HomeMy WebLinkAbout07C 2021 Pavement Management – Approve Feasibility Report and Call for Public Improvement Hearing Feasibility Report for 2021 Pavement Management Project City of Cottage Grove, Minnesota December 2020 Submitted by: Bolton & Menk, Inc. 2035 County Rd D Maplewood, MN 55109 P: 651-704-9970 F: 651-704-9971 December 2, 2020 Honorable Mayor and City Council City of Cottage Grove 12800 Ravine Parkway South Cottage Grove, MN 55016 RE: 2021 Pavement Management Project BMI Project No. N14.122421 Honorable Mayor and City Council Members, Enclosed for your review is the 2021 Pavement Management Project Feasibility Report. The project scope includes street rehabilitation and utility repairs within the Pine Meadow, Sandy Hills, East Meadow Cliff neighborhoods and Jamaica Avenue from 80th Street to Indian Boulevard, as identified in this report. This report describes the improvements necessary within the project area. Cost estimates for the proposed improvements are presented in the Report. We would be happy to discuss this report at your convenience. Please contact me at 651-968-7674 if you have any questions. Sincerely, BOLTON & MENK, INC. Michael Boex, PE Prepared by: Bolton & Menk, Inc. Introduction 2021 Pavement Management ǀ N14.122421 Page i Table of Contents Introduction .......................................................................................................................... 1 Existing Conditions – Residential ............................................................................................ 2 Streets ...................................................................................................................................... 2 Sanitary Sewer ......................................................................................................................... 3 Water Main .............................................................................................................................. 3 Storm Sewer ............................................................................................................................ 4 Existing Conditions – Jamaica Avenue ..................................................................................... 4 Streets ...................................................................................................................................... 4 Sanitary Sewer ......................................................................................................................... 5 Water Main .............................................................................................................................. 6 Storm Sewer ............................................................................................................................ 6 Proposed Improvements – Residential.................................................................................... 6 Streets ...................................................................................................................................... 6 Walkway .................................................................................................................................. 7 Sanitary Sewer ......................................................................................................................... 7 Water Main .............................................................................................................................. 7 Storm Sewer ............................................................................................................................ 7 Storm Water Quality ................................................................................................................ 8 Proposed Improvements – Jamaica Avenue ............................................................................ 8 Streets ...................................................................................................................................... 8 Walkway .................................................................................................................................. 8 Sanitary Sewer ......................................................................................................................... 9 Water Main .............................................................................................................................. 9 Storm Sewer ............................................................................................................................ 9 Storm Water Quality ................................................................................................................ 9 Proposed Improvements – Arbor Meadows Park .................................................................... 9 Proposed Improvements – River Oaks Golf Course ................................................................ 10 Permits and Easements ........................................................................................................ 10 Estimated Costs ................................................................................................................... 10 Cost Allocation ....................................................................................................................... 10 Financing ................................................................................................................................ 12 Public Hearing ...................................................................................................................... 12 Project Schedule .................................................................................................................. 13 Conclusion and Recommendations ....................................................................................... 13 Prepared by: Bolton & Menk, Inc. Introduction 2021 Pavement Management ǀ N14.122421 Page ii Tables Table 1: Residential Streets Existing Street Section ................................................................. 3 Table 2: Jamaica Avenue Existing Street Section ..................................................................... 4 Table 3: Ground Penetrating Radar ......................................................................................... 5 Table 4: Falling Weigh Deflectometer ..................................................................................... 5 Table 5: Estimated Cost Summary ......................................................................................... 10 Table 6: Deductions to Residential Property ......................................................................... 11 Table 7: Estimated Cost Allocation Per Policy ........................................................................ 11 Table 8: Estimated Cost Per Unit ........................................................................................... 12 Table 9: Estimated Cost Allocation Per Policy ........................................................................ 12 Table 10: Cost Per Unit Comparison ...................................................................................... 14 Appendix Appendix A: Existing Pavement Condition Photos ................................................................. 15 Appendix B: Figures ............................................................................................................. 22 Appendix C: Cost Estimate Summary .................................................................................... 34 Appendix D: Preliminary Assessment Roll ............................................................................. 36 Appendix E: Pavement Cores – Residential ........................................................................... 43 Appendix F: Geotechnical Report – Jamaica Avenue.............................................................. 57 Figures Figure 1: Location ................................................................................................................. 23 Figure 2: Year Constructed – Residential ............................................................................... 24 Figure 3: Year Constructed – Jamaica Avenue ....................................................................... 25 Figure 4: Pavement Condition – Residential .......................................................................... 26 Figure 5: Street Improvements – Residential ......................................................................... 27 Figure 6: Street Improvements – Jamaica Avenue ................................................................. 28 Figure 7: Arbor Meadows Park Improvements ...................................................................... 29 Figure 8: River Oaks Golf Course Parking Lot Improvements .................................................. 30 Figure 9: Utility Improvements – Residential ......................................................................... 31 Figure 10: Utility Improvements – Jamaica Avenue ............................................................... 32 Figure 11: Assessable Parcels ................................................................................................ 33 Prepared by: Bolton & Menk, Inc. Introduction 2021 Pavement Management ǀ N14.122421 Page iii Certification Feasibility Report for 2021 Pavement Management Report City of Cottage Grove, Minnesota I hereby certify that this plan, specification or report was prepared by me or under my direct supervision, and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. By: Michael Boex, PE License No. 44576 Bolton & Menk, Inc. Date: December 2, 2020 Prepared by: Bolton & Menk, Inc. Introduction 2021 Pavement Management ǀ N14.122421 Page 1 INTRODUCTION The Pine Meadows, Sandy Hills, and East Meadow Cliff neighborhoods, along with Jamaica Avenue from 80th Street to Indian Boulevard, have been identified as candidates for rehabilitation during the 2021 construction season as a part of the City of Cottage Grove's ongoing roadway rehabilitation program. The City Council authorized preparation of this report to determine the feasibility of rehabilitating these streets as a part of the 2021 Pavement Management Project. Pine Meadows 2nd, 4th, and 5th Additions and Sandy Hills 7th and 8th Additions are located south of 85th Street (including 85th between Johansen Avenue and CSAH 19), approximately 280 feet west of Keats Avenue (CSAH 19), and east of Jewel Lane, as shown on Figure 1. The East Meadow Cliff neighborhood is located south of 80th Street and east of Jamaica Avenue, as shown on Figure 1. Jamaica Avenue, between 80th Street and Indian Boulevard, is also included in this project and is shown on Figure 1. There are 11 residential streets within these neighborhoods totaling approximately 14,000 linear feet, plus approximately 4,000 linear feet of an urban collector roadway. The purpose of this report is to further evaluate the work required for this street rehabilitation project, to provide an estimate of cost, and to establish a method of cost allocation or assessment in order to determine the physical and economic feasibility. This feasibility report examines the following street segments: Pine Meadows 2nd, 4th and 5th Additions 1. 85th Street, from approximately 280 feet west of Keats Avenue to Johansen Avenue (9603 – 9998) 2. Jorgensen Avenue, from 85th Street to Joliet Avenue (8506 – 8749) 3. Joliet Avenue, from Jorgensen Avenue to the end of the street (8536 – 8750) 4. Jorgensen Bay (8531 – 8571) Sandy Hills 7th and 8th Additions 1. Johansen Avenue, from 85th Street to the end of the street 2. Jody Circle, west of Johansen Avenue (8502 – 8896) 3. 87th Street, from Jody Circle to Johansen Avenue 4. Hillside Trail, from Jody Circle to Johansen Avenue, including the segment east of Johansen Avenue East Meadow Cliff Neighborhood 1. Jefferey Avenue, from 80th Street to the cul-de-sac (8001 – 8305) 2. Upper 81st Street, from Jeffery Avenue to approximately 285 feet west of Jefferey Avenue (9055 – 9071) 3. Jeffery Lane, west of Jefferey Avenue (8044 – 8228) Jamaica Avenue 1. Between Indian Boulevard and 80th Street Prepared by: Bolton & Menk, Inc. Existing Conditions – Residential 2021 Pavement Management ǀ N14.122421 Page 2 If the City decides to proceed with the proposed street and utility improvements as described in this report, it is anticipated construction would begin in 2021 as shown in the detailed project schedule found on page 13. EXISTING CONDITIONS – RESIDENTIAL STREETS The streets within these neighborhoods are urban-residential and are generally 32 feet wide (from face of curb to face of curb) with D412 concrete curb and gutter; Johansen Avenue is 40-feet wide (from face of curb to face of curb). The streets in the East Meadow Cliff neighborhood were constructed in 1991. The streets in the Pine Meadows 2nd, 4th and 5th Additions were constructed between 1992 and 1996. The in-place pavement section of streets in the East Meadow Cliff and Pine Meadows neighborhoods were designed to be approximately 3-inches of bituminous over 6-inches of aggregate base. The streets in Sandy Hills 7th and 8th Additions were constructed between 1997 and 1998. The in-place pavement section of these streets was designed to be approximately 3.5-inches of bituminous over 6-inches of aggregate base. Figure 2 depicts the age of the streets. A visual inspection was performed in 2020 to evaluate the pavement surface conditions in the three residential neighborhoods. The inspection determined the pavement conditions are considered “Poor” to “Fair” and generally have major distress. Figure 4 depicts the pavement condition within the neighborhoods, and Appendix A contains some representative photos of the existing pavement condition. In addition, there are sections of existing curb and gutter that have settled, cracked, or have other defects that will require replacement. Pothole repairs and skin patch overlays have been performed to keep the road in a drivable and relatively smooth condition. A significant amount of street maintenance funds have been used or are anticipated in upcoming maintenance cycles in these areas. Past experience on recent projects has shown that the pavement cracking pattern on streets of this general age and condition range extends well below the surface. In fact, the previous seal coat can help mask the cracking in some instances. It should be noted that the visual surface rating is a preliminary indicator of condition and potential rehabilitation techniques; it should not solely dictate the maintenance or rehabilitation strategy. Factors such as age, traffic projections, pavement strength, and pavement structure condition should also be considered. Coring of the pavement was performed to determine the thickness of the existing street section and evaluate pavement condition. The core locations are shown on Figure 2 and photos of the pavement cores can be seen in Appendix E. From the cores, it can be seen that the average section in the neighborhoods consists of approximately 3.81 inches of bituminous over 6.75 inches of base, as shown in Table 1. The thicker than expected bituminous is in part due to multiple seal coat applications or skin patch overlays, as well as difficulty in evaluating bituminous depths from the stripped cores. Prepared by: Bolton & Menk, Inc. Existing Conditions – Residential 2021 Pavement Management ǀ N14.122421 Page 3 Table 1: Residential Streets Existing Street Section No. Location Bituminous (in) Aggregate Base (in) Street Neighborhood C-1 Upper 81st Street East Meadow Cliff 3.502 6.50 C-2 Jeffery Lane East Meadow Cliff 3.751 8.25 C-3 Jeffery Avenue East Meadow Cliff 4.002 8.75 C-4 Jeffery Avenue East Meadow Cliff 4.001 7.50 C-05 85th Street Pine Meadows 2nd Addition 4.101 5.75 C-06 85th Street Pine Meadows 4th Addition 4.502 3.75 C-07 85th Street Pine Meadows 4th Addition 3.501 7.25 C-08 Jorgensen Avenue Pine Meadows 5th Addition, Phase 1 3.802 9.25 C-09 Joliet Avenue Pine Meadows 5th Addition, Phase 1 3.10 8.25 C-10 Jorgensen Avenue Pine Meadows 5th Addition, Phase 2 3.60 2.50 C-11 Jorgensen Avenue Pine Meadows 5th Addition, Phase 2 4.001 4.50 C-12 Jody Circle Sandy Hills 7th Addition 4.401 5.25 C-13 Johansen Avenue Sandy Hills 7th Addition 4.001 9.00 C-14 Hillside Trail Sandy Hills 8th Addition 3.001 7.25 C-15 Jody Circle Sandy Hills 8th Addition 3.901 7.50 Average 3.81 6.75 1. Stripping present (Varying severity) 2. Severe stripping present (Core was broken upon extraction) Thirteen of the fifteen cores within the residential neighborhoods displayed some degradation due to asphalt stripping. Stripping is generally described as the separation of aggregate from the asphalt due to moisture. The stripping found degrades the strength and durability of the pavement. Four of the cores were noted as broken, meaning the stripping was severe enough that the bituminous fell apart as the core was extracted. The locations of stripping generally coincided with areas where Public Works has performed extensive maintenance via skin patch overlays and patching, whereas areas with slight stripping may not be visible at the pavement surface. Due to the granular subgrade soils and good aggregate base, the pavement structure as a whole is typically structurally sound. Therefore, the issue facing the City is typically functional and not structural – meaning the recurring maintenance issues are due to the stripped pavement material raveling and breaking apart. SANITARY SEWER The sanitary sewer system within the residential neighborhoods consists primarily of 8-inch diameter polyvinyl chloride pipe (PVC). The existing sanitary sewer has been televised to evaluate pipe condition. The televising reports show that the pipe is generally in good condition. Miscellaneous structure repairs including patching and other repairs were noted during the inspections. WATER MAIN The water mains within the residential neighborhoods are 6 to 18-inch diameter ductile iron pipe (DIP), which were installed in conjunction with the development of the neighborhoods. Prepared by: Bolton & Menk, Inc. Existing Conditions – Jamaica Avenue 2021 Pavement Management ǀ N14.122421 Page 4 The water mains are believed to be in good condition. However, projects of similar eras have had instances of excessive bolt corrosion on valves and it is possible the valves in this project area may be in a similar condition. Therefore, some select valves will be checked for corrosion prior to street work occurring. Additionally, there are expected to be some valves which are not operational and will need to be addressed with the project. The valves will be operated and evaluated by Public Works prior to the start of the project. STORM SEWER The existing storm sewer has been televised to determine pipe condition and necessary repairs. In addition, storm structures were also inspected. The televising reports show that the storm sewer mains are generally in good condition. However, some problems encountered in the existing storm sewer were cracked or broken pipes. Most structures were identified as in good condition with some miscellaneous structure patching, and other repairs noted during the inspections. EXISTING CONDITIONS – JAMAICA AVENUE STREETS Jamaica Avenue, between 80th Street and Indian Boulevard, is a four-lane divided urban roadway consisting of B618 concrete curb and gutter, 14-foot lanes and a grass median. In 1980, a 74-foot wide section was constructed with a 6-inch aggregate base and a 24-foot bituminous mat, consisting of two 1.5-inch lifts, on the west side. In 1981, a 24-foot bituminous mat, consisting of two 1.5-inch lifts, was constructed on the east side of the original 74-foot aggregate base section. In 1993, the existing south bound and northbound lanes had a 1.5-inch bituminous overlay on the existing 3-inch bituminous mat. As part of this 1993 project, the lanes were constructed to a 28-foot (from face of curb to face of curb) street width for each direction of traffic, with B618 concrete curb and gutter, a grass median, and concrete sidewalk. The in-place pavement section of Jamaica Avenue was designed to be 4.5-inches of bituminous over 6-inches of aggregate base. Figure 3 depicts the age of the streets. Coring of the pavement was performed to determine the thickness of the existing street section and evaluate pavement condition. The core locations are shown on Figure 3 and photos of the pavement cores can be seen in Appendix F. From the cores, it can be seen that the average section along Jamaica Avenue consists of approximately 5.5-inches of bituminous over 7-inches of base, as shown in Table 2. The thicker than expected bituminous is in part due to multiple seal coat applications or thin overlays. The cores show slight to severe stripping occurring in various depths of the pavement, depending on the location. All cores from Jamaica Avenue displayed some degradation due to stripping. The stripping found degrades the strength and durability of the pavement. Table 2: Jamaica Avenue Existing Street Section No. Location Bituminous (in) Aggregate Base (in) B-5 Between 80th Street and 75th Street 6.001 11.00 B-6 Between 75th Street and Indian Boulevard 5.501 5.00 B-7 South of 75th Street 5.001 5.00 Average 5.50 7.00 1. Stripping present (Varying severity) Prepared by: Bolton & Menk, Inc. Existing Conditions – Jamaica Avenue 2021 Pavement Management ǀ N14.122421 Page 5 Additional testing was performed on Jamaica Avenue in an effort to better identify the properties of the roadway. Therefore, ground penetrating radar (GPR) and falling weight deflectometer (FWD) testing was performed on all four lanes. Ground penetrating radar is a non-intrusive procedure that produces an image of the underground materials by sending and interpreting electromagnetic waves. GPR was used to supplement the cores and obtain more data points regarding pavement and aggregate base thickness. The pavement section properties, between 80th Street and Indian Boulevard, obtained from the GPR is presented below. Table 3: Ground Penetrating Radar Layer SB Outside Lane SB Inside Lane NB Inside Lane NB Outside Lane Average (in) CV Average (in) CV Average (in) CV Average (in) CV BP 5.3 13% 5.2 13% 5.2 8% 5.7 8% Base 5.9 20% 5.2 20% 5.3 22% 7.7 25% Total 11.2 12% 10.4 11% 10.6 11% 13.4 16% *BP = Bituminous Pavement; Base = Aggregate Base; Total = BP and Base; CV = Coefficient of Variation The falling weight deflectometer is a non-destructive process used to evaluate pavement structural condition by providing an in-situ characterization of the pavement layer stiffness. The FWD applies dynamic loads to a pavement surface, simulating the magnitude and duration of a single wheel load. The downward movement (vertical deflection) of the pavement at various distances from the loading plate are measured with various sensors. These measurements help determine the overall pavement load rating, pavement layer characteristics and material properties (modulus), and subgrade strength characteristics (in-situ R-Value). The R-Value is representative of the ability of a soil to resist lateral spreading due to an applied vertical load from traffic. The 15th percentile R-Values and GE values, between 80th Street and Indian Boulevard, from the FWD are presented below. Table 4: Falling Weigh Deflectometer From To Lane R-Value GE 80th Street 75th Street NB 23.7 27.4 75th Street Indian Boulevard NB 30.5 26.2 Indian Boulevard 75th Street SB 36.9 22.0 75th Street 80th Street SB 24.8 27.9 Average 28.9 25.8 Appendix F contains the complete Jamaica Avenue geotechnical report completed in July 2020. This report analyzes the pavement of Jamaica Avenue from Indian Boulevard to the Highway 61/Jamaica Avenue roundabout south of East Point Douglas Road. SANITARY SEWER The sanitary sewer system along Jamaica Avenue connects adjacent neighborhoods east and west of Jamaica Avenue. The sanitary sewer north of 80th Street that connects to the neighborhood east of Jamaica Avenue has been televised to determine pipe condition and necessary repairs. The televising reports show that the pipe is generally in good condition and no repairs are needed. Prepared by: Bolton & Menk, Inc. Proposed Improvements – Residential 2021 Pavement Management ǀ N14.122421 Page 6 WATER MAIN There are two locations where water main crosses Jamaica Avenue to connect adjacent neighborhoods, once at Indian Boulevard and once at 75th Street. The water main on the west side of Jamaica Avenue at Indian Boulevard is a 12-inch diameter DIP and was installed in 1979 in conjunction with the development of the neighborhood west of Jamaica Avenue. In 1980 this water main was connected to and installed across Jamaica Avenue in conjunction with the development of the neighborhood to the east of Jamaica Avenue. The water main on the west side of Jamaica Avenue at 75th Street is a 12-inch diameter DIP and was installed in 1974 in conjunction with the development of the neighborhood west of Jamaica Avenue. In 1979 this water main was connected to and installed across Jamaica Avenue in conjunction with the development of the neighborhood to the east of Jamaica Avenue. The water mains are believed to be in good condition. However, due to the age of the water main, there are expected to be some valves which are not operational and will need to be addressed with the project. The valves will be operated and evaluated by Public Works prior to the start of the project. STORM SEWER The existing storm sewer has been televised to determine pipe condition and necessary repairs. In addition, storm structures were also inspected. The televising reports show that the storm sewer mains are generally in good condition. However, some problems encountered in the existing storm sewer were cracked or broken pipes. Most structures were identified as in good condition with some miscellaneous structure patching, lining, and other repairs noted during the inspections. PROPOSED IMPROVEMENTS – RESIDENTIAL STREETS Due to the age of pavements in the residential neighborhoods (22-29 years old), the observed depth and extent of the asphalt stripping in the cores, extent of previous City maintenance, and past City experience with streets of this age and condition, a mill-overlay is not recommended at this time for the Pine Meadows, Sandy Hills, and East Meadow Cliff neighborhoods. The risks typical of all mill-overlay projects, i.e. reflective cracking, and the associated maintenance required were evaluated to determine acceptable risk levels. Past projects have shown that stripping of the pavement can extend well below the surface of the pavement, making complete removal of the stripped portions unfeasible. In those cases, the remaining pavement posed risk for excessive volume of cracking or raveling in the base course. Due to the types of distress present in the existing pavement, the anticipated acceleration of deterioration due to asphalt stripping, and risks associated with a mill-overlay at this age, the residential streets within the Pine Meadows, Sandy Hill, and East Meadow Cliff neighborhoods are proposed to undergo a full pavement removal and replacement with 3.5-inches of new pavement. The wear course is proposed to be virgin mix, excluding the use of recycled asphalt pavement (RAP). The concrete curb and gutter in all three neighborhoods are proposed to undergo spot replacement, as shown in Figure 5. The curb in poor condition will be evaluated for removal just prior to construction. Preliminary estimates indicate that approximately 17% will need to be removed and replaced in the Pine Meadows and Rolling Hills neighborhoods and 18% in the East Meadow Cliff neighborhood. The percentage of curb is not necessarily evenly distributed and there may be some long sections of curb Prepared by: Bolton & Menk, Inc. Proposed Improvements – Residential 2021 Pavement Management ǀ N14.122421 Page 7 replacement. Where conditions are favorable, the goal is that the concrete curb and gutter last two pavement lifecycles. In locations where curb is removed and replaced in front of driveways, impacted concrete or bituminous driveways will be patched the entire width with in-kind materials as a part of the street rehabilitation process. In areas of spot curb replacement, this patch typically extends a few feet behind the curb. Restoration is anticipated to consist of screened Loam Topsoil Borrow with seed and hydromulch. Traffic signs are proposed to be replaced as a part of this project to meet federal retro reflectivity requirements. In addition, signs will be evaluated for conformance to the adopted City sign policy and signs will be removed or supplemented as required. The existing streetlight system has received routine maintenance and does not have any major areas of concern. The existing four feed point cabinets in the residential neighborhoods are beyond their useful life and should be replaced as part of this project. Existing poles, direct-bury wire, and handholes will remain in place. Should the spot curb removal process impact the existing direct-buy wiring, spot repairs will be completed as necessary. WALKWAY Costs have been included in this report to update all pedestrian ramps to the current Americans with Disabilities Act (ADA) standards. All pedestrian ramps will be evaluated and reconstructed to compliant pedestrian ramps; this may include removing some segments of existing sidewalk to meet the required landings and grades. Spot sidewalk removal and replacement is also proposed to correct damaged curb panels along Johansen Avenue. SANITARY SEWER Utility improvements are shown in Figure 9. The sanitary sewer manhole castings will be salvaged and reinstalled. The existing concrete adjusting rings will be replaced with new high-density polyethylene (HDPE) adjusting rings to conform to current City standards. Miscellaneous structure repairs such as patching or replacing a top slab will be performed as needed. WATER MAIN It is proposed that broken valve top sections be removed and replaced as a part of this project. It is anticipated that a small sample of valves be dug up in each neighborhood and checked for bolt corrosion in the spring. Any corroded bolts would be replaced if necessary, and additional valves with like conditions could be dug up and checked if warranted. As a part of this process, the valve box would be replaced in conjunction with the work. Also, it is proposed to extend the hydrant barrel on any hydrant requiring adjustment. Finally, hydrants will be reconditioned by sandblasting and painting, and concrete hydrant access pads are proposed to be constructed in accordance with current City standards. STORM SEWER Generally speaking, the intent of this project is to rehabilitate the streets and not change existing drainage patterns. In-line repairs are recommended to address cracks and offset joints. Structures in poor condition will be replaced to conform to current City standards. Adjustment rings for manholes and catch basins will be replaced with HDPE rings. The existing castings will be salvaged and reinstalled unless they are damaged or do not meet current City standards. Miscellaneous structure patching, lining, and other repairs will be performed as needed. Prepared by: Bolton & Menk, Inc. Proposed Improvements – Jamaica Avenue 2021 Pavement Management ǀ N14.122421 Page 8 Public Works staff provided input on areas with historic drainage concerns. No major flooding or drainage issues were noted; therefore, only minor curb grade modifications are proposed to facilitate drainage. STORM WATER QUALITY Storm water quality improvements are not required in this neighborhood due to no increase of impervious surfacing. PROPOSED IMPROVEMENTS – JAMAICA AVENUE STREETS Due to the condition of the pavement along Jamaica Avenue between Indian Boulevard and 80th Street, the observed depth and extent of the asphalt stripping in the cores, results of the GPR and FWD, extent of previous City maintenance and past City experience with streets of this age and condition, a full- depth pavement replacement is recommended at this time. Due to the types of distress present in the existing pavement, the anticipated acceleration of deterioration due to asphalt stripping, and risks associated with a mill-overlay at this age, Jamaica Avenue is proposed to undergo a full pavement removal and replacement with 5.5-inches of new pavement. The wear course is proposed to be virgin mix, excluding the use of recycled asphalt pavement (RAP). The concrete curb and gutter along Jamaica Avenue is proposed to undergo spot replacement, as shown in Figure 6. The curb in poor condition will be evaluated for removal just prior to construction. Preliminary estimates indicate that approximately 11% will need to be removed and replaced. The percentage of curb is not necessarily evenly distributed and there may be some long sections of curb replacement. Where conditions are favorable, the goal is that the concrete curb and gutter last two pavement lifecycles. In order to accommodate a future signal system at 80th Street, both north and south-bound Jamaica Avenue approaches will need geometric improvements to facilitate through traffic, at which time a full reconstruction should be coordinated. Due to the necessary geometric improvements, full curb replacement and the signal would be installed in conjunction with a future Jamaica Avenue project. Restoration is anticipated to consist of screened Loam Topsoil Borrow with seed and hydromulch. Traffic signs are proposed to be replaced as a part of this project to meet federal retro reflectivity requirements. In addition, signs will be evaluated for conformance to the adopted City sign policy and signs will be removed or supplemented as required. The existing streetlight system has received routine maintenance and does not have any major areas of concern. Existing poles, direct-bury wire, and handholes will remain in place. Should the spot curb removal process impact the existing direct-buy wiring, spot repairs will be completed, as necessary. WALKWAY Costs have been included in this report to update all pedestrian ramps to the current Americans with Disabilities Act (ADA) standards. All pedestrian ramps will be evaluated and reconstructed to compliant pedestrian ramps; this may include removing some segments of existing sidewalk to meet the required landings and grades. Several pedestrian ramps along Jamaica Avenue have been recently reconstructed in past pavement management projects and will not need to be reconstructed as part of this project. Prepared by: Bolton & Menk, Inc. Proposed Improvements – Arbor Meadows Park 2021 Pavement Management ǀ N14.122421 Page 9 Spot sidewalk removal and replacement is also proposed to correct for damaged curb panels along both sides of Jamaica Avenue. SANITARY SEWER Utility improvements are shown in Figure 10. The sanitary sewer manhole castings will be salvaged and reinstalled. The existing concrete adjusting rings will be replaced with new high-density polyethylene (HDPE) adjusting rings to conform to current City standards. WATER MAIN The valve boxes will be adjusted to final grades and any broken valve top sections will be removed and replaced as part of this project. STORM SEWER Generally speaking, the intent of this project is to rehabilitate the streets and not change existing drainage patterns. In-line repairs are recommended to address cracks, while pipes that had holes in them are recommended to be removed and replaced. Structures in poor condition will be replaced to conform to current City standards. Adjustment rings for manholes and catch basins will be replaced with HDPE rings. The existing castings will be salvaged and reinstalled unless they are damaged or do not meet current City standards. Miscellaneous structure patching and other repairs will be performed as needed. Public Works staff provided input on areas with historic drainage concerns. No major flooding or drainage issues were noted; therefore, only minor curb grade modifications are proposed to facilitate drainage. STORM WATER QUALITY Storm water quality improvements are not required in this neighborhood due to no increase of impervious surfacing. PROPOSED IMPROVEMENTS – ARBOR MEADOWS PARK Arbor Meadows park is located south of 85th Street, east of Johansen Avenue, west of Joliet Avenue, and north of Hillside Trail. Similar to past pavement management projects, when a neighborhood undergoes a pavement management project, the neighborhood park is also evaluated for site improvements. The parking lot for Arbor Meadows Park was constructed in 1997 along with the Sandy Hills 7th Addition and consists of approximately 3-inches of bituminous over 6-inches of aggregate base. The existing trail that connects the Arbor Meadows parking lot to Jorgensen Avenue, was constructed in 2016 with 6- inches of gravel and 3-inches of bituminous. As part of the 2021 project the parking lot is proposed to have a full pavement replacement with spot curb and gutter replacement. The existing pedestrian ramp will be reconstructed to meet ADA compliance. A new trail is proposed to connect to the existing trail near the playground, follow the perimeter of the park, and connect to the existing trail west of Jorgensen Avenue, as shown in Figure 7. This new trail would also connect to the two existing street connections at Johansen Avenue and Hillside Trail. In addition to these improvements, it is proposed to install a water irrigation service for future use. Bidding alternatives will be evaluated during design for additional improvements. Prepared by: Bolton & Menk, Inc. Proposed Improvements – River Oaks Golf Course 2021 Pavement Management ǀ N14.122421 Page 10 PROPOSED IMPROVEMENTS – RIVER OAKS GOLF COURSE River Oaks Golf Course is a City-owned 18-hole scenic golf course located on Highway 61. In late 2020 the club house underwent construction with a kitchen addition to the northwest corner of the clubhouse. As part of the pavement management project, the parking lot is proposed to receive a full pavement replacement with spot curb and gutter replacement. As part of these improvements, the existing pedestrian ramps will be reconstructed to meet ADA compliance, new parking lot lighting and islands will be installed, as shown in Figure 8. We will continue to work with Cottage Grove staff to evaluate additional golf course site improvements during the final design phase of the project as budgetary conditions allow. PERMITS AND EASEMENTS A Phase II General Storm Water Permit from the MPCA is anticipated to be required for the project because disturbance and restoration will likely exceed one acre. All streets in the project area are located within the South Washington Watershed District (SWWD), however, because there will be no disturbance to the existing subgrade a permit is not required. No additional drainage and utility easements are anticipated in the neighborhoods; however, this will be evaluated during the final design phase of the project. ESTIMATED COSTS Cost estimates for the improvements have been prepared and are included in Appendix C. All costs for items to be constructed are based on anticipated unit prices for the 2021 construction season. All costs include a twenty-five percent allowance for indirect costs associated with the project (engineering, administrative, financing, and legal) as well as a ten percent contingency. No costs are included for capitalized interest during the construction period or before assessments are levied. The following is an overall summary of the estimated costs: Table 5: Estimated Cost Summary Location Estimated Project Cost* Pine Meadows, Sandy Hills & East Meadow Cliff Neighborhoods $2,423,817.35 Jamaica Avenue $1,442,819.13 Arbor Meadows Park $291,142.50 River Oaks Golf Course $522,119.81 Total $4,679,898.79 *Costs presented include 10% contingency + 25% indirect costs COST ALLOCATION Assessments for this project will be based upon the "Infrastructure Maintenance Task Force Special Assessment Policy for Public Improvements," dated September 30, 2005, Revised August 8, 2012. All adjacent benefiting properties are proposed to be assessed. Per the Urban Residential policy, 45% of the project cost for both surface and subsurface improvements would be assigned to each individual residential lot on a unit basis. The intent of the City's policy is to treat all properties within a residential Prepared by: Bolton & Menk, Inc. Estimated Costs 2021 Pavement Management ǀ N14.122421 Page 11 development as similar individual units regardless of lot frontage. The amount assessed is based on the City standard street section even if the width is greater. City funds would be responsible for the remaining 55% of the project costs. Per the policy, 100% of the project costs adjacent to the property are assessed to City-owned property. In areas where residential property was opposite City property, half of the street width was assigned to the residential area and the other half to the City. The estimated project assessments are as follows: Residential Land Use: Infrastructure costs adjacent to City property or other land uses are removed from the neighborhoods to determine the residential cost contribution. The policy also states that all urban/residential lots on urban/residential streets shall be assessed based on the city standard street section even if the width is greater. Table 6: Deductions to Residential Property Location City Property Street Width Estimated Assessment Deduct Pine Meadows, Sandy Hills & East Meadow Cliff $9,545.39 $43,290.84 $52,836.23 Jamaica Avenue $1,442,819.13* $0.00 $1,442,819.13 Arbor Meadows Park $291,142.50 $0.00 $291,142.50 River Oaks Golf Course $522,119.81 $0.00 $522,119.81 Total $2,265,626.83 $43,290.84 $2,308,917.67 * Since no residential property that abuts Jamaica Ave has direct access, there are no assessable parcels and the City therefore covers the cost. Per the IMTF policy, urban residential lots on urban/residential streets within or outside the MUSA, 45% of the project costs for both surface and sub-surface assessments will be assessed. Table 7: Estimated Cost Allocation Per Policy Location Estimated Project Cost Estimated Assessment Deduct Residential Adjusted Cost Residential Assessed Amount (45% of Total) Pine Meadows, Sandy Hills & East Meadow Cliff $2,423,817.35 $52,836.23 $2,370,981.12 $1,066,941.50 Jamaica Avenue $1,442,819.13 $1,442,819.13 $0.00 $0.00 Arbor Meadows Park $291,142.50 $291,142.50 $0.00 $0.00 River Oaks Golf Course $522,119.81 $522,119.81 $0.00 $0.00 Total $4,679,898.79 $2,308,917.67 $2,370,981.12 $1,066,941.50 Prepared by: Bolton & Menk, Inc. Estimated Costs 2021 Pavement Management ǀ N14.122421 Page 12 Since all three neighborhoods have the same construction method and similar expected curb removal, a single assessment was determined by the total assessable RBLE units and total assessed amount for all three neighborhoods. Based on the table below, the total single-family residential assessment is $4,167.74 per unit in the Pine Meadows, Sandy Hills Neighborhoods and East Meadow Cliff Neighborhood. Table 8: Estimated Cost Per Unit Location Assessable RBLE Units Assessed Amount (45% of Total) Assessed Cost Per RBLE Unit Per Policy Special Benefit Appraisal Pine Meadows, Sandy Hills & East Meadow Cliff 256 $1,066,941.50 $4,167.74 $5,600 - $7,600 When the calculated assessment exceeds the special benefit appraisal, the single-family assessments will be proposed to be capped at the amount of the special benefit appraisal. If needed, City funds will cover the difference between the calculated assessment and the benefit appraisal. The benefit appraisal was completed in October 2020 and resulted in a change of benefit from $5,600 to $7,600, which is greater than the policy calculation, therefore the policy calculation will determine the proposed assessment. Religious Institution Use: Crossroads Church, located at the northwest corner of Jamaica Avenue and 80th Street, is accessed from Ivystone Avenue. In 2016, when 80th Street was reconstructed, a benefit appraisal was completed for Crossroads Church and no benefit was found because it is not directly accessed from 80th Street. Due to a similar circumstance of no direct access from Jamaica Avenue, Crossroads Church will not be assessed. Summary: The IMTF policy therefore allocates costs in the following manner: Table 9: Estimated Cost Allocation Per Policy Location Residential Assessed Amount (45% of Total) Other Funds* Estimated Project Cost** Pine Meadows, Sandy Hills & East Meadow Cliff $1,066,941.50 $1,356,875.85 $2,423,817.35 Jamaica Avenue $0.00 $1,442,819.13 $1,442,819.13 Arbor Meadows Park $0.00 $291,142.50 $291,142.50 River Oaks Golf Course $0.00 $522,119.81 $522,119.81 Total $1,066,941.50 $3,612,957.29 $4,679,898.79 *See Appendix C for Fund Breakout ** Total Project Cost (10% contingency + 25% Indirect) Prepared by: Bolton & Menk, Inc. Public Hearing 2021 Pavement Management ǀ N14.122421 Page 13 FINANCING Assessments are proposed to be levied based on the City's current assessment policy. The remainder of the project would be financed through a combination of City funds such as the General Tax Levy and Utility and Enterprise funds for items such as storm sewer and street lighting improvements. Figure 11 depicts the assessable parcels for the project. PUBLIC HEARING Because the properties within the project area benefit from the proposed improvements, and the project will be partially funded through assessment, it will be necessary for the City to hold a public improvement hearing to receive comment on the proposed project and to determine further action to be taken. PROJECT SCHEDULE Below is the proposed schedule assuming starting construction in 2021: • 08/19/2020 Council Orders Feasibility Report • 12/02/2020 Council Receives and Approves Feasibility Report Council Sets a Public Improvement Hearing Date • 12/10/2020 Hold Neighborhood Meeting • 01/06/2020 Council Holds Public Improvement Hearing Council Orders the Preparation of the Plans and Specifications • 03/03/2021 Council Approves the Plans and Specifications • 03/25/2021 Project Bid Date • 04/07/2021 Contract Award • Spring 2021 Begin Construction • September 2021 Complete Construction • September 2021 Council Sets Assessment Hearing Date • October 2021 Council Holds Assessment Hearing CONCLUSION AND RECOMMENDATIONS It is recommended that this report be used as a guide for the layout, design, and cost allocation for the public improvements to be made as part of the 2021 Pavement Management Project. It is further recommended that the owners of properties within the project limits be notified of the proposed improvements in order to provide comment. To determine project feasibility, a comparison was made between the costs estimated herein and the costs experienced for other similar projects within the City. These comparisons, on a per linear foot construction cost basis (no indirect project costs), are shown in the following table: Prepared by: Bolton & Menk, Inc. Conclusion and Recommendations 2021 Pavement Management ǀ N14.122421 Page 14 Table 10: Cost Per Unit Comparison 2021 Pavement Management Project (Estimated Costs per Linear Foot) Pine Meadows 2nd, 4th, and 5th Additions and Sandy Hills 7th and 8th Additions – Pavement Replacement Area & Spot Curb $115.76 / LF East Meadow Cliff – Pavement Replacement Area & Spot Curb $115.40 / LF 2017 Pavement Management Project (Bid Results) Rolling Hills 3rd, 6th, and 7th Additions – Pavement Replacement Area & Spot Curb $102.71 / LF Jamaica Ridge Additions – Pavement Replacement Area & Spot Curb $90.65 / LF 2016 Pavement Management Project (Bid Results) District F3/F5 – Pavement Replacement Area & Spot Curb $97.06 / LF From the tabulation above, it is indicated that the cost to rehabilitate in the residential areas are like past projects of similar scope. The increase depicted is partially due to rises in construction and material costs. Financial responsibilities have been determined based on estimated project costs as well as adopted City policy. Funding sources consist of assessments to benefitted properties and use of existing designated City funds. Based on the information contained herein, it can be concluded that the construction of utility and street improvements is feasible. The deteriorated condition of the pavement, stable condition of the subgrade, and condition of the concrete curb and gutter suggest that similar rehabilitation be performed in all three neighborhoods, as well as Jamaica Avenue. The improvements are cost effective as they utilize the existing subgrade and keep existing curb wherever possible. From an engineering standpoint, this project is feasible, necessary, cost effective, and can best be accomplished by letting competitive bids for the work under one contract in order to complete the work in an orderly and efficient manner. City of Cottage Grove, Minnesota Appendix A: Existing Pavement Condition Photos 2021 Pavement Management ǀ N14.122421 Page 15 Appendix A: Existing Pavement Condition Photos City of Cottage Grove, Minnesota Appendix A: Existing Pavement Condition Photos 2021 Pavement Management ǀ N14.122421 Page 16 Pine Meadow Neighborhood Approximate Location: 9821 85th Street Temporary skin patch overlay across entire width of road performed in 2010. Additional patching has since occurred, and original distresses have reflected through. Pine Meadow Neighborhood Approximate Location: 9998 85th Street Reflective cracking through temporary skin patch overlay. City of Cottage Grove, Minnesota Appendix A: Existing Pavement Condition Photos 2021 Pavement Management ǀ N14.122421 Page 17 Pine Meadow Neighborhood Approximate Location: 8732 Joliet Avenue Fatigue/small block cracking adjacent to an open transverse joint. Pine Meadow Neighborhood Approximate Location: 8719 Jorgensen Avenue Curb and gutter settlement and resultant poor drainage evident; numerous street patches present. City of Cottage Grove, Minnesota Appendix A: Existing Pavement Condition Photos 2021 Pavement Management ǀ N14.122421 Page 18 Sandy Hills Neighborhood Approximate Location: 8689 Johansen Avenue Thin overlay along the curb line to address asphalt stripping, numerous patch attempts and crack sealing present. Sandy Hills Neighborhood Approximate Location: 9553 Hillside Trail Large block cracking typical throughout. City of Cottage Grove, Minnesota Appendix A: Existing Pavement Condition Photos 2021 Pavement Management ǀ N14.122421 Page 19 Sandy Hills Neighborhood Approximate Location: 9589 Hillside Trail Asphalt stripping along the curb line; previous patching attempts evident. East Meadow Cliff Neighborhood Approximate Location: 8279 Jeffery Avenue This photo was taken in 2018 and depicts fatigue cracking, previous route and seal of cul-de-sac. This area has since been patched but the underlying condition is still present. City of Cottage Grove, Minnesota Appendix A: Existing Pavement Condition Photos 2021 Pavement Management ǀ N14.122421 Page 20 East Meadow Cliff Neighborhood Approximate Location: 8236 Jeffery Avenue South This photo was taken in 2018 and depicts severe asphalt stripping and previous attempts to patch. This area has since been patched but the underlying condition is still present. East Meadow Cliff Neighborhood Approximate Location: 8241 Jeffery Lane Functional concrete curb and gutter, although exposed aggregate surface appearance. City of Cottage Grove, Minnesota Appendix A: Existing Pavement Condition Photos 2021 Pavement Management ǀ N14.122421 Page 21 East Meadow Cliff Neighborhood Approximate Location: 8033 Jeffery Lane This photo was taken in 2018 and depicts typical block cracking and pavement fatigue in the neighborhood. East Meadow Cliff Neighborhood Approximate Location: 9063 Upper 81st Street Asphalt stripping and associated patching attempts. City of Cottage Grove, Minnesota Appendix B: Figures 2021 Pavement Management ǀ N14.122421 Page 22 Appendix B: Figures CSAH 19 (Keats Avenue)80th Street Indian Boulevard Jamaica Avenue90th Street 75th Street Hillside Trail Hi g h w a y 6 1 Kinbro AvenueH i g hw a y 6 1 River Oaks Golf Course Sandy Hills 7th and 8th Additions East Meadow Cliff Neighborhood Pine Meadows 2nd, 4th and 5th Additions Arbor Meadows Park Jamaica Avenue H:\COTT\N14122421\CAD\C3D\FIGR-122421-Locations.dwg 11/20/2020 8:10:22 AMR 2021 Pavement Management Project City of Cottage Grove, MN Figure 1: Location December 2020 R FEETSCALE 0 1250 2500 HORZ. SS S SS S S S S S S S S S S S S SS S D S S D S S S S S S S S S S S S S S S S S S S S S S S S S S S D D D D D DD D D D D D D S 9758 9700 87998790 8610 8853 854185028542 9814 9671 88858879 8651 9577 8627 8652 9646 8737 8568 8664 9560 9727 8355 9646 9659 9642 8476 9802 9664 8408 8409 8400 8398 8399 8840 9794 9647 8373 9821 8467 8667 8564 9713 9708 9676 8256 8333 9759 9803 8489 8429 9672 8348 8366 9810 8446 8364 8837 8809 8638 9813 8781 9610 8555 8516 8492 8478 8793 8715 9615 9754 8344 9766 8719 8515 9719 9590 8563 9778 8362 8312 8500 8450 9770 8346 8320 9658 9575 9555 8571 8497 8695 9672 8512 9774 9855 8360 8384 9691 8388 8452 8405 9637 9998 8465 9425 8666 8716 85318553 96519641 8645 8738 8888 875097388829 8731 8732 8871 8762 8714 8745 86978698 8671 9749 8528 9648 9675 8391 8377 8309 84029683 9686 9815 8583 8421 8818 9719 9702 8654 9565 979888808866 9709 8680 9553 94759453 8648 8692 8697 8542 8674 8507 8657 8421 8464 8412 8418 88038802 9690 8653 8624 8613 8587 8584 84438424 8434 8573 8575 8625 8826 9771 8614 85958613 971488138810 8591 8600 8689 85908598 8507 9570 8656 8881 8856 9783 8749 8865 97268821 9776978888968874 8628 860586259550 8767 8750 8506 9755 8821 8660 9540 8705 8681 9799 9712 8556 8430 8600 9809 9762 9680 9629 8524 8436 9720 9782 9595 8508 9818 9798 8385 83159716 9795 8866 9615 8850 9580 8373 8359 8434 8340 8536 8564 8612 8844 8836 9589 9622 8523 8490 8443 9731 8327 8531 8520 8890 8851 9634 9790 8539 8586 9620 9757 8422 9632 8835 8552 9520 9822 9795 8417 8287 8547 8351 9629 9825 8452 8445 8528 8466 9766 8351 9735 8425 9644 8258 8579 8495 9806 8448 9742 9786 8590 8576 8479 8322 9660 9758 9750 9819 96038480 8491 Pine Meadows 2nd Addition Pine Meadows 5th Addition Phase 1 Pine Meadows 5th Addition Phase 2 Sandy Hills 8th Addition Sandy Hills 7th Addition Pine Meadows 4th Addition Arbor Meadows Park C-15 C-14 C-13 C-12 C-05 C-06 C-07 C-08 C-09 C-11 C-10 CSAH 19 (Keats Avenue)85th StreetHillside TrailJohansen AvenueHillside TrailJody CircleJody CircleJoliet AvenueJorgensen AvenueJorgensenBay85th Street PlaceJorgensen AvenueJody Lane84th S t r e e t Jewel LaneJewel AvenueJody Circle 87t h S t r e e t Hillside Trail S S S S SSS S S S S S S S S S S S S S S S D D 9034 9305 8216 8437 8432 8093 8065 80679063 9030 8339 8281 8265 8430 82498248 82328231 8474 9026 8462 8503 8055 8310 8288 8194 8096 8287 8239 815381358139 8146 8127 8002 8244 8228 8233 8217 8295 9301 8197 8175 8168 8315 8197 8180 8320 82168215 9223 8138 8126 8124 8105810881028115 8093 8463 8125 8078 8054 8044 8261 8218 8078 8500 8450 8444 9300 8026 8425 7880 8305 8495 8417 8296 8494 8456 8469 8443 9304 8409 9055 9291 8001 90589042 917991659055 91959031 9235 90389061 8166 81518154 8252 81968195 8247 81378126 8119 8090 8136 81598144 8131 8112 9022 8168 81698167 8180 8194 8153 817181628152 8182 823681838181 8270 8499 8263 8381 8429 8438 8264 8280 8367 8498 8477 8416 8279 8353 8395 84528474 8426 8468 8423 9394 8056 9064 8445 8507 8504 9243922792119149913591199105 8490 8496 8241 8497 8325 8253 8501 8081 8080 90718063 8050 8492 8062 8486 8297 8311 8071 8059 8053 8279 8072 9019 8505 8461 8097 9005 8227 8193 8296 8302 8033 8422 8079 8502 8486 8453 8182 8480 8019 8205 8350 8128 9018 8085 8487 East Meadow Cliff Neighborhood C-2 C-4 C-1 C-3 80th Street Janero AvenueJasmine AvenueJeffrey AvenueJeffrey Lane81st Street Upper 81st Street H:\COTT\N14122421\CAD\C3D\FIGR-122421-Year Constructed.dwg 11/20/2020 8:10:48 AMR Figure 2: Year Constructed - Residential City of Cottage Grove, MN 2021 Pavement Management Project December 2020 R FEETSCALE 0 150 300 LEGEND NEIGHBORHOOD BOUNDARY PAVEMENT DISTRICT/ PROJECT LIMITS PAVEMENT CORE RECONSTRUCTED 2011 EAST MEADOW CLIFF CONSTRUCTED 1991 PINE MEADOWS CONSTRUCTED 1992 2nd Addition CONSTRUCTED 1994 4th Addition CONSTRUCTED 1995 5th Addition, Phase 1 CONSTRUCTED 1996 5th Addition, Phase 2 SANDY HILLS CONSTRUCTED 1997 7th Addition CONSTRUCTED 1998 8th Addition X OE OE 7809 7792 7777 9116 7820 7667 7796 7713 7476 9363 9176 9020 7781 7733 7696 7567 7557 7836 7735 9228 7788 7955 7787 7707 9189 7370 7343 7782 9323 7741 7650 7428 7353 7593 7564 7558 7532 7751 7811 9042 7637 7614 7629 7607 7603 7684 7577 7758 7668 7652 7612 7653 7741 7765 7815 7771 7760 7753 7755 9196 9180 9166 9150 7840 8965 7820 9225 9241 9017 7800 7317 9263 9231 9319 8844 7295 9108 9343 7357 9219 7328 9267 9235 9331 7325 9279 8887 9223 9128 7783 7737 7705 7526 9187 8888 7484 9181 7710 7524 9264 9114 7860 7954 7363 9055 7880 7966 7537 8866 7708 9260 9116 9013 7315 7305 9122 7845 7772 7699 7692 7384 7775 7883 7517 8822 9167 7421 9208 9244 9216 7345 7380 9304 7365 7373 9184 9156 9280 7405 9097 9001 7538 9043 7410 7437 7420 9335 7390 9252 9145 7318 9307 9247 9136 7333 9315 9223 9239 9316 9115 9188 9320 9224 9163 9308 7450 7440 7449 7443 7441 7438 7431 7461 7452 7388 7400 7393 9296 7444 7449 7430 7440 7459 7459 7485 7485 7474 7486 9193 7479 7462 9170 7527 7497 7533 7541 7545 7710 7739 7741 7677 7740 7721 7597 7592 7604 7595 7582 7597 7679 7662 7667 7652 7636 7613 7632 7602 7559 7572 7581 7573 7572 7563 7563 7594 7588 7555 7556 7578 7577 7632 7675 7676 7704 7661 77017721 7711 7754 7757 7746 7731 7746 7755 7760 7785 7775 7758 7829 7764 7758 7691 7684 7676 7596 7587 7747 7798 7886 7790 7789 9163 9147 9103 9133 7896 7799 7878 9132 9104 9208 7813 9134 9106 9240 9224 9120 9056 9032 9179 9165 9055 8900 9195 9031 9235 8867 9273 9307 7882 7883 9108 7804 7703 7754 7610 7527 7547 7498 9215 9251 9283 9271 9287 9299 7333 9351 9102 7320 8864 8884 9355 7310 9212 9109 9105 7542 7508 9067 9021 7523 7497 9256 9268 9240 9220 9324 9248 9133 7380 9276 9080 8844 7480 7469 74607740 7622 7617 7631 7526 7398 9303 9335 9347 7330 7438 7439 7429 7417 7395 7403 7385 9236 7378 9204 9192 7379 9275 9243 9339 9311 7340 9255 9259 7959 8884 8868 9243 9227 9211 9149 9135 9119 9105 7915 7863 7827 7752 7768 7793 7744 7730 7720 9207 9193 9177 9117 9051 9033 7896 9156 7889 7607 7680 7642 7634 7599 7572 7586 7550 7498 9090 9100 7486 7473 7458 9288 7375 9272 9300 7383 7368 9284 7348 7338 9312 9227 7307 7337 7791 7784 7722 7657 7714 7667 7703 7649 7990 7794 7722 7685 7688 7466 7420 9207 7401 9110 7780 7852 7766 7720 9299 9199 9196 7400 7799 7895 7717 7702 7684 7469 7408 7410 7776 7762 7734 7723 7650 7418 9200 7400 7786 7704 7706 7686 7617 7507 7506 7481 7405 9292 9117 7795 7868 9112 9135 7899 7742 7725 7756 7604 7457 9285 9232 7390 9019 7996 7745 7691 7700 7562 7752 7705 9379 9140 7411 9005 9118 7795 7725 7635 9259 7653 7620 7626 9321 7789 9112 7291 7729 7750 7602 7496 9295 9225 7415 9291 7308 9056 9183 9327 7410 7425 7375 9149 7319 7900 78017805 7774 7748 7618 7594 7715 7847 7875 7788 9349 8828 7960 7779 7636 7769 7429 B6B7B5 80th Street75th StreetIndian BoulevardIvystone Avenue Jamaica Avenue H:\COTT\N14122421\CAD\C3D\FIGR-122421-Year Constructed.dwg 11/20/2020 8:11:02 AMR Figure 3: Year Constructed - Jamaica Avenue City of Cottage Grove, MN 2021 Pavement Management Project December 2020 RFEETSCALE 0 150 300 LEGEND PAVEMENT DISTRICT / PROJECT BOUNDARY PAVEMENT CORE CONSTRUCTED 1980 CONSTRUCTED 1981 OVERLAY 1993 X SS S SS S S S S S S S S S S S S SS S D S S D S S S S S S S S S S S S S S S S S S S S S S S S S S S D D D D D DD D D D D D D S 9758 9700 87998790 8610 8853 854185028542 9814 9671 88858879 8651 9577 8627 8652 9646 8737 8568 8664 9560 9727 8355 9646 9659 9642 8476 9802 9664 8408 8409 8400 8398 8399 8840 9794 9647 8373 9821 8467 8667 8564 9713 9708 9676 8256 8333 9759 9803 8489 8429 9672 8348 8366 9810 8446 8364 8837 8809 8638 9813 8781 9610 8555 8516 8492 8478 8793 8715 9615 9754 8344 9766 8719 8515 9719 9590 8563 9778 8362 8312 8500 8450 9770 8346 8320 9658 9575 9555 8571 8497 8695 9672 8512 9774 9855 8360 8384 9691 8388 8452 8405 9637 9998 8465 9425 8666 8716 85318553 96519641 8645 8738 8888 875097388829 8731 8732 8871 8762 8714 8745 86978698 8671 9749 8528 9648 9675 8391 8377 8309 84029683 9686 9815 8583 8421 8818 9719 9702 8654 9565 979888808866 9709 8680 9553 94759453 8648 8692 8697 8542 8674 8507 8657 8421 8464 8412 8418 88038802 9690 8653 8624 8613 8587 8584 84438424 8434 8573 8575 8625 8826 9771 8614 85958613 971488138810 8591 8600 8689 85908598 8507 9570 8656 8881 8856 9783 8749 8865 97268821 9776978888968874 8628 860586259550 8767 8750 8506 9755 8821 8660 9540 8705 8681 9799 9712 8556 8430 8600 9809 9762 9680 9629 8524 8436 9720 9782 9595 8508 9818 9798 8385 83159716 9795 8866 9615 8850 9580 8373 8359 8434 8340 8536 8564 8612 8844 8836 9589 9622 8523 8490 8443 9731 8327 8531 8520 8890 8851 9634 9790 8539 8586 9620 9757 8422 9632 8835 8552 9520 9822 9795 8417 8287 8547 8351 9629 9825 8452 8445 8528 8466 9766 8351 9735 8425 9644 8258 8579 8495 9806 8448 9742 9786 8590 8576 8479 8322 9660 9758 9750 9819 96038480 8491 Pine Meadows 2nd Addition Pine Meadows 5th Addition Phase 1 Pine Meadows 5th Addition Phase 2 Sandy Hills 8th Addition Sandy Hills 7th Addition Pine Meadows 4th Addition Arbor Meadows Park CSAH 19 (Keats Avenue)85th StreetHillside TrailJohansen AvenueHillside TrailJody CircleJody CircleJoliet AvenueJorgensen AvenueJorgensenBay85th Street PlaceJorgensen AvenueJody Lane84th S t r e e t Jewel LaneJewel AvenueJody Circle 87t h S t r e e t Hillside Trail S S S S SSS S S S S S S S S S S S S S S S D D 9034 9305 8216 8437 8432 8093 8065 80679063 9030 8339 8281 8265 8430 82498248 82328231 8474 9026 8462 8503 8055 8310 8288 8194 8096 8287 8239 815381358139 8146 8127 8002 8244 8228 8233 8217 8295 9301 8197 8175 8168 8315 8197 8180 8320 82168215 9223 8138 8126 8124 8105810881028115 8093 8463 8125 8078 8054 8044 8261 8218 8078 8500 8450 8444 9300 8026 8425 7880 8305 8495 8417 8296 8494 8456 8469 8443 9304 8409 9055 9291 8001 90589042 917991659055 91959031 9235 90389061 8166 81518154 8252 81968195 8247 81378126 8119 8090 8136 81598144 8131 8112 9022 8168 81698167 8180 8194 8153 817181628152 8182 823681838181 8270 8499 8263 8381 8429 8438 8264 8280 8367 8498 8477 8416 8279 8353 8395 84528474 8426 8468 8423 9394 8056 9064 8445 8507 8504 9243922792119149913591199105 8490 8496 8241 8497 8325 8253 8501 8081 8080 90718063 8050 8492 8062 8486 8297 8311 8071 8059 8053 8279 8072 9019 8505 8461 8097 9005 8227 8193 8296 8302 8033 8422 8079 8502 8486 8453 8182 8480 8019 8205 8350 8128 9018 8085 8487 East Meadow Cliff Neighborhood 80th Street Janero AvenueJasmine AvenueJeffrey AvenueJeffrey Lane81st Street Upper 81st Street H:\COTT\N14122421\CAD\C3D\FIGR-122421-Pavement Condition.dwg 11/20/2020 8:11:25 AMR Figure 4: Pavement Condition - Residential City of Cottage Grove, MN 2021 Pavement Management Project December 2020 R FEETSCALE 0 150 300 LEGEND NEIGHBORHOOD BOUNDARY PAVEMENT DISTRICT/ PROJECT LIMITS 30 35 40 ASPHALT STRIPPING PRESENT THIN OVERLAY RESULT OF ASPHALT STRIPPING * * * * * ** * * * * * * * 9758 9700 87998790 8610 8853 854185028542 9814 9671 88858879 8651 9577 8627 8652 9646 8737 8568 8664 9560 9727 8355 9646 9659 9642 8476 9802 9664 8408 8409 8400 8398 8399 8840 9794 9647 8373 9821 8467 8667 8564 9713 9708 9676 8333 9759 9803 8489 8429 8547 9672 8348 8366 9810 8446 8364 8837 8809 8638 9813 8781 9610 8555 8516 8492 8478 8793 8715 9615 9754 8344 9766 8719 8515 9719 9590 8563 9778 8362 8312 8565 8500 8450 9770 8346 8320 9658 9575 9555 8571 8497 8695 9672 8512 9774 9855 8360 8384 9691 8388 8452 8405 9637 9998 8465 9425 8666 8716 85318553 96519641 8645 8738 8888 875097388829 8731 8732 8871 8762 8714 8745 86978698 8671 8899 9749 8528 9648 9675 8391 8377 84029683 9686 9815 8583 8421 8818 9719 9702 8654 9565 979888808866 9709 8680 9553 94759453 8648 8692 8697 8542 8674 8507 8657 8421 8464 8412 8418 88038802 9690 8653 8624 8613 85878635 8584 84438424 8434 8573 8575 8625 8826 9771 8614 85958613 971488138810 8591 86008657 8689 85908598 8507 9570 8656 8671 8881 8856 9783 8749 8865 97268821 9776978888968874 8628 860586259550 8767 8750 8506 9755 8821 8660 9540 8705 8681 9799 9712 8556 8430 8600 9809 9762 9680 9629 8524 8436 9720 9782 9595 8508 8523 9818 9798 8385 8315 9795 8866 9615 8850 9580 8373 8359 8434 8340 8536 8564 8612 8844 8836 9589 9622 8523 8490 8443 9731 8327 8531 8520 8890 8851 9634 8619 9790 8603 8539 8586 9620 9757 8422 9632 8835 8552 9520 9822 9795 8417 8547 8351 9629 9825 8452 8445 8528 8509 8466 9766 8351 9735 8425 9644 8258 8579 8495 9806 8448 9742 9786 8590 8576 8479 9660 9758 9750 9819 96038480 8491 CSAH 19 (Keats Avenue)85th StreetHillside TrailJohansen AvenueHillside TrailJody CircleJody CircleJoliet AvenueJorgensen AvenueJorgensenBay85th Street PlaceJorgensen AvenueJody Lane84th S t r e e t Jewel LaneJewel AvenueJody Circle 87t h S t r e e t Hillside Trail Arbor Meadows Park 9305 8216 8437 8432 8093 8065 80679063 8339 8281 8265 8430 82498248 82328231 8474 9026 8462 8503 8055 8310 8288 8194 8096 8287 8239 815381358139 8146 8127 8244 8228 8233 8217 8295 9301 8197 8175 8168 8315 8197 8180 8320 82168215 9223 8138 8126 8124 8105810881028115 8093 8463 8125 8078 8054 8044 8261 8218 8078 8500 8450 8444 9300 8026 8425 7880 8305 8495 8417 8296 8494 8456 8469 8443 9304 8409 9055 9291 917991659055 91959031 9235 8166 81518154 8252 81968195 8247 81378126 8119 8090 8136 81598144 8131 8112 9022 8168 81698167 8180 8194 8153 817181628152 8182 823681838181 8270 8499 8263 8381 8429 8438 8264 8280 8367 8498 8477 8416 8279 8353 8395 84528474 8426 8468 8423 9394 8056 8445 8507 8504 9243922792119149913591199105 8490 8496 8241 8497 8325 8253 8501 8081 8080 90718063 8050 8492 8062 8486 8297 8311 8071 8059 8053 8279 8072 9019 8505 8461 8097 9005 8227 8193 8296 8302 8033 8422 8079 8502 8486 8453 8182 8480 8019 8205 8350 8128 9018 8085 8487 80th Street Janero AvenueJasmine AvenueJeffrey AvenueJeffrey Lane81st Street Upper 81st Street H:\COTT\N14122421\CAD\C3D\FIGR-122421-Street Improvements.dwg 11/20/2020 8:11:42 AMR Figure 5: Street Improvements - Residential City of Cottage Grove, MN 2021 Pavement Management Project December 2020 R FEETSCALE 0 150 300 LEGEND FULL PAVEMENT REPLACEMENT WITH SPOT CURB REPAIR 7809 7792 7777 9116 7820 7667 7796 7713 7476 9363 9176 9020 7781 7733 7696 7567 7557 7836 7735 9228 7788 7955 7787 7707 9189 7370 7343 7782 9323 7741 7650 7428 7353 7593 7564 7558 7532 7751 7811 9042 7637 7614 7629 7607 7603 7684 7577 7758 7668 7652 7612 7653 7741 7765 7815 7771 7760 7753 7755 9196 9180 9166 9150 7840 8965 7820 9225 9241 9017 7800 7317 9263 9231 9319 8844 7295 9108 9343 7357 9219 7328 9267 9235 9331 7325 9279 8887 9223 9128 7783 7737 7705 7526 9187 8888 7484 9181 7710 7524 9264 9114 7860 7954 7363 9055 7880 7966 7537 8866 7708 9260 9116 9013 7315 7305 9122 7845 7772 7699 7692 7384 7775 7883 7517 8822 9167 7421 9208 9244 9216 7345 7380 9304 7365 7373 9184 9156 9280 7405 9097 9001 7538 9043 7410 7437 7420 9335 7390 9252 9145 7318 9307 9247 9136 7333 9315 9223 9239 9316 9115 9188 9320 9224 9163 9308 7450 7440 7449 7443 7441 7438 7431 7461 7452 7388 7400 7393 9296 7444 7449 7430 7440 7459 7459 7485 7485 7474 7486 9193 7479 7462 9170 7527 7497 7533 7541 7545 7710 7739 7741 7677 7740 7721 7597 7592 7604 7595 7582 7597 7679 7662 7667 7652 7636 7613 7632 7602 7559 7572 7581 7573 7572 7563 7563 7594 7588 7555 7556 7578 7577 7632 7675 7676 7704 7661 77017721 7711 7754 7757 7746 7731 7746 7755 7760 7785 7775 7758 7829 7764 7758 7691 7684 7676 7596 7587 7747 7798 7886 7790 7789 9163 9147 9103 9133 7896 7799 7878 9132 9104 9208 7813 9134 9106 9240 9224 9120 9056 9032 9179 9165 9055 8900 9195 9031 9235 8867 9273 9307 7882 7883 9108 7804 7703 7754 7610 7527 7547 7498 9215 9251 9283 9271 9287 9299 7333 9351 9102 7320 8864 8884 9355 7310 9212 9109 9105 7542 7508 9067 9021 7523 7497 9256 9268 9240 9220 9324 9248 9133 7380 9276 9080 8844 7480 7469 74607740 7622 7617 7631 7526 7398 9303 9335 9347 7330 7438 7439 7429 7417 7395 7403 7385 9236 7378 9204 9192 7379 9275 9243 9339 9311 7340 9255 9259 7959 8884 8868 9243 9227 9211 9149 9135 9119 9105 7915 7863 7827 7752 7768 7793 7744 7730 7720 9207 9193 9177 9117 9051 9033 7896 9156 7889 7607 7680 7642 7634 7599 7572 7586 7550 7498 9090 9100 7486 7473 7458 9288 7375 9272 9300 7383 7368 9284 7348 7338 9312 9227 7307 7337 7791 7784 7722 7657 7714 7667 7703 7649 7990 7794 7722 7685 7688 7466 7420 9207 7401 9110 7780 7852 7766 7720 9299 9199 9196 7400 7799 7895 7717 7702 7684 7469 7408 7410 7776 7762 7734 7723 7650 7418 9200 7400 7786 7704 7706 7686 7617 7507 7506 7481 7405 9292 9117 7795 7868 9112 9135 7899 7742 7725 7756 7604 7457 9285 9232 7390 9019 7996 7745 7691 7700 7562 7752 7705 9379 9140 7411 9005 9118 7795 7725 7635 9259 7653 7620 7626 9321 7789 9112 7291 7729 7750 7602 7496 9295 9225 7415 9291 7308 9056 9183 9327 7410 7425 7375 9149 7319 7900 78017805 7774 7748 7618 7594 7715 7847 7875 7788 9349 8828 7960 7779 7636 7769 7429 80th Street75th StreetIndian BoulevardIvystone Avenue Jamaica Avenue OE OE H:\COTT\N14122421\CAD\C3D\FIGR-122421-Street Improvements.dwg 11/20/2020 8:11:55 AMR Figure 6: Street Improvements - Jamaica Avenue City of Cottage Grove, MN 2021 Pavement Management Project December 2020 RFEETSCALE 0 150 300 LEGEND FULL PAVEMENT REPLACEMENT WITH SPOT CURB REPAIR Arbor Meadows Park Jo r g e n s e n A v e n u e Jorgensen AvenueJohansen AvenueJody Circle 87 t h S t r e e t Hillside Trail 8610 8541 85028542 8652 9646 8568 8664 9560 8564 9610 8516 8793 8515 9590 9658 9575 9555 8512 85318553 8645 8745 8528 9815 8583 8697 8542 8507 8657 8584 8573 8625 8614 8613 8591 8600 8689 8590 8598 8507 9570 8628 8625 9550 8506 9540 8524 9595 9580 8536 9622 8523 8531 8520 9634 8539 8552 8528 8576 9660 9819 lH:\COTT\N14122421\CAD\C3D\FIGR-122421-Street Improvements.dwg 11/20/2020 2:22:20 PMR Figure 7: Arbor Meadows Park Improvements City of Cottage Grove, MN 2021 Pavement Management Project December 2020 R FEETSCALE 0 50 100 LEGEND EXISTING BITUMINOUS TRAIL PROPOSED BITUMINOUS TRAIL FULL DEPTH PAVEMENT REPLACEMENT WITH SPOT CURB REPLACEMENT CONCRETE PEDESTRIAN RAMP REPLACEMENT CONCRETE PEDESTRIAN RAMP REPLACEMENT (INCLUDED IN RESIDENTIAL STREET IMPROVEMENTS) PROPOSED DIP IRRIGATION SERVICEl H i g h w a y 6 1 River Oaks Golf Course Expansion H:\COTT\N14122421\CAD\C3D\FIGR-122421-Street Improvements.dwg 11/25/2020 10:29:07 AMR Figure 8: River Oaks Golf Course Parking Lot Improvements City of Cottage Grove, MN 2021 Pavement Management Project December 2020 R FEETSCALE 0 40 80 LEGEND FULL DEPTH PAVEMENT REPLACEMENT WITH SPOT CURB REPLACEMENT CONCRETE SIDEWALK (ADA)IMPROVEMENTS CONCRETE SIDEWALK REMOVAL LANDSCAPING BY OTHERS TRASH ENCLOSURE BY OTHERS INFILTRATION AREA DUAL HEAD LED LIGHT FIXTURE 9758 9700 87998790 8610 8853 854185028542 9814 9671 88858879 8651 9577 8627 8652 9646 8737 8568 8664 9560 9727 8355 9646 9659 9642 8476 9802 9664 8408 8409 8400 8398 8399 8840 9794 9647 8373 9821 8467 8667 8564 9713 9708 9676 9803 8489 8429 8348 8366 9810 8446 8364 8837 8809 8638 9813 8781 9610 8555 8516 8492 8478 8793 8715 9615 9754 9766 8719 8515 9719 9590 8563 9778 8362 8312 8500 8450 9770 8346 9658 9575 9555 8571 8497 8695 9672 8512 9774 9855 8360 8384 9691 8388 8452 8405 9637 9998 8465 8666 8716 85318553 96519641 8645 8738 8888 875097388829 8731 8732 8871 8762 8714 8745 86978698 8671 8899 9749 8528 9675 8391 8377 84029683 9686 9815 8583 8421 8818 9719 9702 8654 9565 979888808866 9709 8680 9553 94759453 8648 8692 8697 8542 8674 8507 8657 8421 8464 8412 8418 88038802 9690 8653 8624 8613 85878635 8584 84438424 8434 8573 8575 8625 8826 9771 8614 85958613 971488138810 8591 86008657 8689 85908598 8507 9570 8656 8671 8881 8856 9783 8749 8865 97268821 9776978888968874 8628 860586259550 8767 8905 8750 8506 8821 8660 9540 8705 8681 9799 8556 8430 8600 9809 9762 9680 9629 8524 8436 9720 9782 9595 8508 9818 9798 8385 9795 8866 9615 8850 9580 8373 8359 8434 8340 8536 8564 8612 8844 8836 9589 9622 8523 8490 8443 9731 8531 8520 8890 8851 9634 8619 9790 8539 8586 9620 9757 8422 9632 8835 8552 9520 9822 9795 8417 8547 9629 9825 8452 8445 8528 8466 9766 8351 9735 8425 9644 8579 8495 9806 8448 9742 9786 8590 8576 8479 9660 9758 9750 9819 96038480 8491 D D D DD D DDD D D D D D D D D D D D D D D D D D D D D DD S S S S S S S S S S S S S S S S S S S S SS S S S S S S S S S S S S S S SS S SS S S S S S S S S S S S S SS S D S S D S S S S S S S S S S S S S S S S S S S S S S S S S S S D D D D D DD D D D D D D S >>lll l l llll l l l l l lll ll lllllllllllllllllllll lllllllllllllll llllllllllllllll l l l l llllllllllll l llll l l l l lllllll l l lllllllllllllllll l l l l llllllllllll ll l l lll >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>llll>>>>>>>>>>>>>> >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> >>>>>>>>>>>>>>>>>>>>>>>>>> >>CSAH 19 (Keats Avenue)85th StreetHillside TrailJohansen AvenueHillside TrailJody CircleJody CircleJoliet AvenueJorgensen AvenueJorgensenBay85th Street PlaceJorgensen AvenueJody Lane84th S t r e e t Jewel LaneJewel AvenueJody Circle 87t h S t r e e t Hillside Trail Arbor Meadows Park 9305 8216 8437 8432 8093 8065 80679063 8339 8281 8265 8430 82498248 82328231 8474 9026 8462 8503 8055 8310 8288 8194 8096 8287 8239 815381358139 8146 8127 8244 8228 8233 8217 8295 9301 8197 8175 8168 8315 8197 8180 8320 82168215 9223 8138 8126 8124 8105810881028115 8093 8463 8125 8078 8054 8044 8261 8218 8078 8500 8450 8444 9300 8026 8425 7880 8305 8495 8417 8296 8494 8456 8469 8443 9304 8409 9055 9291 917991659055 91959031 9235 8166 81518154 8252 81968195 8247 81378126 8119 8090 8136 81598144 8131 8112 9022 8168 81698167 8180 8194 8153 817181628152 8182 823681838181 8270 8499 8263 8381 8429 8438 8264 8280 8367 8498 8477 8416 8279 8353 8395 84528474 8426 8468 8423 9394 8056 8445 8507 8504 9243922792119149913591199105 8490 8496 8241 8497 8325 8253 8501 8081 8080 90718063 8050 8492 8062 8486 8297 8311 8071 8059 8053 8279 8072 9019 8505 8461 8097 9005 8227 8193 8296 8302 8033 8422 8079 8502 8486 8453 8182 8480 8019 8205 8350 8128 9018 8085 8487 D D D D D D D D D D D D D D D D D D D D D D D D D D D S S S S SS S S S S S SS S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S SSS S S S S S S S S S S S S S S S D D llll l l l l l l l l l l ll l l l l l l l llllllllllllll lllll lllllllllllllll l llllllllllllll l l l l l l l l lllllllllllllllll l l llllll>>> >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>l>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> >> >>>>>>>>>>>>>>>>>>80th Street Janero AvenueJasmine AvenueJeffrey AvenueJeffrey Lane81st Street Upper 81st Street H:\COTT\N14122421\CAD\C3D\FIGR-122421-Utility Improvements.dwg 11/20/2020 1:52:24 PMR Figure 9: Utility Improvements - Residential City of Cottage Grove, MN 2021 Pavement Management Project December 2020 R FEETSCALE 0 150 300 LEGEND STORM SEWER: PATCH STRUCTURE (WALL, INVERT, OR DOGHOUSE) STORM SEWER: REPLACE GRATE OR CASTING STORM SEWER: REPLACE CB RINGS STORM SEWER: ROTATE TOP SLAB STORM SEWER: REPLACE STRUCTURE SANITARY SEWER: REPLACE LID SANITARY SEWER: PATCH STRUCTURE (WALL, INVERT, OR DOGHOUSE) SANITARY SEWER: ADD 1-FT BARREL SECTION SANITARY SEWER: REPLACE CONE SECTION WATER MAIN: EXTEND HYDRANT BARREL NOTE: ALL MANHOLE STRUCTURES WILL BE ADJUSTED AND ALL ADJUSTMENT RINGS WILL BE REPLACED WATER MAIN: VALVE EVALUATION AND REPAIR 9020 7696 7836 7955 7782 7650 7564 7558 7532 7751 7811 9042 7614 7577 7758 7760 7840 7820 9017 7800 7705 7526 8888 7710 78607880 7708 7772 7692 7775 9001 9043 7485 7485 7474 7486 747974977541 7545 7739 7721 7595 7652 7613 7632 7559 7581 7563 7578 7676 7704 7757 7746 7775 7758 7829 7676 7596 7798 7790 77897799 9056 9032 9031 7883 7703 7754 7610 7527 74987542 7508 9067 9021 7523 7497 9080 74807740 76317793 7744 7730 9051 9033 7680 7642 7634 7599 7586 7498 7486 7473 7667 7649 7685 7688 7852 7766 7720 7895 7684 7762 7704 7686 7617 78687899 7742 7756 9019 7700 7752 9005 7635 7653 7626 7750 7602 7900 7774 7748 7618 7594 7847 7788 7769D DDDDDDDDDDDDDDDDDDDDDSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS>>>>>>>>>llllllllllllll l l l l lll llllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllll l l l l lllllllllllll l llllll>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>SDDSDSDSDS>>>>>l>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>75th StreetJamaica Avenue80th Street7160 7191 7316 7370 7343 7353 7564 7558 7532 7614 7577 8966 8946 8915 7180 8955 8975 8996 88877526 8888 7363 9055 7296 71219013 7151 7384 7300 7421 7373 9097 9001 9043 74107420 7390 73337450 7440 7441 7438 7431 7461 7452 7400 7393 7444 7449 7430 7440 7459 7459 7485 7485 7474 7486 7479 7462 749775417595 7652 7613 7559 75787596 7610 74987542 7508 9067 9021 7523 7497 7380 9080 7480 7469 7460 7438 7439 7429 7417 7403 7642 7634 7586 7498 9090 7486 7473 7458 7383 7337 8935 7261 7420 7401 7241 8895 8995 74007410 7332 7171 7411 7626 7291 7602 7221 7375 7618 7594 7429D DDDDDD DDDDDDDDSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS>>>>>>>>lllllllllllllllllllllllll l l lllllllllllllllllllllllllllllllllll l l l lllllllll l l l l l l lllllllllll l l l l >>>>>>> >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> > > >>>>>>>>>>>>>>>>>>>>>>>>>>>>>> >>>>>>>>>>>>>>>>>>> >>>>>>>>>>>>>>>>>> >> >> >> >>75th StreetIvystone Avenue Jamaica Avenue Indian BoulevardH:\COTT\N14122421\CAD\C3D\FIGR-122421-Utility Improvements.dwg 11/20/2020 2:29:58 PMR Figure 10: Utility Improvements - Jamaica Avenue City of Cottage Grove, MN 2021 Pavement Management Project December 2020 RFEETSCALE 0 150 300 LEGEND STORM SEWER: PATCH STRUCTURE (WALL, INVERT, OR DOGHOUSE) STORM SEWER: ADD 1-FT BARREL SECTION STORM SEWER: REPLACE GRATE OR CASTING STORM SEWER: REPLACE CB RINGS STORM SEWER: REPLACE TOP SLAB STORM SEWER: LINE STRUCTURE SANITARY SEWER: REPLACE RINGS STORM SEWER: REPLACE STRUCTURE CSAH 19 (Keats Avenue)85th StreetHillside TrailJohansen AvenueHillside TrailJody CircleJody CircleJoliet AvenueJorgensen AvenueJorgensenBay85th Street PlaceJorgensen AvenueJody Lane84th S t r e e t Jewel AvenueJody Circle 87t h S t r e e t 9758 9700 87998790 8610 8853 854185028542 9814 9671 88858879 8651 9577 8627 8652 9646 8737 8568 8664 9560 9727 8355 9646 9659 9642 8476 9802 9664 8408 8409 8400 8398 8399 8840 9794 9647 8373 9821 8467 8667 8564 9713 9708 9676 8256 8333 9759 9803 8489 8429 8547 9672 8348 8366 9810 8446 8364 8837 8809 8638 9813 8781 9610 8555 8516 8492 8478 8793 8715 9615 9754 8344 9766 8719 8515 9719 9590 8563 9778 8362 8312 8565 8500 8450 9770 8346 8320 9658 9575 9555 8571 8497 8695 9672 8512 9774 9855 8360 8384 9691 8388 8452 8405 9637 9998 8465 8666 8716 85318553 96519641 8645 8738 8888 875097388829 8731 8732 8871 8762 8714 8745 86978698 8671 9749 8528 9648 9675 8391 8377 8309 84029683 9686 9815 8583 8421 8818 9719 9702 8654 9565 979888808866 9709 8680 9553 94759453 8648 8692 8697 8542 8674 8507 8657 8421 8464 8412 8418 88038802 9690 8653 8624 8613 85878635 8584 84438424 8434 8573 8575 8625 8826 9771 8614 85958613 971488138810 8591 86008657 8689 85908598 8507 9570 8656 8671 8881 8856 9783 8749 8865 97268821 9776978888968874 8628 860586259550 8767 8750 8506 9755 8821 8660 9540 8705 8681 9799 9712 8556 8430 8600 9809 9762 9680 9629 8524 8436 9720 9782 9595 8508 8523 9818 9798 8385 83159716 9795 8866 9615 8850 9580 8373 8359 8434 8340 8536 8564 8612 8844 8836 9589 9622 8523 8490 8443 9731 8327 8531 8520 8890 8851 9634 8619 9790 8603 8539 8586 9620 9757 8422 9632 8835 8552 9520 9822 9795 8417 8287 8547 8351 9629 9825 8452 8445 8528 8509 8466 9766 8351 9735 8425 9644 8258 8579 8495 9806 8448 9742 9786 8590 8576 8479 8322 9660 9758 9750 9819 96038480 8491 80th Street Janero AvenueJasmine AvenueJeffrey AvenueJeffrey Lane81st Street 9034 9305 8216 8437 8432 8093 8065 80679063 9030 9020 8339 8281 8265 8430 82498248 82328231 8474 9026 8462 8055 8310 8288 8194 8287 8239 9196918091669150 815381358139 8146 8127 8002 8244 8228 8233 8217 8295 9301 8197 8175 8168 8315 8197 8320 82168215 9223 8126 8124 8105810881028115 8093 8463 8125 8078 8054 8044 8261 8218 8078 8500 8450 8444 9300 9308 8026 8425 8305 8417 8296 8456 8411 8469 8443 9304 8409 9055 9291 8001 90589042 920891349106 92409224912090569032 917991659055 91959031 9235 9038 81518154 8252 81968195 8247 8137 8119 8090 8136 81598144 8131 9022 8168 81698167 8180 8153 81718162 8182 823681838181 8270 8461 8263 9309 8381 8429 8438 8264 8280 8367 8498 8477 8416 8408 8279 8353 8395 84528474 8428 8426 8468 8423 9394 8056 9064 8445 8504 7959 9243922792119149913591199105 7915 7863 7827 8490 8496 8241 8325 8253 8081 8080 90718063 8050 8492 8062 8486 8297 8311 8071 8059 8053 8279 8072 9019 8461 8097 9005 8227 8193 8296 8302 8033 8422 8079 8502 8486 8453 8182 8480 8019 8205 8350 8128 9018 8085 Upper 81st Street H:\COTT\N14122421\CAD\C3D\FIGR-122421-Assessable Parcels.dwg 11/20/2020 1:56:56 PMR Figure 11: Assessable Parcels City of Cottage Grove, MN 2021 Pavement Management Project December 2020 R FEETSCALE 0 150 300 LEGEND SINGLE FAMILY RESIDENTIAL CITY PROPERTY City of Cottage Grove, Minnesota Appendix C: Cost Estimate Summary 2021 Pavement Management ǀ N14.122421 Page 34 Appendix C: Cost Estimate Summary LocationFeasibility ReportConstruction CostTotal Cost *Deduct For Street WidthDeduct For City Property AssessmentResidential Adjusted Total CostResidential Assessed AmountCity FundsSanitary Utility FundWater Utility FundStormwater Utility FundStreetlight Enterprise FundPlayground/Park Shelter Replacement/Public Landscape InitiativeParkImprovement FundRiver Oaks Golf CourseMSA Funds General LevySingleFamilyUnitsRBLEUnitsSingle Family Assessed $/UnitSingle Family Assessed $/Unit45% of AdjustedPine Meadows, Sandy Hills & East Meadow Cliff - Pavement ReplacementStreets1,539,701.25$ 2,117,089.22$ (43,290.84)$ (8,337.45)$ 2,065,460.93$ 929,457.42$ 1,187,631.80$ -$ -$ -$ -$ -$ -$ -$ -$ 1,187,631.80$ Sanitary Sewer43,850.00$ 60,293.75$ -$ (237.45)$ 60,056.30$ 27,025.34$ 33,268.41$ 33,268.41$ -$ -$ -$ -$ -$ -$ -$ -$ Water Main84,325.00$ 115,946.88$ -$ (456.62)$ 115,490.26$ 51,970.62$ 63,976.26$ -$ 63,976.26$ -$ -$ -$ -$ -$ -$ -$ Storm Sewer94,900.00$ 130,487.50$ -$ (513.88)$ 129,973.62$ 58,488.13$ 71,999.37$ -$ -$ 71,999.37$ -$ -$ -$ -$ -$ -$ Subtotal - Pine Meadows, Sandy Hills & East Meadow Cliff - Pavement Replacement 1,762,776.25$ 2,423,817.35$ (43,290.84)$ (9,545.39)$ 2,370,981.12$ 1,066,941.50$ 1,356,875.85$ 33,268.41$ 63,976.26$ 71,999.37$ -$ -$ -$ -$ -$ 1,187,631.80$ Jamaica Avenue - Pavement ReplacementStreets1,005,998.00$ 1,383,247.25$ -$ (1,383,247.25)$ -$ -$ 1,383,247.25$ -$ -$ -$ -$ -$ -$ -$ -$ 1,383,247.25$ Sanitary Sewer1,550.00$ 2,131.25$ -$ (2,131.25)$ -$ -$ 2,131.25$ 2,131.25$ -$ -$ -$ -$ -$ -$ -$ -$ Water Main2,400.00$ 3,300.00$ -$ (3,300.00)$ -$ -$ 3,300.00$ -$ 3,300.00$ -$ -$ -$ -$ -$ -$ -$ Storm Sewer39,375.00$ 54,140.63$ -$ (54,140.63)$ -$ -$ 54,140.63$ -$ -$ 54,140.63$ -$ -$ -$ -$ -$ -$ Subtotal - Jamaica Avenue - Pavement Replacement1,049,323.00$ 1,442,819.13$ -$ (1,442,819.13)$ -$ -$ 1,442,819.13$ 2,131.25$ 3,300.00$ 54,140.63$ -$ -$ -$ -$ -$ 1,383,247.25$ Arbor Meadows Park - Park Improvements$211,740.00 291,142.50$ -$ (291,142.50)$ -$ -$ 291,142.50$ -$ -$ -$ -$ -$ 291,142.50$ -$ -$ -$ NA NA NA NARiver Oaks Golf Course$379,723.50 522,119.81$ -$ (522,119.81)$ -$ -$ 522,119.81$ -$ -$ -$ -$ -$ -$ 522,119.81$ -$ -$ NA NA NA NATotal - Project 3,403,562.75$ 4,679,898.79$ (43,290.84)$ (2,265,626.83)$ 2,370,981.12$ 1,066,941.50$ 3,612,957.29$ 35,399.66$ 67,276.26$ 126,140.00$ -$ -$ 291,142.50$ 522,119.81$ -$ 2,570,879.05$ Special Benefit AppraisalAssessment Policy Calculation2021 Pavement Management ProjectCity Funds BreakoutCost Estimate Summary* Includes 10% Contingency + 25% Indirect Costs256.0 256.0$4,167.74 $5,600-$7,600NA NA NANA City of Cottage Grove, Minnesota Appendix D: Preliminary Assessment Roll 2021 Pavement Management ǀ N14.122421 Page 36 Appendix D: Preliminary Assessment Roll Parcel ID Owner Address Units $/Unit Total /Unit 1502721410053 RAMEY ROBERT & LISA 8579 JORGENSEN AVE S 1 4,167.74$ 4,167.74$ 1502721410025 WOEHNKER PETER K & AMY L 8528 S JORGENSON AVE 1 4,167.74$ 4,167.74$ 1502721410009 SWABACK THEODORE R & BRITANY 8520 JORGENSEN AVE S 1 4,167.74$ 4,167.74$ 1502721410028 BRILLHART BREANNA & ALEX 8576 JORGENSEN AVE S 1 4,167.74$ 4,167.74$ 1502721410012 GUDERIAN CELESTE J 8552 JOLIET AVE S 1 4,167.74$ 4,167.74$ 1502721410062 SCHAEFER CHRISTOPHER L 8695 JORGENSEN AVE S 1 4,167.74$ 4,167.74$ 1502721410007 THAO SHENG & CHIP 8512 JORGENSEN AVE S 1 4,167.74$ 4,167.74$ 1502721410011 SPRINGMAN STEVEN W & CYNTHIA 8536 S JOLIET AVE 1 4,167.74$ 4,167.74$ 1502721410060 CASLAND ANTHONY R & AVIS A 8667 JORGENSEN AVE S 1 4,167.74$ 4,167.74$ 1502721410027 JONES MELANIE 8564 JORGENSEN AVE S 1 4,167.74$ 4,167.74$ 1502721410046 KELSEY TREVOR C & JULIE 8523 JORGENSEN AVE S 1 4,167.74$ 4,167.74$ 1502721410045 CHASE JESSE P & CYNTHIA M WILKEN 8515 JORGENSEN AVE S 1 4,167.74$ 4,167.74$ 1502721410064 KONZE MARLIN G & ANNABELLE M 8719 JORGENSEN AVE S 1 4,167.74$ 4,167.74$ 1502721410006 METCALF RICHARD L JR & SONYA L 8506 JORGENSEN AVE S 1 4,167.74$ 4,167.74$ 1502721410010 HEAVNER MICHAEL A & ROSEANN M 8524 JORGENSEN AVE 1 4,167.74$ 4,167.74$ 1502721410063 SUTTERFIELD SHERYL J 8705 JORGENSEN AVE S 1 4,167.74$ 4,167.74$ 1502721410061 TAUFEN VICKI L & ANTHONY R 8681 JORGENSEN AVE S 1 4,167.74$ 4,167.74$ 1502721410035 FARLEY MATTHEW & LISA 8660 JORGENSEN AVE S 1 4,167.74$ 4,167.74$ 1502721410008 LEWIS HOLLY A 8516 JORGENSEN AVE S 1 4,167.74$ 4,167.74$ 1502721410031 ADAMS MATTHEW 8610 JORGENSEN AVE S 1 4,167.74$ 4,167.74$ 1502721410056 INGRAM STEPHEN M & RITA M 8605 JORGENSEN AVE S 1 4,167.74$ 4,167.74$ 1502721410033 RAWAY ERIC & HALEY 8648 JORGENSEN AVE S 1 4,167.74$ 4,167.74$ 1502721410058 OLSON DAVID G 8627 JORGENSEN AVE S 1 4,167.74$ 4,167.74$ 1502721410032 BOLLE PETER A & RACHEL K 8624 JORGENSEN AVE N 1 4,167.74$ 4,167.74$ 1502721410057 NELSON MICHAEL D & CONSTANCE A 8613 JORGENSEN AVE S 1 4,167.74$ 4,167.74$ 1502721410065 VORWERK RICHARD K & PAMELA A 8731 JORGENSEN AVE S 1 4,167.74$ 4,167.74$ 1502721410066 TLUSTOS SAMUEL E 8749 JORGENSEN AVE S 1 4,167.74$ 4,167.74$ 1502721410059 ARNEBECK JASON R & ANNA L 8651 JORGENSEN AVE S 1 4,167.74$ 4,167.74$ 1502721410034 OAKLAND ERIC & MELANIE A 8654 JORGENSEN AVE S 1 4,167.74$ 4,167.74$ 1502721410030 ANDERSON JEFFREY & KELLY 8600 JORGENSEN AVE S 1 4,167.74$ 4,167.74$ 1502721410055 LINDUSKY GREGORY M & BRENDA L 8595 JORGENSEN AVE S 1 4,167.74$ 4,167.74$ 1502721410029 BUSS DANIEL L 8590 JORGENSEN AVE S 1 4,167.74$ 4,167.74$ 1502721410054 LLOYD DAVID S & CINDY C 8587 S JORGENSEN AVE 1 4,167.74$ 4,167.74$ 1502721410044 BERG VANESSA E & JEREMIAH M 8507 JORGENSEN AVE S 1 4,167.74$ 4,167.74$ 1502721410026 JOHNSON REV LIV TRS 2930 EDGERTON ST 1 4,167.74$ 4,167.74$ 1502721410017 MEYER MARC R & JENNIFER J LARSON 8628 JOLIET AVE S 1 4,167.74$ 4,167.74$ 1502721410022 STUEDLE WESTON & LYNDSEY 8714 JOLIET AVE S 1 4,167.74$ 4,167.74$ 1502721410038 FLAHERTY TIMOTHY J 8653 JOLIET AVE S 1 4,167.74$ 4,167.74$ 1502721410019 CHANDRAN BALA M 8666 JOLIET AVE S 1 4,167.74$ 4,167.74$ 1502721410018 SAVARD CHAD C & JENNIFER E 8652 JOLIET AVE S 1 4,167.74$ 4,167.74$ 1502721410039 THIELING ROBERT M 8645 JOLIET AVE S 1 4,167.74$ 4,167.74$ 1502721410014 BUSS CHRISTOPHER J & CARYN S 8584 JOLIET AVE S 1 4,167.74$ 4,167.74$ 1502721410043 BRASHER MICHAEL R & JOY R 8573 JOLIET AVE S 1 4,167.74$ 4,167.74$ 1502721410040 SIMON SANDRA & PELLINO III C E 8625 JOLIET AVE S 1 4,167.74$ 4,167.74$ 1502721410024 HENK WILLIAM J & NICOLE V 8750 JOLIET AVE S 1 4,167.74$ 4,167.74$ 1502721410023 MALOTT JAMES M & JACALYN J 8732 JOLIET AVE S 1 4,167.74$ 4,167.74$ 1502721410036 BRUDELIE JULIE B & NATHAN O 8697 JOLIET AVE S 1 4,167.74$ 4,167.74$ 1502721410021 JOHNSON BRUCE L & JEAN A 8698 JOLIET AVE S 1 4,167.74$ 4,167.74$ 1502721410037 PLUMBO DAVID A & AMANDA R 8671 JOLIET AVE S 1 4,167.74$ 4,167.74$ 1502721410020 BERG BRIAN C & REBECCAH A 8680 JOLIET AVE S 1 4,167.74$ 4,167.74$ 1502721410016 WITZANY GARY R & VERNA A 8614 JOLIET AVE S 1 4,167.74$ 4,167.74$ 1502721410041 SCHWARTAU CRAIG R & JULIE A 8613 JOLIET AVE S 1 4,167.74$ 4,167.74$ 1502721410015 MOODY JAMES D & AMANDA C PALMER 8598 JOLIET AVE S 1 4,167.74$ 4,167.74$ 1502721410042 RYAN RICHARD P 8591 JOLIET AVE S 1 4,167.74$ 4,167.74$ 1502721410013 NORTON KATHLEEN M 8568 JOLIET AVE S 1 4,167.74$ 4,167.74$ Preliminary Assessment Roll Pine Meadows 2nd, 4th, and 5th Additions Pavement Replacement Preliminary Assessment Roll Pine Meadows 2nd, 4th, and 5th Additions Pavement Replacement 1502721140050 HENRY CARLENE T 14683 TRIPLE EAGLE CT 1 4,167.74$ 4,167.74$ 1502721140052 MAASS ADAM L & JILL K 9810 85TH ST S 1 4,167.74$ 4,167.74$ 1502721140053 DIEDRICH MARK & JULIE A 9806 85TH ST S 1 4,167.74$ 4,167.74$ 1502721130097 MOSITES PATRICK J & CATHERINE M MOSITES 9742 85TH ST S 1 4,167.74$ 4,167.74$ 1502721410069 STEFFEN GREGORY P & JULIE K 9825 85TH ST S 1 4,167.74$ 4,167.74$ 1502721130091 HILL DAVID A 9620 85TH ST S 1 4,167.74$ 4,167.74$ 1502721130108 LANE GABRIEL D & ANDREA 9757 85TH ST S 1 4,167.74$ 4,167.74$ 1502721130105 JAROSIEWICZ-LINDSEY KRISTINE M 9735 85TH ST S 1 4,167.74$ 4,167.74$ 1502721130098 SEIDL TRAVIS J ETAL 9754 85TH ST S 1 4,167.74$ 4,167.74$ 1502721130100 BESTLER DWANE L & PAMELA A 9615 85TH ST S 1 4,167.74$ 4,167.74$ 1502721140048 VOELKER JOHN W & CYNTHIA M 9803 85TH ST S 1 4,167.74$ 4,167.74$ 1502721410068 HERMERDING BRYAN J & KATIE L 9821 85TH ST S 1 4,167.74$ 4,167.74$ 1502721140032 MORAN MICHAEL P & THERESA A 9822 85TH ST S 1 4,167.74$ 4,167.74$ 1502721140046 NCHANG ROSALINE 9795 85TH ST S 1 4,167.74$ 4,167.74$ 1502721140055 SAUBER JENEL L 9798 85TH ST S 1 4,167.74$ 4,167.74$ 1502721130096 NITTI GINO A 9720 85TH ST S 1 4,167.74$ 4,167.74$ 1502721410067 BABCOCK CHRISTOPHER & MICHELLE 9819 85TH ST S 1 4,167.74$ 4,167.74$ 1502721130099 BLUE RONALD G & TARA L 9603 85TH ST S 1 4,167.74$ 4,167.74$ 1502721140031 HARRINGTON APRIL & LUCAS 9818 85TH ST S 1 4,167.74$ 4,167.74$ 1502721140049 SCHENCK KYLE & CAROLEE 9809 85TH ST S 1 4,167.74$ 4,167.74$ 1502721140047 MANIS LIV TRS 9799 85TH ST S 1 4,167.74$ 4,167.74$ 1502721130104 IH3 PROPERTY MINNESOTA LP 1717 MAIN ST STE 2000 1 4,167.74$ 4,167.74$ 1502721130095 MCNAMARA SCOT A 9708 S 85TH ST 1 4,167.74$ 4,167.74$ 1502721410070 ROBERTSON JULIE & BRIAN 9855 85TH ST S 1 4,167.74$ 4,167.74$ 1502721140030 WENZEL BRIAN R & KELLY A 9814 85TH ST S 1 4,167.74$ 4,167.74$ 1502721130094 PORTER TIMOTHY W & SANDRA A 9686 85TH ST S 1 4,167.74$ 4,167.74$ 1502721140051 LEWIS JEFFREY C & KIMBERLEY A 9815 85TH ST S 1 4,167.74$ 4,167.74$ 1502721130101 DOYLE JOHN A & TERI L 9637 85TH ST S 1 4,167.74$ 4,167.74$ 1502721140003 POLZIN JILLIAN N 9998 85TH ST S 1 4,167.74$ 4,167.74$ 1502721130103 PROWSE DAVID & JUDITH 9671 85TH ST S 1 4,167.74$ 4,167.74$ 1502721130092 HOWELL MARLAN H & PEGGY A 9642 85TH ST S 1 4,167.74$ 4,167.74$ 1502721140054 HARDY STEVEN J & MARJORIE E 9802 S 85TH ST 1 4,167.74$ 4,167.74$ 1502721130102 HOMAN BRIAN G & LINDA L 9659 85TH ST S 1 4,167.74$ 4,167.74$ 1502721130093 SCHUMAN TIMOTHY & DANIELLE 9664 85TH ST S 1 4,167.74$ 4,167.74$ 1502721410048 HOUCK GARY & MARIA J HAAS 8539 JORGENSEN BAY S 1 4,167.74$ 4,167.74$ 1502721410052 PECHMANN DANIEL W & PATRICIA L 8571 JORGENSON BAY S 1 4,167.74$ 4,167.74$ 1502721410047 WHILLOCK STEVEN E & ROSLYN A 8531 JORGENSEN BAY S 1 4,167.74$ 4,167.74$ 1502721410049 CHRISTENSEN MARK D & JENNIFER A 8547 JORGENSEN BAY 1 4,167.74$ 4,167.74$ 1502721410051 LUMAN CHARLES J JR & LAURIE 8563 JORGENSEN BAY S 1 4,167.74$ 4,167.74$ 1502721410050 VANGERPEN MICHAEL & STEPHANIE 8555 JORGENSEN BAY S 1 4,167.74$ 4,167.74$ 95 395,935.32$ Totals Parcel ID Owner Address Units $/Unit Total /Unit 1502721420097 WILLIAMS REYNOLD L 8890 JOHANSEN AVE S 1 4,167.74$ 4,167.74$ 1502721420082 KOPPE THOMAS J & SUZANNE M 8851 JOHANSEN AVE S 1 4,167.74$ 4,167.74$ 1502721420081 FALETTI MICHAEL J & DESIREE C 8835 JOHANSEN AVE S 1 4,167.74$ 4,167.74$ 1502721420098 BONAHOOM RICHARD M & RITA L 8866 JOHANSEN AVE S 1 4,167.74$ 4,167.74$ 1502721420099 JOHNSON ROBERT D 8840 JOHANSEN AVE S 1 4,167.74$ 4,167.74$ 1502721420062 SULLIVAN JAMES D & RUTH A 8793 JOHANSEN AVE S 1 4,167.74$ 4,167.74$ 1502721420061 BOESE JEFFREY L & LAUREL M 8745 JOHANSEN AVE S 1 4,167.74$ 4,167.74$ 1502721420055 HOLM SCOTT R & TERESA A 8541 JOHANSEN AVE S 1 4,167.74$ 4,167.74$ 1502721420057 HANSON DANNY W & SHELLEY A 8625 JOHANSEN AVE S 1 4,167.74$ 4,167.74$ 1502721420056 WILSON JESSE & SUSAN 8583 JOHANSEN AVE S 1 4,167.74$ 4,167.74$ 1502721420054 MEADE SALLY A 8664 JOHANSEN AVE S 1 4,167.74$ 4,167.74$ 1502721420058 PULANCO DANIEL D & MICHELE M 8657 JOHANSEN AVE S 1 4,167.74$ 4,167.74$ 1502721420060 SMITH DUANE A & MICHELLE L 8697 JOHANSEN AVE S 1 4,167.74$ 4,167.74$ 1502721420059 MORELAND LEAH J & JOHN 8689 JOHANSEN AVE S 1 4,167.74$ 4,167.74$ 1502721420021 HOLGATE GEORGE A JR & PAMELA L 8586 JODY CIR S 1 4,167.74$ 4,167.74$ 1502721420039 SMITH TIMOTHY J & CHRISTINA A 8715 JODY CIR S 1 4,167.74$ 4,167.74$ 1502721420020 ROSS EDWARD M & DEBRA K 8564 JODY CIR S 1 4,167.74$ 4,167.74$ 1502721420022 DUANE R ECKERT REV TRS ETAL 8612 JODY CIR S 1 4,167.74$ 4,167.74$ 1502721430012 HUERTA RICHARD L & MARY ANN 8844 JODY CIR S 1 4,167.74$ 4,167.74$ 1502721430011 GLAZIER DARIN & JODI 8836 JODY CIR S 1 4,167.74$ 4,167.74$ 1502721420023 PUST AARON D & LAUREN E 8638 JODY CIR S 1 4,167.74$ 4,167.74$ 1502721430013 FLOYSAND ERIC C & CHRISTINA M 8850 JODY CIR 1 4,167.74$ 4,167.74$ 1502721420042 GARRICK LYNN 8799 JODY CIR S 1 4,167.74$ 4,167.74$ 1502721420030 VAIL RAYMOND J & JOSCELYN S 8790 JODY CIR S 1 4,167.74$ 4,167.74$ 1502721430014 BRUMM TIMOTHY A & AMY K 8856 JODY CIR 1 4,167.74$ 4,167.74$ 1502721420096 DRAGT TODD & LINDA 8885 JODY CIR S 1 4,167.74$ 4,167.74$ 1502721420095 VANDENAVOND TODD M & DONNA J 8879 JODY CIR S 1 4,167.74$ 4,167.74$ 1502721420094 KLEINBOEHL CODY & AMY 8871 JODY CIR S 1 4,167.74$ 4,167.74$ 1502721420092 HPA US1 LLC 180 STETSON AVE N #3650 1 4,167.74$ 4,167.74$ 1502721420067 GRAMS ASHTON & CYNTHIA A 8818 JODY CIR S 1 4,167.74$ 4,167.74$ 1502721420091 GEORGE STEVIN L & CAROL J 8813 JODY CIR S 1 4,167.74$ 4,167.74$ 1502721420027 FILIPOVICH DANIEL & LAURINE 8716 JODY CIR S 1 4,167.74$ 4,167.74$ 1502721420029 WILLIAMS KATHLEEN A & BRICE M 8762 JODY CIR S 1 4,167.74$ 4,167.74$ 1502721420041 DAVY ZONA M & ROBERT M 8767 JODY CIR S 1 4,167.74$ 4,167.74$ 1502721430019 LISTERUD MARK & LEEANN PRAIRIE 8896 JODY CIR S 1 4,167.74$ 4,167.74$ 1502721430018 VANSCHOONHOVEN JAMES D & KIMBERLY A 8888 JODY CIR S 1 4,167.74$ 4,167.74$ 1502721430017 BANASZEWSKI KENNETH W & JULIE 8880 JODY CIR S 1 4,167.74$ 4,167.74$ 1502721430016 LEWICKI ROBERT A & EILEEN C 8874 JODY CIR S 1 4,167.74$ 4,167.74$ 1502721430015 BEHR GEORGE F III & MOLLY AK 8866 JODY CIR S 1 4,167.74$ 4,167.74$ 1502721420093 BELL KIMBERLY L & SIDNEY M 8829 JODY CIR S 1 4,167.74$ 4,167.74$ 1502721420068 CORRIGAN BRETT & LISA 8826 JODY CIR S 1 4,167.74$ 4,167.74$ 1502721420066 ANDERSON DOUGLAS B & CINDY L 8810 JODY CIR 1 4,167.74$ 4,167.74$ 1502721420035 COLLUPY ROBERT A & JONNIE L 8803 JODY CIR N 1 4,167.74$ 4,167.74$ 1502721420065 BUYTENDORP JAMES L & JOANN M 8802 JODY CIR 1 4,167.74$ 4,167.74$ 1502721420028 KIELSA MICHAEL A & MICHELLE P 8738 JODY CIR S 1 4,167.74$ 4,167.74$ 1502721420040 WHITE PAUL B & ROXANNE D 8737 JODY CIR S 1 4,167.74$ 4,167.74$ 1502721420047 MAHER TROY D & TIFFANY A DRESSEN 8531 JODY CIR S 1 4,167.74$ 4,167.74$ 1502721420048 RYAN CARY L & KAREN C 8553 JODY CIR S 1 4,167.74$ 4,167.74$ 1502721420049 DEBAERE JOHN J & ELIZABETH M 8575 JODY CIR S 1 4,167.74$ 4,167.74$ 1502721420024 BARFELS THOMAS E & DIANNE M 8656 JODY CIR S 1 4,167.74$ 4,167.74$ 1502721420046 NEUMANN CHRISTOPHER & MICHELLE LAUS 8507 JODY CIR S 1 4,167.74$ 4,167.74$ 1502721420017 COLLETT CHRISTOPHER M & CRYSTAL M 8502 JODY CIR S 1 4,167.74$ 4,167.74$ 1502721420018 ARMBRUSTER REBECCA J & JOSEPH B 8528 JODY CIR S 1 4,167.74$ 4,167.74$ 1502721420019 SKEIE PAUL G & LOREE A 8542 JODY CIR 1 4,167.74$ 4,167.74$ 1502721420026 DOTY DAVID W & PENNY H 8692 JODY CIR S 1 4,167.74$ 4,167.74$ Preliminary Assessment Roll Sandy Hills 7th and 8th Additions Pavement Replacement Preliminary Assessment Roll Sandy Hills 7th and 8th Additions Pavement Replacement 1502721420025 JOSLIN DAVID & HEATHER 8674 JODY CIR S 1 4,167.74$ 4,167.74$ 1502721420037 WILLHITE BERNARD J & DIANE E 9575 87TH ST S 1 4,167.74$ 4,167.74$ 1502721420038 MORRIS CRAIG L & DIANE M 9555 87TH ST S 1 4,167.74$ 4,167.74$ 1502721420050 LEPSCHE WILLIAM L & CASSONDRA D 9520 87TH ST S 1 4,167.74$ 4,167.74$ 1502721420036 ANDERSON RICHARD T & ASHLEY M 9595 87TH ST S 1 4,167.74$ 4,167.74$ 1502721420053 ELLINGSON MARK A & JILLIAN M 9580 87TH ST S 1 4,167.74$ 4,167.74$ 1502721420051 DEWAELE LAWRENCE E & JODI L 9540 87TH ST S 1 4,167.74$ 4,167.74$ 1502721420052 LURKEN KERRY & STEPHANIE 9560 87TH ST S 1 4,167.74$ 4,167.74$ 1502721420070 BUNESS RYAN T & KALLIE L 9658 HILLSIDE TRL S 1 4,167.74$ 4,167.74$ 1502721420079 GEEHAN ANDREA L & ALLEN S DEGEL 9634 HILLSIDE TRL S 1 4,167.74$ 4,167.74$ 1502721420072 SUNDELL RANDI L & RYAN D 9672 HILLSIDE TRL S 1 4,167.74$ 4,167.74$ 1502721420083 DAHLER WILLIAM M & JODI L 9795 HILLSIDE TRL S 1 4,167.74$ 4,167.74$ 1502721420080 BOCHE BLAKE C & JILL M 9615 HILLSIDE TRL S 1 4,167.74$ 4,167.74$ 1502721430022 MAURER WILLIAM L & MELISSA M 9766 HILLSIDE TRL S 1 4,167.74$ 4,167.74$ 1502721420045 TRUDEL CHRISTOPHER P & ANGELA 9590 HILLSIDE TRL S 1 4,167.74$ 4,167.74$ 1502721420078 GABBERT CHRISTOPHER & MICHELE 9622 HILLSIDE TRL S 1 4,167.74$ 4,167.74$ 1502721420031 SWARD CRISTIE A & TIMOTHY J 9589 HILLSIDE TRL S 1 4,167.74$ 4,167.74$ 1502721420071 SCHULT JOSEPH W & BETH A 9660 HILLSIDE TRL 1 4,167.74$ 4,167.74$ 1502721430021 GIESER DANIEL H & NINA A 9758 HILLSIDE TRL S 1 4,167.74$ 4,167.74$ 1502721430020 HANTEN JOHN A & TRACY A 9750 HILLSIDE TRL S 1 4,167.74$ 4,167.74$ 1502721420090 GILLELAND JAMES S & BETH A 9629 HILLSIDE TRL 1 4,167.74$ 4,167.74$ 1502721420063 DEVARENNES MARC S & JOYCE E 9610 HILLSIDE TRL 1 4,167.74$ 4,167.74$ 1502721420086 JOHNSON STEPHEN M & MALONE M M 9719 HILLSIDE TRL S 1 4,167.74$ 4,167.74$ 1502721420073 JANET L WININGER LIV TRS 9690 HILLSIDE TRL S 1 4,167.74$ 4,167.74$ 1502721420088 KING SUEANN & SHARON HANESTAD 9651 HILLSIDE TRL S 1 4,167.74$ 4,167.74$ 1502721420089 LUCAS MICHELLE W & MICHAEL S 9641 HILLSIDE TRL 1 4,167.74$ 4,167.74$ 1502721420076 WILLSON JOHN W & RUTH A 9726 HILLSIDE TRL S 1 4,167.74$ 4,167.74$ 1502721420075 EDWARDS DERICK B & KAREN E 9714 HILLSIDE TRL S 1 4,167.74$ 4,167.74$ 1502721420044 ALLIE MARC J & JACQUELYN M 9570 HILLSIDE TRL S 1 4,167.74$ 4,167.74$ 1502721420043 HERZOG DENNIS M & DENISE A 9550 HILLSIDE TRL S 1 4,167.74$ 4,167.74$ 1502721430023 LANE RUSSELL & ESBERG SHARON 9776 HILLSIDE TRL 1 4,167.74$ 4,167.74$ 1502721430024 BOLLBACK JAMES D & JULIE 9788 HILLSIDE TRL S 1 4,167.74$ 4,167.74$ 1502721430025 WRIGHT JOHN R & ASHTON M 9798 HILLSIDE TRL S 1 4,167.74$ 4,167.74$ 1502721420077 SOKOL BARBIE S 9738 HILLSIDE TRL 1 4,167.74$ 4,167.74$ 1502721420085 TATE DIRK A & JULIE R 9771 HILLSIDE TRL 1 4,167.74$ 4,167.74$ 1502721420084 LARSON KEVIN K & LORI L 9783 HILLSIDE TRL S 1 4,167.74$ 4,167.74$ 1502721420087 ENGELS JEFFREY T & JOETH J 9709 HILLSIDE TRL S 1 4,167.74$ 4,167.74$ 1502721420074 ISRAEL BRIAN W & JENNIFER M 9702 HILLSIDE TR 1 4,167.74$ 4,167.74$ 1502721420032 PFEIFFER BRYANT S & ERIN C 9577 HILLSIDE TRL S 1 4,167.74$ 4,167.74$ 1502721420033 FISCHER JOEL A & JENNIFER A 9565 HILLSIDE TRL 1 4,167.74$ 4,167.74$ 1502721420034 NADLER PAUL W 9553 HILLSIDE TRL S 1 4,167.74$ 4,167.74$ 1502721420069 KIRCHNER ANDREW A & MELONIE L 9646 HILLSIDE TRL S 1 4,167.74$ 4,167.74$ 97 404,270.80$ Totals Parcel ID Owner Address Units $/Unit Total /Unit 1502721220069 KLEIN GREGORY J & CANDIUS S 8054 JEFFERY AVE S 1 4,167.74$ 4,167.74$ 1502721220089 SKARA MICHAEL A & HOLLIE L 8044 JEFFERY LN 1 4,167.74$ 4,167.74$ 1502721220110 SCHIEMANN GREGORY R & LISA M 8033 JEFFERY AVE S 1 4,167.74$ 4,167.74$ 1502721220122 MULVIHILL DENNIS M & DANIELLE 8227 JEFFERY LN S 1 4,167.74$ 4,167.74$ 1502721220121 ALLERTON LIV TRS 8205 JEFFERY LN S 1 4,167.74$ 4,167.74$ 1502721220120 MUCKENHIRN ROBERT J & JULIE BERGSTEDT 8193 JEFFERY LN S 1 4,167.74$ 4,167.74$ 1502721220113 GIBBONS JAMES P & VALORIE R 8079 JEFFREY LN S 1 4,167.74$ 4,167.74$ 1502721220084 MARKS BRIAN J & PATRICIA A 8279 JEFFERY AVE S 1 4,167.74$ 4,167.74$ 1502721220100 KOEPSELL JAMES H & DORIS J 8182 JEFFERY LN S 1 4,167.74$ 4,167.74$ 1502721220070 HAIDER DAVID M & STEPHANIE M 8072 JEFFREY AVE S 1 4,167.74$ 4,167.74$ 1502721220071 KLINGBEIL THOMAS R & PAMELA L 8080 JEFFERY AVE S 1 4,167.74$ 4,167.74$ 1502721220068 DONAHUE MARK & JODI 9071 UPPER 81ST ST S 1 4,167.74$ 4,167.74$ 1502721220111 HEIMBRECHT KYLE R & JANESSA J 8055 JEFFERY LN S 1 4,167.74$ 4,167.74$ 1502721220063 GUZMAN ALANA 8026 JEFFERY AVE S 1 4,167.74$ 4,167.74$ 1502721220082 OLSON NICHOLAS & JENNIFER FARINELLA 8288 JEFFERY AVE 1 4,167.74$ 4,167.74$ 1502721220099 KILBOURNE BRETT 8194 JEFFERY LN S 1 4,167.74$ 4,167.74$ 1502721220091 CHINN CHRISTOPHER & KATHERINE 8097 JEFFERY AVE 1 4,167.74$ 4,167.74$ 1502721220114 SAND STEPHEN D & LORI A 8081 JEFFERY LN S 1 4,167.74$ 4,167.74$ 1502721220061 ANDERSON KRISTINA L 8126 JEFFERY AVE S 1 4,167.74$ 4,167.74$ 1502721220107 KEENAN BRIAN P 8056 JEFFERY LN S 1 4,167.74$ 4,167.74$ 1502721220112 LOVELL MATTHEW & JESSICA TOUTANT-LOVELL 8067 JEFFERY LN S 1 4,167.74$ 4,167.74$ 1502721220067 NUNEZ ELIAZAR & CATALINA 9063 UPPER 81ST ST 1 4,167.74$ 4,167.74$ 1502721220087 LEKO KAREN 8241 JEFFERY LN S 1 4,167.74$ 4,167.74$ 1502721220098 OLSON CHRISTOPHER G & VIRGINIA 8216 JEFFERY LN 1 4,167.74$ 4,167.74$ 1502721220064 JONES LAWRENCE D & SANDRA L 9064 UPPER 81ST ST S 1 4,167.74$ 4,167.74$ 1502721220086 GRAVES DIANNA E & JANE THEISSEN 8253 JEFFERY LN S 1 4,167.74$ 4,167.74$ 1502721220088 BAILEY LUKE J 8239 JEFFERY LN S 1 4,167.74$ 4,167.74$ 1502721220083 STINSON LEIF H 8287 JEFFERY AVE S 1 4,167.74$ 4,167.74$ 1502721220090 PIERCE JAMES M 8065 JEFFERY AVE S 1 4,167.74$ 4,167.74$ 1502721220066 WELTER THOMAS R & RUTH 9055 UPPER 81ST ST S 1 4,167.74$ 4,167.74$ 1502721220108 VERNSTROM GEORGE D & KATHLEEN S 8001 JEFFERY AVE S 1 4,167.74$ 4,167.74$ 1502721220062 JOHNSON LYNDON B & EVELYN L 8002 JEFFERY AVE S 1 4,167.74$ 4,167.74$ 1502721220065 GUTTETER ANDREW & KAYLA STAAB 9058 UPPER 81ST ST S 1 4,167.74$ 4,167.74$ 1502721220081 ESPERSEN ERIC D 8270 JEFFERY AVE S 1 4,167.74$ 4,167.74$ 1502721220096 FORD ESTHER 8197 JEFFREY AVE S 1 4,167.74$ 4,167.74$ 1502721220076 PORATH DONALD W & DIANE M 8180 JEFFERY AVE S 1 4,167.74$ 4,167.74$ 1502721220079 DINGLE SEAN 8244 JEFFERY AVE S 1 4,167.74$ 4,167.74$ 1502721220078 ROSENWALD TRAVIS J & ANGELA 8236 JEFFERY AVE S 1 4,167.74$ 4,167.74$ 1502721220093 LEE VONG & SUCHAI VANG 8131 JEFFERY AVE S 1 4,167.74$ 4,167.74$ 1502721220117 VOGT ANTHONY K & TAMERA L 8137 JEFFERY LN S 1 4,167.74$ 4,167.74$ 1502721220103 JANASZAK MEGHAN 8124 JEFFERY LN S 1 4,167.74$ 4,167.74$ 1502721220115 DOSMANN JODI I 8093 JEFFERY LN 1 4,167.74$ 4,167.74$ 1502721220105 BERGQUIST MICHAEL D & KRISTY 8090 JEFFERY LN S 1 4,167.74$ 4,167.74$ 1502721220080 TOMAI EDWARD M & TIFFANY 8252 JEFFERY AVE S 1 4,167.74$ 4,167.74$ 1502721220097 BRINK TROY & ALISHA 8228 JEFFERY LN 1 4,167.74$ 4,167.74$ 1502721220077 KANE RAYMOND J 8218 JEFFERY AVE S 1 4,167.74$ 4,167.74$ 1502721220102 CALLAIS SHELLY L 8146 JEFFERY LN S 1 4,167.74$ 4,167.74$ 1502721220095 JAROSIEWICZ TARA R 8175 JEFFERY AVE S 1 4,167.74$ 4,167.74$ 1502721220119 BUTH MICHAEL & LANA 8171 JEFFERY LN S 1 4,167.74$ 4,167.74$ 1502721220075 CARLSON KENNETH C & MARJORIE 8162 JEFFERY AVE S 1 4,167.74$ 4,167.74$ 1502721220094 OLSON BRIAN A & RYNKA E 8153 JEFFERY AVE 1 4,167.74$ 4,167.74$ 1502721220118 SMITHWICK JOSEPH R 8159 JEFFERY LN S 1 4,167.74$ 4,167.74$ 1502721220074 KASZAS SUSAN M 8144 JEFFERY AVE S 1 4,167.74$ 4,167.74$ 1502721220092 ASMEROM MEHARI & HIWOT M TESSEMA 8119 JEFFERY AVE S 1 4,167.74$ 4,167.74$ 1502721220116 KUMMER BRIAN & SARAH 8105 JEFFERY LN S 1 4,167.74$ 4,167.74$ Preliminary Assessment Roll East Meadow Cliff Pavement Replacement 1502721220072 TOMASCHKO ANDREW JOHN 8108 JEFFERY AVE S 1 4,167.74$ 4,167.74$ 1502721220104 BRUNSVOLD JENNIFER L & JUSTIN A 8102 JEFFERY LN S 1 4,167.74$ 4,167.74$ 1502721230048 BLAIR ROBERT & CAMILLE 8302 JEFFERY AVE S 1 4,167.74$ 4,167.74$ 1502721230047 ABTS JAMES E JR & JOY C 8296 JEFFERY AVE S 1 4,167.74$ 4,167.74$ 1502721230049 CHASE RICHARD L & KIMBERLY L 8305 JEFFERY AVE S 1 4,167.74$ 4,167.74$ 1502721220109 CURRIE DANIEL W 8605 INDIAN BLVD S 1 4,167.74$ 4,167.74$ 1502721220085 CUNNINGHAM BRAD L 1725 INNSBRUCK PKWY 1 4,167.74$ 4,167.74$ 1502721220106 FOGLE DONALD P JR 35625 63RD AVENUE WAY 1 4,167.74$ 4,167.74$ 1502721220101 PRIBYL NICOLE L & PATRICK D 6973 TIMBER RIDGE DR S 1 4,167.74$ 4,167.74$ 64 266,735.38$ Totals City of Cottage Grove, Minnesota Appendix E: Pavement Cores – Residential 2021 Pavement Management ǀ N14.122421 Page 43 Appendix E: Pavement Cores – Residential Coring Location C-1 Coring Location C-2 Bituminous and Aggregate Base Coring Results Cottage Grove 2018 PMP Cottage Grove, MN NTI Project No. 17.IGH03784.000 Coring Location C-3 Coring Location C-4* *NTI’s Field Technicians disturbed the aggregate base beneath the road with the coring drill barrel. The displaced materials were removed from the hole and the core prior to these pictures. This incident accounts for the discrepancy between the hole and core dimensions. Pavement Core Log Core ID :C-05 AET Project No. :28-20367Roadway Name :85th St Date :9/16/2020 1:43:58 PMLatitude :44.827501 Longitude :-92.909888 Comments :No visible lift thicknesses observed. Chip seal on surface and core showing minimal to moderate stripping throughout entire core. Direction of Travel :EB Location Type :Right Wheel Path Lane ID :Drive Lane Core Diameter (in) :6 Recovered Core (in) :4.1 Down-Hole Measurement (in) :4.25 Base Thickness (in) :5.75 Page 1 of 30American Engineering Testing, Inc. 550 Cleveland Avenue North St. Paul, MN 55114 www.amengtest.com Pavement Core Log Core ID :C-06 AET Project No. :28-20367Roadway Name :85th St Date :9/16/2020 1:22:18 PMLatitude : Longitude :Comments :No visible lift thicknesses observed. Core broke at approximately 1" below the surface. Minimal stripping observed throughout entire core. Direction of Travel :WB Location Type :Right Wheel Path Lane ID :Drive Lane Core Diameter (in) :6 Recovered Core (in) :4.5 Down-Hole Measurement (in) :4.25 Base Thickness (in) :3.75 Page 2 of 30American Engineering Testing, Inc. 550 Cleveland Avenue North St. Paul, MN 55114 www.amengtest.com Pavement Core Log Core ID :C-07 AET Project No. :28-20367Roadway Name :85th St Date :9/16/2020 1:06:52 PMLatitude : Longitude :Comments :No visible lift thicknesses observed. Minimal to moderate stripping observed throughout entire core.Direction of Travel :EB Location Type :Center of Lane Lane ID :Drive Lane Core Diameter (in) :6 Recovered Core (in) :3.5 Down-Hole Measurement (in) :3.5 Base Thickness (in) :7.25 Page 3 of 30American Engineering Testing, Inc. 550 Cleveland Avenue North St. Paul, MN 55114 www.amengtest.com Pavement Core Log Core ID :C-08 AET Project No. :28-20367Roadway Name :Jorgensen Ave Date :9/16/2020 2:57:32 PMLatitude : Longitude :Comments :No visible lift thicknesses observed. Core broke at two places in the upper 2" of the core. Severe to moderate stripping throughout entire core. Direction of Travel :SB Location Type :Right Wheel Path Lane ID :Drive Lane Core Diameter (in) :6 Recovered Core (in) :3.8 Down-Hole Measurement (in) :3.5 Base Thickness (in) :9.25 Page 4 of 30American Engineering Testing, Inc. 550 Cleveland Avenue North St. Paul, MN 55114 www.amengtest.com Pavement Core Log Core ID :C-09 AET Project No. :28-20367Roadway Name :Joliet Ave Date :9/16/2020 3:25:37 PMLatitude :44.824711 Longitude :-92.908117 Comments :From surface of core down, Lift 1: 1.3", Lift 2: 1.8". Core generally solid throughout.Direction of Travel :SB Location Type :Right Wheel Path Lane ID :Drive Lane Core Diameter (in) :6 Recovered Core (in) :3.1 Down-Hole Measurement (in) :3.25 Base Thickness (in) :8.25 Page 5 of 30American Engineering Testing, Inc. 550 Cleveland Avenue North St. Paul, MN 55114 www.amengtest.com Pavement Core Log Core ID :C-10 AET Project No. :28-20367Roadway Name :Jorgensen Ave Date :9/16/2020 3:13:02 PMLatitude :44.823128 Longitude :-92.907949 Comments :From surface of core down, Lift 1: 1.5", Lift 2: 2.1". Core generally solid throughout.Direction of Travel :WB Location Type :Center of Lane Lane ID :Drive Lane Core Diameter (in) :6 Recovered Core (in) :3.60 Down-Hole Measurement (in) :3.75 Base Thickness (in) :2.5 Page 6 of 30American Engineering Testing, Inc. 550 Cleveland Avenue North St. Paul, MN 55114 www.amengtest.com Pavement Core Log Core ID :C-11 AET Project No. :28-20367Roadway Name :Jorgensen Ave Date :9/16/2020 3:39:58 PMLatitude :44.823718 Longitude :-92.90685 Comments :From surface of core down, Lift 1: 1.75", Lift 2: 2.25". Chip seal on surface and minimal stripping observed throughout entire core. Direction of Travel :SB Location Type :Right Wheel Path Lane ID :Drive Lane Core Diameter (in) :6 Recovered Core (in) :4.00 Down-Hole Measurement (in) :4 Base Thickness (in) :4.5 Page 7 of 30American Engineering Testing, Inc. 550 Cleveland Avenue North St. Paul, MN 55114 www.amengtest.com The core location was moved approximately 20 feet south due to a car that was parked in the location of the core that was marked. Pavement Core Log Core ID :C-12 AET Project No. :28-20367Roadway Name :Jody Cir Date :9/16/2020 2:41:36 PMLatitude :44.825815 Longitude :-92.912776 Comments :From surface of core down, Lift 1: 1.75", Lift 2: 2.6". Chip seal on surface and minimal to moderate stripping observed throughout entire core. Direction of Travel :EB Location Type :Right Wheel Path Lane ID :Drive Lane Core Diameter (in) :6 Recovered Core (in) :4.35 Down-Hole Measurement (in) :4.5 Base Thickness (in) :5.25 Page 8 of 30American Engineering Testing, Inc. 550 Cleveland Avenue North St. Paul, MN 55114 www.amengtest.com Pavement Core Log Core ID :C-13 AET Project No. :28-20367Roadway Name :Johansen Ave Date :9/16/2020 2:00:53 PMLatitude :44.824217 Longitude :-92.911295 Comments :From surface of core down, Lift 1: 1.75", Lift 2: 2.25". Chip seal on surface and minimal stripping observed in top lift.Direction of Travel :SB Location Type :Right Wheel Path Lane ID :Drive Lane Core Diameter (in) :6 Recovered Core (in) :4.00 Down-Hole Measurement (in) :4 Base Thickness (in) :9 Page 9 of 30American Engineering Testing, Inc. 550 Cleveland Avenue North St. Paul, MN 55114 www.amengtest.com Pavement Core Log Core ID :C-14 AET Project No. :28-20367Roadway Name :Hillside Tr Date :9/16/2020 2:13:59 PMLatitude : Longitude :Comments :No visible lift thicknesses observed. Chip seal on surface and minimal stripping throughout entire core.Direction of Travel :SB Location Type :Left Wheel Path Lane ID :Drive Lane Core Diameter (in) :6 Recovered Core (in) :3.00 Down-Hole Measurement (in) :3 Base Thickness (in) :7.25 Page 10 of 30American Engineering Testing, Inc. 550 Cleveland Avenue North St. Paul, MN 55114 www.amengtest.com Pavement Core Log Core ID :C-15 AET Project No. :28-20367Roadway Name :Jody Cir Date :9/16/2020 2:27:55 PMLatitude :44.822541 Longitude :-92.912726 Comments :From surface of core down, Lift 1: 2.0", Lift 2: 1.85". Moderate to minimal stripping observed throughout entire core.Direction of Travel :WB Location Type :Right Wheel Path Lane ID :Drive Lane Core Diameter (in) :6 Recovered Core (in) :3.85 Down-Hole Measurement (in) :4 Base Thickness (in) :4.5 Page 11 of 30American Engineering Testing, Inc. 550 Cleveland Avenue North St. Paul, MN 55114 www.amengtest.com City of Cottage Grove, Minnesota Appendix F: Geotechnical Report – Jamaica Avenue 2021 Pavement Management ǀ N14.122421 Page 57 Appendix F: Geotechnical Report – Jamaica Avenue CONSULTANTS · ENVIRONMENTAL · GEOTECHNICAL · MATERIALS · FORENSICS www.amengtest.com REPORT OF GEOTECHNICAL EXPLORATION Jamaica Avenue Improvements Between Highway 61 and Indian Blvd Cottage Grove, Minnesota AET Report No. 28-20309 Date: July 2, 2020 Prepared for: Bolton & Menk, Inc. 2035 County Road D East Maplewood, Mn 55109 Page i 550 Cleveland Avenue North | Saint Paul, MN 55114 Phone (651) 659-9001 | (800) 972-6364 | Fax (651) 659-1379 | www.amengtest.com | AA/EEO This document shall not be reproduced, except in full, without written approval from American Engineering Testing, Inc. CONSULTANTS •ENVIRONMENTAL •GEOTECHNICAL •MATERIALS •FORENSICS J uly 2, 2020 Bolton & Menk, Inc. 2035 County Road D East Maplewood, Mn 55109 Attn: Mike Boex, PE Michael.boex@bolton-menk.com RE: Geotechnical Exploration Data Report Jamaica Avenue Improvements Cottage Grove, Minnesota AET Project No. 28-20309 Dear Mr. Boex: American Engineering Testing, Inc. (AET) is pleased to present the results of our subsurface exploration program for the referenced project in Cottage Grove, Minnesota. These services were performed according to our proposal to you dated May 6, 2020. We are submitting one electronic copy of the report to you. Paper copies can be provided upon request. Please contact me if you have any questions about the report. Sincerely, American Engineering Testing, Inc. Jacob O. Michalowski, P.E. Senior Engineer Phone: (651) 283-2481 jmichalowski@amengtest.com Report of Geotechnical Exploration Jamaica Avenue Improvements - Cottage Grove, MN AMERICAN July 2, 2020 ENGINEERING AET Report No. 28-20309 TESTING, INC. Copyright 2020 American Engineering Testing, Inc. All Rights Reserved Unauthorized use or copying of this document is strictly prohibited by anyone other than the client for the specific project. Page ii SIGNATURE PAGE Prepared for: Prepared by: Bolton & Menk, Inc. American Engineering Testing, Inc. 2035 County Road D East 550 Cleveland Avenue North Maplewood, Mn 55109 St. Paul, Minnesota 55114 (651) 659-9001/www.amengtest.com Attn: Mike Boex, PE Michael.boex@bolton-menk.com Authored by: Reviewed by: Thomas Evans, P.E. Jacob O. Michalowski, P.E. Engineer II Senior Engineer Report of Geotechnical Exploration Jamaica Avenue Improvements - Cottage Grove, MN AMERICAN July 2, 2020 ENGINEERING AET Report No. 28-20309 TESTING, INC. Page iii TABLE OF CONTENTS Transmittal Letter............................................................................................................................. i Signature Page ................................................................................................................................ ii TABLE OF CONTENTS ............................................................................................................... iii 1.0 INTRODUCTION .................................................................................................................... 1 2.0 SCOPE OF SERVICES ............................................................................................................ 1 3.0 PROJECT INFORMATION ..................................................................................................... 1 4.0 SUBSURFACE EXPLORATION AND TESTING ................................................................ 1 4.1 Ground Penetrating Radar ..................................................................................................... 2 4.2 Falling Weight Deflectometer ............................................................................................... 2 4.3 Field Exploration Program .................................................................................................... 3 4.4 Laboratory Testing ................................................................................................................ 3 5.0 SITE CONDITIONS ................................................................................................................. 4 5.1 GPR Data ............................................................................................................................... 4 5.2 Pavement Section .................................................................................................................. 4 5.3 Subgrade Soils ....................................................................................................................... 6 5.4 FWD Results.......................................................................................................................... 6 5.5 Groundwater .......................................................................................................................... 6 6.0 ASTM STANDARDS .............................................................................................................. 7 7.0 CONCLUDING COMMENTS ................................................................................................ 7 APPENDIX A – Geotechnical Field Exploration and Testing Boring Log Notes Unified Soil Classification System AASHTO Soil Classification System Figure 1 – Testing Location Map Pavement Core Logs Subsurface Boring Logs Gradation Curves APPENDIX B – Falling Weight Deflectometer Testing Figure 2 – Effective Subgrade R-Value Map APPENDIX C – Ground Penetrating Radar Testing Jamaica Avenue Northbound Plot Jamaica Avenue Southbound Plot APPENDIX D – Geotechnical Report Limitations and Guidelines for Use Report of Geotechnical Exploration Jamaica Avenue Improvements - Cottage Grove, MN AMERICAN July 2, 2020 ENGINEERING AET Report No. 28-20309 TESTING, INC. Page 1 of 7 1.0 INTRODUCTION The City of Cottage Grove (the City) and Bolton & Menk, Inc. (BMI) are proposing improvements to a segment of Jamaica Avenue in Cottage Grove, Minnesota. To assist planning and design, you have authorized American Engineering Testing, Inc. (AET) to conduct a subsurface exploration program at the site and conduct soil laboratory testing, This report presents the results of the above services, an 2.0 SCOPE OF SERVICES AET's services were performed according to our proposal to you dated May 6, 2020. The authorized scope consists of: • Obtaining eleven 4-inch pavement cores. • Drilling and sampling eleven standard penetration test (SPT) borings to depths of 6 feet at the pavement core locations. • Conducting a Ground Penetrating Radar (GPR) survey in both directions of travel and both lanes. • Performing Falling Weight Deflectometer (FWD) testing at 1/10th mile increments in each direction and both right lanes. • Conducting soil laboratory testing. • Preparation of this report. These services are intended for geotechnical purposes. The scope is not intended to explore for the presence or extent of environmental contamination. 3.0 PROJECT INFORMATION We understand the City and BMI are proposing improvements to a 2.1-mile section of Jamaica Avenue from Highway 61 to Indian Blvd in Cottage Grove, Minnesota. The bituminous-surfaced road is a 4-lane divided road. The annual average daily traffic (AADT) along the road reportedly varies from 6,400 vehicles per day in the northern sections to 21,900 vehicles per day near Highway 61. The traffic data was obtained from the MnDOT Traffic Mapping Application. 4.0 SUBSURFACE EXPLORATION AND TESTING The subsurface exploration program conducted for the project consisted of ground penetrating radar (GPR) testing, falling weight deflectometer (FWD) testing, eleven standard penetration test (SPT) borings, and eleven pavement cores. Report of Geotechnical Exploration Jamaica Avenue Improvements - Cottage Grove, MN AMERICAN July 2, 2020 ENGINEERING AET Report No. 28-20309 TESTING, INC. 4.1 Ground Penetrating Radar The pavement thickness testing program conducted for the project consisted of a high speed (air coupled) GPR antenna collecting pavement thickness data at a rate of four scans per foot. The data was collected using a 2 GHz antenna, which allows material layer measurements at depths of up to approximately 18 inches with a resolution less than about ½-inch. The data collected is linked to GPS and allows us to plot the data on a graph. The GPR test data and details of the methods used appear in Appendix C. The GPR data was collected on May 18, 2020. Scans of the pavement were collected according to SIR-30 processor settings established by GSSI RoadScan system, in both the northbound and southbound directions of the right and left lanes. A calibration file, required for data post- processing, was collected at the beginning of the testing day. GPR interface identification was accomplished using RADAN 7.0, a proprietary software package included with the GSSI RoadScan system. The software includes tools to aid in delineating pavement layer transitions, and it automatically calculates their depths from the pavement surface using the calibration file(s) collected prior to testing. The identified layers were compared to the soil boring and pavement core data collected at specific locations to validate the accuracy of the layer thicknesses. Depending on pavement age and condition, the presence of moisture, ambient electromagnetic interference, and pavement structure, total depths of asphalt and aggregate base are not always explicitly clear. Where gaps in clear identification of pavement and base layer thicknesses are encountered, the results are reported as a percent of the picking rate of the layer interface. A picking rate of 100 percent indicates the layer interfaces were visible in 100 percent of the scanned points. 4.2 Falling Weight Deflectometer The pavement deflection testing program conducted for the project consisted of falling weight deflectometer (FWD) testing at approximately 0.1-mile interval spacing in the right lanes of both northbound and southbound directions. The FWD testing was performed on May 19, 2020 using a Dynatest 8000FWD. After seating drops, data for four impulse loads (two at 6,000 lbs. and two at 9,000 lbs. nominal load) were collected at each test point. The FWD test results and details of the methods used appear in Appendix B. Page 2 of 7 Report of Geotechnical Exploration Jamaica Avenue Improvements - Cottage Grove, MN AMERICAN July 2, 2020 ENGINEERING AET Report No. 28-20309 TESTING, INC. Page 3 of 7 The deflection data was analyzed using MnDOT methods for determining the in-place (effective) subgrade and pavement strength, as well as allowable axle loads for a roadway (MnDOT Investigation 183 revised in 1983). The MnDOT methods use the Hogg Model for estimating the subgrade modulus. The effective GE of a pavement system is estimated from the deflection relationship equation, derived from MnDOT Investigations 183 and 195. Our methodology uses MnDOT’s Investigation 183 for calculation of an estimated load capacity in late spring and required overlay to estimate the structure for future assumed traffic loading. 4.3 Field Exploration Program After preliminary review of the GPR data, AET selected eleven soil boring and pavement core locations. Before drilling, we contacted Gopher State One Call to locate public underground utilities. The pavement cores and soil borings were performed on June 3, 2020. Pavement core logs are provided in Appendix A. These logs include a photograph of the extracted core, as well as total recovered core height, lift thicknesses (where visible), and comments on pavement condition. Subsurface boring logs and details of the methods used appear in Appendix A. The boring logs contain information concerning soil layering, soil classification, geologic description, and moisture condition. Relative density or consistency is also noted for the natural soils, which is based on the standard penetration resistance (N-value). Borings B-2 through B-6 were performed in the northbound right lane, and borings B-7 through B-10 were performed in the southbound right lane. Boring B-1 was performed in the northbound right turn lane to E Point Douglas Road, and boring B-11 was performed in the southbound right turn lane to E Point Douglas Road. The locations of the pavement cores and soil borings are illustrated on the Figure 1 – Testing Locations Map preceding the pavement core logs and subsurface boring logs in Appendix A. The soil boring locations were recorded in the field by AET personnel using a GPS unit. The elevations at the boring locations were not recorded. 4.4 Laboratory Testing The laboratory test program included four sieve analyses. The water content and the percent passing the #200 sieve results appear on the individual boring logs adjacent to the samples upon which they were performed. The full sieve analysis test results are shown on the Gradation Curves sheet in Appendix A following the boring logs. Report of Geotechnical Exploration Jamaica Avenue Improvements - Cottage Grove, MN AMERICAN July 2, 2020 ENGINEERING AET Report No. 28-20309 TESTING, INC. Page 4 of 7 5.0 SITE CONDITIONS 5.1 GPR Data The GPR data shows clear interfaces between the bituminous pavement and possible aggregate base layer and between the possible aggregate base layer and underlying material both with a picking rate of 100%. The pavement cores and soil borings were used to aid in the interpretation of the GPR layer interfaces. The GPR plots are included in Appendix C to illustrate the thickness of the identified bituminous and base layers within both the right and left lanes of northbound and southbound. The values presented in Tables 1 and 2 below were determined using 25-foot interval averages. The 15th percentile represents the value at which 85% of the section has a pavement layer thickness that is greater than identified. This is the value we generally recommend using for pavement design purposes. Table 1 - GPR Thickness Summary NB Lanes Layer NB Left Lane NB Right Lane Average CV 15th Min. Average CV 15th Min. BP 5.6 11% 5.0 4.5 5.5 15% 4.7 4.2 Base 5.7 24% 4.3 2.4 7.3 24% 5.4 3.5 BP + Base 11.3 12% 10.0 7.1 12.8 16% 10.5 8.4 Note: BP – Bituminous Pavement. CV – coefficient of variation (Std Dev/Average). 15th – 15th percentile thickness value. Table 2 - GPR Thickness Summary SB Lanes Layer SB Left Lane SB Right Lane Average CV 15th Min. Average CV 15th Min. BP 5.5 14% 4.8 4.2 5.6 15% 4.8 4.3 Base 5.2 23% 4.0 2.4 6.1 23% 4.7 1.8 BP + Base 10.7 12% 9.4 7.4 11.7 12% 10.3 7.7 Note: BP – Bituminous Pavement. CV – coefficient of variation (Std Dev/Average). 15th – 15th percentile thickness value. 5.2 Pavement Section The pavement encountered at the core and soil boring locations consists of bituminous over a possible aggregate base layer. Table 3 below presents the bituminous and aggregate base thickness found at the pavement core/boring locations. Report of Geotechnical Exploration Jamaica Avenue Improvements - Cottage Grove, MN AMERICAN July 2, 2020 ENGINEERING AET Report No. 28-20309 TESTING, INC. Page 5 of 7 Table 3 - Pavement Thickness Summary Pavement Core Extracted Core Bituminous Thickness (in)A Downhole Bituminous Thickness (in) B. Approximate Base Thickness (in) C. Approximate Total Thickness (in) B. B-1 7.6 7¾ 3 10¾ B-2 4.9 5 8 13 B-3 6.1 6 9 15 B-4 5.3 5½ 5 10½ B-5 5.7 6 11 17 B-6 5.2 5½ 5 10½ B-7 4.4 5 5 10 B-8 5.6 7½ 5 12½ B-9 5.0 5½ 6 11½ B-10 5.6 5½ 8½ 14 B-11 2.9 7¼ 4 11¼ Notes: A. Average of three measurements of the core measured to the nearest 0.1-inch. B. From borings and rounded to the nearest ¼-inch. C. From borings and rounded to the nearest ½-inch. The core lift thicknesses reported on the core logs are from the top down at one location along the core. The noted lift thicknesses were interpreted by AET. In summary, the bituminous thickness encountered at the soil boring and pavement core locations varies from 5 to 7¾ inches. The possible aggregate base material varies from about 3 inches to 11 inches and consists mostly of gravelly silty sand (A-1-b) and sand (A-1-b). Bituminous condition was also evaluated based on the pavement cores obtained at the site. Photographs of the pavement cores are provided on the pavement core logs in Appendix A. The pavement cores indicate slight to severe stripping. The core from boring B-11 crumbled during coring operations and was not fully recovered. Additionally, a possible chip seal was observed at the surface of all eleven cores. Stripping occurs when water or water vapor gets between the asphalt film and the aggregates, thereby breaking the adhesive bond between the aggregate and asphalt binder. This will “strip” the asphalt from the aggregate, eventually leading to pavement failure. When stripping within the pavement becomes excessive, severe pavement deformation and fatigue cracking will occur, and then traffic loadings will result in local failures such as alligator cracking, potholes, and excessive rutting in the wheel paths. Report of Geotechnical Exploration Jamaica Avenue Improvements - Cottage Grove, MN AMERICAN July 2, 2020 ENGINEERING AET Report No. 28-20309 TESTING, INC. Page 6 of 7 5.3 Subgrade Soils The subgrade soils encountered in the borings below the possible aggregate base course consist mostly of additional fill soils consisting of sand with silt (A-2-4), silty sand (A-2-4), and sand (A- 3). The fill soils extended to depths of between 1 foot and to the final drilling depths of 6 feet. Below the fill, medium dense to very dense sand (A-3) alluvial soils were encountered and extended to the final drilling depths of 6 feet. 5.4 FWD Results Figure 1 in Appendix A illustrates the locations of the FWD tests. Figure 2 in Appendix B shows the effective subgrade R-value from each of the FWD tests. All FWD tests were performed in the right lanes. Table 4 below provides a summary of the FWD testing that was analyzed using MnDOT TONN 2010 software. The results show that the upper 3 to 4 feet of the existing subgrade has good soil support. Table 4. FWD Test Results. Roadway From To Lane Effective R Effective GE Avg CV 15th Avg CV 15th Jamaica Ave Roundabout East Point Douglas Rd NB 32.9 NA NA 31.9 NA NA Jamaica Ave East Point Douglas Rd 90th St NB 55.4 NA NA 33.0 NA NA Jamaica Ave 90th St Hillside Trl NB 26.3 16% 21.7 26.2 7% 23.5 Jamaica Ave Hillside Trl 80th St NB 40.3 15% 35.0 33.0 7% 30.4 Jamaica Ave 80th St 75th St NB 36.9 28% 23.7 31.1 11% 25.7 Jamaica Ave 75th St Indian Blvd NB 33.6 11% 30.5 30.9 8% 27.4 Jamaica Ave Indian Blvd 75th St SB 44.7 16% 36.9 29.5 8% 26.2 Jamaica Ave 75th St 80th St SB 30.0 13% 24.8 24.6 9% 22.0 Jamaica Ave 80th St Hillside Trl SB 36.9 9% 34.0 30.5 6% 27.9 Jamaica Ave Hillside Trl 90th St SB 31.8 9% 28.6 30.6 6% 28.9 Jamaica Ave 90th St East Point Douglas Rd SB 41.6 16% 35.5 30.6 10% 27.4 Jamaica Ave East Point Douglas Rd Roundabout SB 37.9 NA NA 37.0 NA NA Note: CV – coefficient of variation (Std Dev/Average). 15th – 15th percentile thickness value. 5.5 Groundwater Groundwater was not observed in our soil borings during the geotechnical exploration. Due to the relatively high permeability of most of the soils encountered, it is our opinion that the measured water levels should provide an accurate indication or lack thereof the groundwater level at the time Report of Geotechnical Exploration Jamaica Avenue Improvements - Cottage Grove, MN AMERICAN July 2, 2020 ENGINEERING AET Report No. 28-20309 TESTING, INC. Page 7 of 7 of drilling. Groundwater levels do not remain constant; they fluctuate due to varying seasonal and annual rainfall and snow melt amounts, as well as other factors. 6.0 ASTM STANDARDS When we refer to an ASTM Standard in this report, we mean that our services were performed in general accordance with that standard. Compliance with any other standards referenced within the specified standard is neither inferred nor implied. 7.0 CONCLUDING COMMENTS Within the limitations of scope, budget, and schedule, we have endeavored to provide our services according to generally accepted geotechnical engineering practices at this time and location. Other than this, no warranty, either express or implied, is intended. Appendix A Geotechnical Field Exploration and Testing Boring Log Notes Unified Soil Classification System AASHTO Soil Classification System Testing Locations Pavement Core Reports Subsurface Boring Logs Gradation Curves Appendix A Geotechnical Field Exploration and Testing AET Project 28-20309 Appendix A - Page 1 of 2 AMERICAN ENGINEERING TESTING, INC. A.1 FIELD EXPLORATION The subsurface conditions at the site were explored by drilling and sampling eleven Standard Penetration Test (SPT) borings and eleven pavement cores. The locations of the borings appear on the Boring Location Maps, preceding the Subsurface Boring Logs in this appendix. A.2 SAMPLING METHODS A.2.1 Split-Spoon Samples (SS) - Calibrated to N60 Values Standard penetration (split-spoon) samples were collected in general accordance with ASTM: D1586 with one primary modification. The ASTM test method consists of driving a 2-inch O.D. split-barrel sampler into the in-situ soil with a 140-pound hammer dropped from a height of 30 inches. The sampler is driven a total of 18 inches into the soil. After an initial set of 6 inches, the number of hammer blows to drive the sampler the final 12 inches is known as the standard penetration resistance or N-value. Our method uses a modified hammer weight, which is determined by measuring the system energy using a Pile Driving Analyzer (PDA) and an instrumented rod. In the past, standard penetration N-value tests were performed using a rope and cathead for the lift and drop system. The energy transferred to the split-spoon sampler was typically limited to about 60% of its potential energy due to the friction inherent in this system. This converted energy then provides what is known as an N60 blow count. The most recent drill rigs incorporate an automatic hammer lift and drop system, which has higher energy efficiency and subsequently results in lower N-values than the traditional N60 values. By using the PDA energy measurement equipment, we can determine actual energy generated by the drop hammer. With the various hammer systems available, we have found highly variable energies ranging from 55% to over 100%. Therefore, the intent of AET’s hammer calibrations is to vary the hammer weight such that hammer energies lie within about 60% to 65% of the theoretical energy of a 140-pound weight falling 30 inches. The current ASTM procedure acknowledges the wide variation in N-values, stating that N-values of 100% or more have been observed. Although we have not yet determined the statistical measurement uncertainty of our calibrated method to date, we can state that the accuracy deviation of the N-values using this method is significantly better than the standard ASTM Method. A.2.2 Disturbed Samples (DS)/Spin-up Samples (SU) Sample types described as “DS” or “SU” on the boring logs are disturbed samples, which are taken from the flights of the auger. Because the auger disturbs the samples, possible soil layering and contact depths should be considered approximate. A.2.3 Sampling Limitations Unless observed in a sample, contacts between soil layers are estimated based on the spacing of samples and the action of drilling tools. Cobbles, boulders, and other large objects generally cannot be recovered from test borings, and they may be present in the ground even if they are not noted on the boring logs. Determining the thickness of “topsoil” layers is usually limited, due to variations in topsoil definition, sample recovery, and other factors. Visual-manual description often relies on color for determination, and transitioning changes can account for significant variation in thickness judgment. Accordingly, the topsoil thickness presented on the logs should not be the sole basis for calculating topsoil stripping depths and volumes. If more accurate information is needed relating to thickness and topsoil quality definition, alternate methods of sample retrieval and testing should be employed. A.3 CLASSIFICATION METHODS Soil descriptions shown on the boring logs are based on the Unified Soil Classification (USC) system. The USC system is described in ASTM: D2487 and D2488. Where laboratory classification tests (sieve analysis or Atterberg Limits) have been performed, accurate classifications per ASTM: D2487 are possible. Otherwise, soil descriptions shown on the boring logs are visual-manual judgments. Charts are attached which provide information on the USC system, the descriptive terminology, and the symbols used on the boring logs. A chart explaining the USC system is attached in Appendix A. Visual-manual judgment of the AASHTO Soil Group is also noted as a part of the soil description. A chart presenting details of the AASHTO Soil Classification System is also attached. Appendix A Geotechnical Field Exploration and Testing AET Project 28-20309 Appendix A - Page 2 of 2 AMERICAN ENGINEERING TESTING, INC. A.4 WATER LEVEL MEASUREMENTS The ground water level measurements are shown at the bottom of the boring logs. The following information appears under “Water Level Measurements” on the logs: Date and Time of measurement Sampled Depth: lowest depth of soil sampling at the time of measurement Casing Depth: depth to bottom of casing or hollow-stem auger at time of measurement Cave-in Depth: depth at which measuring tape stops in the borehole Water Level: depth in the borehole where free water is encountered Drilling Fluid Level: same as Water Level, except that the liquid in the borehole is drilling fluid The true location of the water table at the boring locations may be different than the water levels measured in the boreholes. This is possible because there are several factors that can affect the water level measurements in the borehole. Some of these factors include: permeability of each soil layer in profile, presence of perched water, amount of time between water level readings, presence of drilling fluid, weather conditions, and use of borehole casing. A.5 LABORATORY TEST METHODS A.5.1 Sieve Analysis of Soils (thru #200 Sieve) Conducted per AET Procedure 01-LAB-040, which is performed in general conformance with ASTM: D6913, Method A. A.6 TEST STANDARD LIMITATIONS Field and laboratory testing is done in general conformance with the described procedures. Compliance with any other standards referenced within the specified standard is neither inferred nor implied. A.7 SAMPLE STORAGE Unless notified to do otherwise, we routinely retain representative samples of the soils recovered from the borings for a period of 30 days. 01REP052C (7/11) AMERICAN ENGINEERING TESTING, INC. BORING LOG NOTES DRILLING AND SAMPLING SYMBOLS TEST SYMBOLS Symbol Definition Symbol Definition AR: Sample of material obtained from cuttings blown out the top of the borehole during air rotary procedure. B, H, N: Size of flush-joint casing CAS: Pipe casing, number indicates nominal diameter in inches COT: Clean-out tube DC: Drive casing; number indicates diameter in inches DM: Drilling mud or bentonite slurry DR: Driller (initials) DS: Disturbed sample from auger flights DP: Direct push drilling; a 2.125 inch OD outer casing with an inner 1½ inch ID plastic tube is driven continuously into the ground. FA: Flight auger; number indicates outside diameter in inches HA: Hand auger; number indicates outside diameter HSA: Hollow stem auger; number indicates inside diameter in inches LG: Field logger (initials) MC: Column used to describe moisture condition of samples and for the ground water level symbols N (BPF): Standard penetration resistance (N-value) in blows per foot (see notes) NQ: NQ wireline core barrel PQ: PQ wireline core barrel RDA: Rotary drilling with compressed air and roller or drag bit. RDF: Rotary drilling with drilling fluid and roller or drag bit REC: In split-spoon (see notes), direct push and thin-walled tube sampling, the recovered length (in inches) of sample. In rock coring, the length of core recovered (expressed as percent of the total core run). Zero indicates no sample recovered. SS: Standard split-spoon sampler (steel; 1.5" is inside diameter; 2" outside diameter); unless indicated otherwise SU Spin-up sample from hollow stem auger TW: Thin-walled tube; number indicates inside diameter in inches WASH: Sample of material obtained by screening returning rotary drilling fluid or by which has collected inside the borehole after “falling” through drilling fluid WH: Sampler advanced by static weight of drill rod and hammer WR: Sampler advanced by static weight of drill rod 94mm: 94 millimeter wireline core barrel ▼: Water level directly measured in boring : Estimated water level based solely on sample appearance CONS: One-dimensional consolidation test DEN: Dry density, pcf DST: Direct shear test E: Pressuremeter Modulus, tsf HYD: Hydrometer analysis LL: Liquid Limit, % LP: Pressuremeter Limit Pressure, tsf OC: Organic Content, % PERM: Coefficient of permeability (K) test; F - Field; L - Laboratory PL: Plastic Limit, % qp: Pocket Penetrometer strength, tsf (approximate) qc: Static cone bearing pressure, tsf qu: Unconfined compressive strength, psf R: Electrical Resistivity, ohm-cms RQD: Rock Quality Designation of Rock Core, in percent (aggregate length of core pieces 4" or more in length as a percent of total core run) SA: Sieve analysis TRX: Triaxial compression test VSR: Vane shear strength, remolded (field), psf VSU: Vane shear strength, undisturbed (field), psf WC: Water content, as percent of dry weight %-200: Percent of material finer than #200 sieve STANDARD PENETRATION TEST NOTES (Calibrated Hammer Weight) The standard penetration test consists of driving a split-spoon sampler with a drop hammer (calibrated weight varies to provide N60 values) and counting the number of blows applied in each of three 6" increments of penetration. If the sampler is driven less than 18" (usually in highly resistant material), permitted in ASTM: D1586, the blows for each complete 6" increment and for each partial increment is on the boring log. For partial increments, the number of blows is shown to the nearest 0.1' below the slash. The length of sample recovered, as shown on the “REC” column, may be greater than the distance indicated in the N column. The disparity is because the N-value is recorded below the initial 6" set (unless partial penetration defined in ASTM: D1586 is encountered) whereas the length of sample recovered is for the entire sampler drive (which may even extend more than 18"). 01CLS021 (07/08) AMERICAN ENGINEERING TESTING, INC. UNIFIED SOIL CLASSIFICATION SYSTEM ASTM Designations: D 2487, D2488 AMERICAN ENGINEERING TESTING, INC. Criteria for Assigning Group Symbols and Group Names Using Laboratory TestsA Soil Classification Notes ABased on the material passing the 3-in (75-mm) sieve. BIf field sample contained cobbles or boulders, or both, add “with cobbles or boulders, or both” to group name. CGravels with 5 to 12% fines require dual symbols: GW-GM well-graded gravel with silt GW-GC well-graded gravel with clay GP-GM poorly graded gravel with silt GP-GC poorly graded gravel with clay DSands with 5 to 12% fines require dual symbols: SW-SM well-graded sand with silt SW-SC well-graded sand with clay SP-SM poorly graded sand with silt SP-SC poorly graded sand with clay (D30)2 ECu = D60 /D10, Cc = D10 x D60 FIf soil contains >15% sand, add “with sand” to group name. GIf fines classify as CL-ML, use dual symbol GC-GM, or SC-SM. HIf fines are organic, add “with organic fines” to group name. IIf soil contains >15% gravel, add “with gravel” to group name. JIf Atterberg limits plot is hatched area, soil is a CL-ML silty clay. KIf soil contains 15 to 29% plus No. 200 add “with sand” or “with gravel”, whichever is predominant. LIf soil contains >30% plus No. 200, predominantly sand, add “sandy” to group name. MIf soil contains >30% plus No. 200, predominantly gravel, add “gravelly” to group name. NPl>4 and plots on or above “A” line. OPl<4 or plots below “A” line. PPl plots on or above “A” line. QPl plots below “A” line. RFiber Content description shown below. Group Symbol Group NameB Coarse-Grained Soils More than 50% retained on No. 200 sieve Gravels More than 50% coarse fraction retained on No. 4 sieve Clean Gravels Less than 5% finesC Cu>4 and 1<Cc<3E GW Well graded gravelF Cu<4 and/or 1>Cc>3E GP Poorly graded gravelF Gravels with Fines more than 12% fines C Fines classify as ML or MH GM Silty gravelF.G.H Fines classify as CL or CH GC Clayey gravelF.G.H Sands 50% or more of coarse fraction passes No. 4 sieve Clean Sands Less than 5% finesD Cu>6 and 1<Cc<3E SW Well-graded sandI Cu<6 and/or 1>Cc>3E SP Poorly-graded sandI Sands with Fines more than 12% fines D Fines classify as ML or MH SM Silty sandG.H.I Fines classify as CL or CH SC Clayey sandG.H.I Fine-Grained Soils 50% or more passes the No. 200 sieve (see Plasticity Chart below) Silts and Clays Liquid limit less than 50 inorganic PI>7 and plots on or above “A” lineJ CL Lean clayK.L.M PI<4 or plots below “A” lineJ ML SiltK.L.M organic Liquid limit–oven dried <0.75 Liquid limit – not dried OL Organic clayK.L.M.N Organic siltK.L.M.O Silts and Clays Liquid limit 50 or more inorganic PI plots on or above “A” line CH Fat clayK.L.M PI plots below “A” line MH Elastic siltK.L.M organic Liquid limit–oven dried <0.75 Liquid limit – not dried OH Organic clayK.L.M.P Organic siltK.L.M.Q Highly organic soil Primarily organic matter, dark in color, and organic in odor PT PeatR 3 2 ½1 ¾4 10 20 40 60 140 200 100 80 60 40 20 0 0 20 40 60 80 100 81 Sieve NumberScreen Opening (in.) 50 10 5 1.0 0.10.5 PARTICLE SIZE IN MILLIMETERS SIEVE ANALYSIS PERCENT PASSINGPERCENT RETAINEDD60 = 15mm D30 = 2.5mm D10 = 0.075mm Cu = = = 200D60 D10 15 0.075 Cc = = = 5.6(D30) D10 x D60 2.5 0.075 x 15 2 2 CL-ML For classification of fine-grained soils and fine-grained fraction of coarse-grained soils. Equation of "A"-line Horizontal at PI = 4 to LL = 25.5. then PI = 0.73 (LL-20) Equation of "U"-line Vertical at LL = 16 to PI = 7. then PI = 0.9 (LL-8)"A" LINE "U" LINECL OR OL CH OR OH 10 20 30 40 50 60 70 80 90 100 110 0 0 10 20 30 40 50 60 16 7 4PLASTICITY INDEX (PI)LIQUID LIMIT (LL) Plasticity Chart ADDITIONAL TERMINOLOGY NOTES USED BY AET FOR SOIL IDENTIFICATION AND DESCRIPTION Grain Size Term Particle Size Boulders Over 12" Cobbles 3" to 12" Gravel #4 sieve to 3" Sand #200 to #4 sieve Fines (silt & clay) Pass #200 sieve Gravel Percentages Term Percent A Little Gravel 3% - 14% With Gravel 15% - 29% Gravelly 30% - 50% Consistency of Plastic Soils Term N-Value, BPF Very Soft less than 2 Soft 2 - 4 Firm 5 - 8 Stiff 9 - 15 Very Stiff 16 - 30 Hard Greater than 30 Relative Density of Non-Plastic Soils Term N-Value, BPF Very Loose 0 - 4 Loose 5 - 10 Medium Dense 11 - 30 Dense 31 - 50 Very Dense Greater than 50 Moisture/Frost Condition (MC Column) D (Dry): Absence of moisture, dusty, dry to touch. M (Moist): Damp, although free water not visible. Soil may still have a high water content (over “optimum”). W (Wet/ Free water visible, intended to Waterbearing): describe non-plastic soils. Waterbearing usually relates to sands and sand with silt. F (Frozen): Soil frozen Layering Notes Laminations: Layers less than ½" thick of differing material or color. Lenses: Pockets or layers greater than ½" thick of differing material or color. Peat Description Fiber Content Term (Visual Estimate) Fibric Peat: Greater than 67% Hemic Peat: 33 – 67% Sapric Peat: Less than 33% Organic Description (if no lab tests) Soils are described as organic, if soil is not peat and is judged to have sufficient organic fines content to influence the Liquid Limit properties. Slightly organic used for borderline cases. Root Inclusions With roots: Judged to have sufficient quantity of roots to influence the soil properties. Trace roots: Small roots present, but not judged to be in sufficient quantity to significantly affect soil properties. ML OR OL MH OR OH A-7 A-7-5 A-7-6 Sieve Analysis, Percent passing: No. 10 (2.00 mm) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .50 max.. . . .. . . .. . . .. . . .. . . .. . . .. . . .. . . .. . . .. . . . No. 40 (0.425 mm) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .30 max.50 max.51 min.. . . .. . . .. . . .. . . .. . . .. . . .. . . .. . . . No. 200 (0.075 mm) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .15 max.25 max.10 max.35 max.35 max.35 max.35 max.36 min.36 min.36 min.36 min. Characteristics of Fraction Passing No. 40 (0.425 mm) Liquid limit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . .40 max.41 min.40 max.41 min.40 max.41 min.40 max.41 min. Plasticity index . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .N.P.10 max.10 max.11 min.11 min.10 max.10 max.11 min.11 min. General Ratings as Subgrade . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Definitions of Gravel, Sand and Silt-Clay 01CLS022 (07/11)AMERICAN ENGINEERING TESTING, INC. The term "silty" is applied to fine material having plasticity index of 10 or less and the term "clayey" is applied to fine material having plasticity index of 11 or greater. AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS AASHTO SOIL CLASSIFICATION SYSTEM Classification of Soils and Soil-Aggregate Mixtures GRAVEL - Material passing sieve with 3-in. square openings and retained on the No. 10 sieve. COARSE SAND - Material passing the No. 10 sieve and retained on the No. 40 sieve. FINE SAND - Material passing the No. 40 sieve and retained on the No. 200 sieve. COMBINED SILT AND CLAY - Material passing the No. 200 sieve Excellent to Good Group A-8 soils are organic clays or peat with organic content >5%. BOULDERS (retained on 3-in. sieve) should be excluded from the portion of the sample to which the classificaiton is applied, but the percentage of such material, if any, in the sample should be recorded. (35% or less passing No. 200 sieve)(More than 35% passing No. 200 sieve) General Classification A-4 A-5 The terms "gravel", "coarse sand", "fine sand" and "silt-clay", as determinable from the minimum test data required in this classification arrangement and as used in subsequent word descriptions are defined as follows: Granular Materials Silt-Clay Materials A-1 A-2 A-2-6 A-2-7 . . . . 6 max. Fine Sand Silty or Clayey Gravel and Sand Silty Soils Clayey Soils Plasticity index of A-7-5 subgroup is equal to or less than LL minus 30. Plasticity index of A-7-6 subgroup is greater than LL minus 30. A-3 A-2-4 A-2-5 Stone Fragments, Gravel and Sand Fair to Poor A-6 The placing of A-3 before A-2 is necessary in the "left to right elimination process" and does not indicate superiority of A-3 over A-2. Usual Types of Significant Constituent Materials A-1-a A-1-b Group Classification -10 0 10 20 30 40 50 100 90 80 70 60 50 40 30 20 15 35 0 2 4 6 8 1012 1416 18 203040 506070 80 1020304050607080100140180 LIQUID LIMIT PLAS TI CI T Y I N D E X PERCENT PASSING NO. 200 SIEVEPARTIAL GROUP INDEXGROUP INDEX CHART Group Index (GI) = (F-35) [0.2+0.005 (LL-40) ] + 0.01 (F-15) (PI-10) where F = % Passing No. 200 sieve, LL = Liquid Limit, and PI = Plasticity Index. When working with A-2-6 and A-2-7 subgroups the Partial Group Index (PGI) is determined from the PI only. When the combined Partial Group Indices are negative, the Group Index should be reported as zero.A-2-6 and A-2-782% Passing No. 200 sieve LL = 38 PI = 21 PGI = 8.9 for LL PGI = 7.4 for PI GI = 16 Then:Example: 10 20 30 40 50 60 70 80 90 100 0 10 20 30 40 50 60 70 Sub- G r o u p A-7-5 Sub-G roupA-7 -6 A-7A-5 A-4 A-6 PI = LL - 30PLASTICITY INDEX (PI) Liquid Limit and Plasticity Index Ranges for the A-4, A-5, A-6 and A-7 SubgroupsLiquid Limit ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! @A @A @A @A @A @A @A @A @A @A @A B9 B8 B7 B6 B5 B4 B3 B2 B1 B11 B10 Jamaica Ave S8 0 t h S t S 9 0 t h S t SJamaica Ave S8 0 t h S t S Hillside Trl S 75th St S 81st St S Isle Ave S88th St S 90t h St S Janero Ave SIn d ia n B lvd S Inwood Ave SJewelAveSInskipTrlSIrvin AveSJensen Ave S85t h S t S Iris h AveS 91st St SInnsdale Ave SJergen Ave SFoothill Rd S JasmineAveSIronwoodAveSIvywood Ave S80th St S 73rd St S Iv ersonAveS E P o int DouglasRdS Ivystone Ave S79th St S Ingl eside AveS JareauAv eS Jocelyn Ave S Jody Cir SIndahlAveS Jeffery Ave SIdeal A v e SIsleton A v e SJodyL n S Jenner Ln SIn m a n A v e S JennerAveS8 3r d St S IvanAveS78 t h St S Ira Ave SIngbergTrlS Islay Ave SJanie Ave SIsl et on C t S 92n d St S 77th St S JefferyLnS87th St SIngersol l AveS Jasmine Ln SJarvisAv e S W P oint D ouglas R d S Ivysto neCtS89th Street Cir S 8 2 n d S t r e e t C t SIngle Ct SIsle Ct S Jergen Bay SJergen Ct S76th Stre et Ct S 8 3 r d S t r e e t C t S Upper 81st St S Ja n e r o C t Irvin Avenue Ct S Jody Trl SIndian Boulevard Ct SI r i s h A v e n u e C t S77th Street Ct 89th Street Ct S 8 0 th S t S 81s t St S Inman Ave SJanero Ave S92nd St SIrish Avenue Ct SIn m a n A ve S Isle t o n A v e S 8 3r d S t S IversonAveS 77th St S I nwo o d A v e SJensen Ave SJer g e nAveSJefferyLn S In n s d a l e A ve S Jeffe r y A ve SJaneroAveS80 t h S t S Jewel Ave SJewel Ave SJefferyAveS79th St S I ngl esi de Ave SJen senAveSJaneroAveSJ a s m in e A v e S 7 5 t h S t S 79thSt S JensenAv eS9 1st St S J o cel y nAveS80t h S t S Inman Ave S£¤10 £¤10 Grey Cloud Elem entar y S ch o olKingston Pa r k Footh ill Park Pi netree Pond Park Testing Locations AET Project No. 28-20309 Jamaica Avenue ImprovementsCottage Grove, Minnesota0800400 Feet ± File: 28-20309P-1.mxd Date: 06/26/2020 AMERICANENGINEERINGTESTING, INC Figure 1Map Reference: Date: 06/26/2020 Geotechnical Data Report Legend @A Boring !FWD Testing 550 Cleveland Avenue North | Saint Paul, MN 55114 Phone (651) 659-9001 | (800) 972-6364 | Fax (651) 659-1379 | www.amengtest.com | AA/EEO This document shall not be reproduced, except in full, without written approval from American Engineering Testing, Inc. CONSULTANTS ·ENVIRONMENTAL ·GEOTECHNICAL ·MATERIALS ·FORENSICSPAVEMENT CORE LOG Jamaica Avenue Improvements – Cottage Grove, Minnesota AET Project Number: 28-20309 Core: B-1 Date Cored: June 2, 2020 Description: Core Diameter: 4” Total Core Height: 7.6” Lift 1: 2.2” Lift 2: 1.6” Lift 3: 1.5” Lift 4: 2.5” Comments: Possible chip seal at the surface. Core contains slight stripping throughout. Lift 4 contains slight to moderate stripping. 550 Cleveland Avenue North | Saint Paul, MN 55114 Phone (651) 659-9001 | (800) 972-6364 | Fax (651) 659-1379 | www.amengtest.com | AA/EEO This document shall not be reproduced, except in full, without written approval from American Engineering Testing, Inc. CONSULTANTS ·ENVIRONMENTAL ·GEOTECHNICAL ·MATERIALS ·FORENSICSPAVEMENT CORE LOG Jamaica Avenue Improvements – Cottage Grove, Minnesota AET Project Number: 28-20309 Core: B-2 Date Cored: June 2, 2020 Description: Core Diameter: 4” Total Core Height: 4.9” Lift 1: 1.9” Lift 2: 3.0” Comments: Possible chip seal at the surface. Core contains moderate stripping throughout. 550 Cleveland Avenue North | Saint Paul, MN 55114 Phone (651) 659-9001 | (800) 972-6364 | Fax (651) 659-1379 | www.amengtest.com | AA/EEO This document shall not be reproduced, except in full, without written approval from American Engineering Testing, Inc. CONSULTANTS ·ENVIRONMENTAL ·GEOTECHNICAL ·MATERIALS ·FORENSICSPAVEMENT CORE LOG Jamaica Avenue Improvements – Cottage Grove, Minnesota AET Project Number: 28-20309 Core: B-3 Date Cored: June 2, 2020 Description: Core Diameter: 4” Total Core Height: 6.1” Lift 1: 1.3” Lift 2: 1.2” Lift 3: 1.5” Lift 4: 2.1” Comments: Possible chip seal at the surface. Core has slight to moderate stripping throughout. 550 Cleveland Avenue North | Saint Paul, MN 55114 Phone (651) 659-9001 | (800) 972-6364 | Fax (651) 659-1379 | www.amengtest.com | AA/EEO This document shall not be reproduced, except in full, without written approval from American Engineering Testing, Inc. CONSULTANTS ·ENVIRONMENTAL ·GEOTECHNICAL ·MATERIALS ·FORENSICSPAVEMENT CORE LOG Jamaica Avenue Improvements – Cottage Grove, Minnesota AET Project Number: 28-20309 Core: B-4 Date Cored: June 2, 2020 Description: Core Diameter: 4” Total Core Height: 5.3” Lift 1: 2.0” Lift 2: 1.5” Lift 3: 1.8” Comments: Possible chip seal at the surface. Lift 1 contains slight stripping. Lifts 2 and 3 contain moderate to severe stripping. 550 Cleveland Avenue North | Saint Paul, MN 55114 Phone (651) 659-9001 | (800) 972-6364 | Fax (651) 659-1379 | www.amengtest.com | AA/EEO This document shall not be reproduced, except in full, without written approval from American Engineering Testing, Inc. CONSULTANTS ·ENVIRONMENTAL ·GEOTECHNICAL ·MATERIALS ·FORENSICSPAVEMENT CORE LOG Jamaica Avenue Improvements – Cottage Grove, Minnesota AET Project Number: 28-20309 Core: B-5 Date Cored: June 2, 2020 Description: Core Diameter: 4” Total Core Height: 5.7” Lift 1: 2.2” Lift 2: 1.9” Lift 3: 1.6” Comments: Possible chip seal at the surface. Lifts 1 and 2 contains slight stripping. Lift 3 contains moderate stripping. 550 Cleveland Avenue North | Saint Paul, MN 55114 Phone (651) 659-9001 | (800) 972-6364 | Fax (651) 659-1379 | www.amengtest.com | AA/EEO This document shall not be reproduced, except in full, without written approval from American Engineering Testing, Inc. CONSULTANTS ·ENVIRONMENTAL ·GEOTECHNICAL ·MATERIALS ·FORENSICSPAVEMENT CORE LOG Jamaica Avenue Improvements – Cottage Grove, Minnesota AET Project Number: 28-20309 Core: B-6 Date Cored: June 2, 2020 Description: Core Diameter: 4” Total Core Height: 5.2” Lift 1: 1.7” Lift 2: 1.2” Lift 3: 2.3” Comments: Possible chip seal at the surface. Lift 1 contains moderate to severe stripping. Bottom of lift 1 contained large voids. Lifts 2 and 3 contains slight to moderate stripping. 550 Cleveland Avenue North | Saint Paul, MN 55114 Phone (651) 659-9001 | (800) 972-6364 | Fax (651) 659-1379 | www.amengtest.com | AA/EEO This document shall not be reproduced, except in full, without written approval from American Engineering Testing, Inc. CONSULTANTS ·ENVIRONMENTAL ·GEOTECHNICAL ·MATERIALS ·FORENSICSPAVEMENT CORE LOG Jamaica Avenue Improvements – Cottage Grove, Minnesota AET Project Number: 28-20309 Core: B-7 Date Cored: June 2, 2020 Description: Core Diameter: 4” Total Core Height: 4.4” Lift 1: 1.8” Lift 2: 1.3” Lift 3: 1.3” Comments: Possible chip seal at the surface. Core generally has slight to moderate stripping throughout. 550 Cleveland Avenue North | Saint Paul, MN 55114 Phone (651) 659-9001 | (800) 972-6364 | Fax (651) 659-1379 | www.amengtest.com | AA/EEO This document shall not be reproduced, except in full, without written approval from American Engineering Testing, Inc. CONSULTANTS ·ENVIRONMENTAL ·GEOTECHNICAL ·MATERIALS ·FORENSICSPAVEMENT CORE LOG Jamaica Avenue Improvements – Cottage Grove, Minnesota AET Project Number: 28-20309 Core: B-8 Date Cored: June 2, 2020 Description: Core Diameter: 4” Total Core Height: 5.6” Lift 1: 2.0” Lift 2: 1.6” Lift 3: 2.0” Downhole Bituminous Thickness: 7 1/2” Comments: Possible chip seal at the surface. Lifts 1 and 2 contain slight stripping. Lift 3 contains moderate stripping. Bottom of core not recovered. 550 Cleveland Avenue North | Saint Paul, MN 55114 Phone (651) 659-9001 | (800) 972-6364 | Fax (651) 659-1379 | www.amengtest.com | AA/EEO This document shall not be reproduced, except in full, without written approval from American Engineering Testing, Inc. CONSULTANTS ·ENVIRONMENTAL ·GEOTECHNICAL ·MATERIALS ·FORENSICSPAVEMENT CORE LOG Jamaica Avenue Improvements – Cottage Grove, Minnesota AET Project Number: 28-20309 Core: B-9 Date Cored: June 2, 2020 Description: Core Diameter: 4” Total Core Height: 5.0” Lift 1: 1.6” Lift 2: 1.7” Lift 3: 1.8” Comments: Possible chip seal at the surface. Lift 1 contains slight stripping. Lift 2 contains moderate stripping. Lift 3 contains severe stripping and large voids. 550 Cleveland Avenue North | Saint Paul, MN 55114 Phone (651) 659-9001 | (800) 972-6364 | Fax (651) 659-1379 | www.amengtest.com | AA/EEO This document shall not be reproduced, except in full, without written approval from American Engineering Testing, Inc. CONSULTANTS ·ENVIRONMENTAL ·GEOTECHNICAL ·MATERIALS ·FORENSICSPAVEMENT CORE LOG Jamaica Avenue Improvements – Cottage Grove, Minnesota AET Project Number: 28-20309 Core: B-10 Date Cored: June 2, 2020 Description: Core Diameter: 4” Total Core Height: 5.6” Lift 1: 2.1” Lift 2: 2.1” Lift 3: 1.3” Comments: Possible chip seal at the surface. Core contains moderate stripping throughout. 550 Cleveland Avenue North | Saint Paul, MN 55114 Phone (651) 659-9001 | (800) 972-6364 | Fax (651) 659-1379 | www.amengtest.com | AA/EEO This document shall not be reproduced, except in full, without written approval from American Engineering Testing, Inc. CONSULTANTS ·ENVIRONMENTAL ·GEOTECHNICAL ·MATERIALS ·FORENSICSPAVEMENT CORE LOG Jamaica Avenue Improvements – Cottage Grove, Minnesota AET Project Number: 28-20309 Core: B-11 Date Cored: June 2, 2020 Description: Core Diameter: 4” Total Core Height: 2.9” Bituminous Downhole Thickness: 7 1/4” Comments: Possible chip seal at the surface. Core contains severe stripping throughout. Core crumbled during coring operations. 12 20 20 FILL COARSE ALLUVIUM 7.75" Bituminous pavement 3" FILL, mostly sand, a little gravel, dark brown (A-1-b) (possible aggregate base) FILL, mixture of sand and silty sand, light brown (A-2-4) SAND, a little gravel, fine to medium grained, light brown, moist, medium dense (SP) (A-3) END OF BORING Northbound Right Turn Lane to E Point Douglas Road 44 33 17 CORE SS SS SS 2 M M M WATER LEVEL MEASUREMENTS None DR: 10:20 LG:1C TIME DRILLING METHOD SD 6/2/20 3.25" HSA BORINGCOMPLETED: DATE 6.0 NOTE: REFER TO THE ATTACHED SHEETS FOR AN EXPLANATION OF TERMINOLOGY ON THIS LOGRig: 4.0 SS 0-4' WATERLEVEL SURFACE ELEVATION: 0.0 CAVE-INDEPTHCASINGDEPTHSAMPLEDDEPTH 6/2/20 DEPTH: DRILLINGFLUID LEVEL FIELD & LABORATORY TESTS MATERIAL DESCRIPTION 1 2 3 4 5 6 N %-#200MC AET JOB NO: PROJECT: RECIN. AMERICAN ENGINEERING TESTING, INC. DEPTHINFEET PLWC LOG OF BORING NO. GEOLOGY LATITUDE: B-1 (p. 1 of 1) SAMPLETYPE LONGITUDE: 01-DHR-060 LL 03/2011 DENDEN 44.816568° -92.932841° SUBSURFACE BORING LOG 28-20309 Jamaica Avenue Improvements; Cottage Grove, MN AET_CORP W-LAT-LONG 28-20309.GPJ AET+CPT+WELL_20181012_JG.GDT 7/2/20 20 24 14 FILL5" Bituminous pavement 8" FILL, mostly sand, a little gravel, dark brown (A-1-b) FILL, mostly sand, a little gravel, brown (A-3) END OF BORING Northbound Right Lane 38 21 7 CORE SS SS SS 9 M M M WATER LEVEL MEASUREMENTS None DR: 10:47 LG:1C TIME DRILLING METHOD SD 6/2/20 3.25" HSA BORINGCOMPLETED: DATE 6.0 NOTE: REFER TO THE ATTACHED SHEETS FOR AN EXPLANATION OF TERMINOLOGY ON THIS LOGRig: 4.0 SS 0-4' WATERLEVEL SURFACE ELEVATION: 0.0 CAVE-INDEPTHCASINGDEPTHSAMPLEDDEPTH 6/2/20 DEPTH: DRILLINGFLUID LEVEL FIELD & LABORATORY TESTS MATERIAL DESCRIPTION 1 2 3 4 5 6 N %-#200MC AET JOB NO: PROJECT: RECIN. AMERICAN ENGINEERING TESTING, INC. DEPTHINFEET PLWC LOG OF BORING NO. GEOLOGY LATITUDE: B-2 (p. 1 of 1) SAMPLETYPE LONGITUDE: 01-DHR-060 LL 03/2011 DENDEN 44.820932° -92.928463° SUBSURFACE BORING LOG 28-20309 Jamaica Avenue Improvements; Cottage Grove, MN AET_CORP W-LAT-LONG 28-20309.GPJ AET+CPT+WELL_20181012_JG.GDT 7/2/20 18 18 24 FILL COARSE ALLUVIUM 6" Bituminous pavement 9" FILL, mostly gravelly silty sand, dark brown (A-1-b) (possible aggregate base) FILL, mostly silty sand, a little gravel, brown (A-2-4) SAND, fine grained, light brown, moist, dense to medium dense (SP) (A-3) END OF BORING Northbound Right Lane 42 36 22 CORE SS SS SS M M M WATER LEVEL MEASUREMENTS None DR: 11:06 LG:1C TIME DRILLING METHOD SD 6/2/20 3.25" HSA BORINGCOMPLETED: DATE 6.0 NOTE: REFER TO THE ATTACHED SHEETS FOR AN EXPLANATION OF TERMINOLOGY ON THIS LOGRig: 4.0 SS 0-4' WATERLEVEL SURFACE ELEVATION: 0.0 CAVE-INDEPTHCASINGDEPTHSAMPLEDDEPTH 6/2/20 DEPTH: DRILLINGFLUID LEVEL FIELD & LABORATORY TESTS MATERIAL DESCRIPTION 1 2 3 4 5 6 N %-#200MC AET JOB NO: PROJECT: RECIN. AMERICAN ENGINEERING TESTING, INC. DEPTHINFEET PLWC LOG OF BORING NO. GEOLOGY LATITUDE: B-3 (p. 1 of 1) SAMPLETYPE LONGITUDE: 01-DHR-060 LL 03/2011 DENDEN 44.824840° -92.925149° SUBSURFACE BORING LOG 28-20309 Jamaica Avenue Improvements; Cottage Grove, MN AET_CORP W-LAT-LONG 28-20309.GPJ AET+CPT+WELL_20181012_JG.GDT 7/2/20 14 24 24 FILL COARSE ALLUVIUM 5.5" Bituminous pavement 5" FILL, mostly gravelly silty sand, brown (A-1-b) (possible aggregate base) FILL, mostly silty sand, a little gravel, brown (A-2-4) SAND, a little gravel, fine to medium grained, light brown, moist, medium dense (SP) (A-3) END OF BORING Northbound Right Lane 33 30 26 CORE SS SS SS M M M WATER LEVEL MEASUREMENTS None DR: 11:28 LG:1C TIME DRILLING METHOD SD 6/2/20 3.25" HSA BORINGCOMPLETED: DATE 6.0 NOTE: REFER TO THE ATTACHED SHEETS FOR AN EXPLANATION OF TERMINOLOGY ON THIS LOGRig: 4.0 SS 0-4' WATERLEVEL SURFACE ELEVATION: 0.0 CAVE-INDEPTHCASINGDEPTHSAMPLEDDEPTH 6/2/20 DEPTH: DRILLINGFLUID LEVEL FIELD & LABORATORY TESTS MATERIAL DESCRIPTION 1 2 3 4 5 6 N %-#200MC AET JOB NO: PROJECT: RECIN. AMERICAN ENGINEERING TESTING, INC. DEPTHINFEET PLWC LOG OF BORING NO. GEOLOGY LATITUDE: B-4 (p. 1 of 1) SAMPLETYPE LONGITUDE: 01-DHR-060 LL 03/2011 DENDEN 44.830737° -92.923838° SUBSURFACE BORING LOG 28-20309 Jamaica Avenue Improvements; Cottage Grove, MN AET_CORP W-LAT-LONG 28-20309.GPJ AET+CPT+WELL_20181012_JG.GDT 7/2/20 14 24 24 FILL6" Bituminous pavement 11" FILL, mostly gravelly sand with silt, dark brown (A-1-b) (possible aggregate base) FILL, mostly silty sand, a little gravel, brown (A-2-4) END OF BORING Northbound Right Lane 33 58 74 CORE SS SS SS 6 M M M WATER LEVEL MEASUREMENTS None DR: 11:56 LG:1C TIME DRILLING METHOD SD 6/2/20 3.25" HSA BORINGCOMPLETED: DATE 6.0 NOTE: REFER TO THE ATTACHED SHEETS FOR AN EXPLANATION OF TERMINOLOGY ON THIS LOGRig: 4.0 SS 0-4' WATERLEVEL SURFACE ELEVATION: 0.0 CAVE-INDEPTHCASINGDEPTHSAMPLEDDEPTH 6/2/20 DEPTH: DRILLINGFLUID LEVEL FIELD & LABORATORY TESTS MATERIAL DESCRIPTION 1 2 3 4 5 6 N %-#200MC AET JOB NO: PROJECT: RECIN. AMERICAN ENGINEERING TESTING, INC. DEPTHINFEET PLWC LOG OF BORING NO. GEOLOGY LATITUDE: B-5 (p. 1 of 1) SAMPLETYPE LONGITUDE: 01-DHR-060 LL 03/2011 DENDEN 44.836755° -92.923860° SUBSURFACE BORING LOG 28-20309 Jamaica Avenue Improvements; Cottage Grove, MN AET_CORP W-LAT-LONG 28-20309.GPJ AET+CPT+WELL_20181012_JG.GDT 7/2/20 12 24 24 FILL COARSE ALLUVIUM OR FILL 5.5" Bituminous pavement 5" FILL, mostly sand, a little gravel, brown (A-1-b) (possible aggregate base) SAND, fine to medium grained, light brown, moist, dense to medium dense (SP) (A-3) (possible fill) END OF BORING Northbound Right Lane 38 45 21 CORE SS SS SS 5 M M M WATER LEVEL MEASUREMENTS None DR: 1:05 LG:41 TIME DRILLING METHOD SD 6/2/20 3.25" HSA BORINGCOMPLETED: DATE 6.0 NOTE: REFER TO THE ATTACHED SHEETS FOR AN EXPLANATION OF TERMINOLOGY ON THIS LOGRig: 4.0 SS 0-4' WATERLEVEL SURFACE ELEVATION: 0.0 CAVE-INDEPTHCASINGDEPTHSAMPLEDDEPTH 6/2/20 DEPTH: DRILLINGFLUID LEVEL FIELD & LABORATORY TESTS MATERIAL DESCRIPTION 1 2 3 4 5 6 N %-#200MC AET JOB NO: PROJECT: RECIN. AMERICAN ENGINEERING TESTING, INC. DEPTHINFEET PLWC LOG OF BORING NO. GEOLOGY LATITUDE: B-6 (p. 1 of 1) SAMPLETYPE LONGITUDE: 01-DHR-060 LL 03/2011 DENDEN 44.842500° -92.923866° SUBSURFACE BORING LOG 28-20309 Jamaica Avenue Improvements; Cottage Grove, MN AET_CORP W-LAT-LONG 28-20309.GPJ AET+CPT+WELL_20181012_JG.GDT 7/2/20 20 24 3 FILL COARSE ALLUVIUM OR FILL 5" Bituminous pavement 5" FILL, mostly sand, a little gravel, brown (A-1-b) (possible aggregate base) FILL, mostly sand, a little gravel, brown (A-3) SAND, a little gravel, fine grained, light brown, moist, loose to medium dense (SP) (A-3) (possible fill) END OF BORING Southbound Right Lane 40 40 42 CORE SS SS SS M M M WATER LEVEL MEASUREMENTS None DR: 1:33 LG:41 TIME DRILLING METHOD SD 6/2/20 3.25" HSA BORINGCOMPLETED: DATE 6.0 NOTE: REFER TO THE ATTACHED SHEETS FOR AN EXPLANATION OF TERMINOLOGY ON THIS LOGRig: 4.0 SS 0-4' WATERLEVEL SURFACE ELEVATION: 0.0 CAVE-INDEPTHCASINGDEPTHSAMPLEDDEPTH 6/2/20 DEPTH: DRILLINGFLUID LEVEL FIELD & LABORATORY TESTS MATERIAL DESCRIPTION 1 2 3 4 5 6 N %-#200MC AET JOB NO: PROJECT: RECIN. AMERICAN ENGINEERING TESTING, INC. DEPTHINFEET PLWC LOG OF BORING NO. GEOLOGY LATITUDE: B-7 (p. 1 of 1) SAMPLETYPE LONGITUDE: 01-DHR-060 LL 03/2011 DENDEN 44.839348° -92.924089° SUBSURFACE BORING LOG 28-20309 Jamaica Avenue Improvements; Cottage Grove, MN AET_CORP W-LAT-LONG 28-20309.GPJ AET+CPT+WELL_20181012_JG.GDT 7/2/20 18 24 24 FILL COARSE ALLUVIUM OR FILL 7.5" Bituminous pavement 5" FILL, mostly gravelly silty sand, dark brown (A-1-b) (possible aggregate base) FILL, mostly silty sand, a little gravel, brown (A-2-4) FILL, mixture of sand and silty sand, a little gravel, brown (A-2-4) SAND, a little gravel, fine grained, light brown, moist, very dense (SP) (A-3) (possible fill) END OF BORING Southbound Right Lane 32 48 74 CORE SS SS SS M M M WATER LEVEL MEASUREMENTS None DR: 1:58 LG:41 TIME DRILLING METHOD SD 6/2/20 3.25" HSA BORINGCOMPLETED: DATE 6.0 NOTE: REFER TO THE ATTACHED SHEETS FOR AN EXPLANATION OF TERMINOLOGY ON THIS LOGRig: 4.0 SS 0-4' WATERLEVEL SURFACE ELEVATION: 0.0 CAVE-INDEPTHCASINGDEPTHSAMPLEDDEPTH 6/2/20 DEPTH: DRILLINGFLUID LEVEL FIELD & LABORATORY TESTS MATERIAL DESCRIPTION 1 2 3 4 5 6 N %-#200MC AET JOB NO: PROJECT: RECIN. AMERICAN ENGINEERING TESTING, INC. DEPTHINFEET PLWC LOG OF BORING NO. GEOLOGY LATITUDE: B-8 (p. 1 of 1) SAMPLETYPE LONGITUDE: 01-DHR-060 LL 03/2011 DENDEN 44.832661° -92.924036° SUBSURFACE BORING LOG 28-20309 Jamaica Avenue Improvements; Cottage Grove, MN AET_CORP W-LAT-LONG 28-20309.GPJ AET+CPT+WELL_20181012_JG.GDT 7/2/20 12 21 16 FILL COARSE ALLUVIUM 5.5" Bituminous pavement 6" FILL, mostly gravelly silty sand, dark brown (A-1-b) FILL, mostly silty sand, a little gravel, brown (A-2-4) SAND, a little gravel, fine to medium grained, light brown, moist, dense to medium dense (SP) (A-3) END OF BORING Southbound Right Lane 26 48 18 CORE SS SS SS M M M WATER LEVEL MEASUREMENTS None DR: 2:23 LG:41 TIME DRILLING METHOD SD 6/2/20 3.25" HSA BORINGCOMPLETED: DATE 6.0 NOTE: REFER TO THE ATTACHED SHEETS FOR AN EXPLANATION OF TERMINOLOGY ON THIS LOGRig: 4.0 SS 0-4' WATERLEVEL SURFACE ELEVATION: 0.0 CAVE-INDEPTHCASINGDEPTHSAMPLEDDEPTH 6/2/20 DEPTH: DRILLINGFLUID LEVEL FIELD & LABORATORY TESTS MATERIAL DESCRIPTION 1 2 3 4 5 6 N %-#200MC AET JOB NO: PROJECT: RECIN. AMERICAN ENGINEERING TESTING, INC. DEPTHINFEET PLWC LOG OF BORING NO. GEOLOGY LATITUDE: B-9 (p. 1 of 1) SAMPLETYPE LONGITUDE: 01-DHR-060 LL 03/2011 DENDEN 44.827981° -92.924220° SUBSURFACE BORING LOG 28-20309 Jamaica Avenue Improvements; Cottage Grove, MN AET_CORP W-LAT-LONG 28-20309.GPJ AET+CPT+WELL_20181012_JG.GDT 7/2/20 10 24 24 FILL COARSE ALLUVIUM 5.5" Bituminous pavement 8.5" FILL, mostly gravelly silty sand, dark brown (A-1-b) (possible aggregate base) FILL, mostly sand with silt, light brown (A-2-4) SAND, a little gravel, fine grained light brown, moist, medium dense (SP) (A-3) END OF BORING Southbound Right Lane 30 21 17 CORE SS SS SS M M M WATER LEVEL MEASUREMENTS None DR: 2:43 LG:41 TIME DRILLING METHOD SD 6/2/20 3.25" HSA BORINGCOMPLETED: DATE 6.0 NOTE: REFER TO THE ATTACHED SHEETS FOR AN EXPLANATION OF TERMINOLOGY ON THIS LOGRig: 4.0 SS 0-4' WATERLEVEL SURFACE ELEVATION: 0.0 CAVE-INDEPTHCASINGDEPTHSAMPLEDDEPTH 6/2/20 DEPTH: DRILLINGFLUID LEVEL FIELD & LABORATORY TESTS MATERIAL DESCRIPTION 1 2 3 4 5 6 N %-#200MC AET JOB NO: PROJECT: RECIN. AMERICAN ENGINEERING TESTING, INC. DEPTHINFEET PLWC LOG OF BORING NO. GEOLOGY LATITUDE: B-10 (p. 1 of 1) SAMPLETYPE LONGITUDE: 01-DHR-060 LL 03/2011 DENDEN 44.822520° -92.927134° SUBSURFACE BORING LOG 28-20309 Jamaica Avenue Improvements; Cottage Grove, MN AET_CORP W-LAT-LONG 28-20309.GPJ AET+CPT+WELL_20181012_JG.GDT 7/2/20 18 24 24 FILL COARSE ALLUVIUM 7.25" Bituminous pavement 4" FILL, mostly gravelly silty sand, dark brown (A-1-b) (possible aggregate base) FILL, mostly silty sand, a little gravel, brown (A-2-4) SAND, a little gravel, fine to medium grained, light brown to brown, moist, dense to medium dense (SP) (A-3) (possible fill) END OF BORING Southbound Right Turn Lane to E Point Douglas Road 33 36 17 CORE SS SS SS M M M WATER LEVEL MEASUREMENTS None DR: 3:10 LG:41 TIME DRILLING METHOD SD 6/2/20 3.25" HSA BORINGCOMPLETED: DATE 6.0 NOTE: REFER TO THE ATTACHED SHEETS FOR AN EXPLANATION OF TERMINOLOGY ON THIS LOGRig: 4.0 SS 0-4' WATERLEVEL SURFACE ELEVATION: 0.0 CAVE-INDEPTHCASINGDEPTHSAMPLEDDEPTH 6/2/20 DEPTH: DRILLINGFLUID LEVEL FIELD & LABORATORY TESTS MATERIAL DESCRIPTION 1 2 3 4 5 6 N %-#200MC AET JOB NO: PROJECT: RECIN. AMERICAN ENGINEERING TESTING, INC. DEPTHINFEET PLWC LOG OF BORING NO. GEOLOGY LATITUDE: B-11 (p. 1 of 1) SAMPLETYPE LONGITUDE: 01-DHR-060 LL 03/2011 DENDEN 44.818452° -92.931318° SUBSURFACE BORING LOG 28-20309 Jamaica Avenue Improvements; Cottage Grove, MN AET_CORP W-LAT-LONG 28-20309.GPJ AET+CPT+WELL_20181012_JG.GDT 7/2/20 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 0.0010.010.1110100 3/4 30 medium D10 coarse 4 14081.5 6 200100 GRAIN SIZE IN MILLIMETERS Specimen Identification Specimen Identification MC% LL PL PI Cc SILT OR CLAY GRADATION CURVES 22.5 6.1 31.5 1.4 %Sand %Silt %Clay 75.4 84.7 62.1 93.8 %Gravel SAND 40 fine D30 1 D60 U.S. SIEVE NUMBERS 20161410 U.S. SIEVE OPENING IN INCHES HYDROMETER 8.4 6.3 16.5 2.7 0.89 1.14 0.62 0.82 23 B-1 B-2 B-5 B-6 0.8' 1.5' 1.0' 3.0' 0.8' 1.5' 1.0' 3.0' B-1 B-2 B-5 B-6 1/2 P E R C E N T F I N E R B Y W E I G H T 3 Sand with gravel, dark brown (A-1-b) Sand, a little gravel, brown (A-3) Gravelly sand with silt, dark brown (A-1-b) Sand, light brown (A-3) 3/8 19.00 12.50 19.00 12.50 2.14 0.56 2.68 0.41 0.699 0.240 0.518 0.227 Classification Cu D100 6 70 504 GRAVEL fineCOBBLES coarse 0.2563 0.0897 0.1623 0.1534 2.1 9.3 6.4 4.8 6/2/20 Jamaica Avenue Improvements; Cottage Grove, MN PROJECT AET JOB NO. DATE 28-20309 AMERICAN ENGINEERING TESTING, INC. Appendix B Falling Weight Deflectometer Field Exploration and Testing Figure 2 – Effective Subgrade R-Value Map Appendix B Falling Weight Deflectometer Field Exploration and Testing AET Project No. 28-20309 Appendix B - Page 1 of 3 AMERICAN ENGINEERING TESTING, INC. B.1 PAVEMENT TESTING The pavement structural conditions at the site were evaluated nondestructively using Falling Weight Deflectometer (FWD). The description of the equipment precedes the Deflection Data and Analysis Results in this appendix. B.2 EQUIPMENT DESCRIPTION B.2.1 Dynatest 8000 FWD Test System The FWD owned by AET is a Dynatest 8000 FWD Test System that consists of a Dynatest 8002 trailer and a third generation control and data acquisition unit developed in 2003, called the Dynatest Compact15, featuring fifteen (15) deflection channels. The new generation FWD, including a Compact15 System and a standard PC with the FwdWin Field Program constitutes the newest, most sophisticated Dynatest FWD Test System, which fulfills or exceeds all requirements to meet ASTM-4694 Standards. Figure B1 provides a view of this equipment. Figure B1 Dynatest 8002 FWD Test System The FWD imposes a dynamic impulse load onto the pavement surface through a load plate. Total pulse is an approximately half sine shape with a total duration typically between 25 to 30 ms. The FWD is capable of applying a variety of loads to the pavement ranging from 1,500 lbf (7 kN) to 27,000 ibf (120 kN) by dropping a variable weight mass from different heights to a standard, 11.8-inch (300-mm) diameter rigid plate. The drop weights and the buffers are constructed so that the falling weight buffer subassembly may be quickly and conveniently changed between falling masses of 440 lbm (200 kg) for highways and 770 lbm (350 kg) for airports. With the 440 lbm (200 kg) package for highways three drop heights are used with the target load of 6,000 lbf (27 kN) at drop height 1, 9,000 lbf (40 kN) at drop height 2, and 12,000 lbf at drop height 3 (53 kN). The drop sequence consists of two seating drops from drop height 3 and 2 repeat measurements at drop height 1 and 1 measurement at drop height 2 for flexible pavements and 2 repeat measurements at drop height 2 and 1 measurement at drop height 3 for rigid pavements. The data from the seating drops is not stored. The FWD is equipped with a load cell to measure the applied forces and nine geophones or deflectors to measure deflections up to 100 mils (2.5 mm). The load cell is capable of accurately measuring the force that is applied perpendicular to the loading plate with a resolution of 0.15 psi (1 kPa) or better. The force is expressed in terms of pressure, as a function of loading plate size. Nine deflectors at the offsets listed in the following table in the Long Term Performance Program (LTPP) configuration are capable of measuring electronically discrete deflections per test, together with nine (9) separate deflection measuring channels for recording of the data. One (1) of the deflectors measures the deflection of the pavement surface through the center of the loading plate, while seven (7) deflectors are capable of being positioned behind the loading plate along the housing bar, up to a distance of 5 ft (2.5 m) from the center of the loading plate and one (1) being positioned in front of the loading plate along the bar. Deflector D9 D1 D2 D3 D4 D5 D6 D7 D8 Offset (in.) -12 0 8 12 18 24 36 48 60 Appendix B Falling Weight Deflectometer Field Exploration and Testing AET Project No. 28-20309 Appendix B - Page 2 of 3 AMERICAN ENGINEERING TESTING, INC. Field testing is performed in accordance with the standard ASTM procedures as described in ASTM D 4695-96, “Standard Guide for General Pavement Deflection Measurements” and the calibration of our equipment is verified each year at the Long Term Pavement Performance Calibration Center in Maplewood, MN. B.2.2 Linear Distance and Spatial Reference System Distance measuring instrument (DMI) is a trailer mounted two phase encoder system. When DMI is connected to the Compact15 it provides for automatic display and recording distance information in both English and metric units with a 1 foot (0.3 meters) resolution and four percent accuracy when calibrated using the provided procedure in the Field Program. Spatial reference system is a Trimble ProXH Global Positioning System (GPS) that consists of fully integrated receiver, antenna and battery unit with Trimble’s new H-Star™ technology to provide subfoot (30 cm) post-processed accuracy. The External Patch antenna is added to the ProXH receiver for the position of the loading plate. The External Patch antenna can be conveniently elevated with the optional baseball cap to prevent any signal blockage. B.2.3 Air and Pavement Temperature Measuring System A temperature monitoring probe, for automatic recording of air temperature, is an electronic (integrated circuit) sensing element in a stainless steel probe. The probe mounts on the FWD unit in a special holder with air circulation and connects to the Compact15. A non-contact Infra-Red (IR) Temperature Transmitter, for automatic recording of pavement surface temperature only, features an integrated IR-detector and digital electronics in a weather proof enclosure. The IR transmitter mounts on the FWD unit in a special holder with air circulation and connects to the Compact15. Both probe and IR transmitter have a resolution of 0.9 ºF (0.5 ºC) and accuracy within ± 1.8ºF (1 ºC) in the 0 to 158 ºF (-18 to +70ºC) range when calibrated using the provided procedure. B.2.4 Camera Monitoring System A battery operated independent DC-1908E multi-functional digital camera with a SD card is used for easy positioning of the loading plate or recording of the pavement surface condition at the testing locations. B.3 SAMPLING METHODS At the project level, the testing interval is set at 0.1 mi. (maximum) or 10 locations per uniform section in the Outside Wheel Path (OWP) = 2.5 ft ± 0.25 ft (0.76 m ± 0.08 m) for nominal 12 ft (3.7 m) wide lanes. Where a divided roadbed exists, surveys will be taken in both directions if the project will include improvements in both directions. If there is more than one lane in one direction the surveys will be taken in the outer driving lane versus the passing lane of the highway. FWD tests are performed at a constant lateral offset down the test section. B.4 QUALITY CONTROL (QC) AND QUALITY ASSURANCE (QA) In addition to the annual reference calibration, the relative calibration of the FWD deflection sensors is conducted monthly but not to exceed 6 weeks during the months in which the FWD unit is continually testing. The DMI is also calibrated monthly by driving the vehicle over a known distance to calculate the distance scale factor. The accuracy of the FWD air temperature and infra-red (IR) sensors are checked on a monthly basis or more frequently if the FWD operator observes “suspicious” temperature readings. Some care in the placement of the load plate and sensors is taken by the survey crew, especially where the highway surface is rutted or cracked, to ensure that the load plate lays on a flat surface and that the load plate and all geophones lie on the same side of any visible cracks. Liberal use of comments placed in the FWD data file at the time of data collection is required. Comments pertaining to proximity to reference markers, bridge abutments, patches, cracks, etc., are all important documentation for the individual evaluating the data. Scheduled preventive maintenance ensures proper equipment operation and helps identify potential problems that can be corrected to avoid poor quality or missing data that results if the equipment malfunctions while on site. The routine and major maintenance procedures established by the LTPP are adopted and any maintenance has been done at the end of the day after the testing is complete and become part of the routine performed at the end of each test/travel day and on days when no other work is scheduled. Appendix B Falling Weight Deflectometer Field Exploration and Testing AET Project No. 28-20309 Appendix B - Page 3 of 3 AMERICAN ENGINEERING TESTING, INC. B.5 DATA ANALYSIS METHODS B.5.1 Inputs The two -way AADT and HCADT are required to calculate the ESALs. The state average truck percent and truck type distribution are used when HCADT is not provided. The as-built pavement information (layer type, thickness, and construction year) are required and if not provided, GPR and/or coring and boring is needed. B.5.2 Adjustments Temperature adjustment to the deflections measured on bituminous pavements is determined from the temperature predicted at the middle depth of the pavement using the LTPP BELLS3 model that uses the pavement surface temperature and previous day mean air temperature. The predicted middle depth temperature and the standard temperature of 80 degrees Fahrenheit are used to calculate the temperature adjustment factor for deflection data analysis. Seasonal adjustment developed by Mn/DOT is also used. B.5.3 Methods For bituminous pavements, the deflection data were analyzed using the Mn/DOT method for determining the in-place (effective) subgrade and pavement strength, as well as allowable axle loads for a roadway (Investigation 603) revised in 1983 and automated with spreadsheet format in 2008. The Mn/DOT method uses Hogg Model for estimating the subgrade modulus and the Effective GE Equation (Investigation 603) for estimating the effective GE of pavements. The Mn/DOT method also uses the TONN method for estimating Spring Load Capacity and Required Overlay, as described in the Mn/DOT publication “Estimated Spring Load-Carrying Capacity”. For gravel roads, the deflection data were analyzed using the American Association of State Highway and Transportation Officials’ (AASHTO) method for determining the in-place (effective) subgrade and pavement strength, as well as allowable axle loads for a roadway as in the AASHTO Guide for Design of Pavement Structures, 1993. For concrete pavements, the deflection data were analyzed using the FAA methods for determining the modulus of subgrade reaction (k-value), effective elastic modulus of concrete slabs, load transfer efficiency (LTE) on approach and leave slabs of a joint, slab support conditions (void analysis) and impulse stiffness modulus ratio (durability analysis) as in the FAA AC 150/5370-11A, Use of Nondestructive Testing Devices in the Evaluation of Airport Pavement, 2004. B.6 TEST LIMITATIONS B.6.1 Test Methods The data derived through the testing program have been used to develop our opinions about the pavement conditions at your site. However, because no testing program can reveal totally what is in the subsurface, conditions between test locations and at other times, may differ from conditions described in this report. The testing we conducted identified pavement conditions only at those points where we measured pavement surface temperature, deflections, and observed pavement surface conditions. Depending on the sampling methods and sampling frequency, every location may not be tested, and some anomalies which are present in the pavement may not be noted on the testing results. If conditions encountered during construction differ from those indicated by our testing, it may be necessary to alter our conclusions and recommendations, or to modify construction procedures, and the cost of construction may be affected. B.6.2 Test Standards Pavement testing is done in general conformance with the described procedures. Compliance with any other standards referenced within the specified standard is neither inferred nor implied. ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !Jamaica Ave S8 0 t h S t S 9 0 t h S t SJamaica Ave S8 0 t h S t S Hillside Trl S 75th St S 81st St S Isle Ave S88th St S 90t h St S Janero Ave SIn d ia n B lvd S Inwood Ave SJewelAveSInskipTrlSIrvin AveSJensen Ave S85t h S t S Iris h AveS 91st St SInnsdale Ave SJergen Ave SFoothill Rd S JasmineAveSIronwoodAveSIvywood Ave S80th St S 73rd St S Iv ersonAveS E P o int DouglasRdS Ivystone Ave S79th St S Ingl eside AveS JareauAv eS Jocelyn Ave S Jody Cir SIndahlAveS Jeffery Ave SIdeal A v e SIsleton A v e SJodyL n S Jenner Ln SIn m a n A v e S JennerAveS8 3r d St S IvanAveS78 t h St S Ira Ave SIngbergTrlS Islay Ave SJanie Ave SIsl et on C t S 92n d St S 77th St S JefferyLnS87th St SIngersol l AveS Jasmine Ln SJarvisAv e S W P oint D ouglas R d S Ivysto neCtS89th Street Cir SUpper89thStreetCirS 8 2 n d S t r e e t C t SIngle Ct SIsle Ct S Jergen Bay SJergen Ct S76th Stre et Ct S 8 3 r d S t r e e t C t S Upper 81st St S Ja n e r o C t Irvin Avenue Ct S Jody Trl SIndian Boulevard Ct SI r i s h A v e n u e C t S77th Street Ct 8 0 th S t S 81s t St S Inman Ave SJanero Ave S92nd St SIrish Avenue Ct SIn m a n A ve S Isle t o n A v e S 8 3r d S t S IversonAveS 77th St S I nwo o d A v e SJensen Ave SJer g e nAveSJe fferyLn S In n s d a l e A ve S Jeffe r y A ve SJaneroAveS80 t h S t S Jewel Ave SJewel Ave SJefferyAveS79th St S I ngl esi de Ave SJen senAveSJaneroAveSJ a s m in e A v e S 7 5 t h S t S 79thSt S78th St SJensenAv eS9 1st St S J o cel y nAveS80t h S t S Inman Ave S£¤10 £¤10 Grey Cloud Elem entar y S ch o olKingston Pa r k Footh ill Park Pi netree Pond Park Effective Subgrade R-value AET Project No. 28-20309 Jamaica Avenue ImprovementsCottage Grove, Minnesota0800400 Feet ± File: 28-20309P-1.mxd Date: 06/26/2020 AMERICANENGINEERINGTESTING, INC Figure 2Map Reference: Date: 06/26/2020 Geotechnical Data Report Legend !20 - 30 !30 - 40 !40 - 55 Appendix C AET Project No. 28-20309 Ground Penetrating Radar Field Exploration and Testing GPR Plots Appendix C Ground Penetrating Radar Field Exploration and Testing AET Project No. 28-20309 Appendix C - Page 1 of 3 AMERICAN ENGINEERING TESTING, INC. C.1 FIELD EXPLORATION The pavement structural conditions at the site were evaluated nondestructively using Ground Penetrating Radar (GPR). The description of the equipment precedes the GPR Data and Analysis Results in this appendix. C.2 EQUIPMENT DESCRIPTION C.2.1 GSSI GPR Test System The GPR test system owned by AET is a GSSI Roadscan System that consists of a bumper-mounted, 2 GHz air- coupled antenna and a SIR-20 control and data acquisition processor, featuring dual channels. The GPR processor, including a SIR-20 data acquisition system, wheel-mounted DMI (Distance Measuring Instrument), and a tough book with the SIR-20 Field Program constitutes the newest, most sophisticated GSSI Test System, which fulfills or exceeds all requirements to meet ASTM-4748, ASTM D-6087 Standards. Figure C1 provides a view of this equipment. Figure C1 GSSI 2 GHz air-coupled GPR Test System The GPR antenna emits a high frequency electromagnetic wave into the material under investigation. The reflected energy caused by changes in the electromagnetic properties within the material is detected by a receiver antenna and recorded for subsequent analysis. The 2 GHz air-coupled GPR is capable of collecting radar waveforms at more than 100 signals per second, allows for data to be collected at driving speeds along the longitudinal dimension of the pavements or bridge decks with the antennas fixed at the rear or in front of the vehicle. The antenna used for Roadscan is the Horn antenna Model 4105 (2 GHz). The 2 GHz antenna is the current antenna of choice for road survey because it combines excellent resolution with reasonable depth penetration (18-24 inches in pavement materials). The data collection is performed at normal driving speeds (45-55 mph), requiring no lane closures nor causing traffic congestion. At this peed the 2 GHz antenna is capable of collecting data at 1-foot interval (1 scan/foot). The data were collected at a rate of about 1 vertical scans per foot. Each vertical scan consisted of 512 samples and the record length in time of each scan was 12 nanoseconds. Filters used during acquisition were 300 MHz high pass and 5,000 MHz low pass. In a GPR test, the antenna is moved continuously across the test surface and the control unit collects data at a specified distance increment. In this way, the data collection rate is independent of the scan rate. Alternatively, scanning can be performed at a constant rate of time, regardless of the scan distance. Single point scans can be performed as well. Data is reviewed on-screen and in the field to identify reflections and ensure proper data collection parameters. Field testing is performed in accordance with the standard ASTM procedures as described in ASTM D 4695-96, “Standard Guide for General Pavement Deflection Measurements”. C.2.2 System Calibrations Horn antenna processing is used to get the velocity of the radar energy in the material by comparing the reflection strengths (amplitudes) from a pavement layer interface with a perfect reflector (a metal plate). The calibration scan is obtained with the horn antenna placed over a metal plate at the same elevation as a scan obtained over pavement. Appendix C Ground Penetrating Radar Field Exploration and Testing AET Project No. 28-20309 Appendix C - Page 2 of 3 AMERICAN ENGINEERING TESTING, INC. The same setting for data collection is used for metal plate calibration. Fifteen seconds are need for jump ing up and down on the vehicle’s bumper to collect the full range of motion for the vehicle’s shocks. The filename of raw calibration file is recorded. Survey wheel is calibrated by laying out a long distance (> 50 feet) with tape measure. C.2.3 Linear Distance and Spatial Reference System Distance measuring instrument (DMI) is a trailer mounted two phase encoder system. When DMI is connected to the SIR-20 it provides for automatic display and recording distance information in both English and metric units with a 1 foot (0.3 meters) resolution and four percent accuracy when calibrated using provided procedure in the Field Program. Spatial reference system is a Trimble ProXH Global Positioning System (GPS) that consists of fully integrated receiver, antenna and battery unit with Trimble’s new H-Star™ technology to provide subfoot (30 cm) post processed accuracy. The External Patch antenna is added to the ProXH receiver for the position of the loading plate. The External Patch antenna can be conveniently elevated with the optional baseball cap to prevent any signal blockage. C.2.4 Camera Monitoring System A battery operated independent DC-1908E multi-functional digital camera with a SD card is used for easy positioning of the loading plate or of the pavement surface condition at the testing locations. C.3 SAMPLING METHODS At the project level, the testing interval is set at 12 scans per foot in the Outside Wheel Path (OWP) = 2.5 ft ± 0.25 ft (0.76 m ± 0.08 m) for nominal 12 ft (3.7 m) wide lanes at a survey speed of approximately 10 mph. Where a divided roadbed exists, surveys will be taken in both directions if the project will include improvements in both directions. If there is more than one lane in one direction the surveys will be taken in the outer driving lane (truck lane) versus the passing lane of the highway. GPR tests are performed at a constant lateral offset down the test section. When GPR tests are performed on bridge decks, multiple survey lines are followed transversely at 2-foot spacing between survey lines. At the network level, GPR tests on one scan per foot are set to be able to collect data on pavements at driving speeds, without statistically compromising the quality of the data collected. If GPR tests are for the in situ characterization of material GPR data will be collected at two scan per foot at slower driving speeds. C.4 QUALITY CONTROL (QC) AND QUALITY ASSURANCE (QA) Beside the daily metal plate calibration the DMI is also calibrated monthly by driving the vehicle over a known distance to calculate the distance scale factor. The GPR will be monitored in real time in the data collection vehicle to minimize data errors. The GPR units will be identified with a unique number and that number will accompany all data reported from that unit as required in the QC/QA plan. Scheduled preventive maintenance ensures proper equipment operation and helps identify potential problems that can be corrected to avoid poor quality or missing data that results if the equipment malfunctions while on site. The routine and major maintenance procedures established by the LTPP are adopted and any maintenance has been done at the end of the day after the testing is complete and become part of the routine performed at the end of each test/travel day and on days when no other work is scheduled. To insure quality data, the GPR assessments only took place on dry pavement surfaces, and data was collected in each wheel path. C.5 DATA ANALYSIS METHODS C.5.1 Data Editing Field acquisition is seldom so routine that no errors, omissions or data redundancy occur. Data editing encompasses issues such as data re-organization, data file merging, data header or background information updates, repositioning and inclusion of elevation information with the data. C.5.2 Basic Processing Appendix C Ground Penetrating Radar Field Exploration and Testing AET Project No. 28-20309 Appendix C - Page 3 of 3 AMERICAN ENGINEERING TESTING, INC. Basic data processing addresses some of the fundamental manipulations applied to data to make a more acceptable product for initial interpretation and data evaluation. In most instances this type of processing is already applied in real-time to generate the real-time display. The advantage of post survey processing is that the basic processing can be done more systematically and non-causal operators to remove or enhance certain features can be applied. The Reflection Picking procedure is used to eliminate unwanted noise, detects significant reflections, and records the corresponding time and depth. It uses antenna calibration file data to calculate the radar signal velocity within the pavement. C.5.3 Advance Processing Advanced data processing addresses the types of processing which require a certain amount of operator bias to be applied and which will result in data which are significantly different from the raw information which were input to the processing. C.5.4 Data Interpretation The EZ Tracker Layer Interpretation procedure uses the output from the first step to map structural layers and calculate the corresponding velocities and depths. C.6 TEST LIMITATIONS C.6.1 Test Methods The data derived through the testing program have been used to develop our opinions about the pavement conditions at your site. However, because no testing program can reveal totally what is in the subsurface, conditions between test locations and at other times, may differ from conditions described in this report. The testing we conducted identified pavement conditions only at those points where we measured pavement thicknesses and observed pavement surface conditions. Depending on the sampling methods and sampling frequency, every location may not be tested, and some anomalies which are present in the pavement may not be noted on the testing results. If conditions encountered during construction differ from those indicated by our testing, it may be necessary to alter our conclusions and recommendations, or to modify construction procedures, and the cost of construction may be affected. B.6.2 Test Standards Pavement testing is done in general conformance with the described procedures. Compliance with any other standards referenced within the specified standard is neither inferred nor implied. C.7 SUPPORTING TEST METHODS C.7.1 Falling Weight Deflectometer (FWD) If the pavement layer moduli and subgrade soil strength are desired the deflection data are collected using a Dynatest 8000 FWD Test System that consists of a Dynatest 8002 trailer and a third generation control and data acquisition unit developed in 2003, called the Dynatest Compact15, featuring fifteen (15) deflection channels. The new generation FWD, including a Compact15 System and a standard PC with the FwdWin field Program constitutes the newest, most sophisticated Dynatest FWD Test System, which fulfills or exceeds all requirements to meet ASTM-4694, ASTM D- 4695 Standards. The system provides continuous data at pre-set spacing. C.7.2 Soil Boring/Coring Field Exploration If both pavement thicknesses and subgrade soil types and conditions are desired the shallow coring/boring and sampling is used. The limited number of coring/boring is necessary to verify the GPR layer thickness data. C.7.3 Pavement Surface Condition Survey The type and severity of pavement distress influence the deflection response for a pavement. Therefore, GPR operators record any distress located from about 1 ft (0.3 m) in front of vehicle to about 30 ft (9 m) ahead. This information is recorded in the FWD file using the comment line in the field program immediately following the test. American Engineering Testing, Inc.550 Cleveland Avenue NorthSt. Paul, Minnesota 55114Phone: (651) 659-9001Fax: (651) 659-1379Units: inchesProject: Date:7/1/20AET Job No.:28-20309Test Date:5/22/20Average CV 15th Min. Average CV 15th Min.Road: Section/Grid:S01BP6.4 16% 5.2 4.6 6.8 20% 5.2 4.6From: To:90th StBase4.9 25% 3.8 2.9 7.2 22% 5.4 4.2BP + Base11.3 7% 10.5 9.9 14.0 14% 11.4 9.5GENERAL INFORMATION: GROUND PENETRATING RADARSUMMARY STATISTICSJamaica Avenue Improvements~80' N of US 10/61 WB Exit RampJamaica AvenueNB Inside Lane NB Outside LaneLayer-18.0-16.0-14.0-12.0-10.0-8.0-6.0-4.0-2.00.00.00 0.05 0.10 0.15 0.20 0.25Depth (in)GPR Distance (mi) Ground Penetrating Radar Pavement Thickness SurveyNB BP InsideNB BP OutsideNB Base InsideNB Base Outside90th St SB‐1E. Pt. Douglas Rd.90th St American Engineering Testing, Inc.550 Cleveland Avenue NorthSt. Paul, Minnesota 55114Phone: (651) 659-9001Fax: (651) 659-1379Units: inchesProject: Date:7/1/20AET Job No.:28-20309Test Date:5/22/20Average CV 15th Min. Average CV 15th Min.Road: Section/Grid:S02BP5.6 7% 5.3 4.6 5.0 10% 4.6 4.2From: To:80th StBase6.3 22% 4.9 3.2 6.9 22% 5.2 3.7BP + Base11.9 11% 10.6 9.0 12.0 14% 9.9 8.4GENERAL INFORMATION: GROUND PENETRATING RADARSUMMARY STATISTICSJamaica Avenue Improvements90th StJamaica AvenueNB Inside Lane NB Outside LaneLayer-18.0-16.0-14.0-12.0-10.0-8.0-6.0-4.0-2.00.00.00 0.20 0.40 0.60 0.80 1.00Depth (in)GPR Distance (mi) Ground Penetrating Radar Pavement Thickness SurveyNB BP InsideNB BP OutsideNB Base InsideNB Base Outside80th stB‐4B‐3B‐2Janero Ave. SIsle Ave. SJasmine Ave SHillside Tr. S90th St80th St American Engineering Testing, Inc.550 Cleveland Avenue NorthSt. Paul, Minnesota 55114Phone: (651) 659-9001Fax: (651) 659-1379Units: inchesProject: Date:7/1/20AET Job No.:28-20309Test Date:5/22/20Average CV 15th Min. Average CV 15th Min.Road: Section/Grid:S03BP5.2 8% 4.8 4.5 5.7 8% 5.2 4.9From: To:~350' S of 70th StreetBase5.3 22% 4.2 2.4 7.7 25% 5.7 3.5BP + Base10.6 11% 9.3 7.1 13.4 16% 11.1 8.4GENERAL INFORMATION: GROUND PENETRATING RADARSUMMARY STATISTICSJamaica Avenue Improvements80th StJamaica AvenueNB Inside Lane NB Outside LaneLayer-18.0-16.0-14.0-12.0-10.0-8.0-6.0-4.0-2.00.00.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0Depth (in)GPR Distance (mi) Ground Penetrating Radar Pavement Thickness SurveyNB BP InsideNB BP OutsideNB Base InsideNB Base OutsideB‐5B‐6Indian Blvd. S75th St. S80th St. S American Engineering Testing, Inc.550 Cleveland Avenue NorthSt. Paul, Minnesota 55114Phone: (651) 659-9001Fax: (651) 659-1379Units: inchesProject: Date:7/1/20AET Job No.:28-20309Test Date:5/22/20Average CV 15th Min. Average CV 15th Min.Road: Section/Grid:S01BP6.8 12% 5.9 5.3 6.8 13% 5.9 5.3From: To:90th StBase4.5 24% 3.4 2.4 4.4 30% 3.3 1.8BP +Base11.3 8% 10.5 8.4 11.2 9% 10.2 9.5GENERAL INFORMATION: GROUND PENETRATING RADARSUMMARY STATISTICSJamaica Avenue Improvements~80' N of US 10/61 WB On RampJamaica AvenueSB Inside Lane SB Outside LaneLayer-18.0-16.0-14.0-12.0-10.0-8.0-6.0-4.0-2.00.00.00 0.05 0.10 0.15 0.20 0.25Depth (in)GPR Distance (mi) Ground Penetrating Radar Pavement Thickness SurveySB BP InsideSB BP OutsideSB Base InsideSB Base OutsideB‐11E. Pt. Douglas Rd.90th St American Engineering Testing, Inc.550 Cleveland Avenue NorthSt. Paul, Minnesota 55114Phone: (651) 659-9001Fax: (651) 659-1379Units: inchesProject: Date:7/1/20AET Job No.:28-20309Test Date:5/22/20Average CV 15th Min. Average CV 15th Min.Road: Section/Grid:S02BP5.5 11% 5.0 4.5 5.5 13% 5.0 4.4From: To:80th StBase5.3 25% 3.9 2.5 6.6 18% 5.5 3.0BP +Base10.9 13% 9.3 7.6 12.2 11% 10.9 7.7GENERAL INFORMATION: GROUND PENETRATING RADARSUMMARY STATISTICSJamaica Avenue Improvements90th StJamaica AvenueSB Inside Lane SB Outside LaneLayer-18.0-16.0-14.0-12.0-10.0-8.0-6.0-4.0-2.00.00.0 0.2 0.4 0.6 0.8 1.0Depth (in)GPR Distance (mi) Ground Penetrating Radar Pavement Thickness SurveySB BP InsideSB BP OutsideSB Base InsideSB Base OutsideB‐8B‐9B‐10Janero Ave. SIsle Ave. SJasmine Ave SHillside Tr. S90th St80th St American Engineering Testing, Inc.550 Cleveland Avenue NorthSt. Paul, Minnesota 55114Phone: (651) 659-9001Fax: (651) 659-1379Units: inchesProject: Date:7/1/20AET Job No.:28-20309Test Date:5/22/20Average CV 15th Min. Average CV 15th Min.Road: Section/Grid:S03BP5.2 13% 4.7 4.2 5.3 13% 4.7 4.3From: To:~350' S of 70th StreetBase5.2 20% 4.2 2.5 5.9 20% 4.8 3.2BP +Base10.4 11% 9.3 7.4 11.2 12% 9.9 8.4GENERAL INFORMATION: GROUND PENETRATING RADARSUMMARY STATISTICSJamaica Avenue Improvements80th StJamaica AvenueSB Inside Lane SB Outside LaneLayer-18.0-16.0-14.0-12.0-10.0-8.0-6.0-4.0-2.00.00.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0Depth (in)GPR Distance (mi) Ground Penetrating Radar Pavement Thickness SurveySB BP InsideSB BP OutsideSB Base InsideSB Base OutsideB‐7Indian Blvd. S75th St. S80th St. Report of Geotechnical Exploration Jamaica Avenue Improvements - Cottage Grove, MN AMERICAN July 2, 2020 ENGINEERING AET Report No. 28-20309 TESTING, INC. Appendix D Geotechnical Report Limitations and Guidelines for Use Appendix D Geotechnical Report Limitations and Guidelines for Use AET Project. 28-20309 Appendix D – Page 1 of 2 AMERICAN ENGINEERING TESTING, INC D.1 REFERENCE This appendix provides information to help you manage your risks relating to subsurface problems which are caused by construction delays, cost overruns, claims, and disputes. This information was developed and provided by ASFE1, of which, we are a member firm. D.2 RISK MANAGEMENT INFORMATION D.2.1 Geotechnical Services are Performed for Specific Purposes, Persons, and Projects Geotechnical engineers structure their services to meet the specific needs of their clients. A geotechnical engineering study conducted for a civil engineer may not fulfill the needs of a construction contractor or even another civil engineer. Because each geotechnical engineering study is unique, each geotechnical engineering report is unique, prepared solely for the client. No one except you should rely on your geotechnical engineering report without first conferring with the geotechnical engineer who prepared it. And no one, not even you, should apply the report for any purpose or project except the one originally contemplated. D.2.2 Read the Full Report Serious problems have occurred because those relying on a geotechnical engineering report did not read it all. Do not rely on an executive summary. Do not read selected elements only. D.2.3 A Geotechnical Engineering Report is Based on A Unique Set of Project-Specific Factors Geotechnical engineers consider a few unique, project-specific factors when establishing the scope of a study. Typically factors include: the client’s goals, objectives, and risk management preferences; the general nature of the structure involved, its size, and configuration; the location of the structure on the site; and other planned or existing site improvements, such as access roads, parking lots, and underground utilities. Unless the geotechnical engineer who conducted the study specifically indicates otherwise, do not rely on a geotechnical engineering report that was:  not prepared for you,  not prepared for your project,  not prepared for the specific site explored, or  completed before important project changes were made. Typical changes that can erode the reliability of an existing geotechnical engineering report include those that affect:  the function of the proposed structure, as when it’s changed from a parking garage to an office building, or from a light industrial plant to a refrigerated warehouse,  elevation, configuration, location, orientation, or weight of the proposed structure,  composition of the design team, or  project ownership. As a rule, always inform your geotechnical engineer of project changes, even minor ones, and request an assessment of their impact. Geotechnical engineers cannot accept responsibility or liability for problems that occur because their reports do not consider developments of which they were not informed. D.2.4 Subsurface Conditions Can Change A geotechnical engineering report is based on conditions that existed at the time the study was performed. Do not rely on a geotechnical engineering report whose adequacy may have been affected by: the passage of time; by man-made events, such as construction on or adjacent to the site; or by natural events, such as floods, earthquakes, or groundwater fluctuations. Always contact the geotechnical engineer before applying the report to determine if it is still reliable. A minor amount of additional testing or analysis could prevent major problems. 1 Geoprofessional Business Association, 1300 Piccard Drive, LL14, Rockville, MD 20850 Telephone: 301/565-2733: www.geoprofessional.org Appendix D Geotechnical Report Limitations and Guidelines for Use AET Project. 28-20309 Appendix D – Page 2 of 2 AMERICAN ENGINEERING TESTING, INC D.2.5 Most Geotechnical Findings Are Professional Opinions Site exploration identified subsurface conditions only at those points where subsurface tests are conducted or samples are taken. Geotechnical engineers review field and laboratory data and then apply their professional judgment to render an opinion about subsurface conditions throughout the site. Actual subsurface conditions may differ, sometimes significantly, from those indicated in your report. Retaining the geotechnical engineer who developed your report to provide construction observation is the most effective method of managing the risks associated with unanticipated conditions. D.2.6 A Report’s Recommendations Are Not Final Do not over rely on the construction recommendations included in your report. Those recommendations are not final, because geotechnical engineers develop them principally from judgment and opinion. Geotechnical engineers can finalize their recommendations only by observing actual subsurface conditions revealed during construction. The geotechnical engineer who developed your report cannot assume responsibility or liability for the report’s recommendations if that engineer does not perform construction observation. D.2.7 A Geotechnical Engineering Report Is Subject to Misinterpretation Other design team members’ misinterpretation of geotechnical engineering reports has resulted in costly problems. Lower that risk by having your geotechnical engineer confer with appropriate members of the design team after submitting the report. Also retain your geotechnical engineer to review pertinent elements of the design team’s plans and specifications. Contractors can also misinterpret a geotechnical engineering report. Reduce that risk by having your geotechnical engineer participate in prebid and preconstruction conferences, and by providing construction observation. D.2.8 Do Not Redraw the Engineer’s Logs Geotechnical engineers prepare final boring and testing logs based upon their interpretation of field logs and laboratory data. To prevent errors or omissions, the logs included in a geotechnical engineering report should never be redrawn for inclusion in architectural or other design drawings. Only photographic or electronic reproduction is acceptable but recognizes that separating logs from the report can elevate risk. D.2.9 Give Contractors a Complete Report and Guidance Some owners and design professionals mistakenly believe they can make contractors liable for unanticipated subsurface conditions by limiting what they provide for bid preparation. To help prevent costly problems, give contractors the complete geotechnical engineering report, but preface it with a clearly written letter of transmittal. In the letter, advise contractors that the report was not prepared for purposes of bid development and that the report’s accuracy is limited; encourage them to confer with the geotechnical engineer who prepared the report (a modest fee may be required) and/or to conduct additional study to obtain the specific types of information they need or prefer. A prebid conference can also be valuable. Be sure contractors have sufficient time to perform additional study. Only then might you be able to give contractors the best information available to you, while requiring them to at least share some of the financial responsibilities stemming from unanticipated conditions. D.2.10 Read Responsibility Provisions Closely Some clients, design professionals, and contractors do not recognize that geotechnical engineering is far less exact than other engineering disciplines. This lack of understanding has created unrealistic expectations that have led to disappointments, claims, and disputes. To help reduce the risk of such outcomes, geotechnical engineers commonly include a variety of explanatory provisions in their report. Sometimes labeled “limitations” many of these provisions indicate where geotechnical engineers’ responsibilities begin and end, to help others recognize their own responsibilities and risks. Read these provisions closely. Ask questions. Your geotechnical engineer should respond fully and frankly. D.2.11 Geoenvironmental Concerns Are Not Covered The equipment, techniques, and personnel used to perform a geoenvironmental study differ significantly from those used to perform a geotechnical study. For that reason, a geotechnical engineering report does not usually relate any geoenvironmental findings, conclusions, or recommendations; e.g., about the likelihood of encountering underground storage tanks or regulated contaminants. Unanticipated environmental problems have led to numerous project failures. If you have not yet obtained your own geoenvironmental information, ask your geotechnical consultant for risk management guidance. Do not rely on an environmental report prepared for someone else.