Loading...
HomeMy WebLinkAbout07L 2020 City-Wide Sweeping Quotes City Council Action Request Form March 18, 2020 Public Works/Engineering Consent 2020 City-Wide Sweeping Quotes Adopt Resolution 2020-040 awarding the 2020 City-Wide Sweeping Project to the low quote supplied by Mike McPhillips, Inc. for $85.00 per hour. Budget Implication Stormwater Maintenance Fund = $85.00 per hour CC Memo Resolution Quotes To: Honorable Mayor and City Council Jennifer Levitt, City Administrator From: Amanda Meyer, P.E., Assistant City Engineer Date: March 9, 2020 Re: 2020 City-Wide Sweeping Quotes Background The City of Cottage Grove recently received quotes to complete the annual city-wide sweeping project. This sweeping project is completed each year in the spring to remove debris from City streets, including sediment and organic matter. Sweeping projects such as this are one of the most effective best management practices for preventing these materials from entering the storm sewer system. Once this material enters the storm sewer, it is deposited in stormwater ponds where it is costly to remove. In addition, this material will contain phosphorus that can dissolve into stormwater runoff and reach local lakes and rivers. Increased phosphorus can cre- ate large algae blooms, so removal of the material from the streets is a very effective way to improve water quality in these water bodies. Discussion It is estimated that there will be 300-350 total hours of sweeping for the 2020 project. Quotes were due for this project on March 11, 2020. Two quotes were received. Each contractor pro- vided an hourly rate quote for four primary machines and two alternate machines that will be used on the project. Additionally, the manufacture year of the machines was included to allow the City to determine the average fleet age. The age of the fleet is important, as this work needs to be completed in a tight timeframe prior to the City’s spring hydrant flushing project. Due to this tight timeframe, equipment downtime can cause a major scheduling issue. The following table summarizes the results of the quotes received. The complete quotes are also attached for reference. Contractor Quoted Amount Low Mike McPhillips, Inc. $85.00/hour #2 Allied Blacktop Company $116.00/hour The low quote for the project was Mike McPhillips, Inc. at $85.00 per hour. The budgeted amount for the City of Cottage Grove for 2020 is $27,000. At the estimated 350 hours of sweep- ing for the City of Cottage Grove, the low quote of $85.00 per hours gives an estimated cost of $29,750. Recommendation It is recommended that the City Council award the 2020 City-Wide Sweeping project to the low quote supplied by Mike McPhillips, Inc., for $85.00 per hour. CITY OF COTTAGE GROVE, MINNESOTA CITY COUNCIL RESOLUTION 2020-XXX RESOLUTION AWARDING THE 2020 CITY-WIDE SWEEPING PROJECT TO MIKE MCPHILLIPS, INC. FOR $85.00 PER HOUR WHEREAS, quotes were requested to provide the necessary work for the 2020 City-Wide Sweeping Project; and WHEREAS, two firms submitted quotes; and WHEREAS, it appears that the Mike McPhillips, Inc. provided the lowest accepted quote; and WHEREAS, it is the recommendation of the City Engineer that the quote be awarded to Mike McPhillips, Inc. for $85.00 per hour. NOW THEREFORE BE IT RESOLVED, by the City Council of the City of Cottage Grove, County of Washington, State of Minnesota, that the 2020 City-Wide Street Sweeping Project be awarded to Mike McPhillips, Inc. for $85.00 per hour. Passed this 18th day of March 2020. Myron Bailey, Mayor Attest: Joe Fischbach, City Clerk