approved as established in the civil plan set dated December 26, 2019, and per the noted setback adjustment for Lots 23 to 26 as noted in the Planning Staff Report dated January 27, 2020. 38. The minimum attached garage area for each unit shall meet the minimum sizing require- ment for multiple-family units as outlined in the Zoning Ordinance. 39. The principal structures shall utilize a combination of colors and architectural designs similar to the building elevation identified in the January 27, 2020, Planning Staff Report. 40. Windows, doors, and garage doors must have a low or no maintenance trim on all four sides of the dwelling abutting a public right-of way. 41. The front façade siding shall consist of LP siding, cementious board, or equivalent product approved by the Community Development staff. Vinyl siding is prohibited. Utilities 42. The Developer is responsible to provide for the necessary easements and costs associated with road, trail, sidewalk and utility improvements serving the site. All drainage and utility easements as recommended by the City Engineer must be shown on the final plat and dedicated to the City for public purposes. 43. The water utility plan shall conform to the City’s water supply and distribution plan. 44. The sanitary sewer utility plan shall conform to the City’s sanitary sewer comprehensive plan. 45. All stormwater designs shall meet the intent of the City’s Surface Water Management Plan and the SWWD Water Management Plan. 46. The developer must make all necessary adjustments to the curb stops, gate valves, and metal castings to bring them flush with the topsoil (after grading). Streets 47. Both sides of all private streets shall be posted as no parking for fire lanes. 48. Permanent or temporary vehicular access other than through the identified access points on 66th Street is prohibited. 49. The private streets shall be identified in conformance with the City’s adopted signage policy. 50. The City will furnish and install the street name plates and poles. The developer must pay the City for the costs of labor and materials for these street name signs. Planning Staff Report – ZA2019-063, PP2019-064 High Pointe – Rezoning and Preliminary Plat January 27, 2020 Page 18 of 20 Tree Mitigation 51. Based on the tree inventory and removal plan, the applicant shall pay $131,850.00 to the City’s Public Landscape Initiative Fund. The terms of payment shall be identified in the Developers Agreement. Sidewalks and Trails 52. The Developer is required to construct all bituminous recreation trails and concrete side- walks adjacent to and within the project boundaries as noted in the Planning Report dated January 27, 2020. Landscaping and Irrigation 53. The irrigation box for the underground irrigation systems must be on private property. 54. The final landscaping plan shall be consistent with the City’s approved tree list. Homeowners Association (HOA) 55. The platting of the property shall include the requirement of a homeowner’s association (HOA). All residences must be part of the Homeowner’s Association (HOA). 56. The applicant must submit private covenants with the final plat application which details the following: a. The declaration of covenants shall include a provision that if the homeowners associa- tion defaults on payment of property taxes on outlots required to be owned by the home- owners association and becomes tax-forfeited property with the City obtaining ownership, the City will bill annually each landowner within the subdivision the cost to maintain the forfeited parcel(s) and all property taxes due thereon. b. If fencing is installed in the subdivision along any public right of way, it must be con- structed of the same design, materials, and color. The fencing must not encroach within the public right-of-way. c. All fencing within the subdivision shall meet the approval of the Community Develop- ment Director. d. All signs, mailboxes, and accessory lighting will be uniform in materials and design and be approved as part of the final landscape plan. e. After the initial restoration project and follow up maintenance is complete, the public open space areas created through the platting will be managed as Class E open space, which has very minimal City involvement. 57. Each lot in the subdivision shall have four (4) trees and ten (10) shrubs installed per the requirements established in the Development Agreement. Planning Staff Report – ZA2019-063, PP2019-064 High Pointe – Rezoning and Preliminary Plat January 27, 2020 Page 19 of 20 58. Maintenance is required for all private roads, streetlights, stormwater, common outlots, land- scaping, fencing, irrigation signage, and group mailboxes. The HOA will be responsible for maintaining to the back of curb or shoulder of all abutting roadways. 59. Building address range signs shall be placed by the Developer. 60. Snow removal is required as detailed in the Development Agreement. 61. All mailboxes and location of mailboxes must comply with the U.S. Post Office guidelines and regulations. Onsite Infrastructure Improvements 62. The developer and HOA are responsible for all street and streetlight maintenance. The developer and HOA will sign an agreement with the City for maintaining all streets and streetlight infrastructure. 63. The developer will be required to conduct all major activities to construct the public im- provements during the following hours of operation: Monday through Friday 7:00 A.M. to 7:00 P.M. Saturday 9:00 A.M. to 5:00 P.M. Sunday Not Allowed This does not apply to activities that are required on a 24-hour basis such as dewatering, etc. Any deviations from the above hours are subject to approval of the City Engineer. Violations of the working hours will result in a $500 fine per occurrence. 64. Upon completion of the work, the Developer shall provide the City with a full set of as-built plans for City records and transmitted to the City in a DWG Autocad format and pdf format. Developer must also furnish the City with a pdf format of the final plat and four prints of the recorded plat. If the Developer does not provide as-builts, the City will produce them at the developer’s expense. 65. The Developer must provide to the City an irrevocable letter of credit for on-site improve- ments to ensure that the developer will construct or install and pay for the following: a. Pave streets b. Concrete curb and gutter c. Hard surface driveways d. Street lights e. Water system (trunk and lateral) and water house service stubs f. Sanitary sewer system (trunk and lateral) and sanitary house service stubs g. Storm sewer system h. Shaping and sodding drainage ways and emergency overflows in accordance with the drainage development plan approved by the City Engineer Planning Staff Report – ZA2019-063, PP2019-064 High Pointe – Rezoning and Preliminary Plat January 27, 2020 Page 20 of 20 i. Adjust and repair new and existing utilities j. Sidewalks and trails k. Erosion control, site grading and ponding l. Surveying and staking m. Storm water basin boundary markers These improvements are all in conformance with City approved plans and specifications and will be installed at the sole expense of the developer in conformance with City Code Title 10, Chapter 5. The bank and form of the security is subject to the reasonable approval of the City. The security shall be automatically renewing. The term of the security may be extended from time to time if the extension is furnished to the City at least forty-five (45) days prior to the stated expiration date of the security. If the required public improvements are not com- pleted, or terms of the Development Agreement are not satisfied, at least thirty (30) days prior to the expiration of a letter of credit, the City may draw down the letter of credit. The City may draw down the security without prior notice for any default of the development agreement. The minimum amount for this financial guarantee will be included in the devel- opment agreement. 66. The developer must post a cash escrow with the City’s Finance Director to cover engineer- ing, legal, and administrative costs incurred by the City. If this non-interest bearing account balance becomes deficient, the Developer must deposit additional funds. This must be done before final bonding obligations are complete. This escrow amount will be included in the development agreement. 67. The City Forester will mark the location where the boulevard trees must be planted along 66th street and approve the tree species to be planted. The final landscape plan must be coordinated with the City Forester. Prepared by: John M. Burbank, AICP Senior Planner Attachments  Resolution 2019-113, Approving High Pointe Concept Plan  High Pointe Civil Development Plans Dated December 26, 2019  Bolton & Menk, Inc. Review Memorandum Dated January 13, 2020.  Preliminary Plat  Subdivision Rendering HIGH POINTE 14 OF 1 0021593.00 ALL SHEETS SHEET: 11/22/19 PROJECT NUMBER: SITE REVISION (NOT TO SCALE) INITIAL SUBMITTAL DATE: Vicinity Map FORFORCOTTAGE GROVE, MN UTILITIES AND LANDSCAPE PRELIMINARY PLAT, GRADING,HIGH POINTE PRELIMINARY PLANS CITY REVIEW......... ......... DATE 12/26/19 1 NO. Wetland Buffer PlanTree Preservation PlanTree Inventory Sheet Title CoverExisting ConditionsPreliminary PlatOpen Space PlanPreliminary Grading Drainage and Erosion Control PlanPreliminary Utility PlanStreet ProfilesDetailsDetailsPreliminary Landscape PlanPreliminary Landscape Details 123456789 1113 101214 Sheet Number SHEET INDEX 0021593.00 12701 Whitewater Drive, Suite #300Minnetonka, MN 55343 DEB RIDGEWAY FRANCIS D HAGEN II 952-985-7864 DRIDGEWAY@DRHORTON.COM (952) 937-5150(952) 937-5822(888) 937-5150 PhoneFax CONTACT: CONTACT: 20860 KENBRIDGE COURT, SUITE 100 COTTAGE GROVE, MN PREPARED FOR:LAKEVILLE, MINNESOTA 55044PHONE: EMAIL: PREPARED BY:PROJECT NUMBER: DR HORTON, INC. - MINNESOTA FORFOR UTILITIES AND LANDSCAPE PRELIMINARY PLAT, GRADING,HIGH POINTE PRELIMINARY PLANS N:\\0021593.00\\DWG\\CIVIL\\PRELIM\\0021593S-CVP01.DWG HIGH POINTE MIDDLE SCHOOL YTNU OC NOTGNPLAT OF NEW OLTMAN IHSAW HT UOS 338 D SI R/W SHOWN PER THE 2 000131272 060 :DIP HTUOS EUN EVA WEIVD OOG )Y AW FO THGI R CILBUP( THE SW 1/4 OF ESC. 6 E. LINE OF THE NW 1/4 OF X X TA W SAN 100.00 X X B/B 60.00 B/B 100.00 X X WAT 0 0 .0 5 0 0. 0 5 01 00. 60.00 MIDDLE SCHOOL & OAKRIDGE VIEW ESTATES R/W SHOWN PER THE PLATS OF NEW OLTMAN THE SW 1/4 OF ESC. 6 W. LINE OF THE NW 1/4 OF WAT FO POHOFHOP POHHOP POHHOPPOH 91.02 O FOFOFOPOHF FOFOFOPOH POHPOH POHPOH NEG HTUOS EUNEVA AVE (PUBLIC RIGHT OF WAY) EUNEVA YRUTNEC OTS CNI ,SECIVRES GNIGAKCAP E-NET 000412272010 :DIP 1 NAMFFOH ELLEHCIM & LEAHCIM PID: 0102722410002 60.00 HIGH POINTE 180' 14 5.0 OF 120' 11/22/19 60' Common Ground Alliance 3 5 Call 48 Hours before digging:10.0 811 or call811.com 1" = DATE: SHEET NUMBER: 60' (INCLUDING GUEST PARKING) PROPOSED15 FT25 FT31%182 STALLS PROVIDED, 4 DWY (TYP) 0' 0021593.00 AG2 - AGRICULTURAL4.19 AC R-582 HOMES 14.42 AC1.99 AC1.56 AC10.87 AC PROPOSED LOT LINE 3 22.0 AC): PROPERTY LINELOT LINESETBACK LINEEASEMENT LINECURB AND GUTTERPOND NORMAL WATER LEVELRETAINING WALL 0.41 PRIVATE DRIVE ( GENEVA 2 DWY (TYP) PROJECT NUMBER: 25 FT40%2/UNIT; 164 STALLS (INCLUDES DWY) STANDARD15 FT AC); 1.58 ( PROPOSED 22.0 1 10.0 65TH ST. PRELIMINARY PLAT B-B 24 5.0 WETLANDS:GROSS (82 UN / 14.42 AC): MAJOR R.O.W. (MULTI-FAMILY TOWNHOMES: EXISTING EXISTING ZONING:PROPOSED ZONING:GROSS SITE AREA:NET SITE AREA:PONDING/OPEN SPACE (OUTLOT A-D):DEVELOPMENT SUMMARYPROJECT DENSITY: SETBACK (R-5): The Northwest Quarter of the Southwest Quarter EXCEPT the South 20 acres thereof, Section Six (6),Township Twenty-seven (27), Range Twenty-one (21), Washington County, Minnesota.AND NET (82 UN / 10.87 AC):MIN. BLDG-BLDG SETBACK:MIN. PERIMETER SETBACK:MAX. IMPERVIOUS SURFACE:MIN. OFF STREET PARKING: Outlot C, NEW OLTMAN MIDDLE SCHOOL, Washington County, Minnesota.SITE DEVELOPMENT DATA PROPERTY DESCRIPTIONLOT DETAIL (NOT TO SCALE) LOT NUMBER SITE LEGEND 12701 Whitewater Drive, Suite #300Minnetonka, MN 55343 . (952) 937-5150(952) 937-5822(888) 937-5150 H TUO S EU NEV A WE IVD OOG 0 . PhoneFax 5 2 4 8 454 K LAWE DIS '5 2DESOP ORP . 7 3 2 75 75 1 3 62 62 6 2 BACK OF CURB TO BACK OF CURB 6 2 3131 31 31 1 3 2,325 sf 2,325 sf 42.2 75 75 5 7 5 2,325 sf 56 7 6 2 726 1,950 sf2 526 1,950 sf75 75 1,950 sf 775 1,950 sf1,950 sf 5 1,950 sf75 38.0 7 2,325 sf 13 26 60.0 26 26 26 6 2 62 STREET 6 1,950 sf 1,950 sf 6 2 6275 75 LOT 83 13 26 26 26 5 26 T E E 75 R 1,950 sf 1 T 75 S 1,950 sf DRAINAGE & UTILITY 18.3 EASEMENT OVER ALL OF 3 22.7 26 26 3131 8.3 2,325 sf 1,950 sf 35.0 75 75 75 325 31 31 0 9 . .3131 ALL LOT DIMENSIONS ARE ROUNDED TO THE NEAREST FOOT.ALL AREAS ARE ROUNDED TO THE NEAREST SQUARE FOOT.STREET NAMES ARE SUBJECT TO APPROVAL BY THE CITY.STREET WIDTHS ARE SHOWN FROM DRAINAGE AND UTILITY EASEMENTS SHALL BE PROVIDED AS REQUIRED. 0 0 2 2,325 sf 75 2,325 sf 2R 75 0 4 .B 2- 5 0 T B 2 E 2.3.4. 1.5. E DEVELOPMENT NOTES 1 R R 3 6 T S 2 26 6 2 1,950 sf HIGH POINTE 6 2 75 COTTAGE GROVE, MN 6 36.2 2 1 3 2626 5 7 7513 1,950 sf 5 62 4 . 7 8 62 1 2,325 sf 13 5 7 1,950 sf5 6 7 226 STREET 4 5 41,950 sf 35.9 1,950 sf 7 311,950 sf 3 55 75 7 5 2,325 sf 6 275 5 7 75 5 67 2 262,325 sf 267 1,950 sf 1,950 sf 756 22,325 sf 1,950 sf 3 1 3 5 . 0 13 4 6 2 6 2 313 3161 3 75 2,325 sf 750 61 31 31 75 110 2,325 sf 75 H R/W 1 T 31 3 26971 2,325 sf6 75 U 26 2 1,950 sf O 75 AREA S 30,878 SF (0.71 AC) 14,218 SF (0.33 AC)16,209 SF (0.37 AC)121,369 SF (2.79 AC) 2626 1,950 sf 2626 T 7575 H 1,950 sf E T 121,369 sf E 2626 15.5 U 75 R LICENSE NO. 1,950 sf 31 31 T O 2,325 sf 75 S S 26 26 254MINNESOTA 7 5 1,950 sf T PROPOSED 10' TRAIL H 75 ET 31 31 E 6 26262,325 sf 11/22/19 75 R6 75 1,950 sf T 3 8.0 .OPEN SPACEWETLAND/BUFFERWET/BUF/STWTR/O.S. USESTORMWATER 68,916 sf S 6 1 26 26 OR UNDER MY DIRECT SUPERVISION AND THAT I AM AOF THE STATE OF CORY MEYERDATE: 1I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY MEDULY LICENSED LANDSCAPE ARCHITECT UNDER THE LAWS 3 311,950 sf 975 H 2,325 sf 57 75 T 324 24 5 26 7526 B-B 75 60.0 1,950 sf 6 31 LOT 83 31 751 2,325 sf 3 31 2,325 sf 75 OWNERHOACITYHOAHOA DRAINAGE & UTILITY EASEMENT OVER ALL OF 26 26 1,950 sf 96 75 6 2 26 STREET 4 75 1,950 sf HIGHWAY EASEMENT PER DOC NO. 240416 0 3 185 (25' MIN/100' MAX) 2626 1,950 sf 57 OUTLOT TABLE OUTLOT: A B C D 186,166 sf 50' AVG WETLAND BUFFER 1 31 3 (SEE WETLAND BUFFER PLAN) 2,325 sf 75 117 6 4 7 1 1 4 0 .0 6 EDGE OF WETLAND LAKEVILLE, MINNESOTA 55044 33 6 20860 KENBRIDGE COURT, SUITE 100 99 7 16,209 sf 1 5 3 6 1 0 1 26 2 5 7 6 2 .7 5 2 2,325 sf 0 5 7 4 5050 21 3 49,633 SF (1.14 AC) BUFFER SF PROVIDED12,137 SF (0.28AC) 34 DR HORTON, INC. - MINNESOTA 51,950 sf 8 7 1 1 33 1,950 sf 140 PREPARED FOR: 5 11 7 77 3126262631 6 2,325 sf 52 11 7 88 6 54 2 16.0 1 3 4 5 T 775757575 75 E E 2,325 sf 2,325 sf1,950 sf1,950 sf1,950 sf R T 5 T E A W S /BL 1 R 3 P 0O 1 5 1 7 L T A 46 T 312262631 6 5 .N NI 5 EF 1 3 2,325 sf6 G M 5 412 0 . 4 E 13 5N 3 SI 5 7 R A 2 BE U 4- 30,878 sf D TS 1,950 sf R G EE 2B T 4 T 25' WETLAND BUFFER 51 N D 7 I 3 6 2 E T 5 E 2 T S I49,562 SF (1.14 AC) ABUFFER SF REQUIRED11,737 SF (0.27 AC) E X C E A EDGE OF WETLAND R 2,325 sf 57 7575 V T 5 17 3 S 31 31313131 31 42.0 75 95 2,325 sf2,325 sf 12,325 sf 1 757 75 7 11 1 31 262626 26262624 1,950 sf75 75 2,269 sf 4 1,950 sf1,950 sf 5 L 1 I 75 75 A D R E T S 2626 2626 262626 26 OE 1641,950 sf75 PR 1,950 sf751,950 sf 24 1,950 sf U O 9775 75 T R B-B PU F 164 2626 262626 2626 26 CITY REVIEW.... 1,950 sf 75751,950 sf 1,950 sf 1,950 sf 75 11/22/19 75 7 4 14,218 sf OVER ALL OF LOT 83 9 3131 31 313131 3131 6 2,325 sf 2,325 sf 2,325 sf2,325 sf 75 5775 75 25' AVG; 12.5' MIN BUFFER WIDTH (AVG)50' AVG; 25' MIN STREET 1 DRAINAGE & UTILITY EASEMENT 2 2 PROPOSED 5' SIDEWALK 33 3232 12/26/19.... 33 R/W R/W PROPOSEDFUTURESIDEWALK 25.5 91 385385 151 25.4 INITIAL ISSUE:REVISIONS: 33 ENEG 33 HTUOS EUNEVA AV 17,676 sf536 66 R/W EUNEVA YRUTNEC 6' 60' DWR FDH IIFDH II OR 12' WETLAND AREA49,698 SF (1.14 AC) 18,349 SF (0.42 AC) DESIGNED:CHECKED:DRAWN:HORIZONTAL SCALE:VERTICAL SCALE: WETLAND BUFFER TABLE:WETLAND: 1 2 N:\\0021593.00\\DWG\\CIVIL\\PRELIM\\0021593S-PPP01.DWG HIGH POINTE 14 OF 180 11/22/19 Common Ground Alliance 4 Call 48 Hours before digging: 811 or call811.com DATE: SHEET NUMBER: 120 1" = 60 0021593.00 60 0' PROJECT NUMBER: OPEN SPACE PLAN Open Space Area = 2.34 acres or 101,861 sf(101,861 sf / 82 units = 1,242 sf per unit 12701 Whitewater Drive, Suite #300Minnetonka, MN 55343 (952) 937-5150(952) 937-5822(888) 937-5150 PhoneFax HT UOS EUN EVA WEIV DO OG 2 STREET 6 5 T E E R 1 T S 3 HIGH POINTE COTTAGE GROVE, MN 5 T E E R T S STREET 4 3 26971 H T U O S LICENSE NO. T H E T 121,369 sf E MINNESOTA U R T O S S 11/22/19 TH E T E 6 OR UNDER MY DIRECT SUPERVISION AND THAT I AM AOF THE STATE OF CORY MEYERDATE: I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY MEDULY LICENSED LANDSCAPE ARCHITECT UNDER THE LAWS R 6 T S H T 5 6 STREET 4 186,166 sf EDGE OF WETLAND LAKEVILLE, MINNESOTA 55044 20860 KENBRIDGE COURT, SUITE 100 DR HORTON, INC. - MINNESOTA PREPARED FOR: 4 T E E R 5 T S 2 S T ER TE 4 T E EDGE OF WETLAND E R T S CITY REVIEW.... 11/22/19 12/26/19.... INITIAL ISSUE:REVISIONS: STREET 1 22 NEVA AVENEG HTUOS EU 60 CLMCLMSRM EUNEVA YRUTNEC DESIGNED:CHECKED:DRAWN:HORIZONTAL SCALE:VERTICAL SCALE: N:\\0021593.00\\DWG\\CIVIL\\PRELIM\\0021593S-OSP.DWG HIGH POINTE 14 08/15/17 GD25A LAST REVISED: OF 11/22/19 Common Ground Alliance 5 Call 48 Hours before digging: 811 or call811.com DATE: SHEET NUMBER: WALKOUT/LOOKOUT (0.7'AT GARAGE DOOR LOT CORNER ELEVATIONLOT NUMBERREAR GROUND GRADE ATBELOW BASEMENT FLOORELEVATION FOR WALKOUT)MINIMUM BASEMENTFLOOR ELEVATIONFRONT GROUND GRADE 989.6 980.6 SOIL BORING LOCATIONSPOT ELEVATIONCL-CL ELEVATIONTOP AND BOTTOM OF RETAINING WALLSTORM SEWERTREE LINEGRADING LIMITSWETLAND LINEWETLAND BUFFERWETLAND FILLWETLAND BUFFER LIMITSWETLAND BUFFER MONUMENT PROPERTY LINEINDEX CONTOURINTERVAL CONTOURHIGH/LOW POINTFLOW DIRECTIONEMERGENCY OVERFLOWPROPOSED STREET PROFILE GRADEEROSION CONTROL BLANKETROCK CONSTRUCTION ENTRANCERETAINING WALL (MODULAR BLOCK)POND NORMAL WATER LEVELPOND ACCESS MAINTENANCE BENCHDO NOT DISTURB 0021593.00 DRIVEWAY G TYPICAL LOT 983.0 99 991.0 983.0 VARIES WO 02 0.089 989.2 88 900.00900.00CL-CL900.00TW=XXX.XX HP/LPBW=XXX.XX 99 X.XX% 0.00% PROPOSEDE.O.F. DND PROJECT NUMBER: TO PROPOSED GRADE. ELEVATIONS AND HOUSE STYLES SHOWN ARE ENGINEERS SUGGESTED INDICATES A CUSTOM HOUSE PAD WHICH HAS NOT BEEN COMPLETELY GRADED OR PREPAREDDESIGN FOR CUSTOM LOTS AND SHOULD BE VERIFIED WITH THE DEVELOPER. THE NUMBER IN THE PARENTHESIS INDICATES THE TO FRONT GROUND GRADE AT GARAGE DOOR. NUMBER OF BLOCKS THAT THE GARAGE IS DROPPED. EACH BLOCK=8". R = RAMBLER, GRADED FOR 7.7' OF DIFFERENCE FROM BASEMENT FLOOR ELEVATION TO FRONT GROUND GRADE AT GARAGE DOOR. GRADE AT THE LOOKOUT TO THE FRONT GROUND GRADE AT THE GARAGE DOOR.WO = FULL BASEMENT WALKOUT, GRADED FOR 8.4' OF DIFFERENCE FROM THE REAR GROUND GRADE AT THE WALKOUT TO FRONT GROUND AT GARAGE DOOR.NOTE:1. R(1) = RAMBLER, GRADED FOR 7.0' OF DIFFERENCE FROM BASEMENT FLOOR ELEVATIONLO = FULL BASEMENT LOOKOUT GRADED FOR 5.0' OF DIFFERENCE FROM THE REAR GROUNDSOG = SLAB ON GRADE UNIT. DRAINAGE ARROW CUSTOM CONTROL PLAN 2 0 88 900.00 99 EXISTING 150' ALL CONTOURS AND SPOT ELEVATIONS ARE SHOWN TO FINISHED SURFACE/GUTTER GRADESUNLESS OTHERWISE NOTED.REFER TO THE SITE PLAN/RECORD PLAT FOR MOST CURRENT HORIZONTAL SITE DIMENSIONSAND LAYOUT.THE CONTRACTOR SHALL VERIFY THE LOCATION AND ELEVATION OF EXISTING UTILITIES ANDTOPOGRAPHICAL FEATURES WITH THE OWNERS AND FIELD-VERIFY PRIOR TO CONSTRUCTION.THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ENGINEER OF ANY DISCREPANCIES ORVARIATIONS FROM PLAN.ALL CONSTRUCTION SHALL CONFORM TO LOCAL RULES.POSITIVE DRAINAGE FROM THE SITE MUST BE PROVIDED AT ALL TIMES. PRELIMINARY GRADING DRAINAGE AND EROSION 4. GRADING LEGENDGRADING & DRAINAGE NOTES 2.3. 1.5. 100' H 50' O P 1" = 63 50' EX.TC 62.2 86 85 TW 965.3 48EX.TC 62.6BW 962.8 EX. TC 61.8 H 38 TW 963.0 BW 963.0 2TW 964.8 8BW 962.4 O TW 963.1 BW 962.01 8 HTU OS E P UNE VA WEI VD OOG SF F S EX.TC 60.9 F S F TW 963.5TW 963.4 BW 961.1BW 960.9 S F S EX.TC 60.4 SF SF TW 960.6 SF BW 960.6 121 FS 0' 12701 Whitewater Drive, Suite #300Minnetonka, MN 55343 0.2 %0 2 F S 6.7% F S POH 7.6% 6.2% 2 6(952) 937-5150(952) 937-5822(888) 937-5150 5.9% SF 6.9% F PhoneFax 0.70% S POH E.O.F967.0 6.0% 5.1% % X 120 3 . STREET 6 % 73.1 3 % 73.7 5 . 1 73.228.8% .2 7 % 4 7 % . 2 6 F . S 3 5 H T 4 E% %TC 70.7 73.4 E. % 1 R 4.8% 9. O 11 T 9 0 S. 73.86 P 73.300.2 TC 70.1% SF 0 3 . 6 2 5 = % 3 E4.3% 0 7.5% 0R X . % 1 2 61 0 X 0 X. 2 % X 2 5.6% 9 . 1 SF RE=70.5 E.O.F 972.3 %0.70% X%4 0 POH 0 03.1% 0 . SF. 2 2 5 9% T E 13 .E % 1 R 2 X T 4.1%8% S . % 2 9 73. 1 3. 41 % % % 0 0 1 7.6%%0% .29. 2.00%.1 0 7. 8 .2 21 2 4 POH% 0 . SF % 7 X 6 .% X% 33 % .9 2 . 4 7. 3 6 60 4.3% STREET 4 SF H TC 74.1 7.6%HIGH POINTE O COTTAGE GROVE, MN % P H.P. 2 X 968.2 9 . SF 1 TW 974.0 BW 970.5 2.00% X TW 972.0 X BW 970.5 TC 74.6 83 1 1 H 2.00% O P 4.3% 975.4 H.P. H SF O P TW 978.0 BW 976.0 5.6% X F S X %5.3 H 3 T 59 U H O PH H.P. 4.1% O SF 973.7 P O TW 977.5 BW 975.0 S 4.0%TW 974.0 BW 974.0 4.4% SF T 17716 4.4% H E 7 1 T 121,369 sf 1 E U H R O F P S 6.9% T O S 964.1 E.O.F S 1.92% 7.6% SF LICENSE NO. H T X X 4.3% 4 TW 974.0X BW 974.0 E T 4.6% E MINNESOTA 6 58 HF S O R F 6 PS BOT: 957.0 T F S F S 11/22/19 S F 7.6% S 7.8% H PRETREATMENT 2B OR UNDER MY DIRECT SUPERVISION AND THAT I AM AOF THE STATE OF FRANCIS D HAGEN IIDATE: I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY MEDULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS T 4.5% 116X H 5 O F S P 6.2% 6 BOT: 957.0NWL: 960.0HWL: 963.6 2.02% FILT. BASIN 2 7.6% H.P. SF 973.7 7.8% 3.9% PRETREATMENT 2A F 5 S E.O.F958.5 H TW 972.07 BW 972.0 O 5 P X 7.1% STREET 4 F S % 2 3.9% F 9 S . 5 1 H 1 TW 968.0 BW 968.0 O 1 P F S 2.00% 186,166 sf 7.1% F S TW 969.0 BW 964.0 FILT. BASIN 1NWL: 957.0HWL: 961.4 6 H O P 56 F S NWL:957.7HWL:958.4 WETLAND 2 F S LAKEVILLE, MINNESOTA 55044 H 4 O 20860 KENBRIDGE COURT, SUITE 100 TW 968.0BW 961.5 1 P 1 TW 969.0BW 961.5 F S PRETREATMENT 1BOT: 954.0 F S F F S S H O 7 P DR HORTON, INC. - MINNESOTA F F S S 5 5 % PREPARED FOR: 0 0 . F S 5 F S F S H 0 O 5 F . P SF FS S 32 31 F 0 S 1 + 1 3 % 1 3 . F S 7 % F 4 S . 4 F% S 6% .% H 0 F 0 S 0 6. 2 O 2 0 1 . P F 2 S 8 % TC 65.3 9 .4 4 1 TW 962.0 BW 962.0 T 5 E %E %% 0 0 R 05 . 3 0 0 TC 65.85.T . F 2 S 2 S 1 % 1 0 1 0 .% 0 5 2. 3 F S 2 1 H 4.3% 1 6.6% 7.2%6.7%6.1%3.9% O % P 0% 3 . 0 17 0. % NWL:948.2HWL:950.69 WETLAND 12 0% 2 6 . 0 F 0 S 0 . TS R E TE% 4 0 2 1.0 2 T E F % S 0 0 . E 2 % 9 . 3 H 3 R O 5 % P 6 . 6.1% 6.2% T 7 1.92% 8.4% S RE=63.0 F % CITY REVIEW.... 1 .S 3.3%6 4.8% 2 11/22/19 F S 2.00% 5.4% 8.5% 7.6% 1 H 1 O 1 P 5.1% 12/26/19.... 8.4% F SF 2.6%S 5.2% INITIAL ISSUE:REVISIONS: 5.2% 2 4.7% 8.5%1.92% H 8.4% 2.00% 965.8 O E.O.F P O T 52 S 5.1% %00.2 F X S 5' 8.8% 50' SF DWR 2.5% 5.2%FDH IIFDH II OR 35.0% 7.4% H 10' O P 0 2.00% 1 STREET 1 122 X F S RE=65.0 F S X F S SF FO POHOFPOH POHPOHHOP POHPOHPOH FO FOFOFOPOHFOPOH FOFOFOFOHPOH PO POHPOHPOHPOHF POH S H.P. SFSFSF SF 966.7 SFSF SFSF SF SFSF SFSFSF AVENEG HTUOS EUNEVA H.P. 966.8 H O P 3736 3938 4140 4342 DESIGNED:CHECKED:DRAWN:HORIZONTAL SCALE:VERTICAL SCALE: EUNEVA YRUTNEC OTS N:\\0021593.00\\DWG\\CIVIL\\PRELIM\\0021593S-GDP01.DWG HIGH POINTE 14 OF 150' 11/22/19 Common Ground Alliance 6 Call 48 Hours before digging: 811 or call811.com DATE: SHEET NUMBER: 100' 50' 1" = WATER MAIN SANITARY SEWERSTORM SEWER DRAIN TILEHYDRANT w/AUX. VALVE 0021593.00 50' 0' PROPOSED PROJECT NUMBER: PLAN EXISTING THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS PRIOR TO CONSTRUCTION ANDCONFORM TO THE CITY OF COTTAGE GROVE'S STANDARD SPECIFICATIONS FOR STREET &THE CONTRACTOR SHALL RECEIVE THE NECESSARY PERMITS FOR ALL WORK OUTSIDE OF THEVERIFY EXISTING INVERT LOCATION & ELEVATION PRIOR TO BEGINNING CONSTRUCTION.THE CONTRACTOR SHALL CONTACT "GOPHER STATE ONE CALL" FOR FOR UTILITY LOCATIONS NOTIFY THE OWNER OF ANY DIFFERENCES.UNLESS OTHERWISE NOTED, ALL MATERIALS, CONST. TECHNIQUES AND TESTING SHALLUTILITY CONSTRUCTION.PROPERTY LIMITS.PRIOR TO UTILITY INSTALLATION. PRELIMINARY UTILITY 2.4. GENERAL UTILITY NOTES 1.3.5. UTILITY LEGEND 63+21.91 POH 4 9 . 6363 0 1 0 + 5 6688 . 65588 44886 8 3388 3 8282 H 8181 TU+ POH OS E UNE VA WEI VDO OG 0 8 T A W 121121 2 WAT POH 12701 Whitewater Drive, Suite #300Minnetonka, MN 55343 22 66 T EX. HYDRANT A W (952) 937-5150(952) 937-5822(888) 937-5150 POH 00 22 11 STREET 6 2 PhoneFax WAT 5 T E E R 1 T S POH 5 3 1 6161 T A W H CONNECT TO EXISTING8" WATERMAIN 4 O P 5 T E E 119119 R T TAW S 3 T WA 1 WAT H 21 O P 2 6060 T STREET 4 A W POH 3 118118 HIGH POINTE H O COTTAGE GROVE, MN P WAT POH CONSTRUCT MANHOLEOVER EXISTING SANITARY SEWER STUB H 3 T 5959 U HWAT O P POH O S T H E T 117117 E WAT U R POH T 17716 O S S H T 4 WAT ET E WAT 6 5858 R6 POH LICENSE NO. T S MINNESOTA H T A T EX. HYDRANT W 116116 H 11/22/19 5 O P 6 OR UNDER MY DIRECT SUPERVISION AND THAT I AM AOF THE STATE OF FRANCIS D HAGEN IIDATE: I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY MEDULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS T A 5 W H O 5757 P STREET 4 T A W 55 H 11 O 11 P T A W 6 H O P 5656 NWL:957.7HWL:958.4 WETLAND 2 T A W H 44 O FES-193 11 P 11 LAKEVILLE, MINNESOTA 55044 T 20860 KENBRIDGE COURT, SUITE 100 A W H O 7 P CONNECT TO EXISTING8" WATERMAIN 55 55 T A DR HORTON, INC. - MINNESOTA W H 0 O 5 . P 32 331 0 PREPARED FOR: 11 + 11 3 1 T A W H 2 O 1 P 8 4 44 T 55 E E R T 5 T A S W 1 1 1 22 11 H 11 O P 01 T NWL:948.2HWL:950.69 WETLAND 1 A 2 W TS R EE T 4 1 T E E H 33 R O 55 P T T A S W 2 11 H 11 O 11 P CITY REVIEW.... T A 11/22/19 W 2 H 12/26/19.... O P O T 5252 S INITIAL ISSUE:REVISIONS: WAT 3 H O P 00 11 STREET 1 1122 5' O T 50' S EX. HYDRANT DWR WATWAT FDH IIFDH II OR WAT FO POHOFPOHH POHPOHOP POHPOHPOH 10' FO FOFOFOPOHFOPOH FOFOFOFOOHPOH P POHPOHPOHPOHPOH A AVENEG HTUOS EUNEV H O O T P S 51+04.47 3535 383837373636 40409933 444141 434322 WAT EUNEVA YRUTNEC STO 99 00 11 DESIGNED:CHECKED:DRAWN:HORIZONTAL SCALE:VERTICAL SCALE: N:\\0021593.00\\DWG\\CIVIL\\PRELIM\\0021593S-UTP01.DWG HIGH POINTE 14 OF 300' 11/22/19 Common Ground Alliance 7 Call 48 Hours before digging: 811 or call811.com DATE: SHEET NUMBER: 200' 100' 1" = 0021593.00 100' 0' PROJECT NUMBER: STREET PROFILES 990985980975970965960955950945 14 980975970965960955950945 955.7 134 12701 Whitewater Drive, Suite #300Minnetonka, MN 55343 % 0 957.5 0 . A.D. = 1.50% L.P ELEV = 959.69L.P. STA = 12+45.00PVI STA = 12+00.00PVI ELEV = 960.59K = 60.0090.00' VCPVC = 11+55.00ELEV = 962.16PVT = 12+45.00ELEV = 959.69 2 - 980975970965960955 960.76 961.2 3 12 (952) 937-5150(952) 937-5822(888) 937-5150 962.34 966.09 962.5 % 968.8 0 5 . PhoneFax 3 PVI ELEV = 959.60 - 963.62964.05 PVI STA = 12+49.50 966.44 % 962.6 1962.9 0 970.3 112 7 . 0 - 964.62 964.82 966.79 PVI STA = 1+00.00PVI ELEV = 967.14 963.4 963.5 971.6 PVI STA = 2+92.17PVI ELEV = 965.79 965.62964.29 967.14 963.3 963.5 2 % % 972.8 A.D. = 1.40%1 L.P ELEV = 962.56L.P. STA = 8+82.00PVI STA = 9+27.00PVI ELEV = 962.83K = 64.5190.00' VCPVC = 8+82.00ELEV = 962.56PVT = 9+72.00ELEV = 963.7310 0 0 0 0 . . 2 2 966.62 PVI STA = 1+00.00PVI ELEV = 963.62963.33 964.0 963.9 STREET 6 967.62962.69 K = 19.09 PVI STA = 3+20.75PVI ELEV = 968.03 105.00' VC 964.8965.0 39 0 % A.D. = -5.50% ELEV = 964.44ELEV = 963.65 0 6 PVT = 11+12.50 PVC = 10+07.50. 962.42 0 PVI ELEV = 965.49 H.P ELEV = 964.82 961.9 PVI STA = 10+60.00 H.P. STA = 10+45.68 STREET 2 962.69 4961.3 8 980975970965960955950945 963.59 HIGH POINTE 959.2 4 COTTAGE GROVE, MN 965.14 980975970965960955 A.D. = -3.08% 959.3H.P ELEV = 970.68H.P. STA = 5+55.00PVI STA = 6+00.00PVI ELEV = 969.82K = 29.2390.00' VCPVC = 5+55.00ELEV = 970.68PVT = 6+45.00ELEV = 967.57 7 967.32 % 0 960.0K = 39.25 0 . 220.00' VC 5 - A.D. = 5.60% ELEV = 967.32ELEV = 962.49 PVT = 8+70.00 969.47PVC = 6+50.00 L.P ELEV = 962.41 962.7 6 PVI ELEV = 961.82 L.P. STA = 8+46.26PVI STA = 7+60.00 970.78 STREET 4 966.6 17716 971.74 968.7 5 % 972.70 2 9 . 973.1 1 - LICENSE NO. 973.66 972.9 4 MINNESOTA A.D. = -3.84%80.00' VC H.P ELEV = 974.82H.P. STA = 3+20.00PVI STA = 3+20.00PVI ELEV = 975.20K = 20.82PVC = 2+80.00ELEV = 974.43PVT = 3+60.00ELEV = 974.43 974.60 970.9 11/22/19 974.72 985980975970965960955 OR UNDER MY DIRECT SUPERVISION AND THAT I AM AOF THE STATE OF FRANCIS D HAGEN IIDATE: I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY MEDULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS 972.5 3 6 980975970965960955950 973.86 978.4 %6 2 9 . 972.89 0 1 972.81 PVI STA = 1+80.00PVI ELEV = 972.51 980.7 2 972.8 971.91 % 1 971.86 979.5 %9 . 0 972.9 5 PVI STA = 1+00.00PVI ELEV = 970.911 0 962.89. 2 964.7970.91 1 970.90 973.21 973.2 963.85 PVI STA = 5+80.21 PVI ELEV = 973.39 964.9 969.94 974.9 4 % 964.81 2 9 . 965.5 2 1 968.98 0 974.0 965.77 PVI STA = 2+70.39PVI ELEV = 966.16 965.4 PVI ELEV = 970.91 PVI STA = 4+50.55 968.02 985975965955945 990980970960950 PVI STA = 1+00.00PVI ELEV = 962.89 973.0 %3 2 9LAKEVILLE, MINNESOTA 55044 . 3 1 STREET 1 967.06 20860 KENBRIDGE COURT, SUITE 100 972.6 966.10 969.5 2 STREET 5 4 965.14 DR HORTON, INC. - MINNESOTA 968.2 PVI STA = 1+00.00PVI ELEV = 964.84 PREPARED FOR: % 980975970965960955950 3 964.84 2 . 0 964.0 1 - PVI STA = 1+31.00PVI ELEV = 964.77 0 985980975970965960955 CITY REVIEW.... 11/22/19 12/26/19.... INITIAL ISSUE:REVISIONS: 10' DWR FDH IIFDH II OR 20' 100.000005' DESIGNED:CHECKED:DRAWN:HORIZONTAL SCALE:VERTICAL SCALE: N:\\0021593.00\\DWG\\CIVIL\\PRELIM\\0021593S-DTP01.DWG HIGH POINTE 14 OF Common Ground Alliance 8 Call 48 Hours before digging: DATE: SHEET NUMBER: 0021593.00 PROJECT NUMBER: DETAILS 12701 Whitewater Drive, Suite #300Minnetonka, MN 55343 (952) 937-5150(952) 937-5822(888) 937-5150 PhoneFax HIGH POINTE COTTAGE GROVE, MN 17716 MINNESOTA 11/22/19 OR UNDER MY DIRECT SUPERVISION AND THAT I AM AOF THE STATE OF FRANCIS D HAGEN II I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY MEDULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS LAKEVILLE, MINNESOTA 55044 20860 KENBRIDGE COURT, SUITE 100 DR HORTON, INC. - MINNESOTA PREPARED FOR: 11/22/19 N:\\0021593.00\\DWG\\CIVIL\\PRELIM\\0021593S-DTP02.DWG HIGH POINTE 14 OF Common Ground Alliance 9 Call 48 Hours before digging: DATE: SHEET NUMBER: 0021593.00 PROJECT NUMBER: DETAILS 12701 Whitewater Drive, Suite #300Minnetonka, MN 55343 18' TO FOC PROPOSED DRIVE WAY (952) 937-5150(952) 937-5822(888) 937-5150 18' TO FOC 12' PhoneFax 9' FACE OF CURB BACK OF CURB 12' 2 3 NUMBER NUMBER OF STALLS OF STALLS PROPOSED DRIVE WAY HIGH POINTE COTTAGE GROVE, MN 17716 MINNESOTA 11/22/19 OR UNDER MY DIRECT SUPERVISION AND THAT I AM AOF THE STATE OF FRANCIS D HAGEN II I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY MEDULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS LAKEVILLE, MINNESOTA 55044 20860 KENBRIDGE COURT, SUITE 100 DR HORTON, INC. - MINNESOTA PREPARED FOR: 11/22/19 N:\\0021593.00\\DWG\\CIVIL\\PRELIM\\0021593S-DTP02.DWG HIGH POINTE 14 OF 11/22/19 Common Ground Alliance Call 48 Hours before digging:10 811 or call811.com DATE: SHEET NUMBER: SOIL BORING LOCATIONSPOT ELEVATIONCL-CL ELEVATIONTOP AND BOTTOM OF RETAINING WALLSTORM SEWERTREE LINEGRADING LIMITSWETLAND LINEWETLAND BUFFERWETLAND FILLWETLAND BUFFER LIMITSWETLAND BUFFER MONUMENT PROPERTY LINEINDEX CONTOURINTERVAL CONTOURHIGH/LOW POINTFLOW DIRECTIONEMERGENCY OVERFLOWPROPOSED STREET PROFILE GRADEEROSION CONTROL BLANKETROCK CONSTRUCTION ENTRANCERETAINING WALL (MODULAR BLOCK)POND NORMAL WATER LEVELPOND ACCESS MAINTENANCE BENCHDO NOT DISTURB 0021593.00 02 88 900.00900.00CL-CL900.00TW=XXX.XX HP/LPBW=XXX.XX 99 X.XX% 0.00% PROPOSEDE.O.F. DND PROJECT NUMBER: 2 0 88 900.00 99 EXISTING 150' WETLAND BUFFER PLAN GRADING LEGEND 100' H 50' O P 1" = 63 50' 86 85 48 H 38 2 8 O 1 8 HTU OS E P UNE VA WEI VD OOG 121 0' 12701 Whitewater Drive, Suite #300Minnetonka, MN 55343 2 POH 2 6(952) 937-5150(952) 937-5822(888) 937-5150 PhoneFax POH 120 STREET 6 2 5 H T E E R O 1 T S P 5 3 1 61 4 POH 5 9 T E 1 E 1 R T S 3 1 21 POH 2 60 STREET 4 H HIGH POINTE O COTTAGE GROVE, MN P 83 1 1 H O P H O P H 3 T 59 U H O PH O P O S T 17716 H E 7 1 T 121,369 sf 1 E U H R O P T O S S LICENSE NO. H T 4 E T E MINNESOTA 6 58 H O R 6 P T 11/22/19 S H OR UNDER MY DIRECT SUPERVISION AND THAT I AM AOF THE STATE OF FRANCIS D HAGEN IIDATE: I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY MEDULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS T 116 H 5 O P 6 5 H 7 O 5 P STREET 4 5 H 1 O 1 P 186,166 sf 6 H O P 56 NWL:957.7HWL:958.4 WETLAND 2 LAKEVILLE, MINNESOTA 55044 H 4 O 20860 KENBRIDGE COURT, SUITE 100 1 P 1 H O 7 P DR HORTON, INC. - MINNESOTA 5 5 PREPARED FOR: H 0 O 5 . P 32 31 0 1 + 1 3 1 49,633 SF (1.14 AC) BUFFER SF PROVIDED12,137 SF (0.28AC) H 2 O 1 P 8 4 4 T 5 E E R 5 T S 1 1 1 2 1 H 1 O P 1 0 NWL:948.2HWL:950.69 WETLAND 1 2 TS R E TE 49,562 SF (1.14 AC) 4 BUFFER SF REQUIRED 11,737 SF (0.27 AC) 1 T E E H 3 R O 5 P T S CITY REVIEW.... 2 11/22/19 1 H 1 O 1 P 12/26/19.... BUFFER WIDTH (AVG)50' AVG; 25' MIN25' AVG; 12.5' MIN INITIAL ISSUE:REVISIONS: 2 H O P O T 52 S 5' 50' DWR FDH IIFDH II OR 3 H 10' O P 0 1 STREET 1 122 WETLAND AREA49,698 SF (1.14 AC) 18,349 SF (0.42 AC) FO POHOFPOH POHPOHHOP POHPOHPOH FO FOFOFOPOHFOPOH FOFOFOFOHPOH PO POHPOHPOHPOH POH AVENEG HTUOS EUNEVA H O P 3736 3938 4140 4342 WETLAND BUFFER TABLE:WETLAND: 1 2 DESIGNED:CHECKED:DRAWN:HORIZONTAL SCALE:VERTICAL SCALE: EUNEVA YRUTNEC OTS N:\\0021593.00\\DWG\\CIVIL\\PRELIM\\0021593S-WBP01.DWG HIGH POINTE 14 35% OF 180' 11/22/19 Common Ground Alliance 11 Call 48 Hours before digging: 811 or call811.com DATE: SHEET NUMBER: 120' 60' 1" = ---- 0021593.00 60' THE TOTAL TREE HEIGHT. NEWLY DEAD BRANCHES THAT 13 0' PROJECT NUMBER: PLAN ) IRONWOOD, OAK,MAPLE, WALNUT,ASH,HICKORY,BIRCH, BLACK CHERRY, : COTTONWOOD, CATALPA, POPLARS, ASPEN, SILVER MAPLE, BASSWOOD, BOX TREE PRESERVATION : A WOOD PLANT WHICH, AT MATURITY, IS A LEAST TWELVE (12) FEET OF MORE IN HEIGHT, AND A HEALTHY TREE MEASURING A MINIMUM OF SIX INCHES (6") DBH FOR HARDWOOD DECIDUOUS A LIVE TOP CROWN THAT IS GREATER THAN QUALIFYING TREE INCHES REMOVED BEYOND THE PERMITTED THRESHOLDS SHALL BE REPLACED AT A RATE DECIDUOUS TREES: NO LESS THAN 2.5 CALIPER INCHES. CONIFEROUS TREES: NO LESS THAN SIX FEET IN HEIGHT. (83 UNITS / 14.4 ACRE = 5.76 UN./AC. QUALIFYING TREE:TREES, OR A MINIMUM OF EIGHT INCHES (8") DBH FOR SOFTWOOD DECIDUOUS TREES OR A MINIMUM OF TEN FEETCONIFEROUS SPECIESWHICH RETAINS ITS GREEN COLOR YEAR ROUND AND DOES NOT DROP ITS FRONDS OR NEEDLES IN THE WINTER. DBHCONVERSION RATE: A NUMBER EQUAL TO ONE HALF THE TREES'S HEIGHT IN FEET. 1"=2'CROWN WITH MISSING BRANCHES.QUANTITY:OF 50%, OR ONE (1) REPLACEMENT CALIPER INCH FOR TWO (2) REMOVED DIAMETER INCHES.CONIFER SIX (6) FEET IN HEIGHT SHALL BE CREDITED AS CONTRIBUTING TWO (2) CALPIER INCHED TO THE TOTAL OFWHERE (10) OR MORE REPLACEMENT TREES ARE REQUIRED, NOT MORE THAN THIRTY THREE PERCENT (33%) OF THETHE PLANTING OF TREES FOR REPLACEMENT PURPOSES SHALL BE IN ADDITION TO ANY OTHER CITY LANDSCAPE (10') IN HEIGHT FOR CONIFEROUS/EVERGREEN TREES.HARDWOOD DECIDUOUS SPECIES:HACKBERRY, AND LOCUST.SOFTWOOD DECIDUOUS SPECIESELDER, ELM, AND WILLOW.HEALTHY TREE: MAKE UP LESS THAN FIFTEEN PERCENT (15%) OF THE TOTAL CROWN. LESS THAN FIFTEEN PERCENT (15%) OF THE TREERESIDENTIAL: <10 UNITS / ACRESIZE:SPECIES: CONIFEROUS TREES OR HARDWOOD DECIDUOUS TREES SHALL BE USED AS REPLACEMENT TREES. ONE NEWREQUIRED REPLACEMENT INCHES. ORNAMENTAL TREES ARE NOT ACCEPTABLE FOR USE AS REPLACEMENT TREES.REPLACEMENT TREES SHALL BE OF THE SAME SPECIES OF TREE. INDIGENOUS TREE SPECIES ARE ENCOURAGED.REQUIREMENTS. ---------- QUALIFYING TREESIZES AND TYPES OF REPLACEMENT TREES PERMITTED TREE REMOVAL Tree Preservation RequirementsTree Preservation Calculations 12701 Whitewater Drive, Suite #300Minnetonka, MN 55343 POH (952) 937-5150(952) 937-5822(888) 937-5150 H O P HTU OS EU NEV A W EIVD OOG PhoneFax 6008 6009 6007 6006 60056002 2 POH 6001 6003 6004 POH STREET 6 5 T E E R 1 T S 6035 6038 6040 3 6036 6010 60316034 6013 POH6011 6026 6027 6029 60286052 6024 6030 6063 6064 6023 6062 6012 6060 6032 5 T 6025 E 6033 6039 E 6037 R 6061 T S H HIGH POINTE O COTTAGE GROVE, MN P6014 6041 6015 6021604360426059 6022 6016 6050 6020 6044 6045 STREET 4 6049 6046 6048 POH6053 6054 6055 6057 6058 6124 6065 6056 60476066 6125 6017 61106067 6018 3 6111 6112 6051 H 6123 O P6019 61276126 6113 6128 61216114 6100 6134 POH 6099 6122 6130 H 6132 61356131 6133 T 6136 26971 6069 61206117 U 6115 H6116 O P61186068 6137 6129 O 6119 6153 6105 6070 6104 S 6143 6097 61516094 61446098 POH 6071 6102 T 6106 6150 H 6072 E 61426146 6109 T 6101 E 6152 LICENSE NO. 6140 6107 6096 6103 6083 U 6141 R 6139 6149 6154 6147 6138 T 6084 6093 O 6145 6085 6148 6073 S 6155 6108 6092 S 6082MINNESOTA 6179 6095 6080 TH POH 6090 ET 6081 6074 11/22/19 E 6166 6156 6159 6 61646158 6175 6173 61626171 6172 6167 R 6075 6 6177 6079 T 6091 6181 S OR UNDER MY DIRECT SUPERVISION AND THAT I AM AOF THE STATE OF CORY MEYERDATE: I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY MEDULY LICENSED LANDSCAPE ARCHITECT UNDER THE LAWS 6180 6157 6160 6088 H 6178 6169616561686089 6170 6161 61636176 POH6087 T 6077 61746076 6078 5 6 6086 6187 61826183 61846185 H O P 6188 61906186 6195 61896203 STREET 4 6192 6194 6193 6196 6191 H 6206 O P 6220 6208 6205 6265 6197 6207 6233 6264 626162626263 62026198 6204 6266 6232 6199 H 6200 621462136201 NWL:957.7HWL:958.4 O WETLAND 26259 6215 P6258 6260 6277 6210 6211 6216 62096257 6267 6218 6212 6217 6269 6231 6268 62306229 62356234 6270 LAKEVILLE, MINNESOTA 55044 6219 6226 6224 H 6272 O 622362716274 20860 KENBRIDGE COURT, SUITE 100 P 6275 6276 62286254 6278 622762526273 6225 6253 6250 5203 6255 5201 5204 6249 6244 6243 6242 6246 6222 H O6248 P 6238 6247 62215205 DR HORTON, INC. - MINNESOTA 6251 5001 5003 6256 52095002 5202 62396245 6240 623752085210 62415206 62795225 52185216 6236 5220 5224 5215 5219 PREPARED FOR: 52425239 62805228 5229 5207 5234 5232 5237 6287 6289 6286 5217 H 6285 62815211 O 5281 528262905213 P6284 52145212 6288 6282 522752235221 52265222 62835231 524552435241523552335230 52445238 52405236 4 5004 5280 T 5283 E 5005 52465006 E 5284 R 5 T 5007 S 5008 5009 52855247 5010 5286 5248 5278 5249 5277 5250 5276 5279 H5011 5018 ONWL:948.2HWL:950.6 WETLAND 15275 P52685274 2 52735012 TS ER TE 4 5254 T 5265 52645267 52665251 E 52535252 5255 E 52565017 5015 R 5014 527252715013 5269 5270 5016 T 516651685170 51715174 51725173 5257 S H O5261 52625263 P 5178 5188 51755182 5176 5181 5020 5019 5022 5021 5185 5258 5080 50795078 5259 5198 51995200 5260 5196 5023 H 5144 5143 O5024 51425145 51865187519051975050 5051 P 5047 51915025 51895053 5048 50665067 51495068 5077 50855084 5049 5195 5177 51805045 51625046 5183 5139 CITY REVIEW.... 514151475179 5140 5065 51845029 5030 5083506350395028 5167 11/22/19 50865061 51655194 51305192 51565193 5052 5169O 5137 5164 T 51575161 5163 5160S 5090 H 5026 51585081 5082 O5159 5155 5135 P 50425037 5038 51515154 5146 5133 5108 51015027 51035098 5109 5064 STREET 1 5131 12/26/19.... 250582 515350765043 50545044 5055 511050935069 50605059 5062 5136 5121O F POHFOPOHPOHPOH 5127HOPPOHHOP INITIAL ISSUE:REVISIONS: FOFOPOHFO FOFOFOFOPOH HPOH POPOH POH O T S 5134 51325031 5091 5092 508950875071 5075507450735041 513850885070 5072504050365032 5129 HTUOS EUNEVA AVENEG 5035 5128512651145111510450565033 5115511251065095 5124512551525116511351005096 5122512051185150 5034 H O P 6' 5057 EUNEVA YRUTNEC 510751025099 5097 5123511951055094 51175148STO DWR FDH IIFDH II OR 12' 59.999999' DESIGNED:CHECKED:DRAWN:HORIZONTAL SCALE:VERTICAL SCALE: N:\\0021593.00\\DWG\\CIVIL\\PRELIM\\0021593S-TPP01.DWG HIGH POINTE 14 OF 11/22/19 Common Ground Alliance Call 48 Hours before digging:12 811 or call811.com DATE: SHEET NUMBER: 0021593.00 TREES BASED UPON AN ADDITIONAL SITE VISIT PROJECT NUMBER: ALL TREES THAT HAVE A STATUS AS REM-CITY WERE REMOVED INORDER TO ACCOMMODATE CITY RIGHT OF WAY IMPROVEMENTSTREES WITH A NOTE OF EITHER PD* OR BD* WERE CONSIDERED TOAND REVIEW ON 12/19/19 TO REVIEW TREES IN LEAF OFFCONDITIONS. FOR TRAIL AND SIDEWALK PLACEMENT OR GRADING. THESEREMOVALS ARE EXEMPT OF REPLACEMENT AS THEY ARE CITYIMPROVEMENTS.NOT BE HEALTHY 2. NOTES:1. TREE INVENTORY 12701 Whitewater Drive, Suite #300Minnetonka, MN 55343 (952) 937-5150(952) 937-5822(888) 937-5150 PhoneFax HIGH POINTE COTTAGE GROVE, MN 26971 LICENSE NO. MINNESOTA 11/22/19 OR UNDER MY DIRECT SUPERVISION AND THAT I AM AOF THE STATE OF CORY MEYERDATE: I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY MEDULY LICENSED LANDSCAPE ARCHITECT UNDER THE LAWS LAKEVILLE, MINNESOTA 55044 20860 KENBRIDGE COURT, SUITE 100 DR HORTON, INC. - MINNESOTA PREPARED FOR: CITY REVIEW.... 11/22/19 12/26/19.... INITIAL ISSUE:REVISIONS: ## DWR FDH IIFDH II OR ### ########## Tree Inventory DESIGNED:CHECKED:DRAWN:HORIZONTAL SCALE:VERTICAL SCALE: N:\\0021593.00\\DWG\\CIVIL\\PRELIM\\0021593S-TPP01.DWG HIGH POINTE 14 OF H 20' W 20' H 30'' W 15' H 50' W 30' H 50' W 35'-40' H 60' W 30'-40'H 40'-60' W 30' H 50'-75' W 50' H 50'-60' W 40'H 12'-15' W 6'-8' H 70' W 40'-50' H 50'-60' W 40' H 30'-40' W 20'-30'H 60'-80' W 25'-30'H 40'-60' W 15'-30'H 60'-80' W 25'-30'H 15'-20' W 15'-20'H 25'-30' W 20'-25'H 15'-25' W 15'-25'H 40'-60' W 20'-30' H 50'-80' W 30'-40' H 40'-50' W 35'-40' H 50'-70' W 40'-50' H 50'-60' W 40'-50'H 60'-80' W 40'-60' SPACING O.C. 180' 11/22/19 Common Ground Alliance 13 Call 48 Hours before digging: 811 or call811.com DATE: SHEET NUMBER: AS SHOWNAS SHOWNAS SHOWNAS SHOWNAS SHOWNAS SHOWNAS SHOWNAS SHOWNAS SHOWNAS SHOWNAS SHOWNAS SHOWN 120' AS SHOWNAS SHOWNAS SHOWNAS SHOWNAS SHOWNAS SHOWNAS SHOWNAS SHOWNAS SHOWNAS SHOWNAS SHOWNAS SHOWN SPACING O.C. 60' 1" = ---- 0021593.00 SIZE 6' HT., BB60' 2.5" BB2.5" BB2.5" BB2.5" BB2.5" BB2.5" BB2.5" BB2.5" BB2.5" BB2.5" BB2.5" BB2.5" BB6' HT., BB6' HT., BB6' HT., BB6' HT., BB6' HT., BB6' HT., BB2" BB6' HT., BB CLUMP6' HT., BB CLUMP2" BB2" BB 0' PROJECT NUMBER: 105 TREES 102 TREES 66 TREES XXX SHRUBS 789 TREES 492 TREES 82 TREES 82 TREES 328 TREES -83 TREES 380 TREES 436 TREES PRELIMINARY 410 SHRUBS LANDSCAPE PLAN QUANTITIES ON PLAN SUPERSEDE LIST QUANTITIES IN THE EVENT OF A DISCREPANCY. REFER TO FINAL LANDSCAPE PLANS FOR SPECIES LOCATIONS AND QUANTITIES. 163 TREES Northern Pin Oak / Quercus ellipsoidalisSwamp White Oak / Quercus bicolorPrinceton Elm / Ulmus americana 'Princeton'American Sentry Linden / Tilia americana 'McKSentry'Redmond Linden / Tilia americana 'Redmond'Black Hills Spruce / Picea glauca densataNorway Spruce / Picea abiesColorado Spruce / Picea pungensWhite Pine / Pinus strobus Autumn Blaze Maple / Acer x freemanii 'Jeffersred'Sienna Glen Maple / Acer x freemanii 'Sienna'Skyline Honeylocust / Gleditsia tricanthos var. inermis 'Skycole'Red Oak / Quercus rubraAccolade Elm / Ulmus japonica x wilsoniana 'Morton'Autumn Gold Ginkgo / Ginkgo biloba 'Autumn Gold'Hackberry / Celtis occidentalisTechny Arborvitae / Thuja occidentalis 'Techny'Thornless Cockspur Hawthorn / Crataegus crusgalli 'Inermis'Japanese Tree Lilac / Syringa reticulataAllegheny Serviceberry / Amelanchier laevisQuaking Aspen / Populus tremuloidesPrairie Rose Crab / Malus 'Prairie Rose' Norway Pine / Pinus resinosaEastern Redcedar / Juniperus virginiana NOTES: COMMON/BOTANICAL NAME 66 105102163 QTY. SYMBOL 12701 Whitewater Drive, Suite #300Minnetonka, MN 55343 OVERSTORY DECIDUOUS STREET TREES:OVERSTORY DECIDUOUS TREES:CONIFEROUS TREES:ORNAMENTAL DECIDUOUS TREES: UNDESTORY SHRUBSPLANS FOR SHRUB TOTAL. 4 - OVERSTORY DECIDUOUS TREES PER UNIT 5 - UNDERSTORY SHURBS PER UNITEXISTING QUALIFYING TREES MAY BE CREDITED TOWARD THEREQUIRED TREES DETAILED IN THIS SECTION AT A RATE OF ONEPRESERVED QUALIFYING TREE TO ONE REQUIRED TREE.(SEE TREE INVENTORY: 103 QUALIFYING TREES SAVED)SEE TREE PRESERVATION PLAN AND TREE INVENTORY FORCOMPLETE CALCULATIONS. 1 - CONIFEROUS TREE PER UNIT1 - ORNAMENTAL DECIDUOUS TREE PER UNIT SEE TOWNHOME FOUNDATION PLANTING DETAIL WITH FINAL TREESTREESTREES TREES LARGESMALL STREET TREES SHALL BE PLANTED 5' FROM BACK OF CURB IN A LOCATION THAT DOES NOT BUFFERSTREET TREE LOCATIONS AND SPACING ARE SUBJECT TO CHANGE BASED ONCONSTRUCTED DRIVEWAY AND UTILITY LOCATIONS.INTERFERE WITH CURBSTOPS OR INDIVIDUAL SEWER & WATER CONNECTIONS.NO PLANTING WILL BE INSTALLED UNTIL ALL GRADING AND CONSTRUCTION HAS BEENCOMPLETED IN THE IMMEDIATE AREA. (952) 937-5150(952) 937-5822(888) 937-5150 ***** ****** OVERSTORYDECIDUOUSOVERSTORYEVERGREENOVERSTORY - TOTAL LANDSCAPE REQUIRED:TREE PRESERVATION REPLACEMENT: TOTAL LANDSCAPING PROVIDED: RESIDENTIAL DEVELOPMENTS: TOWNHOMES (82 UNITS)EXISTING TREES PRESERVED CREDIT: Preliminary Plant ScheduleLandscape RequirementsLandscape Provisions 2.3. NOTES:1. PhoneFax H O P HT UOS EUN EVA WEIV DOO G 2 POH POH STREET 6 5 T E E R 1 T S HIGH POINTE 3 COTTAGE GROVE, MN POH 5 T E E R T S H O P STREET 4 H O P 26971 3 H O P POH LICENSE NO. H T U H MINNESOTA O P O S POH 11/22/19 T H E T 121,369 sf E OR UNDER MY DIRECT SUPERVISION AND THAT I AM AOF THE STATE OF CORY MEYERDATE: I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY MEDULY LICENSED LANDSCAPE ARCHITECT UNDER THE LAWS UR T O S S H T POH ET E 6 6 R T S H POH T 5 6 H O P STREET 4 H O P 186,166 sf LAKEVILLE, MINNESOTA 55044 20860 KENBRIDGE COURT, SUITE 100 H NWL:957.7NWL:957.7HWL:958.4HWL:958.4 O WETLAND 2WETLAND 2 P DR HORTON, INC. - MINNESOTA H O P PREPARED FOR: H O P H O P 4 T E E R 5 T S H ONWL:948.2NWL:948.2HWL:950.6HWL:950.6 WETLAND 1WETLAND 1 P 2 TS ER E 4 T T E E R T S H O P CITY REVIEW.... 11/22/19 H 12/26/19.... O P INITIAL ISSUE:REVISIONS: O T S H O P 6' STREET 1 2 2 DWR FDH IIFDH II OR FO HOPFOHPOH 12' OPPOHPOHHO POHP 59.99998' FOFOFOFOFOPOHFOPOHFO POH POHPOH POH O T S UNEVA AVENEG HTUOS E H O P EUNEVA YRUTNEC STO DESIGNED:CHECKED:DRAWN:HORIZONTAL SCALE:VERTICAL SCALE: N:\\0021593.00\\DWG\\CIVIL\\PRELIM\\0021593S-PLP01.DWG HIGH POINTE 14 OF 11/22/19 Common Ground Alliance Call 48 Hours before digging:14 811 or call811.com DATE: SHEET NUMBER: 0021593.00 PROJECT NUMBER: PRELIMINARY LANDSCAPE DETAILS 12701 Whitewater Drive, Suite #300Minnetonka, MN 55343 (952) 937-5150(952) 937-5822(888) 937-5150 PhoneFax N.T.S. LA29 10/19/18 LAST REVISED: TOP STAKES 5' ABOVE GROUND (MAX.)WOOD OR PAINTED STEEL DELINEATORAROUND AND OUTSIDE ROOT BALL. OR TO FIRST BRANCH. BOTTOM OFSTAKE 3' (MIN.) BELOW GROUND.STAKING POSTS TO BE 2"X2" STAINEDPOSTS. PLACE 3 POSTS EQUIDISTANTSECURE TREE TO POSTS WITH 16" LONGPOLYPROPYLENE OR POLYETHYLENE, 40MIL., 1.5" WIDE STRAP. SET ROOT BALL ON UNDISTURBED SUBSOILOR COMPACTED SOIL MOUND MATCHINGTREES NATURAL GROUNDLINE WITH PRUNE OUT MISDIRECTED BRANCHES.PROVIDE ONE CENTRAL LEADER.GUYING AND STAKING, AS REQUIRED, FORONE (1) YEAR ON ALL DECIDUOUS ANDCONIFEROUS TREES:PLACE MULCH, DEPTH AS SPECIFIED, OVERPLANT PITS - DO NOT PILE AGAINST TRUNK.FORM 3" DEEP WATERING BASIN.BACKFILL PLANT PIT WITH SPECIFIEDBACKFILL SOIL.REFER TO AMERICAN STANDARD FORNURSERY STOCK FOR MINIMUM BALL SIZE.ROOT FLARE TO BE PLANTED AT OR NEARFINISHED GROUNDLINE.SCARIFY SIDES AND BOTTOM OF HOLE.FINISHED SITE GRADE. HIGH POINTE COTTAGE GROVE, MN 2XBALL PLANTING DIAMETER EVERGREEN TREE 26971 LICENSE NO. MINNESOTA N.T.S. 11/22/19 LA28 10/19/18 OR UNDER MY DIRECT SUPERVISION AND THAT I AM AOF THE STATE OF CORY MEYERDATE: LAST REVISED:I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY MEDULY LICENSED LANDSCAPE ARCHITECT UNDER THE LAWS TOP STAKES 5' ABOVE GROUND (MAX.)WOOD OR PAINTED STEEL DELINEATORAROUND AND OUTSIDE ROOT BALL. OR TO FIRST BRANCH. BOTTOM OFSTAKE 3' (MIN.) BELOW GROUND.STAKING POSTS TO BE 2"X2" STAINEDPOSTS. PLACE 3 POSTS EQUIDISTANTSECURE TREE TO POSTS WITH 16" LONGPOLYPROPYLENE OR POLYETHYLENE, 40MIL., 1.5" WIDE STRAP. TREE WRAP MATERIAL FROM GROUNDLINESET ROOT BALL ON UNDISTURBED SUBSOILOR COMPACTED SOIL MOUND MATCHINGTREES NATURAL GROUNDLINE WITH FINISHEDSITE GRADE. PRUNE OUT MISDIRECTED BRANCHES.PROVIDE ONE CENTRAL LEADER.GUYING AND STAKING, AS REQUIRED, FORONE (1) YEAR ON ALL DECIDUOUS ANDCONIFEROUS TREES:UPWARD TO FIRST BRANCHES, AS REQUIRED.PLACE MULCH, DEPTH AS SPECIFIED, OVERPLANT PITS - DO NOT PILE AGAINST TRUNK.FORM 3" DEEP WATERING BASIN.BACKFILL PLANT PIT WITH SPECIFIED BACKFILLSOIL.REFER TO AMERICAN STANDARD FORNURSERY STOCK FOR MINIMUM BALL SIZE.ROOT FLARE TO BE PLANTED AT OR NEARFINISHED GROUNDLINE.SCARIFY SIDES AND BOTTOM OF HOLE. 2XPLANTING BALL DIAMETER DECIDUOUS TREE LAKEVILLE, MINNESOTA 55044 20860 KENBRIDGE COURT, SUITE 100 Planting Details DR HORTON, INC. - MINNESOTA PREPARED FOR: CITY REVIEW.... 11/22/19 12/26/19.... INITIAL ISSUE:REVISIONS: ## ### DWR FDH IIFDH II OR ### ALL PLANTS SHALL BE FREE FROM DISEASE, PESTS, WOUNDS, SCARS, ETC.ALL PLANTS SHALL BE FREE FROM NOTICEABLE GAPS, HOLES, OR DEFORMITIES.ALL PLANTS SHALL BE FREE FROM BROKEN OR DEAD BRANCHES.ALL PLANTS SHALL HAVE HEAVY, HEALTHY BRANCHING AND LEAFING.CONIFEROUS TREES SHALL HAVE AN ESTABLISHED MAIN LEADER AND A HEIGHT TO WIDTH RATIO OF NO LESSTHAN 5:3. ALL UNDERGROUND UTILITIES PRIOR TO INSTALLATION OF ANY PLANTS OR LANDSCAPE MATERIAL.ACTUAL LOCATION OF PLANT MATERIAL IS SUBJECT TO FIELD AND SITE CONDITIONS.ALL SUBSTITUTIONS MUST BE APPROVED BY THE LANDSCAPE ARCHITECT PRIOR TO SUBMISSION OF ANY BIDAND/OR QUOTE BY THE LANDSCAPE CONTRACTOR.ALL PLANTS TO BE SPECIMEN GRADE, MINNESOTA-GROWN AND/OR HARDY. SPECIMEN GRADE SHALL ADHERE TO,TEMPORARY ONLY.WHEN THE BALLED & BURLAP TREE IS PLANTED, THE ROOT COLLAR/ROOT FLAIR SHALL BE EVEN OR SLIGHTLYABOVE FINISHED GRADE.WRAP ALL SMOOTH-BARKED TREES - FASTEN TOP AND BOTTOM. REMOVE BY APRIL 1ST.THE NEED FOR SOIL AMENDMENTS SHALL BE DETERMINED UPON SITE SOIL CONDITIONS PRIOR TO PLANTING.AREAS AND 12" DEPTH TOPSOIL FOR TREE, SHRUBS, AND PERENNIALS.ALL PLANTS WITHIN TURF AREAS. PERENNIAL AND ORNAMENTAL GRASS BEDS SHALL HAVE 2" DEPTH SHREDDEDAS INDICATED. POLY EDGING SHALL BE PLACED WITH SMOOTH CURVES AND STAKED WITH METAL SPIKES NOALL DISTURBED AREAS TO BE SODDED OR SEEDED, UNLESS OTHERWISE NOTED. SOD TO BE STANDARDAPPROVAL PRIOR TO INSTALLATION OF IRRIGATION SYSTEM. CONTRACTOR TO PROVIDE OPERATION MANUALS,AS-BUILT PLANS, AND NORMAL PROGRAMMING. SYSTEM SHALL BE WINTERIZED AND HAVE SPRING STARTUP CONTRACTOR SHALL CONTACT COMMON GROUND ALLIANCE AT 811 OR CALL811.COM TO VERIFY LOCATIONS OFNO PLANTING WILL BE INSTALLED UNTIL ALL GRADING AND CONSTRUCTION HAS BEEN COMPLETED IN THEIMMEDIATE AREA.CONTRACTOR SHALL PROVIDE TWO YEAR GUARANTEE OF ALL PLANT MATERIALS. THE GUARANTEE BEGINS ON THEDATE OF THE LANDSCAPE ARCHITECT'S OR OWNER'S WRITTEN ACCEPTANCE OF THE INITIAL PLANTING.REPLACEME NT PLANT MATERIAL SHALL HAVE A ONE YEAR GUARANTEE COMMENCING UPON PLANTING.BUT IS NOT LIMITED BY, THE FOLLOWING STANDARDS:PLANTS TO MEET AMERICAN STANDARD FOR NURSERY STOCK (ANSI Z60.1-2014 OR MOST CURRENT VERSION)REQUIREMENTS FOR SIZE AND TYPE SPECIFIED.PLANTS TO BE INSTALLED AS PER MNLA & ANSI STANDARD PLANTING PRACTICES.PLANTS SHALL BE IMMEDIATELY PLANTED UPON ARRIVAL AT SITE. PROPERLY HEEL-IN MATERIALS IF NECESSARY;PRIOR TO PLANTING, FIELD VERIFY THAT THE ROOT COLLAR/ROOT FLAIR IS LOCATED AT THE TOP OF THE BALLED &BURLAP TREE. IF THIS IS NOT THE CASE, SOIL SHALL BE REMOVED DOWN TO THE ROOT COLLAR/ROOT FLAIR.OPEN TOP OF BURLAP ON BB MATERIALS; REMOVE POT ON POTTED PLANTS; SPLIT AND BREAK APART PEAT POTS.PRUNE PLANTS AS NECESSARY - PER STANDARD NURSERY PRACTICE AND TO CORRECT POOR BRANCHING OFEXISTING AND PROPOSED TREES.STAKING OF TREES AS REQUIRED; REPOSITION, PLUMB AND STAKE IF NOT PLUMB AFTER ONE YEAR.LANDSCAPE CONTRACTOR SHALL NOTIFY LANDSCAPE ARCHITECT FOR THE NEED OF ANY SOIL AMENDMENTS.BACKFILL SOIL AND TOPSOIL TO BE EXISTING TOP SOIL FROM SITE AND ADHERE TO MN/DOT STANDARDSPECIFICATION 3877 (COMMON TOPSOIL BORROW), FREE OF ROOTS, ROCKS LARGER THAN ONE INCH, SUBSOILDEBRIS, AND LARGE WEEDS UNLESS SPECIFIED OTHERWISE. MINIMUM 4" DEPTH TOPSOIL FOR ALL LAWN GRASSMULCH TO BE AT ALL TREE, SHRUB, PERENNIAL, AND MAINTENANCE AREAS. TREE AND SHRUB PLANTING BEDSSHALL HAVE 4" DEPTH OF SHREDDED HARDWOOD MULCH. SHREDDED HARDWOOD MULCH TO BE USED AROUNDHARDWOOD MULCH. MULCH TO BE FREE OF DELETERIOUS MATERIAL AND COLORED RED, OR APPROVED EQUAL.MULCH AND FABRIC TO BE APPROVED BY OWNER PRIOR TO INSTALLATION. MULCH TO MATCH EXISTINGCONDITIONS (WHERE APPLICABLE).EDGING TO BE COMMERCIAL GRADE VALLEY-VIEW BLACK DIAMOND (OR EQUAL) POLY EDGING OR SPADED EDGE,GREATER THAN 4 FOOT ON CENTER WITH BASE OF TOP BEAD AT GRADE, FOR MOWERS TO CUT ABOVE WITHOUTDAMAGE. UTILIZE CURBS AND SIDEWALKS FOR EDGING WHERE POSSIBLE. SPADED EDGE TO PROVIDE V-SHAPEDDEPTH AND WIDTH TO CREATE SEPARATION BETWEEN MULCH AND GRASS. INDIVIDUAL TREE, SHRUB, ORRAIN-GARDEN BEDS TO BE SPADED EDGE, UNLESS NOTED OTHERWISE. EDGING TO MATCH EXISTING CONDITIONS(WHERE APPLICABLE).MINNESOTA GROWN AND HARDY BLUEGRASS MIX, FREE OF LAWN WEEDS. ALL TOPSOIL AREAS TO BE RAKED TOREMOVE DEBRIS AND ENSURE DRAINAGE. SLOPES OF 3:1 OR GREATER SHALL BE STAKED. SEED AS SPECIFIED ANDPER MN/DOT SPECIFICATIONS. IF NOT INDICATED ON LANDSCAPE PLAN, SEE EROSION CONTROL PLAN.PROVIDE IRRIGATION TO ALL PLANTED AREAS ON SITE. IRRIGATION SYSTEM TO BE DESIGN/BUILD BY LANDSCAPECONTRACTOR. LANDSCAPE CONTRACTOR TO PROVIDE SHOP DRAWINGS TO LANDSCAPE ARCHITECT FORDURING FIRST YEAR OF OPERATION. SYSTEM SHALL HAVE ONE-YEAR WARRANTY ON ALL PARTS AND LABOR. ALLINFORMATION ABOUT INSTALLATION AND SCHEDULING CAN BE OBTAINED FROM THE GENERAL CONTRACTOR.CONTRACTOR SHALL PROVIDE NECESSARY WATERING OF PLANT MATERIALS UNTIL THE PLANT IS FULLYESTABLISHED OR IRRIGATION SYSTEM IS OPERATIONAL. OWNER WILL NOT PROVIDE WATER FOR CONTRACTOR.REPAIR, REPLACE, OR PROVIDE SOD/SEED AS REQUIRED FOR ANY ROADWAY BOULEVARD AREAS ADJACENT TO THESITE DISTURBED DURING CONSTRUCTION.REPAIR ALL DAMAGE TO PROPERTY FROM PLANTING OPERATIONS AT NO COST TO OWNER. Planting Notes 2.3.4.6.7.8. 9.20.21.22.23. 1.5.10.11.12.13.14.15.16.17.18.19. DESIGNED:CHECKED:DRAWN:HORIZONTAL SCALE:VERTICAL SCALE: N:\\0021593.00\\DWG\\CIVIL\\PRELIM\\0021593S-PLP02.DWG