Loading...
HomeMy WebLinkAbout2021-10-25 PACKET 06.4.STAFF REPORT CASE: ZA21-066, PP21-067, SP21-068 ITEM: 6.4 PUBLIC MEETING DATE: 10/25/21 TENTATIVE COUNCIL REVIEW DATE: 12/15/21 APPLICATION APPLICANT: NP CG Logistics, LLC REQUEST: Site plan review of approximately 3.5 million square feet of warehouse, manufacturing, and office space; preliminary plat to create nine industrial lots and one outlot; and a zoning amendment to rezone 252 acres of land from AG-1, Agricultural Preservation, and AG-2, Agricultural, to 1-2, General Industry, with a PUD, Planned Unit Development. SITE DATA LOCATION: South of 100th Street ZONING: AG-1, Agricultural Preservation, and AG-2, Agricultural GUIDED LAND USE: Industrial LAND USE OF ADJACENT PROPERTIES: CURRENT GUIDED NORTH: Residential & Ind. LDR & Industrial EAST: Agricultural Industrial SOUTH: Agricultural Industrial WEST: Agricultural Industrial SIZE: 3.5 million square feet of warehouse, manufacturing, and office space being developed on 252 acres of land DENSITY: N/A RECOMMENDATION Approval based on the findings of fact and subject to the conditions stipulated in this staff report. Cottage Grove COTTAGE GROVE PLANNING DIVISION � here Pride and Prosperity Meet Planning Staff Contact: Emily Schmitz, Senior Planner; 651-458-2874; eschmitz(o-)_cottagegrovemn.gov Application Accepted:. 60-Day Review Deadline: City of Cottage Grove Planning Division • 12800 Ravine Parkway South • Cottage Grove, MN 55016 Planning Staff Report Cottage Grove Logistics Park (NorthPoint Development) Planning Case No. SP2021-068, ZA2021-066, PP2021-067 October 25, 2021 Proposal NorthPoint Development (NP CG Logistics, LLC) submitted the following applications for a project on 252 acres of land located south of 100th Street: Master Site Plan for proposed construction of approximately 3.4 million square feet of ware- house, manufacturing, distribution, and office building space. 2. Cottage Grove Logistics Park Preliminary Plat creating nine parcels and one outlot. 3. Julen Preliminary Plat creating two parcels, one outlot, and right-of-way of future 105th Street. 4. Zoning Amendment to rezone 252 acres of land within the proposed assemblage from AG-1, Agricultural Preservation, and AG-2, Agricultural, to 1-2, General Industry, with a PUD (Planned Unit Development). Location Map NorthPoint Development, a Kansas City based development company, is proposing a Master Site Plan for a development to be called "Cottage Grove Logistics Park." The proposed development would consist of approximately 252 acres of land and nine separate warehouse, manufacturing, distribution, and office space buildings. The Developer is proposing a phased development, and therefore, will be required to submit applications for site plan review prior to commencement of construction of each phase of the development to ensure its alignment with the proposed Master Site Plan. Planning Staff Report — Case Nos. SP2021-068, ZA2021-066 and PP2021-067 Cottage Grove Logistics Park (NorthPoint) October 25, 2021 Page 2 of 23 Master Site Plan — Cottage Grove Logistics Park Site Characteristics The proposed development encompases an assemblage of six separately owned parcels as well as dedicated ROW from an additional property owner. The assemblage of these parcels amounts to a total of approximately 252 acres of land the majority of which are currently tilled acres with some treed windrows. Two of the parcels have single family homes with several out buildings, which are planned to be removed as part of the redevelopment of the parcels. Site Layout/Property Owners Planning Staff Report — Case Nos. SP2021-068, ZA2021-066 and PP2021-067 Cottage Grove Logistics Park (NorthPoint) October 25, 2021 Page 3 of 23 Review Schedule Application Received: September 29, 2021 Acceptance of Completed Application: October 12, 2021 Planning Commission Date: October 25, 2021 60-Day Review Deadline: December 17, 2021 Tentative City Council Date: December 15, 2021 60-Day Extension: February 15, 2022 Neighborhood Meetings August 4, 2021 The Developer held a neighborhood meeting inviting residents within 500 feet of the proposed project area as well as residents within the River Acres Neighborhood. Approximately 30 residents attended the meeting. The following were the main points of concern received by the Developer: • Traffic impacts to the area • Potential uses or tenants that may occupy the development (heavy industrial) • Potential noise and lighting impacts to surrounding properties • Screening October 12, 2021 Given the substantial concerns received from residents at the initial neighborhood meeting, the Developer held a second neighborhood meeting sending out invites to the same resident list as the first meeting. Approximately 30 residents attended. The Developer provided an overview of adjustments to their proposed plan and the mitigation measures they had taken to address con- cerns heard at the previous meeting. The Developer then held a question -and -answer session where residents were able to pose specific questions and concerns to the Developer. Planning Considerations Comprehensive Plan — Future Land Use Designation The City's approved 2040 Comprehensive Plan guides all proposed properties involved in the proposed Cottage Grove Logistics Park Master Site Plan as Industrial; therefore, the proposed use is consistent with this guided land use. 2040 Future Land Use -- aiul�.re ROomwyf ngcoA�re vre»re ow perrvry Rezeenlial _rn wmG ty Re en -n�qe DerWry RaROe al _ G«nmercd ® Maetl ufe w:eem LV e/ MMaI Ropeways ligvilrol _ GuEfcRemihEfC ngn<J+uol Rah+/Ocen Spoce - GOY Came Gponwoler S•reel aM R 2040 Land Use Map Planning Staff Report — Case Nos. SP2021-068, ZA2021-066 and PP2021-067 Cottage Grove Logistics Park (NorthPoint) October 25, 2021 Page 4 of 23 AUAR In 2017, the City completed an AUAR (Alternative Urban Areawide Review) for the City's Business Park. An AUAR is a planning tool used by local governments to better understand how potential development within a geographic area may impact the environment of their community. This en- vironmental analysis can be used to inform local planning and zoning decisions. The review pro- cess for the AUAR includes an EAW (Environmental Assessment Worksheet), which analyzes environmental impacts resulting from potential development choices and provides ways to reduce impacts or eliminate potential consequences via mitigation measures. The AUAR process is utilized to review and evaluate potential future development scenarios prior to proposed develop- ment, eliminating the need for an additional EAW process at the time of development so the project proposers can implement necessary mitigation measures per the AUAR Mitigation Plan. The City's intent in completing an AUAR in 2017 for the City's expanded Business Park was to provide for shovel -ready developable land at such time a potential user was interested in devel- opment within the area. The City evaluated 1,767 acres within its study area, given the Cottage Grove Business Park and surrounding undeveloped areas have been the subject of large busi- ness searches through the Department of Employment and Economic Development (DEED) and Greater MSP. Understanding one major impediment of successfully becoming the recipient of a business of statewide significance is the time necessary to complete all required environmental review on a case -by -case basis. The AUAR offers business/industrial sites outside of the bound- aries of the current Business Park in 2017 and better positioned the City for a timelier entitlement process for potential future development users. The 2017 AUAR evaluated two separate development scenarios: a major technology center and major distribution use. The major distribution use is consistent with the City's 2040 Comprehen- sive Plan and aligns with the proposed Master Site Plan; therefore, additional environmental review is not required as part of the development process given this was completed by the AUAR process. Zoning The six separate parcels within the proposed assemblage are all currently zoned either AG-1, Agriculture Preservation, or AG-2, Agriculture. The developer is requesting that the entire 252 acres included in the assemblage to 1-2, General Industry, with a PUD (Planned Unit Develop- ment). This zoning classification is consistent with the industrial land use designation shown on the 2040 Comprehensive Plan Land Use Map. The proposed warehousing, manufacturing, distri- bution, and office uses are permitted uses within the 1-2 zoning district. Proposed Zoning Planning Staff Report — Case Nos. SP2021-068, ZA2021-066 and PP2021-067 Cottage Grove Logistics Park (NorthPoint) October 25, 2021 Page 5 of 23 Planned Unit Development The applicant is proposing a Planned Unit Development (PUD) in addition to the rezoning classi- fication of the 252 acres of land. A PUD is an overlay that allows for flexibility in land development, provides for a more efficient and effective use of land, a higher quality of design, design compat- ible with surrounding land uses, and consistent with the Comprehensive Plan. The PUD is intended to provide general site layout, establish design criteria, and identify permitted uses. The applicant is requesting flexibility in building height as well as orientation of loading docks adjacent to public streets. Given the request for flexibility, the City is able to add conditions of approval regarding uniform architecture, increased design requirements, and increased screening and landscape. Cottage Grove Logistics Park Preliminary Plat The Developer is proposing a preliminary plat (Cottage Grove Logistics Park) creating nine sep- arate developable parcels along with one outlot. The plat area encompasses each of six currently individually owned parcels. The proposed assemblage plat (Cottage Grove Logistics Park) will need to provide appropriate right-of-way for each of the adjacent public streets and required ease- ments. With 100th Street being a future County roadway, a total of 180 feet of right-of-way is required. Ideal Avenue and 105th Street both require 100 feet of right-of-way. The right-of-way being dedicated as part of the development along Ideal Avenue and 100th Street will allow for the required roadway improvements to be completed. At such time the Developer submits for a first phase site plan and final plat, an amended preliminary plat may also be required if the proposed first phase adjusts the parcel layout from the preliminary plat below. r - 1ODTH - -= -- - - - - - - - _ LOF1 .. LOT!6 4 LOT 2 LOT d # ! LOT 1 E _ �. 'Urv'r n BLOCK 1 - I oer x i eLocx� — —---- --- —---- - I I I . LOT 7� LOT., !� LOTi —Tu�+si Cottage Grove Logistics Park — Preliminary Plat Julen Preliminary Plat The Developer is also proposing a second and separate preliminary plat as part of their application submittal for the Julen property, which is located directly south of the proposed Master Site Plan area. Planning Staff Report — Case Nos. SP2021-068, ZA2021-066 and PP2021-067 Cottage Grove Logistics Park (NorthPoint) October 25, 2021 Page 6 of 23 Plat Areas The proposed Julen Plat is required for the sole purpose of dedicating the required right-of-way for the future 105th Street given that the Julen property is not ready to develop at this time. The dedicated right-of-way is required for the Master Site Plan area in order to provide access; there- fore, the Developer is including it in their application. The Julen plat will create the right-of-way to serve the development as well as create an outlot (Outlot A) to be owned and maintained by NorthPoint (The Developer). Julen Plat Parcels Created Planning Staff Report — Case Nos. SP2021-068, ZA2021-066 and PP2021-067 Cottage Grove Logistics Park (NorthPoint) October 25, 2021 Page 7 of 23 Lot 1 and Lot 2 of the Julen Plat will be maintained by the current owner (Julen), and any future development of Lot 1 and/or Lot 2 would require approvals. As a condition of approval, a Final Plat of the Julen property must be submitted within six months. — — 105T, SL , ==�n— - BLOCK 1 LOT 2 u.auerwev..n.-.xr s�49P LOT - p4Fi' ;itE St .... ..............-. i Julen Preliminary Plat Setbacks The minimum front, rear, and parking setbacks for the 1-2 zoning district have all been met with the proposed Master Site Plan and will be required to be met with each phased site plan and final plat. side Side Rear yard Side yard Yard Rear yard Front yard setback Building setback adjacent yard adjacent setback adjacent height interior to a setback to an R to an R street district district 40 feet 40 feet 125 feet 80 feet 60 feet 100 feet 45 feet Height City Code requires a maximum building height of 45 feet. The Developer is proposing building heights ranging from 49.5 feet to 51 feet to allow for stacking of materials as part of typical distri- bution operations. The proposed heights require flexibility via the PUD and will be permitted for all proposed buildings within the Master Site Plan area. The proposed height aligns with previously approved building heights within the City's Business Park. Architecture The conditions of approval for the PUD require that all buildings within the PUD and Master Site Plan area shall be constructed of complementary materials. The City's zoning code requires new structures within commercial and industrials districts to be composed of at least 65 percent Class 1 materials as outlined in the zoning code (brick, stone, glass). Given the PUD request, staff has Planning Staff Report — Case Nos. SP2021-068, ZA2021-066 and PP2021-067 Cottage Grove Logistics Park (NorthPoint) October 25, 2021 Page 8 of 23 requested the developer provide additional architectural design standards on all building sides facing public rights -of -way, specifically buildings orientated with loading docks facing public streets. Staff wants to ensure buildings visible from these rights -of -way are constructed to be visually appealing and complement the existing buildings within the Business Park and surround- ing neighborhoods. The Developer has provided renderings of the proposed architectural materi- als including Class A tip -up panels, glazing along all sides, brick, and canopies at each corner or main building entrance. The proposed materials provide a variation and increased visual impact from public rights -of -way. Proposed elevation examples are shown below: A rBJ D E,I i F 280'-011 60'-(➢' 55'-0' 55'-0" 55'-0" 55'-0" WaIAAT® �C1FAE�TOflY � mcc �'TFf30.WI LP 9l�tlm.'OEAR !RP.1 AMD ALUM. FRA StA�4 F7CF LINE 2E'iTIC IfYNARC11AlEN b11L COPING �YP.1 FR EF V CU MUAL M CPNCP E A EIFS CROWN I � I I �• � Q Q I I I b [V — _0�� 12'_�" �2._0�� �_ ��_6 12'-(}; 12'_p•. �_6. _0�� 12'_0" �Z._0�� �_ �� -6 12'-0' 12'_0 '_6.-0. 32,-�, _01, _11.. �_ ,0�� ,_p�� �_p. �_q. �_0�� 12'" _ "12_ ^••V.,INSLL-.TEN HCLLOW I,fIL U.TF-:A� COIIC.'R'ALL PAP— hsuL=CA:.i IN THEFn yEF%l a mORS AIJ�FRAIAES P.INTEN TO TNN 916a:YENEER [IYP} FINI'HED l'r','CEI.IEI'T &10EU .CFriIC C—U AI:OD.:IUM. NiN.E^V MATCH EU. LO NC 7P1 40.4TI11G ME MMIUM TEi:R RE 7YP.. ;1 TYPICAL END ELEVATION J Scale: 1" = 36' Cottage Grove Logistics Park Building Rendering Planning Staff Report — Case Nos. SP2021-068, ZA2021-066 and PP2021-067 Cottage Grove Logistics Park (NorthPoint) October 25, 2021 Page 9 of 23 Parking The Developer's Master Plan is proposing to meet the City's minimum parking standards for ware- house/manufactured uses (1 space per 2,000 square feet of building area). Parking will be eval- uated for each site plan review for individual phases to ensure each phase provides required minimum parking as well as the minimum required eight percent landscaped parking islands. Given the potential for parking to be shared by adjacent buildings within the Master Plan site, cross access agreements will be required as necessary as part of future site plan review. Tree Preservation As with all developments within the City of Cottage Grove, a tree inventory is required to be com- pleted identifying all qualifying trees on the development site and indicating which are proposed to be removed. The Developer has completed and submitted the required inventory. Per City Code, the Developer is permitted to remove 60 percent of the existing qualifying inches on the site with no mitigation required. Given the Developer is proposing to remove greater than 60 per- cent of the qualifying inches on the site, mitigation is required either through planting of mitigation inches on the site or payment of the mitigation fee of $150 per mitigation inch. Tree plantings above and beyond the minimum required landscape for each phase will be credited towards the required tree mitigation. I riches Excess Replacement Total existing Permitted removal permitted Inched Replacement inches inches inches threshold to be removed rate removed required removed 27,906 60% 16,743 24,957 16,743 50% 4,107 Landscaping City Code Title 11-6-20 requires the following minimum landscape requirements: • 15 percent of the proposed developed space to be dedicated green space in a commercial or industrial development • 8 percent green space within parking islands and bump outs. • Building perimeter landscaping on building sides facing a public street or parking lot. The Developer's proposed Master Site Plan proposes landscaping meeting the City's minimum landscape requirements as well as providing 22 percent green space within the Master Site Plan area and the ability to provide 8 percent of the parking lot area with landscape islands. Landscap- ing will be required to be evaluated during each phase and site plan review to ensure the required minimum plantings are proposed per the City's landscape ordinance. Screening The Developer has proposed several screening measures for the Master Site Plan area. Berming up to 10 feet in height is proposed along 100th Street South and adjacent to Ideal Avenue. The berms are proposed to be landscaped with shrubs and coniferous and deciduous trees. Below are depictions of the visual of the site from public rights -of -way: Planning Staff Report — Case Nos. SP2021-068, ZA2021-066 and PP2021-067 Cottage Grove Logistics Park (NorthPoint) October 25, 2021 Page 10 of 23 Lr:rt:s� s.c:aalr, m�a Bang aW7� Trm Yra,�ad b4ara LT 5. -aGa Site Line View from 100th Street at Ideal Avenue HT Site Line View from Neighborhood North of 100th Lr:a4_q lsf rtsa,q Lr:rt:�q Site Line View from Future 105th Street Berming is not proposed along the south and west edge of the Master Site Plan area given this 75-foot area between the development site and the proposed 105th Street right-of-way is encom- passed by a permanent utility easement over the existing power lines. This utility easement area is restricted from landscape planting and additional grading. Given the potential future residential development to the south and west, additional landscape screening should be provided within the Master Site Plan area along these development boundaries. As with each proposed phase and site plan review, additional screening measures may be evaluated at that time. Noise After concerns heard at each of the neighborhood meetings, the Developer has adjusted several components of their Master Site Plan to provide additional mitigation measures to prevent off -site noise: The Developer is proposing berming up to ten feet in height on the north and east property lines. 2. The Developer conducted a noise study at the boundary of the proposed Master Site Plan area. The average dB(A) currently at the site ranged between 51.9 and 56.4 dB(A). The Developer has indicated noise on the site is not anticipated to exceed 60 dB(A) at the property lines, meeting Minnesota State Statute minimum requirements. Planning Staff Report — Case Nos. SP2021-068, ZA2021-066 and PP2021-067 Cottage Grove Logistics Park (NorthPoint) October 25, 2021 Page 11 of 23 3. The Developer is proposing additional landscape plantings (trees and shrubs) on the pro- posed berming as well as the west and south property lines. 4. The Developer is also proposing construction of a sound wall along the southerly boundary of the site to block additional noise pollution to the residential parcels to the south. Staff recommends additional landscape screening/landscaping along the proposed sound wall. Sound Wall Example Sound Wall Proposed Location A condition of approval will require the Developer mitigate any sound complaints of noise emitted from the site exceeding the MPCA's minimum decibel levels. Lighting Per the City's Ordinance, no more than 0.5-foot candle of light shall spill at the property lines abutting residential districts and no more than 1.0-foot candles measured at the property lines abutting commercial or industrial parcels adjacent to the Master Site Plan area. All lighting pro - Planning Staff Report — Case Nos. SP2021-068, ZA2021-066 and PP2021-067 Cottage Grove Logistics Park (NorthPoint) October 25, 2021 Page 12 of 23 posed on the site shall be downward directed. The applicant has conducted a light study and provided a photometric plan indicating no light spillage exceeding the City's minimum standards at the property lines from the proposed lighting within the Master Site Plan area. A light matrix study shall be required to be provided with each phase of development of the Master Site Plan. Signage A sign package shall be required to be submitted with each phase of development. The proposed sign package will be reviewed and approved by Community Development Staff prior to approval of building permits for installation of signage for each phase. The sign package shall include mon- uments signs, wall signs, and directional signs, and be consistent with existing signs in the Cottage Grove Business Park. Traffic/Site Access The proposed Cottage Grove Logistics Park proposes several access points to the Master Site Plan area from 100th Street, Ideal Avenue, and the future 105th Street. As part of the proposed Master Site Plan, the Developer conducted a traffic study to confirm that the traffic study com- pleted as part of the City's AUAR update accurately represents the future needs of the area based on the projected growth. A condition of approval shall require, upon completion of each phase of the development, that the traffic study be updated to confirm how each intersection operates. The following road improvements will be required to be completed as part of the first phase of devel- opment: Construction of 105th Street and Roundabout. - The Developer will be required to construct 105th Street from Ideal Avenue to the proposed round- about to the west as shown in the below image as part of the first phase of development to gain access to the entire proposed Master Site Plan area. This section is required to be constructed as a three -lane urban section with a center left turn lane and right turn lanes at each access point shown in the Master Site Plan. Bituminous trail would be constructed on both sides of the roadway and streetlights would be added for safety. RAN R/W 100" L 40 H20 IT I r I� TRAIL fR I1LANE I TRAIL I— Q ]FF LAW STRIVED MEDIAN' LR T 2VT OLVD 1.50 0.5R--­l �ILS FT I ET1 Fr � INSETA i 4•T0� Y1vR'Y9.G WFARIxL rouxx[xmURF I I 6 ALcp[LetF xssT, a. s lava aus4n) I ^ I 0 14 ET I I 1 � RIB I 0- 14 FT 47 RTL 105TN RTL i.00% 2.00% FT+1 105th Street Typical Section Planning Staff Report — Case Nos. SP2021-068, ZA2021-066 and PP2021-067 Cottage Grove Logistics Park (NorthPoint) October 25, 2021 Page 13 of 23 105th Street and Ideal Avenue Intersection 100th Street Improvements: As part of the first phase of the development, the Developer will be required to complete improve- ments to 100th Street to include a three -lane rural section roadway with paved shoulders, right turn lanes at each access point, trails on both sides, and intersection lighting. The existing section of 100th Street between Jamaica Avenue and Ideal Avenue is an urban section roadway with curb and gutter and is striped in such a way that includes two westbound lanes and one eastbound lane. As part of the required improvements to 100th Street, the Developer will be required to complete pavement and striping improvements to this segment of roadway to provide a three - lane roadway with right turn lanes for any access points. These improvements will also be carried through the 100th Street and Jamaica Avenue intersection in anticipation of a future traffic signal, which would be installed at such time the intersection warrants a signal. R(W R/N: 180 FT L 24-36 FT _I -1 VARIES 6 r���� IT 11 VARIES TRAIL BLVD LATIE STRIPED MEDIAN / In LANE AGG SHLD I 2Ao% 2 W% &.VD AGG SHLD TRAIL �� 0.5 FT� I L 29 FT E%. ROAD SECRON � r � MET � TURF ESTnBIISNMENT 3'TYPE SP9.5 WHAING<OIRSE-a.—M � � � � 1 TOPSOIL 6" AGGREOiIE &SE. Q. 5 (100%USHE% 2FT 12 FT I O TYPICAL SECTION 12 FT UNE 1. STREET LANE (MAYWAPD AVE TO IDEAL AVE)2 FT AGG SHLD 2.0096 AGG 2.00% SHLD 100th Street Typical Section (Hayward to Ideal) Planning Staff Report — Case Nos. SP2021-068, ZA2021-066 and PP2021-067 Cottage Grove Logistics Park (NorthPoint) October 25, 2021 Page 14 of 23 i 0-14 FT \TYPICAL SEOIION RTL IWTH SIREET (IDEALAETO]A^1 aAE) 2.00% 1 Ff� 100th Street Typical Section (Ideal to Jamaica) Proposed Geometry at 100th Street and Jamaica Avenue Intersection Ideal Avenue Imarovements. Ideal Avenue between 100th Street and 105th Street is required to be re -constructed to a three - lane urban street section with right turn lanes and trail on both sides. Street lighting would also be added to this segment of Ideal Avenue for safety. City staff is reviewing the existing section of the roadway to determine if a reclamation could be used as a more cost-effective method to upgrade the roadway. If a reclamation could be completed instead of a full reconstruction, Ideal Avenue could instead be widened and therefore greatly reduce the access impacts to the adjacent prop- erty owners. The turn lanes will be placed at 105th Street as well as at a proposed access point to the logistics park approximately halfway between 100th Street and 105th Street. Planning Staff Report — Case Nos. SP2021-068, ZA2021-066 and PP2021-067 Cottage Grove Logistics Park (NorthPoint) October 25, 2021 Page 15 of 23 W. 0.5 FT zF i i i 0-14 Ff RTL tF1 rn1� sEcrton 9 IDEAL AVENUE Ideal Avenue Typical Section i" Ideal Avenue and 100th Street Intersection m „TE sP s...hAAA� �� NonuAE e AuxECATe arse a. s 0— City and County staff have continued discussions regarding the 100th Street extension to Inno- vation Road following the County's Southwest Arterial Study. While this extension was not in the County's five-year CIP, the County has agreed to expedite the project to begin preliminary design in 2022 with 20-30 percent plan completion in the first year. The expectation is to have the exten- sion completed by the time the Cottage Grove Logistics Park is completed to lessen the impact on the Jamaica Avenue and Highway 61 roundabouts. The extension of 100th Street is reliant on cooperation and continued discussion with the City, County, railroad authority, and 3M. The cur- rent mitigation plan recommends all truck traffic from the Cottage Grove Logistics Park access Highway 61 via 100th Street to Miller Road to Innovation Road in the interim, but the ultimate mitigation plan would be determined with further evaluation of the County's extension schedule and phasing of the park. The City will continue to monitor and address any traffic concerns and impacts to the area and will plan for mitigation measures as necessary to address those identified Planning Staff Report - Case Nos. SP2021-068, ZA2021-066 and PP2021-067 Cottage Grove Logistics Park (NorthPoint) October 25, 2021 Page 16 of 23 impacts. Improvements at the intersection of Miller Road and Innovation Road would be com- pleted in 2022 to allow right and left turning movements for eastbound traffic on Miller Road at the intersection should this routing option be utilized for truck traffic. A stop sign for traffic exiting the 3M compound would be included as well to aid in controlling the three-way intersection. MIN --•- = Miller Road q moil - 0#'K)h 3 ggttr 1n f{•;ttKV1'- Proposed Improvements at Miller Road/Innovation Road s Se 3 Segment 2 Segment 1 o � N } Q , . o > 95TH ST S - u A.% �� : ■ a CIO eo H �� 100TH ST S ' 'o OPTION 2 c Q A9 0 9 s� O -Fo Z Z t ' I 110TH ST S r, gamma, %� Washington County Southwest Arterial Study Alignment Additionally, as previously mentioned, a signal may be required in the future at the 100th Street and Jamaica Avenue intersection. The installation of the signal would be triggered by Minnesota Manual of Uniform Traffic Control Devices (MMUTCD) warrants and the City would continue to monitor evaluate the intersection on an annual basis. Planning Staff Report — Case Nos. SP2021-068, ZA2021-066 and PP2021-067 Cottage Grove Logistics Park (NorthPoint) October 25, 2021 Page 17 of 23 Utilities The subject property is located within the Metropolitan Urban Service Area (MUSA). Sanitary Sewer and water service is available to the site from Ideal Avenue. Specifically, sanitary sewer is available on the west side of Ideal Avenue as part of the trunk extension from the Metropolitan Council's main interreceptor pipe that is currently being completed by the City's South District Sewer Extension project. Watermain is located along the west side of Ideal Avenue and the north side of 100th Street. The watermain along Ideal Avenue was recently constructed as part of the City's River Acres Watermain Project. As part of the development of the logistics park, the Devel- oper will be required to extend 12-inch trunk watermain through the site to aid in looping the River Acres area as well as future proposed residential developments in this area. While the watermain and sanitary sewer within the site will be privately owned and maintained by the Developer, City Public Works staff will be granted access to the logistics park through the Development Agreement for annual hydrant flushing. Surface Water Management/Grading The site grading for the project is proposed to meet the surface water management requirements established by the State, Watershed District, and the City's Surface Water Management Plan. Final construction drawings will need to meet the approval of the City Engineer. Stormwater is proposed to be managed within the Master Plan site via several on site basins. With each proposed phase of development, the Developer shall enter into a stormwater mainte- nance agreement for private stormwater infrastructure. The Developer is also proposing to con- struct a pond within Outlot A on the Master Plan site plan, which will be deeded and maintained long term by the City. The pond constructed in Outlot A will be able to treat both a portion of the Developer's private water as well as some of the public stormwater generated from the public improvements necessary in this area. The City of Cottage Grove is proposing to construct Well 13 in this area which restricts infiltration in portions of the Cottage Grove Logistics Park based on the City's wellhead protection plan. Filtration will be utilized for volume, rate, and water quality control in addition to proposed wet basins on site. Park As part of the Master Site Plan area, the Developer is proposing to deed approximately 7.95 acres to the City. A portion of this outlot will be used by the City as stormwater ponding while the re- mainder will be developed as a neighborhood park (approximately 5 acres). The park is proposed to include a parking lot, shelter area, active play area, a multiuse court, as well as open lawn area. This outlot will be required to be platted and deeded to the City as part of the first phase of the Cottage Grove Logistic Park development. Ten percent of the proposed developed land shall be required to be dedicated or cash received in lieu of as park dedication (25 total acres of dedication required for the Master Site Plan area). The City will verify, as part of the first phase site plan review and final plat, the actual area of the storm ponding and dedicated park area that will be credited to the Developer as park dedication. The City will require the payment prior to the release of the final plat as outlined in a development agreement. Planning Staff Report — Case Nos. SP2021-068, ZA2021-066 and PP2021-067 Cottage Grove Logistics Park (NorthPoint) October 25, 2021 Page 18 of 23 Proposed Neighborhood Park Location Development Fees The applicant would be required to pay area charges and connection fees per phase of develop- ment. These fees will be calculated at time of site plan and final plat submittal and review. Public Hearing Notices The public hearing notice was published in the St. Paul Pioneer Press and mailed to 236 property owners within 500 feet of the property as well as the River Acres Neighborhood on October 14, 2021. City Department Review The City's Technical Review Committee reviewed the applications, provided input, and made a favorable recommendation that the proposal be approved as requested. Recommendation That the Planning Commission recommend that the City Council approve the following subject to the conditions listed below: Master Site Plan for proposed construction of approximately 3.4 million square feet of warehouse, manufacturing, distribution, and office building space. 2. Cottage Grove Logistics Park Preliminary Plat creating nine parcels and one outlot. 3. Julen Preliminary Plat creating two parcels, one outlot, and right-of-way of future 105th Street. Planning Staff Report — Case Nos. SP2021-068, ZA2021-066 and PP2021-067 Cottage Grove Logistics Park (NorthPoint) October 25, 2021 Page 19 of 23 4. Zoning Amendment to rezone 252 acres of land within the proposed assemblage from AG-1, Agricultural Preservation, and AG-2, Agricultural, to 1-2, General Industry, with a PUD (Planned Unit Development). Conditions of Approval Cottage Grove Logistics Park Preliminary Plat 1. All required right-of-way along 100th Street and Ideal Avenue shall be dedicated. 2. A drainage and utility easement over the 12-inch watermain through the site shall be required. 3. The Preliminary Plat approval shall expire six months from the date of the City Council approval unless a Final Plat for Phase 1 has been requested or a time extension granted by the City Council. Julen Property Preliminary Plat 1. Outlot A shall be owned and maintained at all times by the same property owner to the north. 2. A total of 50 feet of right-of-way from the center of Ideal Avenue shall be dedicated. 3. The Preliminary Plat approval shall expire six months from the date of the City Council approval unless a Final Plat has been requested or a time extension granted by the City Council. Master Site Plan Review Conditions of Approval: 1. The Developer is permitted to construct 3.4 million square feet of warehouse, light manufac- turing, distribution, and office space within the approved Master Site Plan. A 10 percent increase in square footage may be approved upon administrative review and approval by the Community Development Director. 2. The PUD and Master Site Plan approval shall expire one year from the date of City Council approval unless a building permit has been requested or a time extension has been granted by City Council. 3. Public improvements required to be completed as part of the first phase of development of the Master Site Plan are as follows: a. Construction of 105th Street from Ideal Avenue west to the roundabout that shall also be constructed as part of the first phase of development. i. Three -lane section roadway with right turn lanes and curb and gutter ii. Trail on both sides iii. Street lighting iv. Landscaping b. Reconstruct 100th Street per engineering requirements. Planning Staff Report — Case Nos. SP2021-068, ZA2021-066 and PP2021-067 Cottage Grove Logistics Park (NorthPoint) October 25, 2021 Page 20 of 23 i. Three -lane section roadway with right turn lanes and gravel shoulder west of Ideal Ave. ii. Three -lane section roadway with right turn lanes and curb and gutter east of Ideal Ave iii. Trail on both sides iv. Intersection lighting V. Landscaping vi. Intersection improvements at Jamaica Ave to position the intersection for the addition of a future traffic signal c. Reconstruction of Ideal Avenue per engineering requirements i. Three -lane section roadway with right turn lanes and curb and gutter ii. Trail on both sides iii. Street lighting iv. Landscaping 4. Permitted, conditional and accessory uses within the Planned Unit Development shall be consistent with the underlying zoning districts except that uses as reviewed and approved by the Community Development Director may be permitted. 5. All future buildings shall be reviewed and approved through the Site and Building Plan process and shall meet or exceed the requirements of the City's architectural and parking ordinances. 6. All future site plans for the Master Site Plan area shall be designed in a manner consistent with the approved Site Plan including, interior lighting, signage, and architectural materials. 7. The Developer shall be responsible for dedication of or cash in lieu of 10 percent of the developable area of the proposed Master Site Plan. 8. All fencing and retaining wall materials shall be complementary to the building materials and shall be approved in writing by the Planning Department prior to issuance of a building permit. Retaining walls greater than four (4) feet in height shall be engineered and detailed calcula- tions should be submitted to the City. 9. The Developer and/or landowner shall be responsible for the maintenance and upkeep of the proposed sound wall. 10. All areas of the site, where practical, shall be sodded and maintained. The development shall mow and maintain all site boulevards to the curb line of the public streets. 11. All HVAC and other roof- or ground -mounted equipment shall be hidden from view with materials that match materials and colors used on the building. 12. Any future trash enclosures shall be constructed on three sides using the same materials and patterns used on the building. Locations shall be approved by the Planning Depart- ment. Planning Staff Report — Case Nos. SP2021-068, ZA2021-066 and PP2021-067 Cottage Grove Logistics Park (NorthPoint) October 25, 2021 Page 21 of 23 13. No exterior storage shall be permitted. 14. A right-of-way permit shall be required for work performed within the City or County right- of-way. 15. A maintenance agreement shall be required for all proposed private stormwater ponding, interior lighting, and private utilities within the site. 16. Upon completion of each phase of the development the Developer shall be required to update the traffic study. 17. No storage of snow is permitted within stormwater basins. 18. Truck and/or truck and trailer parking and idling within the right-of-way of 100th Street, 105th Street, and Ideal Avenue is prohibited. 19. A cross access and parking agreement between proposed buildings and adjacent parcels, if necessary, shall be required and recorded with each phase of development. 20. Final architectural plans, lighting, and exterior construction materials and colors must be re- viewed and approved by the Planning Department prior to the issuance of a building permit. 21. All applicable permits (i.e.; building, electrical, grading, mechanical, right-of-way) must be completed, submitted, and approved by the City prior to the commencement of any construc- tion activities. Detailed construction plans must be reviewed and approved by the Building Official or City Engineer. 22. Prior to submittal of the building permit application, all comments related to the civil site, utility, landscaping, grading, and building construction plans must be addressed and plans revised accordingly. 23. Prior to the issuance of a certificate of occupancy, the applicant shall submit as -built survey plans in electronic format (pdf and dwq) for the site grading and all public and private utilities. 24. Water main, sanitary sewer, and storm sewer improvements shall be constructed per Cottage Grove detail plates and construction specifications. 25. Prior to the release of a final plat for recording, public drainage and utility easements shall be dedicated over all surface water storage areas, cross site conveyance routes, and under- ground water utility infrastructure. 26. All truck traffic from the Master Site Plan area shall be routed to 100th Street, Miller Road, and onto Innovation Road. The ultimate mitigation plan will be determined with further evalu- ation of the County's extension schedule and phasing of the park. The City will continue to monitor and address any traffic concerns and impacts to the area and will plan for mitigation measures as necessary to address those identified impacts. Planning Staff Report — Case Nos. SP2021-068, ZA2021-066 and PP2021-067 Cottage Grove Logistics Park (NorthPoint) October 25, 2021 Page 22 of 23 27. A traffic study shall be required to be completed as part of the review of all phases of devel- opment after Phase 1. 28. Truck dock doors on buildings are required to be closed at all times. 29. All access off 100th Street shall meet Washington County's spacing guidelines and be reviewed and approved by Washington County. 30. The applicant shall ensure that each building located within the Cottage Grove Logistics Park has adequate radio coverage for the Minnesota Regional Radio Communications System, including but not limited to firefighters and police officers. The applicant shall have each build- ing tested for 800 MHz radio coverage at the time the shell building is completed and before a Certificate of Occupancy is issued. Re -testing of the entire building for 800 MHz radio cov- erage at the time the building is 70 percent completed with tenant finishes. If radio coverage testing fails within a building, the installation of the bi-directional 800 MHz signal enhancement system shall be completed within 180 days of the testing report. 31. The final grading and erosion plan shall be approved by the City Engineer. The grading and erosion control plan for the site must comply with NPDES II Permit requirements. Erosion control devices must be installed prior to commencement of any grading activity. Erosion control must be performed in accordance with the recommended practices of the "Minnesota Construction Site Erosion and Sediment Control Planning Handbook" and the conditions stip- ulated. 32. The grading plan and site grading of the property shall be consistent with the approved surface water management plan. 33. The applicant shall obtain a right-of-way permit for all work within the City right-of-way. 34. All concrete and bituminous surfaces on the site must always be maintained in good work- manship like condition. 35. Any fencing on the site shall be constructed with materials meeting the ordinance criteria related to industrial fencing and shall be reviewed and approved by the Community Devel- opment Department prior to installation. 36. Noise mitigation shall be required as specified by the City at any time. 37. The Developer shall be required to mitigate 4,107 caliber tree inches prior to the Master Site Plan area build out. 38. The final landscape plan shall be submitted with a site plan review and final plat application for each phase of development of the Master Plan area. 39. Irrigation shall be provided for all sodded and landscaped areas including berms to back of curb of public right-of-way. Planning Staff Report — Case Nos. SP2021-068, ZA2021-066 and PP2021-067 Cottage Grove Logistics Park (NorthPoint) October 25, 2021 Page 23 of 23 40. Prior to the release of the building permit for each phase, a bona fide cost estimate of the landscaping improvements for each phase and site plan approval must be submitted in con- junction with a letter of credit approved by the City in the amount of 150 percent of such estimate. 41. Landscaping on the site must always be maintained in good health and dead plantings shall be replaced in a timely manner. 42. A light matrix study shall be completed and submitted with the building permit application for each building. All outdoor lighting must meet City Code requirements. All light fixtures must be downward directed with cut-offs. The specifications of all light fixtures must be provided with the application for a building permit. 43. Fire hydrants and watermain valves shall be placed as per the approval of the City's Fire Marshal, City Engineer, and Public Works Department. In addition to granting public drainage and utility easements over the water pipe infrastructure, the applicant shall guarantee the City's ability to access the fire hydrants to flush the water system and valving in the event of an emergency. 44. The applicant has provided demonstrated parking for the Master Plan area. Parking will be required to be provided for each phase of the development and meet the City's minimum parking standards (1 space per 2,000 square feet of warehouse, manufacturing, or office space). If cross parking between buildings is proposed, a cross parking agreement will be required to be recorded with future site plan approvals and recorded against all parcels. All other uses shall meet the parking ordinance requirements and shall be reviewed with a site plan review for each development phase. 45. The submitted exterior construction finish materials of the building shall be consistent with the intent of the City's architectural control ordinance. Prior to the issuance of a building permit, the applicant shall submit a materials board. All proposed materials shall be approved by Planning staff. The PUD shall have architectural consistency throughout the entire project by using complementary architectural features and materials on all buildings. 46. As a component of each phase site plan review, a comprehensive sign package shall be submitted for review and approval by the City prior to the issuance of a building permit for sign installation. 47. All comments outlined in Stantec's letter dated October 15, 2021 shall be addressed and any subsequent review letters by the City Engineer. Prepared by: Attachments: — Application Narrative Emily Schmitz — Civil Plan Set Senior Planner — Photometric Study — Exterior Elevations — Cottage Grove Logistics Park Preliminary Plat — Julen Preliminary Plat — Stantec Review Memo Dated October 15, 2021 Cottage Grove Logistics Park Project Narrative Cottage Grove, MN September 29, 2021 Property: NP CG Logistics, LLC as the applicant, is under contract to purchase 6 different parcels from multiple landowners to form the 'Cottage Grove Logistics Park.' The site in total is +/-253 acres. The applicant is requesting an approval for site plan, preliminary plat, and zoning amendment. See exhibit "A" for full legal description. Zoning and Land Use: The parcels are currently zoned AG-1 and AG-2. The applicant would like to pursue a rezoning to a PUD with an 1-2 designation. The PUD is sought to provide flexibility in land use regulations within the City's current ordinance. This would allow NP CG Logistics, LLC to use a more creative and efficient approach in the development of the land. Density requirements, setbacks, building heights and special uses along with other pertinent land use regulations may be adjusted to allow for a more mutually beneficial development for the City and NP CG Logistics. The site is part of Cottage Grove's 2040 Master Plan and designated as industrial within the 2040 Future Land Use Plan. Additionally, the proposed parcels are also included in Cottage Grove's 2018 Business Park AUAR which analyzed two different scenarios; Major Technology Center and Major Distribution Center, both of which are industrial uses. Therefore, the proposed development falls in line with the Cottage Grove's planned future use of these parcels. Proposal: NorthPoint Development has a national presence and has developed, leased and managed over 126 million square feet of industrial space since the inception of the company in 2012. The proposed Cottage Grove Logistics Park will be the first significant investment and entry into the Minneapolis -St. Paul metro area. Since initially pursuing the development, NorthPoint has seen a high level of interest from our existing tenant poo. We remain excited and committed to building a world - class industrial park in Cottage Grove. NorthPoint's interest in the City of Cottage Grove centers around the community's workforce and pro - business approach to economic development. Additionally, Cottage Grove's proximity to 494, 1-94 and 35E provide immediate access to the entire Twin Cities metro under reduced traffic congestion levels. Data shows that approximately seventy percent of Cottage Grove's resident workforce, commute to private sector jobs outside the City. NorthPoint's proposed development is anticipated to bring nearly 1,500 to 2,000 local jobs to help improve the quality of life and increase the standard of living. The master plan for the proposed development consists of nine Class A speculative industrial buildings ranging in size from 207,000 SF to 520,000 SF, for a total of 3,406,000 square feet. No tenant or tenants are known at this time. The proposed FAR of the site is 33.13%. On -site development will consist of multiple naturalized stormwater management basins, site grading, installation of private utilities, extensive landscaping including berms along 1001" Street and Ideal Avenue, and a sound wall along the south portion of the development. Off -site development will consist of expansion of Ideal Avenue, reconstruction and widening of 1001" Street, public sanitary sewer extension and a new roadway, 1051" Street. Off -site improvements will be designed by the City of Cottage Grove along with their consultants and will be built by NP CG Logistics. The proposed development will be built in approximately 4 phases. The first phase, shown in orange, will start mass grading and construction in approximately Spring of 2022. Each subsequent phase is slated to start construction approximately 8-12 months following the start of the prior phase. However, this is subject to increase or decrease slightly depending on the interest we see from potential tenants. The entire development is anticipated to be completed by the end of 2025. The proposed elevation scheme of this park is not a standard NorthPoint prototype. Rather this is an above and beyond measure to ensure that the development looks and feels less like an industrial park, and more like it belongs within the community. Based on feedback received from the residential neighbors and City staff, additional architectural elements were added to our elevations. Additional clear story windows were added at the storefront entrances of the building, and 'dog legs' to the corners of the buildings that will provide a visual barrier to the truck docks. There will be canopies installed over each ground level window and entry way on the corners of the buildings. The pilaster detail will be a veneer look with textured stone in a contrasting color to break up the look of the longer walls of the buildings. It is possible that through coordination with the City staff, additional elements could be added or adjusted through the process. PRELIMINARY MASTER DEVELOPMENT PLANS FOR COTTAGE GROVE LOGISTICS PARK COTTAGE GROVE, MN PREPARED FOR: NP CG LOGISTICS, LLC 4825 NW 41ST STREET, SUITE 500 RIVERSIDE, MO 64150 CONTACT: CHRISTINA HUBACEK PHONE: 331-251-3111 EMAIL: CHUBACEK@NORTHPOINTKC.COM PREPARED BY: Westwood sszi sa�ciso ��exaoo sszi sazsezz a .arn3a seal sazs�so anvamsaa wenwaoa rmfemonei s.m�, me PROJECT NUMBER: 0033037.00 CONTACT: DAVID T. BADE SHEET ER NUMB SHEET TITLE C0.1 COVER V1.0 ALTA SURVEY V1.1 ALTA SURVEY C1.0 REMOVALS PLAN C1.1 TREE INVENTORY C1.2 TREE INVENTORY C1.3 TREE INVENTORY C1.4 TREE INVENTORY C1.5 TREE INVENTORY C2.0 OVERALL SITE PLAN C2.1 NORTHEAST SITE PLAN C2.2 SOUTH EAST SITE PLAN C2.3 NORTHWEST SITE PLAN C2.4 SOUTHWEST SITE PLAN C2.5 PRELIMINARY PLAT C3.0 OVERALL GRADING PLAN C3.1 NORTHEAST GRADING PLAN C3.2 SOUTHEAST GRADING PLAN C3.3 NORTHWEST GRADING PLAN C3.4 SOUTHWEST GRADING PLAN C4.0 EROSION CONTROL PLAN C5.0 OVERALL SANITARYSEWER&WATERMAIN PLAN C 5.1 NORTHEAST SANITARY SEWER & WATERMA IN PLAN C 5.2 SOUTH EAST SANITARY SEWER &WATERMAIN PLAN C 5.3 NORTHWEST SANITARY SEWER &WATERMAIN PLAN C 5.4 SOUTHWEST SANITARY SEWER &WATERMAIN PLAN C6.0 OVERALL STORM SEWER PLAN C6.1 NORTHEAST STORM SEWER PLAN C6.2 SOUTHEAST STORM SEWER PLAN C6.3 NORTHWEST STORM SEWER PLAN C6.4 SOUTHWEST STORM SEWER PLAN C7.0 DETAILS C7.1 DETAILS II L1.0 OVERALL LANDSCAPE PLAN L1.1 NORTHEAST LANDSCAPE PLAN L1.2 SOUTHEAST LANDSCAPE PLAN L1.3 NORTHWEST LANDSCAPE PLAN L1.4 SOUTHWEST LANDSCAPE PLAN SITE Vicinity Map PRELIMINARY MASTER DEVELOPMEP PLANS COTTAGE GROVE LOGISTICS PARK INITIAL SUBMiTTALDATE. D9/292021 SHEET. cal TITLE COMMITMENT NO. MN303914 LEGEND � ,o. pwF � ® �0u anm.:'v ® %N�N��o p�,�a�.o�,a x ........... — — — — — — — — — — — I TTI`T� M rMENTy O. Ml 0391) ALL_ —f[ I LEGAL DESCRIPTION (PER TITLE COMMITMENT NO. MN303913) LEGAL DESCRIPTION (PER TITLE COMMITMENT NO. MN303914) LEGAL DESCRIPTION (PER TITLE COMMITMENT NO. MN303912) LEGAL DESCRIPTION (PER TITLE COMMITMENT NO. MN304059) a. z GENERAL NOTES ��e.ewme.�.,wp� �t� �m���� ��.mn�.ed�.a�.en= m�m�oe��m. . T =Tl',v.we. Ma e...m ee 0 EXC E PT I DNS (PER TITLE COMMITMENT NO. MN3 03913) EXCEPTIONS (PER TITLE COMMITMENT NO. MN303914) u EXCEPTIONS (PER TITLE COMMITMENT NO. MN303912) gy EXCEPTIONS (PER TITLE COMMITMENT NO. MN304059) z CERTIFICATION ........... A, 2 07/29/2021 ....... 7�fISTREETSO­ VICI I NITY MAP ill x LEGAL DESCRIPTION (PER TITLE COMMITMENT NO. MN303913) TITLE COMMITMENT I : VO. MN303912 gi TITLE COMMITMENT NO. MN304059 LEGAL DESCRIPTION (PERTITLE COMMITMENT NO. MN303914) TITLE COMMITMENT NO. MN� 03914 LEGAL DESCRIPTION (PERTITLE COMMITMENT NO. MN303912) X LEGAL DESCRIPTION (PERTITLE COMMITMENT NO. MN304059) Z- LEGEND -- K-- f— — — — — — — — — — — — — — — — — — - — "I rZIUM — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — I 2 e. 07/29/2021 PRO— NUMBER: 0033037.00 9�s�e� 81�i�or ca11811tlmm 7�-7 6$ c,aaaaa � 8 u R, V $ 3 6 2 V u~ Q j � O 6 G O k 0 V 999 SEE Asa O Z z -1— 1� I -- 1� C— -- Mi ENE; 14 FITE C1.5 e. 09/29/2021 HE C i��I€� II a �I �1 SC'_•ani"—Q 2 � � -, r �uuuuuuumuuuuuu;*�� r - I I r R, i. FFE e,a L- - - - - - - - - - - - - - - - - - - - ------------ SITE LEGEND GENERAL SITE NOTES O SITE DETAILS (SI-OXX) O SIGN LEGEND LN 11 AuswIN'. a�rraio, rusos uos 0 0 auiLowsHuss o.awwissHorso. MINI oa. �O sn7su. o«us. s.wo sowaousosin. w,n7ss.auo.au;. ,w n70o1a1sac.asraiuwe WALL 0 es.�sss o.asaw�ss Ho*so. `sass.0 ass. no sacsos <uaemussss SITE DATA CHART A,<ua,ANI1u.,EasaA,L,E11111 EssoTMEawsENo.Eo. by 000ssuus ® • sosaaorros* o QQ SITE KEYNOTES 81�i�or ca11811ticom X NOT FOR CONSTRUCTION OOTH STREET SOUTH (PUBLIC WAY) R a TOOTH STREET SOUTH (PUBLIC WA Y) mz ssas°c sass - BERM- — — — — — — — —BERM— — — i �I=N I I I I I I I I I I I I kP� K�I � i BUILDING 4 ±440,000 S.F. 470' x 936' FFE=811' IFL II � II Ii I, I�i ill � III Im1 BUILDING 6 r ' +2.81,000 S.F. 284' x 988' FFE=809' III I I rA�a� III I , TfT1TTTT1lTTT I �47iT�llljl �I I I I I I I I I I I I I I I I I I I I n 1111111111111 wTUTu, o — � I��r 1 1 1 MTMT T MT TLMTmTTTTti m--) I �� �� laid I I I I I I I I I I I I I I I I n 1111111111111 n 11111111111 I��T i� I c� � �I �� (III I ' xw a� �� o. III ��I I ��..7 (; 1(hISdIIIIIIIIIIIIIIIl011INJllll����n���������u����u.�_n r� ITE LEGEND GENERAL SITE NOTES O SITE DETAILS (51-OXX) � SIGN LEGEND s u wLL�=r. a-1—ruro, uor 0 0 ac�ro�HscHuss o.aww�sEHorEo. oAmwa oa. rrrrv7 o«KA. sAwo row.�orvs orl-n, w,ro1,-7R.1 roocaaa ll 7H"LL.,"K wwLL or.,LL, O.araw�"No_ . rrars.a,rr.Ror.�ror<�aam�r�r Ar<1a,All 11r,EasaA,r,111111 rEssoTMEawsEN1711 ® araaoAPos. —RNNO= N1,ll «oN,r= —, 1-11 AND L-1 TO r, I DErENrpo 81�i�or ca11811ticom X NOT FOR CONSTRUCTION Jf I \ / \ DETENTOr [P cp--IIIIIIIIIIIIIIIIAII1,14IIII i I I III � I I s ' BUILDING S ±342,000 470'x 78 FFE=80 DilI'M l III I r DETENTION �' c�IIIIIIIIIIIIIIIIIIIn III I III�nIIIIIIIIIIIIIIIIIII�� _ _ _ _ _ _ — I I I ICI " m DETENTION � -- a �w4uuo B----------- ----- ---- e wurvesimvEvrvai SITE LEGEND GENERAL SITE NOTES O SITE DETAILS (SI-OXX) SIGN LEGEND o — A�<�ae�rP ��o<AOAaEssa�E LN A�o��,I R-1-arA1roa per 0 0 o s ,oTaww E oTEo omwao«. rrreT o«r� r o�o�T�oeror �T,.�r=r.a�oTa . roeraaaa<.aeTa�e`KIALL No 7ALL T,uLs oTr","No_ . sssss.aassTRor.�sos<rssm�s�s AL«Ia,allo-R.,EasHALL6E1,111 E11O-111NNOEo. ® • wsaaorrosT o QQ SITE KEYNOTES cj CY BUILDING 5;1 ±464,000 S.F. 470' x 988' FFE=810' �a. J' e BUILDING 7 +207,000 S.F. 284' x 728' FFE=809' I I I I I I I I � _ 811�or ca11811ticom X NOT FOR CONSTRUCTION F 5 C2.2 09/29/2021 p �89 sod -----------=- ---------------- —BERM — — — — — — I 04NIIIIIIIIIIIIIIIII] II III IIIIII IIIIII I1 11111111111111111111]1111111111111111111gIIIIIIIIIIIIII III III BUILDING 1 ±281,000 S.F. li 284' x 988' FFE=812" 77 � roq,a <, — — — r �`�tT;� 1;fsErE�TidN� — — — — — mTmnI I I I I I I I I I I I I I I I I Inu I I I I I I I I I I I I I I I I I m� OUTLOTAl aAC) DETENTION S, A. � III SITE LEGEND GENERAL SITE NOTES O SITE DETAILS (SI-OXX) � $IGN LEGEP p a o A lEa «I.r o �.r . o — P o<AOAaEllaE RIY TR =A=L HAINDNI�TP��LO171INIL� 1-- AND IIANINIIAIL 1-1 TO A�o��,I R-1-arAIro, nor 0 0 o s ,oTaww E mEo omwao«. 11IN7 o«K�D. r o� T�orvror �Tr.�ror.a�oTa . roo1aaaa<.aL1LAANKIALL �rT,LL, OTaEa,"NOTro. LLars.a,rrTRor.�roT<�aem���r ® •—11D1-7NTO, QQ SITE KEYNOTES 81�i�or ca11811tlmm X NOT FOR CONSTRUCTION I F— C2.3 09/29/2021 p III I I I III I I I III I I I in I I I III I I I I III I I I III n I III I I I III I I I I ILLLLf — — — — — — — — — — — — SITE LEGEND GENERAL SITE NOTES 0 SITE DETAILS (SI-OXX)— = SIGN LEGEND I lIOUND N40,�,�,AT 0 7HNIDI'l'I'�"AN I L N I L IN I AN N 011, 17 N� 701—APHI L ZV.171' .IN '1'21-'I�717IIAN 11111, . I T L I I H�:NlVoAN710 104 FI VA71 P-1711AN —I — I :�I­�'N N� H "N I A" — AI 110II IALI 1711PINI OON7.7 I I—L ' I ` V" " 1711— 7 ONI �N D ILI I I ... IN= LoA7ONI " ol 70 -AVA7 ON __ ON 'AN, �1 ZAZN1=1-ON 7 P-O" ..... �I AII IOIND, IHI —IN III IHO— 11 N11- A7_ — NOI.AL 1—R L-L "A�11 IIPoNl, �:,l ILIHI�l NIOIPIN 111— N I IIA N Ill IAIL I 1-110 IIIN —1 -- 101 .1 --IONI AI �L 7 AN L A_ I I III I _I OINI—I 4 �LIL�—,INOIIAR71H7�0 IA,��INO�U�I6 OR —1-, 1AII 01 =7 1-INI nor =I HIANI IU�l 1'1�NA17RI,7�1 �IIA7LON �71'1771­NOIIIIIIIIOARIH117��LPLANIIORI-71ul���l� I _7 NoN"N LOA7 I N, 01 ..PI7R.1 IORIAL 1111711 NOII —11IN7 , — 'ON 17117 Z71HI'I'LILANK IALLIAIINI No 7ALL, ITH", " No_ 1 7" IH- 71AIIII I- AL 11RI All 11-1 IHALL 611111 INLIII III R1111 N1711 "'R7H INTRA7RHAL L6'RN I LI 'RIN N I 1 —7 ,IN `TOIOLTHlI.o6I_NTO­T�_�IWHIO;N—I DSITE KEYNOTES ­H­ �ND�N�NIIRPIO�10111�.INTTRAIIII�N71�L��Vl�I A IlRIIN IINONc lHALL 10-1. 70 A-111I ND1 --A— 6 I —RI 1111H AVI NIRAITI—IRI 6107-1 l 6— NOUI PAVI-7AND ION-71 III �I TI 61 �N A TH 7HI _o_N_oN;O I'7H, CIO-HNIOAL —1-1 11 IINI"" I HALL 1A N7A N "LL A""' 7' A"A"N7 P,Op 117 �I — NC Oo N17,UIT ON �N � TAII ALL 11-11ONI —;�I'Al'Y'TO — PIO-1 —ACI 70 A-1— P" 7 I T' L�C H7PN CN'=oN Py� N IIOR R�11IT�NL �C'Ho`lLCy4'TARL,7O LCH7NC L� I o 'TH "I z x NOT FOR CONSTRUCTION I u I C 2.4 09/29/2021 R I — — — — — — - - - - - — — — — — — — — — — -- -- - - - - - LOT I RT C; --ENT NIII' CI—T-7 NO MN 01,, 77 77 Wiz To 6 le. LE LOT I LOT 4 — I — , LOT 6 N 6U LD K I 611L�I— E COM—MENT 161, 4— OULLOI I TF I III SITE LEGEND PROPERTY DESCRIPTION LZN� —NIN—L SITE DATA CHART 1.1L TV— meal nn N11. 11 GENERAL NOTES "g z., OWNER/SUBDIVIDER ENGINEER AND SURVEYOR VICINITY MAP vda 2 I u 2 999 O u C2.5 e. 09/29/2021 u SEESHEEI I SEE SHEET C3.1 — — — — — — — — — — — — — — — — --- I — yea OF L— — — — — — — — — -- 7 v P ---------- - ------ - — — — — — — — — — — — — — — - — — — — — — — — — — — — — — — — — — — - TRADING LEGEND GRADING NOTES — — — I 1 LO—ON14NDIL—TION ' 011—N-OP—PHYAND U7 L­ A' `Hl��N ON TH 1 11 ALL `ON ILT,�T, `ANl� LILI�HON—,` TONAOOANLr 1-1 AN T 11—AL IUII� INI—INO IN— ION-1 LO�.A. 'LPIOA�N �VAT , ON17RUII 7H' INONIII IHALL 11 NOT111- 7� y " AN A. 11 11101 TO 1-II—TOIANY IT-1—Ol PAM'LNL`TlA PI nI- T 'I N—VALION11UR I� IIIOUIRI-N IHI �U-- —.1 R.IL NO HA � A -- L HATY=lILL " 'Ir " II I �PNP,� U� 0, 'lo4"N%`l'H` W��HN'�ULLUYLALoA�R'ID17�NND�"��LINU�R117URIUI�'��I RON N 0 PIN 'ULA7NolN','ANIoININIgrIAITDI.ULN"NIO ILI' IN-11 -ATON'r AND I—T A�N, `VDAR4I oN Rl� Ool"N ol DDAINT,7,1��N��H—�ON-- ARIA' Ol 1ILURI IHALL 6r To 0 U" 0 U7, A 'A IR � R 14 K I—D IND III— IT, lIPIAll I ALL I—VATo N IHALL 6' N A"" DAN `W T' T� ­NT ID T ON Ol TN �,�N"K,"INT��AT�"RAolP���'D�WINIA7THH,6,Up,�,N��DIDA�NND"IR'1701DPARoN,�7,ANIA NIHALL , AT IN , IR TI—H -AVA7 , �LU .TO. o A_ N N, TH —Ho A III IWNTA PR P—D 1— — INON-1 1-1111ON Ol "ND07 1111 �11 IND - R—IR-- O17HI —1-NOAL IlONIIIII "AN NO W— AL D =lDH` N AVIW ATRAl AUR ' 7 RH T4 P,10,IoANA�Nl�ODD OR,111D 11 HA—�",Io7=AL N D,�NW7H LD N��,P��N%IRIT17 R �N�AKYO A— H2 ALL �T N T LA —1, N-11.1 7 LL 6 " N A111RITAN 7H III H�O N T L� I D11— ILAN 101 ILANTINO AND lUll 15-111—T 10—ITION "l— Al 0-1— IN ND07 11111" 'ID —NI 7"oNTRA" HALL "' 'N' L H y N D D— L-1 OONITOL DIIV - ZIH A' MR l=�`Wo`lN`N-=r DND.T ONNTALNI INO 7RAlII 11 " A, R'I 7'1'AVN 71="IN N I� A�T'ONA="IPULRP�lD��OIAINI�ODV'PNI U'lN17A- OR 11 —T I —ION AN-1-7-11-7-- UN `U 7-1 " IHAL =,�LLITIDAl�QU�RIA17�INY�TAHLILIl�lllHNOU�l���1717NIAINDHI 1— 11-TION T "0" 'HALL 8AI`p"O D Iy 7H' ` 0' T =INT 7RAIll N ID OIN71—VIIII lHALLllN=llAlP—lATl NDOT�l D N—TIONI WITH TH—T—l— —IN- TOI AND 8—. Ol 1ITAININO AHLr IHALL 6r —DIID TO 11 Ol l—'r UN LIeTOTrvE ITEINDIO—D ON 7HII I.-IINIYOVIRILOW 00 '0 ,X 7H�,�RIHH�AL�L=L��U�DARIAIW�N��,TNIPOI��DN�4NDP A OIL -11Ol N N .N7, WH ,L-7= 8 —T E- 6HED ENT ELE­ N5 � o­ ER I LIW D- 11 OON—OMR IHALL D 'po ' I ANY ` L `A7I` AL T`A7 " '71 A- R 7H' 17 ,. D NO — UT , , OM7Ro— , N 110. IL17ID TH ION71AI70, IHAL L D . . . AIL -�j� OIL "'I"AL IN A "ANN 11 All-- 70 — OWN11 AND — RI—INO 11 OON—OTOl IH— PROV DI A 17—T—L '—IN INO — DII11- 6y A , __ R_', 'NAL INONII, NOT FOR CONSTRUCTION I u t; IS, I I Il d [ Asa z 0 1 N U-1 C3.0 09/29/2021 R I + 1-=j I l t BUI ING4 1440,0 S.F FF —811" V/ f I II 11,29MONEW-32 700TH STREET SOUTH (VU6LIC WAY)' --J<<<< u z x lmm%mmdmmml NOT FOR CONSTRUCTION I u 999 Asa aw 0 z C3.1 09/29/2021 R AIDING LEGEND GRADING NOTE v III \BUI ING Y07, DOS.. 2M64'x 28' FFt-80 - BUILDI 9 342,000 S.F. 470, x 7?# FFI-1108 ................ x lmm%mmdmmml NOT FOR CONSTRUCTION C3.2 09/29/2021 R I 7: j 1 I Lj�I471 I U I I N L,o.7 1,,,I- U u -I I u I I S, BUILDING 1 281,000 S.F. 284' x 988' FFE=812' BUILDING 2 +487,000 S.F. 520' x 936' -i;FE=81z, 711 I u,,rri TI—i �,,�,4� I I Ill �,,tl7lllZt lil-�i ii ii n ii ii �ii "711-7 AIDING LEGEND GRADING NOTES 1 "TON14NDIL—TION "'17—OP—PHYAN I U7 L 7 Al I H N NTHI 11 ALL ION IT-7 ON I—L ION10- TO LOIAL,=�NND I DII ARL 7HI INI OoNl ..... ILL , ILI VI, " 1 1 OoNI, I I 1=o L I A7"AL 'LL,7AN, I "HAI IL . NA7 ON P��I % N7, ON 17, ONI� IN— ION7OUl LOIA. 'LY`loA OD'OAV'AT I ON17RI 7HI INIINIII IHALL 11 N—III 71 N I AN A. 11 IIIOR T N N711VA NlIUI _OP� "N�I'H TOUIIIDIIR�—"R �"RL PNA�V�� I LNL7,,A P"�. 0 1 ADTyl = W I LL 'U" U", I I I I I HALL I I �I�IJLO A�RD� H TVI��"�INALP�IN, 1 10 I'l, A17 LOIlON I AN I NI. U" 011 ."PL- I-Il 11H --A— IN --- I-P IIUII, 01 DO"NITN— PA T" I. . ......... I IPPR"ID "I' I N IAO H I I P'Rp' NO IULAI I R-ON I W` L: UND 'R 'UP'RV � ON I IOlRD"N,0,W.,ALWlIIL-L �ULA7No�NDIAN�DINON�,AITIUILDINIILII�N7.NlI LOIT ONI AND I—T ANDI I I17IN o' — ND-NDINT-7—_— AIIA I I LUII IHA L ,70 1 0 U := AND -10-11I Al HIIIIIN = 0 N AT 8IN AT 0. I—D IND I -ON IIPRAII I ALL I. —ION IHALL II N '7H7H 'U `777 No';"N Al ` IPD�= W I HH, II DANND"IR 117 0 1 DPARKoN,�7,AN IA� NI HAL L IIIIIINIIOITR�NIH�l.�INAN�.11�L�IURIAI�l�17oI I II 10"—T��N �IRAol I TH 7 1 1 —Ho A I, IWAN77-11N—R PI P—D 11 7HI III INIIN-1 IIIIIIIIIN Ol "INN Ol "NO07 1111 Ill IND II IIIJ11—NI I17HI I—IIHNIAL RIA N NI W LL A NPA 7 N I 4 , L ��D�l =IDHU �Vl_ATR�'Al AUR I L "ARH'ALV�'I'II I HII 'O'l.0,P,10,1,AN oN'�o�D III 1 1' = 6K�",loN"=ANL NO7 IR—ND,�I 6,U�OD I P�ND IRITIH OR �N�AI A I� H ALL ID N 10 17A II HALL A 1 7 IN I III RA N T LI I DIIAII ILAN 101 ILANTINO AND lUll I116LIH—T IO.IAITON "l— Al 0-1— IN ND17 1111111 IIDIILNI I 7H I OONTR— HALL" 'o A NI 1' ALL 'o A7' 7' T "I y 1 7 � HAI IA��lN�'D��'WARINPRN�=,ADNIDITAONN7ALNIIN17,RIAII�"�N 1171="ININRIAL'.I'AVNA�l'OHNA=IULRP�lD�OIAINI�DVNNDU'INITAIL�OR 11 —T I —ION AND L-701011-- .—�II17-11—H—N-1ARY 1-1-101 UN 'U I- " IHAL =,�LLITIDAIRIQU�RIA17�6NY�TAHLILIl�011,HN�l���171.N�IAINDHI 1— IIIITON T "I" 'HALL 8APIRw I Y 7HI INI NIIR PR OR TO I OoN—M�O IHAL, 61 � I_ I 'ORD N OU ID 7 ION —II —I IHALLION,4"6 'o APo" A7I , NDo7,=lDN,7 7RAIII INII�710NIW17H7H-®7�lrvll�LeN�INIIa 701 AND — 01 IIIININI I 'AHL� IHALL 61 IRADID 70 1101 1-1, UN LI—I-11I INDIIIII ON 7HII I—IIINIYOVIRILOW I soiswwrve -1101 IX 7H­RI`H H�A Y "LI' DARIAI.— N —NlpOoIN�7— W HIIII IAI_PIO DA _L INs 8 —T E- 6HED NT "E"I' N­ 0—ER 110W 0—I I III IOILI 1-7 111 —I"IN7 AN I HOLI DOWNI 11 OON—OMR IHALL I 'po I I ANY "I"' 'o L `A7R AL ­7 " '71 A" I 7HI 17 I. I NI ANII UT , I IM7O 7 1 N 110-1711 THI OON71— IHAL L I I . I ; o' AIL -�II I.IL "IIIIAL IN A "ANN 11 AIII—I 70 11 OWN11 AND IHI RI—INI 11 ION—O"' IHA` PRW III A I7R— I—NINI — I—III0 6YA "I NIID IR—', ONAL IN"NI, ME am ETSO( Llklklkl< Ke Z I u ads Asa C z O IHIIT NU.— C3.3 NOT FOR CONSTRUCTION DII 09/29/2021 R u L ADING LEGEND GRADING NOTES m l// � BUILEIl3_�' MIT 1514,0( 520' u 988' $-? i '�"' \0 I � I C x lmm%mmdmmml NOT FOR CONSTRUCTION C3.4 09/29/2021 R I EROSION CONTROL LEGEND GENERAL EROSION CONTROL NOTES lu - ----------- Asa z O 0 0 NOT FOR CONSTRUCTION EE SHEET CLI SEE SHEET C5.1 J I I I I IN ' :;:iuB I NNI YN� INN iNNINNW W x„ xxxx. xxxxxxx x, xxx. xxxxx, , - Imo' � , . ,� 9 .n In.... ..... mmnr.:xi nxnm x: i �xx xxx, x, ill i xxxx, x, xxxxxxx ,max: _ L-------------------- -- ----------- =----- -J AN ITARY SEWER AND WATERMAIN LEGEND GENERAL WATERMAIN & SANITARY SEWER NOTES Q UTILITY KEYNOTES ol MNa AlON, s.aioa ro<ousrau;riou.wo HOsrTHEO 101 INII—a oT ' sHowHoa uorFn „rrEami.+nrs: oursmFaui,owe wn„un,FssomFawisF oa«wwH .s sH�e..saawwlll aIPlIWATII csaaaHo r .Naws.asassoOwTioH OTwwHssorn „u„HOH,w rR—RIoerTH-1 �oH wsral�o..aawwa<eus iTwow.o er aTr. 1IN mo„ �R,uLo ur <o E<ro ouro s �,E,u o owE so „ o IooE.oaar,,,A I Eas AL H 7 srEOA«oao roM E=ora.TO uw,1 X ,LAHR7N -ON a.IA., IONsrau<roNwrHrH — cOMIA-1 rocs ,<o ao ArErHESE «H E MNN_ra.,uw6NIO E..,,rsa4s owrHa,o r Ea,waErEa AND TME oaE EEawHETHEaA.awTHPo=T<o,E=uwooaa,TEEoRIM E,�Aro,o NOT FOR CONSTRUCTION 811�or ,118am18 1rti com 81�i�or ca11811ticom aFao�sa 700TH STREET SOUTH (PUBLIC WAY) 'O _____________L ___ ____i f mTI77l it l ll l l l l ll l l l l ll l o Uu F-r� - � I r wA.Ea sFam« BUILDING ±440,000 S.F. BUILDING6 +281,000 SF. I I 470' x 936' FFE=811' I I _ 284' x 988' FFE=809' I .a I 11 I Y '2 ANITARY SEWERAND WATERMAIN LEGEND "'p iWiRAL WATE MAIN & SANITARY SEWER NOT S �I III I I I ON oa os<aE.aN<Es s.aoAl, .o<oNs.a .o 0 on .Ea Eaoaw ewoF IH-NOlN— ..Ear�.E o.soEaEss aE.aNaE 11 o�aaao 11 a'EEasassoa.aNO11-M ora L—N �PR—R-1-111 oN o.Eaa a«a,F nwEoa. NN # uoa.Po�E ON rv,�,a-lAll fi<oN17—<�oNw�.a.„Eur�L�,v<oMIAN�F:. *oa:wLL«ooao�NA.F.HE sema<e uNr M�NNE.�7A"UM6N'O"'.,wau4s. ow1.a„�o:wre i.wwFalw�aE OEacm 111II11111II1 11II 11 0III1 IIIIII wA.EasEaw« BUILDING 8 t391,000 S.F. I 470' x 832' Ar.°""gym°r FFE=810' .<rr I m I�TT�T)T�IiT ICI fiTMTI X NOT FOR CONSTRUCTION .NuraEa. �' C5.1 09/29/2021 p BUILDING 5 ±464,000 S.F. 470' x 988' FFE=810' i�n.3T z J i I I I I I I BUILDING 7 +207,000 S.F. 284' x 728' FFE=809' - _ - - - - � . ///"' .. TA BUILDING 9 -342,000 S.F. 470' x 728' FFE=808' --------------- i-------------------- 1 I —26 j I I 1 I I I 81�i�or ca11811tlmm gg - ommo ='aaaaa 8 Ke V d$ V y 3 Z 9 ANITARY SEWER AND WATERMAIN LEGEND GENERAL WATERMAIN& SANITARY SEWER NOTES 0a Us<aEPaN11 <Es sPaOaTU<UNSTa .o 0 on .EEaoaw ewoF sao oa mEo ±..EaM�.E o.soEaEss eE.aNaEo�aaao II Al,IANasassU�IR_lrNM.R a�TON4,NDPR2'LNTHIn UN o.Eaa�a<sa,F�wEoe.III . N 1111 'RAL m,rs�, o aE.ESTEOA«oo or1.16UIL II-110-111ON— o IN7ALLIIN I.IIHA±WH .,1 oN 10 X 11 HI Ol of TONS a lAll :ONSTa1<TONwTaT�E�rL—OMIA-E Toas «PoaoNA.ET„ESE « Nr MNNE=7A"Ur,N'<o,ALL NONOONDUI7 VI P PI A,TLL sa4s owTaa T Ea,waEPEa LIIH7 AND oaENA HOLI AETaEaAPaNwTa-IHALL61IUM Eoaa,FEE arEL—ON ION a. 1-1-W-1MAIN 7HRU17I°ITRA--III ll- °°`°°'°� T' NOT FOR CONSTRUCTION TN�raEa � C5.2 09/29/2021 p j 11 1 u I I I i I I I I 174 11111 u I I I I i I I 11711117111 u I I I I u I I I i i I I 117111111111 u I IT771-r-r-TEM BUILDING 1 —IT 1,7!,1", 281,000 S.F. 284' x 988' *ems cr FFE=812' ....................... 7t ff5 S, ANITARYSEWERAND WATERMAIN LEGEND GENERAL WATERMAIN & SANITARY SEWER NOTES 1 7H — TO "p" I 'D T M o o I R'IU T A A7VI�RLN L N �1` 7 AI -N� 7�H U� 'N HAT —=­,�TlL =Ol I W N �MNU 7AVI'IR ALIIPA �, N, W11 N HW 7LALIL7WHA LAlM;;NlMXlUTRlM INTMI TAKINT, ITON' TIL_O1, NHI�L�LMAT N OONN1170N W-N INIIIIIIIIIINI-11H 1711. 1-1 IH— NIT 'LI _0 MN�AlO�,-- P1101 701-7-71IN AND NO111THI —101 INII-1 Ol 11ILDINI U-11 O-1111� p I Ixo 'N N — 1111 1 111 AN I, :A o RAND A71— N MA IRA AND NITA ONI 'HALL =Al��1"1,1,lAllIAlP,1,1,WATll 70, D _D NA"I'DANI I "TH TH ­R 7 1 'A4, A N L N I 17AL =NM71IN 7A ALTRTMA AND RV "T "o N o' I NDARD "I ' OA710N ' 'OR W LION XA �LH�AoL �1'=A I ALLI— el III Al I IAN 11R _IR AND lloM _ �R — 0 N�A XPAR2' H I, AIIIIIIIN Ol MINN 1111 11 ALI—IILN-HALLH.— MINIM1.1-1 Nl--7—lNl--HANl 'R OR 72ION 7—T 0 -11ARI 11-11-1 NH" 0, 7H 'KN IN=UN.71,11,ITIII AN � _AL P� ' N TH "o N7 I7oR A�LV�I'RTIAIN '10-1101 ININ111 R iH� PRIP M� � RI�O W77HH' I �L IHA N H 7HA7 P' R � 71 = �IoITHO AN, 'AD1. NM TDIWI ITl HTALL�6W7H,� I I I PO N I � 6� � I Ol 7H 11 �ANI,—'I'� IH �N�Vl� LAo7ZI 7HALNL 161' 1­71A NY'7A�RYLW-111111�1 --0— 71L11HINI ,N7.,M, llRH— 71LIPHINI I IIN7"' I IHA�l "AY TO.R.1 HIT,','RAL PI'lN �1­ "AUl "N" ON NAIN'NI A ALILI"17 I 'AN 7AI, 1-11HAL— NITAL�l'�HA�LIL�'l��1HID�ULLV'��7W�LADTI�N71 7-1HON-61-11 N� ON � o' � _ " P I-o K , —6 0 MU17 NILUT U" I IAIR M' WH IH ' o' A ION4AN �N =NoN TO TILPUPMI AN I 1.1 6UIL—I —1110-111ON —11— _ IN7 ALL IIN 7A , I . I IHALL 7 6 1 1-1 71LIVIIIIN 1—, PA17 1111 N 7 L� 6 N17RUI71 N "1 1-11 HI I Ol L PR � L — IHALL 7H Al", IIA—T", MIAN y 1-1711 'ALL Po;,Ho7 N_ IIN 1 14 ALL NONOONDUI7 VI P PI IHALL 1%,N.1,7ALL11 W17H A -Al 17-111 WllE I -ON ­lAll I :ON171117� NW--L—OMIA-� MNN_7A"UM6N'_, A,7 LIIH7 U71 L 7 �l I HA L� HIA�LN ol��71ATINDAALN D =V�I 1�7H'�Ml ; '7oHR U,7, 7H�AoLLN.I�NToONl AN 1, 7AN N A7,oRANLV,,,, A LL OUV � % 'HIAAN'�lL��'LV'I"O'olRl'�IIA�LNNILMO"N77NI'IAI IN—D. 17UI7 NORAN—O U I IA71 VALV' "'To 6 ' AlIU17AILI IR I 11ITIATIR IAIN 111H IHI lLlITlIAl AllM 4 'U"P'o �, OoNoN I'T P� ol'HO 11 WT O� II, VAL_ 7 ;H R 7,1TIl NI HI �U' R' '10W 0 0 0 AT 70, 01 7AP ANY A N -ONI NG 70 7HI I � UN L111 — AITH-- 70 �O lo IH —LL I IA17 N _ON'_N_o ... __ 1UNIIHI-1-11—ON1 011��111707H�IUILIIAR�l�l�TH�R�l�Nll6lll,o,7H�,oN"A,7 1 0 R 7 OR 1 A" I N17"17ON 10 PLIlD " IINTRAITR, IHUALLTL 'H' " LHUI OWN, 'RTI AN Al-6 , L, Rl'o I UL" N TR T 0 � u, IN T, ALL N, Lo A ON AND LINI7H DV A7 N 'oRI HANGII TO THI=,�T-N�L�_OOVIRI�YW 7H m WATR MAN LIN A " APP— MA7' HoR � N7AL R o' I _ 7HoR A IIN W TZ N �O= — 10 N7 17 ONI IH- NO7 "'D `1 KOMM "D ` 7HI p P' LL I M,N UIA17U o' 6y LoL —NIN, =ON I NII 1— — 70 11 A MAN HOLI AIT NG��D �PLA�VIADARN- IHALL 61 IUM— 111 1— RIM �L—ON I ON ION 171U17 —1 MAIN IHALL 1� INII—D IN W-1 �- ION ITIU17ION 'LIN L_ TH � 'UM V I 1 1-1- W-1 MAIN 7HRU17 I�ITRA- - III ll-- BUILDING 2 +487,000 S.F. 520' x 936' FFE=812' 81�i�or ca11811tlmm I /\ I l— ( qx I � x 11116mmemolIll NOT FOR CONSTRUCTION I u I INU C5.3 09/29/2021 R I AN ITARY SEWER AND WATERMAIN LEGEND GENERAL WATERMAIN & SANITARY SEWER NOTES a war�sea�« BUILDING ±514,000 S.F. 520' z 988' FFE=812' mx-ia m I I ®I _ I I I I � I I 81�i�or ca11811tlmm �- V N Q w j � O � Q w � 6 � Q U O V 999 Asa �z as zz a w X G3z 3 d 2 � � w 03 C5.4 NOT FOR CONSTRUCTION e. 09/29/2021 p EE — — — — — — — Er CLI — — — — — — — — — — — SEE SHEET C6.1 — — — — — — — — — 8 1 c.Ilsl 1.- - -------------------------- - - - -------- -------- ............ .................. .... ...... ............ .......... p E =I II L- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ;TORM SEWER LEGEND GENERAL STORM SEWER NOTES 0 UTILITY KEYNOTES NOT FOR CONSTRUCTION Fsv°-aaIT11 wl4L� 1 1 1 n u l l n u l l b�I� s 2Pf° nn" anoa BUILDING 4 ±440 000 S.F. 470' x 936' FFE=811' �1 ° I.T FA �n.:To°M:aM1 1A 'Ll- 0, H11L 'Ill E9EI. .nolsn 700TH STHEETSOUTH (VU6LIC WAY) r BUILDING 6 IE '99 E9x +281,000 S.F. 284x 988' FFE=809' ° TO RN1 SELE WER oEaEND ... ..y.,°dENERAL ST0RA'tiiiIiWf4dTES I'" I I .""' r '° °To-1--T-1A 11 r r-m. 1 I U"7 AT A�NILI 1-1 NH AoI IRI�IOH o° ra ns<°°.AN<°° s°ao°10o °1° 10 nor°.1a° °aoa° °°°or w1a°A 1 ANnIRI°any,°°°o1a°aw°° m°nNNN.=°aA°TM<,° ND —.. 1 A°°n<a1nNOlrNN°°o1A °° .o .°°.�°o°. °<r°N ..°s IIIIR a, oz°z, 1aALL6.11 o—.111.1IR —oz lANo n,° N� III1nA °.°A N°<o1°1°uToNWITH ° 71-10r°AN°s na°aA„<oo°n Al°1a°s° <°AN ON I IN 0 BUILDING 8 18 sTo.M +391,000 S.F. 470' x 832' FFE=810' 171 2,1 I I I I IT1TFFFM F F I I I I I I ri 81�i�or ca11811ticom - ommo� �aaaaa 8 e V da 3 6 Z S o@ V u~i Q w �a w � 6 � Q U V 999 Asa z O Z � g � a X �w x3 z� z 1Anr°°a C6.1 NOT FOR CONSTRUCTION e. 09/29/2021 u 1 4 1 H" I I I I I I A 11 11 "1 I'll o C-H-351 +14 u7i 3 71 �1­ 1 A 1 1 . .......... �7 24 11 7111 11- RIl 18 C�6'��Hj'12�4 711 1, Im ""'iii W111111111 7 1207,000 S.F. _1H Ill 31 284 x 728' FFE-809 of BUILDING 9 ­IH ­H-313 �342000 S.F. 470',x 728' IT.I.—ITU111 I-= I I i 1 11-71111 Ill IT FFE=808' BUILDINGS , BU +464 0 S.F. 74: H-­= s- 4 0�000 S.F. 1 11 Ll IT 1. ITU.-IC vr 7 x988' I -Ill (Al I se FFE=810' sr'C'B -H-1 IE 71141 ll IE asruass IT.I. ­'. 1­�. -714 �1 I E-71- 11" Ll 1a„M4 lTI 12 L" z �4 cl_rzvreav l ­'H A C -7-101 IE 17 21 i IE 114 �111 E 1 ­41 1� IT- Ill- Tu. ST 1E } I E42 1-12. A A- 'E, 7� lu I E 2 q J�1'1',*g 1+14 no i'm oi*q�i I I I L -1, "T17 'T' 4� L' A, ..... ...... .7" EIE-111­;11 - - - - - - - - - - - - - - - - - - C1­1`72 E.o - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - O - - - - - - - - - - - - - - - - - TORM SEWER LEGEND GENERAL STORM SEWER NOTES NT A To ON ' THA-H-ATONAND" A7 I N ol I "H 47' "ND I_ 'I_ I�THLIV , 1101111 L­ VA, U, 111� 999 I U7 P�A'NILI � �AN D AM D'MA U o� I'No7.1 PA N N I7'H' D, N RL-7 N No" "' R' l' .. L 'o A AIL N17 I I ;;N A17 R '­ 7H NTIA 711 , HAL _0 A Po =N�AIN�N'­­ I 1110R 70 1-71.71- AN � ­11 ll� IllINIII �1 6 D CON A.sass, P11HL LN"' l �H 'Nl' P� A�TL.IR� 1AN111 'p P� �A LA" IX' PI ' 7 'AN 'I�A I Asa :A N 7A 1OR11 Al 17OR Z M p A A71'RAL AN N 7AL'­ N I�HW�1� IN7,1 I ZPH� TO 11-INIHIl IN DIAM-1 1HALL M117 R-11IMIN7,1 7oR. _ , ­11 MA. �7 A " AN ­11 ­RAN1 AII-ATION 01 MINN-1 ASPssPAasos.N111HALL 6� 11HI-I. PllS PII A- DIIII PR OR 7o lON17R UCT oN THI ­7­70R 1HALL TAN7H NIl 17A Co =IP�PN'ITAMM 21'TM1A'7'0'1'1.'N�.H D 16U17 "A' I� A�l 'N' A17, 7 O�6 7H' 'T 01=1 R�1' A AAN 111H- ILI-1 7HA7 " RM 71='�IITN'­A'N� 'ADR '1_7�IW17HIHA I 'H'� 1111-6- ol A IATIR MA N 'A" 'R A " L' N' N N17 L' 0 z "N-M, 7H�LoIW -1-0- T-1-1 I ALI ON l AND IT-11. IONNI170NI IHALI I� .17l-I F WA7 IHIA ' R111 R ' D " M NNI 'o7A p L111 N "o" IA'7 11 ' oRl 111H- 71L11-1 4 CON -MR IHA R 7oARlH 7URAL ­NX "U'L L NlA7 NNAININI AN _A7'IT� W 'H N 1 _7 ol A � L� N AN 'WA71RLN 71L11HONI 1�611 011 oN, o' o =All, -1, _� _K1, o U SHALL 1: 7' '7'­ � `N:UIL­� Ill NII-N 1-1- .­ -1, .17 Ill 1­1 71LIVlON 11 ALL NONI­UIV� 111� IHALI I� IN ­­ W,7H A -Al III DIA�N TLI A L RVA71 � L HALL 61 lON TUC- N Al' RDAl l, W 7V'Hg N,�7, THA7 N1­1L1­1Nl­I,1AR7I­ H7H A - - o� P� , 11 AT 17 L"'M'AN 'o N­l_ 'HALL , LIN � 1.117-TION WITH - �71­ lo.1AN lIl A" IIN171117IN ""L"' ' I N7A'7o' 1HALL 7HIIIN ALAA17�L'N� I-lN AN Al 6 , L' 'Io � O� 17 11 10N�'­I� N 7H Al lU '7 IHAIL N_D, 'o'A70N ll­­ IHALI 0-IN ALL N-1- Ill ­­ lol 17, NN-ONAAND AND�=DH �AT7'ON ' oR �N HWN 1,70THINP,�NU,�7OoN�A7,70VI,�Rl�YW H NIR L No7 , ID oR W APLA 7H _ T, IL N, '17 U7 L 7 Il L611-1171DANDA-VID11-111 lH'AL A -1- ION7.110�=NN��W17HATI�"�R-IRI�W'�-,'I'ONoNNIITRAANNYYI'P��RR'H�OlI 11 AL �AA­AA` 'I N, CA 1LT'NA'1'N CURl H L�L761'­�AA171olNI'IIJN­ MAN HLOLI lA l L � _ �A "N I, u 6Y 7H� 'AAN A�7V�MA'N' I'L'NU N�T� T�" ULN LYAUTH R.2.1 D�Zloo'No l­­ ­10NI ANIA N IN - , IDO IN H I� L' .1 1-11ARI10 II- R-N11e1­017HI-7-701 I A M N MUM VIR7 lAL 11 A 'A' N o' W 7H 7ORM PWATI1 L '1HIALNLlN�oT H1ARV1�Q'UoRN17'AoT'A'1oWA'7'1' oN IW�701'1 I K I lIR.T ­N 1-11lN , D-1 II-ARY 1111 U71LI IN ITAL-N -DILINII sTAursPa N I INIU-1 1-11N. WITH 1701. 1­1 .2 17 -1-PIAL1711.1-1 OUIII��6UII�lN�-LLUNLIII���RWII� 1 11 ill 1. _��NloR _TD NOT FOR CONSTRUCTION 7, — — —— — -- — —— — —— — —— — — 7 1— - — -- — -- — -- — --- C-H-737 'A, D: CII-111 41 1� "6 —H— 11. All =1-1 A I �I "Ill 11- I 5ll) I iuiilliiiilNlllllulllill�1171111� -11 -- IIIIIUIIIIII111711111IIIIUIIIIIIIIIITtI Wi C-H— I I I TFFFFFF 1-j=IFFFFMI 7FFA III M III 1-1- IT.. I—A BUILDING I 281000 S.F. 28,F x 988' C-H-4 FFE812' saga a ....... 11-m -I enAe,o . 7`4NIMA, ....... H7,1 'T CBMH-71 t 6 BUILDING 2 +4 T�I 1111, 1-- S8 20' � 97,000 36' A, C._ 2 FFE=812' 700TH STREET SCI A —H-141 Li _7 A� 3. waa E. 1Il 11— IIA7 lull, 11 Pa P C—H-6,13 CBMH,!I2, �T A III CL I ,,11 IT, k 1, 11 �11� 17711! It STORM SEWER LEGEND GENERAL STORM SEWER NOTES " 47` "N 'THA7,THI L`NT1 'N AN A7,0l,01 I IT— ",I, 111� N� U7 No" PANI�AND 'M `1MX'1U7R0` 1,No7.1H'AoRL-7 o A All H " 11 IAI 11 IN17 TH 0 0_�� N NI.A ILN11 "AILN17—IL , Al N'ILA Z'l IN V� 'UR' AN111111 =N�AIN�N,�171�NIIIIOR701aN171.71ONANONo1117He-NeeoeeN�lNelloI AHA' IAN 7A � I_R p 117HR-1.71 TeeeP,IoRll AIN 17�OR N17AL,— N I�HW�1� INo7,1, l =MP,1M-,T0 111, N N AM 7 7LL THIA QIIIR1M1N7,1 o`IA` l IA A L AN A' P�`Il � 'N%=` 7C HIl I N IRA' HA 7LRLIM J -TII MAIN =D "'IM lA7, ALN LA N,N,17A-7,NAKN A-11�1� —1— 1HALL I� III A17M -11 AND IN-L— PII A17M -11 7o A,o INIIII 111RAN1 All-ATION 01 MINN-1 =7A 7 ,N Al Il:1: '1'7A 17L�LlA P.�Al� 11— 1HALL 6e 11-- . Plle PII A— DIIII AN lA, PR OR 7o lON17RUCT ON THI —7-70R 1HALL 06TA N 7H ' N 'l =11 Z lo= I=LIPPIIITAMMD� R 'Al-' 7"l'I AND U17 "A!`-7 111H— ­71, 7HA7 P' RM 71=,�IITN,—AN� `ADR '1-�I I 7H,� 1111-6— 01 11-1-01 —IRMAIN —11 lJILlINA N, 7H�Lol_ —1-0— T-1-1 I AL' 17"'M I— R '0 `T—CONN-ON11HA-1— III WA7I— =DMITR NIlo7AP_,Nlo_A__ 111H— 4 CON —MR IHA�,��IAR"7o R.�,H,7'­ ­N 7o LOCA7�1,W 7,HLN.1l-N1I �AU,7DjNlAND­WA71R LINI 1HALL I� 7' 7,7 R�� 71-HON-611011 oN, o' o , , � Ul .01 K1, NVI`�AU`L�LoNII `� NAINI N I AN 0 NN 'A `TILl- Ill NII-N 1-1- -L,7II 11 . LNN ONClo ND U.S= I�HAAR171lI W17H A -Al 111� III DA TL A71 HALL —ON 7RUC71D N--All— H11-1-- 71THII-111 7H A __ 'HALL, NA LIN � 1.117—TION WITH — �71— 10-AN 111 1 A1711 Ill 1711171N 111—­ — 1IN-70A 1HALL I-- — 11N II I -ON AN Al-6111 11101171111 ION171 .10N — AI-11 IHAIL IN —DI .11loN lo—­ 0 N ALL N =V�IDC� Pl �M 0HRII �A)Ll N KN7 7N, I DAN oND,=DH�N HWN 1,70 THoINPI—U,�70oN —�M R"O Vl,�RIY W 7H NI A U7 L 7 11 1HAL �H6A o D W _ T, IL A7 N, A API 7H 74 ;H­`l0'No.'1o10o='N_W,7� HATI�U'�R'�R�'W'�',ul'ONoNN�loTRAANNYYI'P'�RR'H'o�� 11 AL �--AA" NCAITN�GIIUN C�U�Rl�HAL�L761,1.M�:VA1711NI'117NA,�NARNHL LKA 'o YW M DU UO D AA 70 7AP AN A71�"AN NGT T�', ULN LYAUTH R.2.1 lNU—D —I IHA L o II 7H:TINII oPee�6y "eTOTae7H� ANIA 16N'ILONU — U IDO IN H I� I, ONI 1-11-10 111— RA—IIl-017--Al- 1" RINC ­`lo `AND'Al" 7U7' IL�, `N NT UAL, `0II IAN % 1 11 IRAQURIDATA-11LIN1110111— 1-T_Nl.1l10N7, A D-1 III L N A ` N �`URMM VIIA� ��IAL I I PW ­10 LN ol '1HIALNLlI W T HAVIo 7H 70 AT N 170 N.1,01 10-110IN W71IN 11- INIU-1 1-11N. WITH 'o, I_ U7 —IIA IPIAL1711.1— I OU111- 6UlIll- WALL U-11 —IAWII� _��NloR N_l I I CLAII III UPIAP IT, 4laaaaa 7 Z, 11-1. 71 7- vr j, 11A 1 u 2 . 2 z �4 —21 A 7 u 11 ID A M,-- C.. V CIE C 1� IMIPIT Hill I M I HAsa 0 0 z I— N U.— C6.3 NOT FOR CONSTRUCTION D— 09/29/2021 R u PEQ— NUMBER: 0033037.00 A �11 A I I I 11 A '11— 171 „71 1 1,1311- I E 333E' ED "I"— BUILDING 3 1514,000 S.F. owe saH.Ar520' x 988 R FFE=812' u I I I I I U I I I I I I I I I I I lu IE �7 11 IL 1. 11-0� TORM SEWER LEGEND GENERAL STORM SEWER NOTES I 7H 47' ON'ND 'T�H,��7,THl�L�,TONo�N�IT�HL 1 11-1 111� =LN' A � , Ill All H" 11 IAI 11 IN17 TH o ZNI.A ILN11 N� U7 flo" PANI�AND 'M DIMX'IU77� 1,No7.1 PA N�7,HN'T'ILA, "I 'N 'AoRL-7 N A :"N I'OPN P P� , HA' ZAL. �"� l'1"A "AILNI—_ , Al ;;N R ��7' �N 7H 78 H L _ �o , 'AAN111111 ll-171— A � _R =N NR7A 'PAN, 117HR-1.71 «Eo.PEaA.M<,s Asa 1III :AN.7.1,11111RIIN 17�OR `APLWU.R1MN,71,RoAL�AN N17AL,— N I�HW�1� 1No7A l =MP,1M-,T0 111, N N AM 7 7LL M1'HA Q��RIMIN7,1 `�AA 7 A' P�'Il � RN%U= 4 HIl �NIDH N 'RA' HA 7LRLIM U T11 MAN =D "IM lA7 17, =A- 7 ALNAN N,: N,1,7ALLA o Zl 10 A N=1�1:ILA "7,NAN N A-11�1� —1— 1HALL 1� Ill A17M -11 AND N-L— A17M -11 N 11 —RAN1 A11-110N 01 MINN-1 '1'7A 17L�LlA P.�Al�As1AAL6,11-- Al PllE A— -o l AN 7 11-NlHANDMU17 ­ A17" Al PR OR 7o lON17R UlT ol THI —7-70R 1HALL 06TA N 7H ' N N =LIPPIT MM D� 'Ol, PR,1 2,ITMI -, , A, N � 6� N 17AL_ , 7, N —IH— ­7111 7HA7 P' RM 71=,�IITN,—AN� 'ADR '1-�7�IW17HIHA I H,� 1111-6— 01 01 A ­RMAN —11 - A 6UIL—A 0 Z —1-0— T-1-1 N, 7H�LoIW I ALI 17ORM 11WIR 10 —T— l0ll-ol I IH- I �IH7 I --- WA_T lHA' R_=DMIT N _o7A N 'A17 Ill I R =L61�1,Hlll, 4 lO.N�7N—RolHo I ��IAR,70.R. 11H1,7Z=0'12, NV4�AU`LoLZIAoNAINI N I AN 0 L.ON—�IW 7,HLN.1 I -N11 1,7o�IA�AU,7D, 1N,� A N I WA71R L- IHILL 1E 7' '7,— oN, �1 , N 'A Im 1. 6U1L-l11111llN-7llN--N1 —LNZL,�11110N 1' ALNNON�,ONDU.7�VNIPPol�l�HAAIR�7l�,N�l,7ALLI�W�7HA-Al11-1111�l�l�I DA T A71 HALL —ON 7-71D NA RDA H A70NI A L, lZo ­W7 l o 7H A � P� , 11 AT 17 L",MAN _o N—l_ IHALLIV N—TH -10N LIN-117—TION WITH — �71-10-A-1 11 AN 7`1 llNL1,7,11,1o7 IN llo7'7 Al7o' I HUA,7L I'HA' 'N' 7,H I 11NA7' lo—­ ' 0 NALL N=V�,D�,—I�M OHR�U,7,—AOLLN�I�N7ollll DAN oND,=DIV AT7'0'�N PLA'N HWN 1170THINP,�NU,�7OoN�MR"OVI,�Rl�YW H NI Z) W o T, �L A7 N, �7 R� U7 L 7 �1 1HAL �H6A D A 0 R H A 7H 17, —T1 �NT�R'�R�'W�,'I'ONoNN�ITRAANNYYI"P'�RRH'o�� 11 AL�AV�7��AR�l�N,�AILTIN�GIN��U�Rl�HAL�L761,IUM��:VA171INI, AlD MANHLOLI A:T�NII "T l To'o A7 I N DU YAUTH D , HA L 0 IN TH 6Y 7H� 'AANYIWA V�MAN, 6N LNU N l�T�UOR�2�1 D�Zloo'No l-- —10NI .1 1-11-10 —H� R—Nll�-017--Al- 11 R-1-1111011---1 —A-1-1—ANUAL-11111— 1H u" I A M N MUM VIR7 IAL 11 A "o N o' W 7H 7ORM PWA— L 1HIALNLlN�oT HIARVI�QUoRN17 AoTA,1oWA71,oN1W�701,11Nl1 ll-T-N-1110N D-1 -R—Y1111 —71LIINITAL110-1-1- N11 INIU-1 1-11N. WITH 1701. 1-1 1mm%mI 17 —1—PIAL1711.1-1 OUIII��6UII�lN�—LLUNLIII���RWII� 1 11 ill 1. �NloR _TD NOT FOR CONSTRUCTION G U /,7^rm^x+. COTTAGE GROVE MENNFSOTP Il 11 eRWo.� 6]f1a�� ri I uwsv«rVxoww �G� O '�nx., COTTAGE GROVE MENNFSOTP 1 noscunnro PalEz muwousnrsw muou csn'nn. v� � xaoznoouzRoettmwxol[. Cottage O CORAGE GPOVFMMINNESOTp �n�xx., COTTM£GROVf MINNFSOTA sxaxunas �O� r.�nx., COTTAGE GROVf EMINNFSOTA ssssosai� � �s Imrosnxoourslos. n ~ I s^Momnnlxvsnr sou 1Zc COTTAGE GROVE,AMINNESOTA -_ ? =LL1 �n�vx., COTTAGE GROVf, N9NNFSOTA —n' sc^ir°r mnxxw[snrszs Nzs wuawnn. zx" LL vnnlrs vnnlu rrrns[ussssc[axunrva �Gsn oho 'dvx�. COTTAGE GROVE, MNNESOTA ns om�C[m nff� _ C '"sx~ COTTM£GR—,.NA mg- �srN,eE �n�n+., COTTAGE GROVE MENNFSOTP O O z rownnoixswvur. orto % awls lssnnxcoowxsnsux. --n ssEnxsorsnosrxizrun zTnzs. 13�" , vnx mauxcnsmns ss muoxrExnn. vnnlss rwxrsusss<srccxiunox. Gm e O COTTAGE GROVEAMINNE50TA t� �i rNfcx uwar zMz o zcnonha seeucmery NL IA- �e COTTAGE GRWf MINNFSOTA OV��x.x G O n�xti COTTAGE GROVE MENNESOTA wnxolxv[m. larsmomnn la4 =�==N'—MIZV as<axslssuaxcocwxsmMT �-n maxxoi[nsrsu xunoxcsxnn v� vnnlsz vsrsn xosswuurss�znsza ixvxs P�# COTTAGE GROVE, MINNESOTA •:z�amcrn� �A�AT O�"anxn COTTM£GROVE MNNFSOTA 00000000 �e�nee�xNNn ===Z, COTTAGEGROVffMENN.— zR owesr[n Ar nrt nno swvs % ovw,o rrxcoow —T.- �n mnnxaesrsrszx mnx cx amsn. 1 cOTTAGEGROVE,MINNE50TA vwn muz '�_ — -- roeocx smlrnarsusxtcwxG =—�m" man[o�x.Enr�A"w Mmasszwi. \+x°rs✓x'+• COTTAGE fYtWE, MENNE50TA O meer rvure[a b Cg%.0 811 or call 811.GGm NOT FOR CONSTRUCTION 11-1 09/29/2021 o PROJECT NUMBER'. 00 303700 S 1=2 �' �.. ,06'' A. V " Mo N­ Eml wm,Nax TMrzcme i��1I BE c— — ..... .... �x.�rEroM,�,ax a,ar.�.,Nx Nx'�����x�� xxxe,.o 1-1 11 E-1 ­1 Ml INT ­UINI _T 'N L_ N'= F—I, "­ OKI call8l 1 c" NOT FOR CONSTRUCTION I u I I er C 7.1 MT, CT NUMBER 003303700 3EE SHEET L1.3 SEE SHEET L1.1 81�i�or c.11sl 1.— MGM SEEM. MEMBER. ................ M aul., w .......... . . . . . . . . . . . . . . ONo U`N` t —"T 'o NOT FOR CONSTRUCTION PLANT SCHEDULE BUILDING 3 ,514,000 S.F. 520, x 988, FFE=812' FA_ Q1 664 'T �1 1—NNI TYPICAL FOUNDATION PLANTINGS N.T.S. x NOT FOR CONSTRUCTION I 999 Asa O z z L1.4 09/29/2021 R 811 or' 081 tl1com SEE SHEET LP-6 SEE SHEET LP-5 SEE SHEET LP-4 SEE SHEET LP-3 SEE SHEET LP-2 V F z Z � a 2 u l7 7, X � H >O O= a ®a LP.1 e.. 10/07/2021 V F O � j � O � Q w � 6 G Q O k 0 v a�a o� Z O a 100Z Zag Z m 2 l'J J — r rvumaea. �j LP.3 10/072021 R 811 or '081 l.col u u z 1 �11 LP.5 ffiffilig-M Im"ll OVERALLFLOOR PLAN & TYPICAL FRONT ELEVATION � , �HIM � i'��'oillipMINE TYPICAL REAR ELEVATION TYPICAL END ELEVATION 0 No Studio North, LLC �Nox$iPoinY' DEV ELO PMENi Cottage Grove Logistics Park Rear -Load Prototype A1.00 DoRP IEEE—C -777�77� "7=77 - 777==7= --,� 7==7 -- =-7--r --., 7 7 -7==77 -=7=-- r ------ t----t T ------ I -- ---- I------ T-------T ------ ------ ------ ------ -- ---- F---- t ------ T- t-----7 -- ---- t----- F---- T ------ T- T-----7 -- ---- T----- F---- T ------ T- T-----7 -- ---- ,�, oA� aoa aoe TYPICAL END ELEVATION soe m...Wo..�...a,.,.m. soe soe soe s a soa s a aoa u•PXV�X6mr aoe e e e El o o o o o o o o o o o o o o o o i e P m e TYPICAL SIDE ELEVATION TYPICAL END ELEVATION Ll1 2 n p TYPICAL SIDE ELEVATION 0 No Studio North, LLC (ONorift%int' DEVELOPMENT Cottage Grove Logistics Park Cross -Dock Prototype NPraCm oy Eor ­­­ A1.01 ELEVATIONS I I I JI� 100TH ST oa«:rn oea.rewounun usrueu.. I III ,... b i nw"a.:rrn«rk®w,.a�n®o OT 1 LOT 2 .I 105TH ST - OUTLOT A `I i _ "--________________� -------------sea�sr�az°w \\ ovmra.rvvnxrm®xrumn®oe.xa � I LOT 3 11 LOT BLOCK 1 II J— __'r_ T o � Iasi+ LOT 5 SITE LEGEND p, :. „ PROPERTY DESCRIPTION r,uHE N a�w.,r ooartM a,arr„�i,rtrw rv„rmear a<yk,ars«ra.z9eT�rv,�m, ee v, wa,s wea m ee� o-1-11,mwaar—,-1—zs, Ta ma rva,m, <rea waar, wem rere mi d, w� raiicime mst Milal MervarNeosfPwrkralsecnanz9, Taw.snryvrva,m, a�pa wes cryalmnon Garr, SITE DATA CHART scsP�rM.��msaakar«� a� one ruareimarv„mwaaro�«,k,ats«r�a„za,T,w,,..�pz.rv„m, ao,zr waar, w<«�.vmca�.rr, oaa�mamrv,. vos�aze ��xe 11;p iw:n «a.e i. we<err—mkeI'll 11zwa+ee,eae rza, zaaa,a ,rarrM vesma ,asa« a ,m ��b.>^ meal ine GENERAL NOTES 6 L J I R I LOT 7 I p« r �« n r r <,er wM.awpenem.aee r�a�,eaek u w.ra,�aa crap ne>rc «ee saz«,a. s. ke n�m n=m eap� OWNER/SUBDIVIDER reP"sw"o awo se r,o 're soo ENGINEER AND SURVEYOR LOT 1 9 BLOCK 2 a Is 13 L nnouii I r �; im VICINITY MAP J 811i�or ca11811tlmm g rid 8 Ke V da V 3 6 o Z e ®x €sgi a iry V u~i Q w � Q w � 6 Q U O V 999 EEE 7�5 a } X zz w a r*uuraEa. �' ®a C2.5 e. 10/06/2021 p VICINITY MAP SITE DATA CHART PROPERTY DESCRIPTION GENERAL NOTES ENGINEER AND SURVEYOR E '. Z o 1 OF 1 11 10/08/21 MBER: 0033037.00 Stantec Consulting Services Inc. ® Stantec 733 Marquette Avenue Suite 1000, Minneapolis MN 55402-2309 October 15, 2021 File:193802266 Ryan Burfeind, PE Public Works Director/City Engineer 8635 West Point Douglas Road S. Cottage Grove, Minnesota 55016 Reference: Northpoint Development (Review Comments - Updated Development Plans and Stormwater Management Plan Submitted on 9/30/21) Dear Ryan, Below are review comments for the updated Northpoint Development plans and stormwater management plan submitted on September 30, 2021: General Comments: 1. A number of the plan sheets are very hard to read, very small, and not legible. Please revise as possible (Sheet C 1.1, etc.). 2. Wells have been shown on the removals plan (sheet C1.0). Please include a note on the plans that a copy of well sealing records will need to be provided to the City. 3. Existing wetlands have been shown on the removals plan (sheet C1.0). Westwood has indicted that mitigation is proposed offsite and that a wetland mitigation permit has been submitted. Please submit a copy of the wetland mitigation permit to the City. 4. It appears as though some removals have been shown on private property located near the northwest corner of Ideal Avenue and future 105th Street. Please provide clarification on removal limits or easement documentation to complete work within private property. 5. Please provide clarification on if phasing of removals will occur. 6. The tree preservation and tree inventory information, on sheets C1.1 through C1.5, is under review by City staff. 7. A lighting plan will need to be submitted for review. 8. Submit a signing and pavement marking plan for review. Design with community in mind 9. Clearly define the project phasing within the plans. 10. Include reference to the current City of Cottage Grove "Standard Project Manual for Utility and Street Construction", dated February 2021, in the project plans. 11. Additional City details should be referenced and included for sanitary drop manholes, irrigation services, etc. 12. South driveway access off of Ideal Avenue to building 9 should be eliminated as it is too close to the 105t" Street intersection. 13. Access drives to public streets and internal traffic routes should be reviewed to ensure vehicles/trucks will be able to maneuver proposed radius transitions (include radius dimensions). Please provide Autoturn movements if necessary to show truck routing into/out of the site. 14. Northern access near building 4 is to steep and appears to be greater than 15%. Please revise. 15. 100t" Street access drives do not match with aprons shown. Please revise. 16. Clarify final pavement sections, report indicates "Paving sections shown are for planning purposes only. Refer to geotechnical report for final pavement sections (reference detail plate SI19A)." 17. Is the developer proposing to have an entrance sign and/or monument on the property? If so, this will have to be located outside of the public ROW. 18. Remove Hadley Avenue improvements north of proposed roundabout on all sheets since this will be constructed as part of a separate project. 105t" Street and the roundabout will be constructed with the first phase of construction. 19. Please include details and additional information for all ADA areas (sidewalks near buildings, private drives, etc.). 20. Site detail references numbers have been included in the notes but not shown/labeled throughout the entire plan (sidewalk, signs, etc.). 21. How will trash service be handled for each building? An enclosure/screening will have to be provided if dumpsters are located outside of buildings. 22. A detail has been included for a decretive fence. Please provide clarification for where this fence is proposed. Preliminary Plat Comments (sheet C2.5): 1. Remove the parking lots and drive accesses that are currently shown. 2. Show only property lines, easements, ROW, and lots/blocks. 3. Easement lines are not needed within outlot A as a blanket D&U easement will be included. 4. 1 OOt" Street should have a proposed 180' ROW total. 5. Ideal Avenue should have a proposed 100' ROW total. 6. Clearly show the existing 75' power easement located on the south side of the development. 7. 105t" Street should have a proposed 100' ROW. Overall Grading_ Plan Comments (sheet C3.0): 1. Low floor elevations must be set 1-foot above the adjacent EOFs. 2. Lowest adjacent grade must be 2-feet above the adjacent detention basin EOF. 3. Note, Ideal Avenue is proposed to be reconstructed to an urban section with trails on both sides of the street. Grading transitions should be anticipated to occur along the ROW. Ideal Avenue, between 100t" Street and 105t" Street, will be constructed to a similar section that is proposed for 105t" Street. Staff is currently working on the feasibility design layout for Ideal Avenue. 4. A storm Water Pollution Prevention Plan (SWPPP) must be prepared for the project. 5. Label all basins and include the normal water elevation (NWL) and high water elevation (HWL). 6. Ponds shall be constructed with a maintenance bench (reference City detail STO- 15 on sheet C7.0). 7. Include spot elevations throughout the plan (pavement areas, green space, etc.), minimum 2% grade in green space areas. 8. Include elevations for top and bottom of all proposed retaining walls (referenced in legend but not included). A fence may be required based on the proposed height of the retaining wall. 9. Additional berming, screening and/or fencing should be included on the west sides of building 1 through 3, and also on the south side of building 1. Overall Sanitary Sewer & Watermain Plan Comments (sheet C5.0): 1. The western N/S watermain extension through the development, based on the comprehensive plan, must be 12". The developer will receive a watermain upsizing credit to go from 8" to 12" watermain. 2. Include Sanitary and watermain profile views within the plans. 3. Note #1 1: PVC watermain is not allowed to be used in Cottage Grove (please remove reference to PVC watermain). 4. Include watermain sizes for all service stubs to the proposed buildings within the plans. 5. Label all water fittings and include proposed location/size of all gate valves within the plans. Note that vales on the 12" watermain are to be butterfly valves. 6. Watermain is shown to connect to existing east of building 9 along future 105tn Street right-of-way east of Ideal Avenue. Watermain is not proposed to be extended east of Ideal Avenue and will not be able to be looped in this location. 7. Show and include proposed sizes and location for water irrigation services. 8. Sanitary drop manholes are required when pipe inverts do not match. Overall Storm Sewer Plan Comments (sheet C6.0): 1. The last segment of storm sewer pipe leaving the development ponds/infiltration areas and any segment tying into City trunk storm sewer will have to be Reinforced Concrete Pipe (RCP): FES-760 to FES-761, etc. 2. The developer has shown the storm sewer outlet from the proposed Outlot A pond tying into future improvements installed within Hadley Avenue. Hadley is not proposed to be constructed as part of this development. A temporary storm sewer pipe should be installed and routed to the intersection of future 105t" Street and Hadley Avenue. 3. Inlet and outlet locations to the detention basins should be reviewed to prevent short circuiting in the basins to maximize water quality enhancements. Maximize distance between inlets and outlets. 4. Storm sewer segment between CBMH-731 and FES-730 should be routed to the development pond located southeast of building 1 and treated prior to entering the proposed Outlot A ponding area. 5. The storm sewer segment arrows between FES-760 and FES-761 are facing the wrong way. Please revise. 6. Storm sewer skimmer structures should be added to all basins prior to discharging into the City pond and/or storm sewer system (FES-760, STMH-501, STMH-301, OCS- 546, FES-144, STMH-701). 7. CMP pipe is included and referenced in the notes, since CMP will not be used, please remove from notes. 8. Basin outlet designs, discharge rates, and high-water levels will need to be reviewed once the stormwater plan and HydroCAD models are updated to incorporate the maximum allowable discharge of 19.14 cfs, as indicated in the preliminary stormwater plan. Stormwater Requirements: 1. The submitted preliminary stormwater management plan (SWMP) dated September 29t", 2021, acknowledges it does not meet the City's requirements for rate control, volume control, and water quality. Updates to this plan are necessary to meet the City's requirements. 2. A rational method calculation, or similar method, for determining pipe sizes should be submitted for the proposed storm sewer layout that entail pipe depth, pipe cover, slope, velocities, and capacities within the proposed pipe. 3. For the existing conditions HydroCAD model, the site should be split into multiple nodes to reflect the existing drainage more accurately. There is a high point within the site that carries flows to the west and east. 4. MSE Type III rainfall distribution curves should be used for the existing and proposed HydroCAD models. 5. For the proposed HydroCAD model, provide a more detailed breakout of time of concentrations should be provided. 6. The SWMP for the site acknowledges 19.14 cfs is the maximum allowable discharge. Currently rates exceed this requirement. Revisions to the site design need to be done to meet this requirement. 7. Based on the proposed site layout, the SWMP identifies 13.475 ac-ft must be retained onsite to meet the volume control requirement of the City. The SWMP currently shows only 7.25 ac-ft of volume is being provided. Revisions to the site design need to be done to meet this requirement. 8. The preliminary SWMP for the site indicates that water quality is being met for the site. Verification for water quality will be needed once revisions are made to the site. Please provide the P8 file with your next submittal. 9. Based on the soil borings provided, it appears a top layer of silty sand (SM) is throughout the site. This corresponds to a hydraulic soils group (HSG) B, which has an infiltration rate of 0.45 in/hr according to the MN Stormwater Manual. In areas where infiltration is being proposed, please include in the notes that it is required to remove the topsoil layer to ensure soils from HSG A are being reached as indicated in your stormwater management plan. Overall Landscape Plan Comments (sheets 1-1.0 - LI A: 1. The plans indicate an irrigation system will be installed. Show location of proposed water services and submit irrigation plan for review. 2. Landscape areas should be reviewed to insure they are not placed directly over proposed utilities. Regards, Stantec Consulting Services Inc. Tyler K. Johnson, PE Phone: 612-712-2065 tyler.johnson@stantec.com Design with community in mind David R. Sanocki, PE Phone: 651-712-2124 dave.sanocki@stantec.com