HomeMy WebLinkAbout2022-01-24 PACKET 06.2.STAFF REPORT CASE: SP2022-003 ITEM: 6.2 PUBLIC MEETING DATE: 1/24/22 TENTATIVE COUNCIL REVIEW DATE: 2/16/22 APPLICATION APPLICANT: Minnesota Pipeline Company REQUEST: A site plan review to allow Flint Hills Resources to install a new 210 square foot tank foam building to support a fire suppression system. SITE DATA LOCATION: ZONING: GUIDED LAND USE: 6483 85th Street South 1-3, Heavy Industry Industrial LAND USE OF ADJACENT PROPERTIES: CURRENT GUIDED NORTH: Residential Low Density Residential EAST: Residential Low Density Residential SOUTH: Industrial Industrial WEST: Industrial Industrial SIZE: Tank Foam Building = 210 square feet DENSITY: N/A RECOMMENDATION Approval, subject to the conditions stipulated in this staff report. Cottage Grove COTTAGE GROVE PLANNING DIVISION � here Pride and Prosperity Meet Planning Staff Contact: Emily Schmitz, Senior Planner; 651-458-2874; eschmitz(o-)_cottagegrovemn.gov Cody Flannery, Planning Consultant; :.:flannery _cottagegrovemn.gov Application Accepted:. 12/28/2022 60-Day Review Deadline: 2/26/2022 City of Cottage Grove Planning Division • 12800 Ravine Parkway South • Cottage Grove, MN 55016 Planning Staff Report Minnesota Pipeline Company Planning Case No. SP2022-003 January 24, 2022 Proposal The Minnesota Pipeline Company has applied for site plan review for the construction of a 210 square foot tank foam building to support a fire suppression system. The building will be located outside the existing tank containment system (tank farm) on their property at 6483 85th Street South. Site Location Map Review Process Application Received- December 28, 2021 Acceptance of Completed Application- December 28, 2018 Tentative City Council Date- February 16, 2022 60-Day Review Deadline- February 26, 2022 Background The first oil storage tank in this location was installed on the site in 1957. Subsequent construction phases over the decades have added additional tanks. The existing use for the storage of crude oil, refined oil, alcohol, and other liquid is a conditional use for the 1-3, Heavy Industry, zoning district where it is located. A conditional use permit (CUP) was granted for the existing use as oil storage on the site in 1999 and remains in effect. The applicant continues to submit up to date preparedness plans and completes annual compliance inspections with the City Public Safety Department. This building and fire suppression system will support emergency preparedness for the Minnesota Pipeline Company activities at this site. Planning Staff Report Flint Hills Resources Site Plan Review — Fire Suppression Building January 24, 2022 Page 2 of 7 The City received a request by the Minnesota Pipeline Company for a site plan review to allow Flint Hills Resources to construct a new tank foam building at their site located on 85th Street South. The construction of this new building will support their new fire suppression system as a further precautionary measure to ensure ready deployment of fire suppression equipment and materials in the event of a fire at the tank farm. NEW PROJECT AREA - ........... .. _ t R` 7-7 i \ Overall Layout Planning Considerations Ordinance Requirements Site plans are required to be approved before a building permit for a new structure or major addi- tion to an existing structure may be issued. The purpose of site plan approval is to assure that new proposed development conforms to the city's development standards and ordinances and provide the most appropriate and compatible site plan for the area. Given the proposed structure is adjacent to a residential neighborhood and is an additional structure to the site layout and op- erations from the original approvals for the first development on the property in 1957, a site plan review process is required. In accordance with the site plan review procedures required by Chapter 11-2-4 of the City Code, the city staff has reviewed the site plan for: 1. Traffic and pedestrian circulation 2. Parking 3. Drainage 4. Landscaping 5. Compliance with other applicable ordinances Planning Staff Report Flint Hills Resources Site Plan Review — Fire Suppression Building January 24, 2022 Page 3 of 7 Land Use/Zoning Minnesota Pipeline Company's property is located within the 85th and Geneva Staging Area as defined in the Cottage Grove 2040 Comprehensive Plan. The area south and east of 85th Street and Geneva Avenue is mostly guided Industrial with respect to the petroleum tank farms present. Most of the property in this area is owned by petroleum companies, including Minnesota Pipeline Company. There are two rural homesteads and five single-family homes on the west and north edges of the area, fronting Geneva Avenue and 85th Street. Changes to the Land Use Plan will guide the western and southern parcels as Low Density Residential to buffer the area from future Industrial development. Minnesota Pipeline Company's current operations and proposed building are compatible with current and future land use guidance. Minnesota Pipeline Company' property is zoned 1-3, Heavy Industry. This zoning classification is consistent with the adopted Cottage Grove 2040 Comprehensive Plan. Site Plan The applicant is proposing to construct a 210 square foot steel frame structure. The building foot- print is 12 feet, 4 inches by 15 feet, 10 inches with a height of 12 feet 4 inches at its highest elevation. The building will be equipped with an insulated surface door as well as an insulated, rolling overhead garage door. THOMIPSON'S GROVE 7TH ADDITI6N $ LJ '= L-------------1------- 4 —I-------J L------ ., --J I�—1------� ------ N -SOON $STH 3T_—__—__— _ __ _____ i°rc-0• —� _—__— �� --- --- --- --- ----_- — ��-� i '' i 1r-- --- - -- -- v---~---h--- - N I a' PARCEL 2� Nn. ° 1 I a I it a TK-21 TK-21 1 PARCEL 1 ' wwp- - 1 - ----- 's VICINITY MAP xor ro urc TANK FOAM BUILDING - CIVIL SITE PLAN NOTES: ISSUED FOR PERMIT sfxe. i-so-o R-�=.�°^ . s¢ ow. ¢x a �A011' DECEMBER 22, 2021 tia . asE _ _ _ a�E CgMYfNDNOWnR °+SRuS. Tnxl(FdWO1ME .CNILOVERALL°NEp,pHmx FLIN�TT WIN""" FHILLS 6 S Q GCS • fATTAf£ Gp4£ MINNESOrA _ _ _ _ _ m _ COTiACE CAOYE H°' xry MINNESOTA 51 0 Proposed Site Plan Architecture The proposed exterior material for the structure is a brick veneer on all sides. The proposed ma- terial was requested to be consistent with the City's minimum architectural standards of Class I Planning Staff Report Flint Hills Resources Site Plan Review — Fire Suppression Building January 24, 2022 Page 4 of 7 materials for structures within the Industrial Districts. Given the minimal size of the building, staff is supportive of the proposed veneer as opposed to a full brick material. 15'-10' BUILDING LENGTH T.O.S. 4 1/2"m i 4 1/2-1 BRICK SUB VENEER I I NORTH ELEVATION SCALE. 1/4'-1'-0. PROVIDE GUTTERS AND DOWNSPOUTS 15'-10' BUILDING LENGTH (INSIDE FACE OF WALL PANEL TO 12'-4' BUILDING WIDTH INSIDE FACE OF WALL PANEL) NORTH ELEVATION 2. 12- T.O.S. O T.O.S. a� 0 0 900 �oo BRICK c VENEER Z� FTO T.O. SLAB I I OVERHEAD SOUTH EUVAMN I I ROLL -UP GARAGE D00R PLAN VIEW 2'-5- I 8'-0' I 2'-5' SCALE: 1/C-1'-O' WEST ELEVATION SCALE: 1/4*-1'-0' SOUTH ELEVATION SCALE: 1/4--1'-0- Elevations INSUU VENEER EAST ELEVATION SCALE: 1/4'-1'-0' 9] Setbacks The proposed building location is planned to meet the minimum required setbacks for the 1-3 zoning district. The required setback to the north is150 feet as it abuts a residential district. The side and rear setbacks are adjacent to the existing facility and would not apply. Grading and Drainage The total project disturbance area for the construction of the new building is expected to be 0.11 acres. The disturbed areas outside the new drive and the building will be seeded for a permanent grass cover (approximately 0.06 acres). Stormwater runoff from the project area is conveyed across an established section of dense grass, eventually draining to the 85th Street drainage swale. Because the project impacts less than one acre, no stormwater detention or post -construc- tion water quality treatment will be necessary Planning Staff Report Flint Hills Resources Site Plan Review — Fire Suppression Building January 24, 2022 Page 5 of 7 Vehicle Access The new fire suppression building will have vehicle access via an extension of the existing gravel entrance off 85th Street South. The new drive extension will provide a vehicle path between the terminal station's existing gravel and the new building's equipment access door. This extended gravel drive will be compacted graded aggregate base. MODELED VEHICLE: • 20' PASSENGER TRUCK. • GREEN PATH REPRESENTS REVERSE MOVEMENT. • RED PATH REPRESENTS FORWARD MOVEMENT. Vehicle Access Parking The proposal does not impact any current or proof of parking areas. Landscape/Restoration Plan The disturbed areas outside the new drive and the building will be seeded for a permanent grass cover (approximately 0.06 acres). Depending on construction timing, temporary seeding may be required. If temporary seeding is installed, the contractor will return to the project site and install permanent seeding at the appropriate time. No additional landscape plantings are proposed so as to not obstruct access to the structure and the equipment as needed. Planning Staff Report Flint Hills Resources Site Plan Review — Fire Suppression Building January 24, 2022 Page 6 of 7 PERMANENT GRASS COVER FOLLOWING FINAL LAND DISTURBANCE (on all areas outside the new drive and building). Proposed Restoration Plan Rendering Public Hearing Notices The public hearing notice for the January 24, 2022, Planning Commission meeting was published in the Saint Paul Pioneer Press and mailed to 101 adjacent property owners within 500 feet of the proposed project on January 12, 2022. City Department and Advisory Commission Comments The City's Technical Review Committee met on January 5, 2022. At this meeting, staff considered requiring further landscaping around the building. However, given the purpose of the building is to aid in an emergency fire suppression effort, the Committee determined landscape trees and Planning Staff Report Flint Hills Resources Site Plan Review — Fire Suppression Building January 24, 2022 Page 7 of 7 shrubs could become a potential obstacle for connection to or deployment of emergency equip- ment. The Technical Review Committee found that the proposed site plan meets the requirements of all applicable ordinances. Recommendation That the Planning Commission recommend that the City Council approve the site plan review appli- cation for the 210 square foot fire suppression building on the property of Minnesota Pipeline located at 6483 85th Street South, subject to the conditions stipulated below: The applicant and builders must comply with all City ordinances and policies except as may be modified by agreement of the applicant and City staff. 2. All grading, drainage, erosion control, and utilities must conform to the final plans approved by the City Engineer. 3. All outdoor lighting must meet City Code requirements and must be downward directed with cut-offs. The specifications and analysis of all light fixtures must be provided with the application for a building permit. 4. The applicant is responsible for removing debris from 85th Street South during their con- struction process. This street shall be swept clean daily or as needed. Parking along 85th Street South is prohibited. 5. No exterior storage is allowed. 6. The fire suppression plan must be submitted to and approved by the Fire Marshal and Chief Building Official before a Certificate of Occupancy can be issued. The property owner is responsible to maintain their private watermains, hydrants, and fire suppression systems. 7. Erosion control devices must be installed prior to commencement of any grading activity. Erosion control shall be performed in accordance with the recommended practices of the "Minnesota Construction Site Erosion and Sediment Control Planning Handbook" and the conditions stipulated in Title 10-5-8, Erosion Control During Construction of the City's Sub- division Ordinance. The applicant is responsible for erosion control inspection fees at the current rates. 8. The applicant will be required to conduct all major activities to construct the improvements during the following hours of operation: i. Monday through Friday 7:00 A.M. to 7:00 P.M. ii. Saturday 9:00 A.M. to 5:00 P.M. iii. Sunday Not Allowed Prepared by: Attachments: Site Plan Emily Schmitz Senior Planner FLINT HILLS resourceso TANK FIRE PROTECTION SYSTEM UPGRADES TANK FOAM BUILDING CURRENT REVISION PREVIOUS REVISIONS CIVIL/SITE IMPROVEMENTS COTTAGE GROVE TERMINAL COTTAGE GROVE TERMINAL 6483 85TH ST. S. COTTAGE GROVE, MN 55016 PREVIOUS REVISIONS CONTACT INFORMATION FHR PROJECT MANAGER FLINT HILLS RESOURCES, LLC CONTACT: MATT DOKKEN OFFICE: (651) 437-0921 CELL: (651) 253-7987 EMAIL: MATT.DOKKEN®FHR.COM FHR OPERATIONS SUPERVISOR FLINT HILLS RESOURCES, LLC CONTACT: MIKE KOSTELECKY OFFICE: (651) 458-4860 CELL: (651) 259-6685 EMAIL: MIKE.KOSTELECKY®FHR.COM PROJECT CONSULTING ENGINEERING FIRM ESDC INC. CONTACT: L.B. HERNDON OFFICE: (918) 949-3670, EXT. 105 EMAIL: LBHERNDONCESDCENGINEERING.COM LOCATION MAP DRAWING SHEET INDEX SHEET DESCRIPTION REV. C-0 1 COVER SHEET 0 C-1 SITE IMPROVEMENTS 0 C-2 IMSION AND SEDIMENT CONTROL 0 C-3 EROSION AND SEDIMENT CONTROL DETAILS 0 C-4 CONSTRUCTIDN DETAILS AND SPECIFICATIONS 0 ALL WORK MUST BE PERFORMED IN COMPLIANCE WITH THE FOLLOWING APPLICABLE LOCAL, STATE AND NFPA CODES AS WELL AS THE KOCH PIPELINE COMPANY, L.P. (HEREBY KPL) SPECIFICATIONS AND STANDARDS AND THE CITY OF COTTAGE GROVE, MN ADOPTED BUILDING AND FIRE CODES. IT IS THE CONTRACTORS RESPONSIBILITY TO ENSURE ALL WORK IS PERFORMED IN ACCORDANCE WITH THE FOLLOWING CODES AND STANDARDS: MSBC MINNESOTA STATE BUILDING CODE W/ CITY OF COTTAGE GROVE AMENDMENTS MSFC MINNESOTA STATE FIRE CODE W/ CITY OF COTTAGE GROVE AMENDMENTS KOCH STD220.120 EXCAVATION KOCH ES1505.402 DESIGN BASIS — STATION AND TERMINAL KOCH KPL ROUTINE WASTE STREAM REFERENCE SHEET KOCH M1606.300 LOADING AND MARKING UNDERGROUND FACILITIES MANUAL KOCH TG1430.110 ONE CALL EXCAVATION NOTIFICATION AND RESPONSE KOCH ES1505.408 PIPE AND EQUIPMENT SUPPORT KOCH ES1505.460 SITE PREPARATION, EARTHWORK, GRADING, ROADS, AND PAVEMENT I HER BY CERTIFYD THAT THITON. OP REPORTS PLAN.EPECI PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY .$'�'y1 EU-4 q. '••; = LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA SIGNATURE: - Lp' '•• 53885M lF •' NAME: MARIANEL AA BALE `�- DATE: a-aa-al REG. NUMBER: 53— ISSUED FOR PERMIT .DTI¢ TXIa 6 p Xm °M Xua ,°.Wtl mX k IM uM I" . of FELT I,. B:.,l .S, I.P. -VI. Kmeu, and le II 1° Ar Mrmrn Im X6 cmikmS°I — mh and I" cmaMe°INa W IXr km °1 IXa d-9 IXr Mrmre Mmmfua and °g— IMI X aAdl nM Xe iryi°dicM, c°pkX, kM a °t.drBe w m.dly"nalre°nr. "m weX l°` yedlktllr funlMe0- W Midi It B DWG NO. REFERENCE DRAWINGS FLINT HILLS r e s o u r c e s COTTAGE GROVE MINNESOTA DECEMBER 22, 2021 esdc —EN®/NEER/NO '�erls,a�sas�"X r�s,alsas�;z COVER SHEET COTTAGE GROVE TERMINAL COTTAGE GROVE, MN C-0 TO I "I IF ODPIRV OUR TYPE COVER PERMANENT RAII COVER 'TO OM THE IF O= F=lyR, I ACROII AN =E�Y PRZ 01.OTIOITI,1,11 IRlll, N N I I ITR "I ED UTH IRII-11 POP ROOM ALPTY"K, C Y 0, dF `IETn'd­ I I ME zPROIlCTIMPPCTIFlII IF EE_ o=ECIO ON IlTlUT I =RZAT -ER CUALLITREATTERYLL VIll 11 PROKO.. I lk Ilk III, u lik 1, 41k Ilk ESTIMATED EARTHWORK QUANTITIES TOTAL CUT C Y CY r VoH,EFN oTED NOT ORKI Vo" 'I Rll, M E , MY D IE RVo MTHOMI�'N�ONTDEDHRIONV�oTEHED�'OUN�TMIEIT IO'RnlCTo�IRInIREEREE'ITMPONnIT "u E I CUT IND 1111 IUINTITIA 10 1— 1 COM DIETE IND IFFEDTIIIE PROIECT I � V NITRUIED TH,EENOTED EIIHIORKIVOIUMEel�RE.1pedOMTPIRNION IDEV­M�%lo­ `NILL `DEp 00�R D Z 'e.� ,NNN"NT'L,C,DAR_ HE oTE oKU No I C =D M OVINI E110PTI THI I PRUDENT CONTRIFTOR M. INCUR DURINI THE VOIEI I DEVE10CMENT .ENERALCONLITRUCTION NOTEI I I" E C 0 NTPR­ OR '"" COMPLY ' I" ALL PER=�PTR OV' I ONE OF I HE MA- OF 'CC IF NCT PRE AS NT 0 N N Co NITRUCTON IIUEI IF TH E ON 0, Co RUPFFOL OFF 01 AMER , N AND TIE IAFETFANI lEAll RE.UFAUONI FOR CONLITRUCTION IIIUEI IYTHE U I PERU 01 LVIOR I ENDEIRE M INT' , I HE CONTRACTOR AND REITORE=NTOPECol L0_OL­ FAIR To 0 R E CUAFTOTUATOTE E,=CT ATTHECOMMEN 0 N, ON TPUTITE OR A A VIA E� PEEITIFFINT ONTIT"CIOTNIE =N TO EIRET ACCEORIINC TO I I I RI' N " N I CA 0 ER E IRA A LAS IV TI IF I N I OR M I ON A I TOT Do CA" N OF T" E E "I N ' ITT El IF OR TO ANY CONLITRUCTION ACTIVITILI TIE CONTRACTOR R REIPON R, HE 1 0 R VERI= C THE EAVACT LOCAL ON 01 FIFTY. UTILITIES, PUILIC OR LEAVE, II—NIEREON OR NOT11—NIEREON K TI ONTRACTOR IIALL NOTIPY TIE ­NER 01 ANY ILICREPPNCIEI IE—EEN TIE PLANI AND I E�,CCFOLMTON, I ALL CONLITRUCTION CONFORM TO TIE IPPICAMIE LOCAL REIULATORYPIENCY $TANIARII AND 'PEC I CAT ON, I IF TART N ' CON 'I R HOT ON I I E IENERII CONTRACTOR I 1 11 ME REIPONIIIE FOR AS �Ry ITO LAT ALI RE OU R E I RE RMTEACM PPROV ED SEEN OIL PER No CONTR N A AT AvE A R HOLD 0 R FAIR 'I ON OF 'NY IF M E UNIT I THE Co NFIRICTOR "' RECE AS I "' PLAN I AN, ANY OUT IER OCU ME NTAT 0 N =' A I ILION I TH E PER M IT N . ARM CLIFF PUT, OR TILI I I E N ICTOR I PROCE CAUIE TIE CONTRACTOR TO VE�A UREFO I Co To '0"0' 1 LURE "A- ULD F� RE P ON �FTY I OR ANY IUII ECUENT KDOICCATON 01 TIE ­RK MANIFFEEI IY ANY RE.UFACORYAHTIORUY I THE Co NT I PCOUNT, TORRUEON. ONALNOI R ITI"FlLYl COMPANIES AT SEVENTY = CT ORII, UIRPI PIIFCOAIITEO C1OOMVEMRENNMCELNIT I E CONTRACTOR IHIII PROTLECTIR TIE PROF CONSTRUCT ON LIMITS FROM I LP.E ALI ADUCCENT ARE. OU TASEASH"DEENSTITNATEI CONST'L UCT ON I M I% AIED 0 R I STURED 'y THE CONTRACTOR ANEDIOR H I SUICONTRACTORS, SHALL ME RETURNED To AN ACCEPTAILE COUP TION I M FAIR To _AT KOFS IF IOR TO THE DISTURIANCE I ACCE IS To I HE I TE ED R E M ERIENCY VEH CLES AND RECULATORY A.ENa INSPECTORS SHALL IF M A NTA NED AT ALL I M E I I I R N. CONSTR UCT ON I I ElU NO ENT AND MATERALS SHALL IF N A` E I Co NSTR UCTIO NAND STO RA. E AREAS SHALL I�TKEREDCF�ANAREAUFTDM EICNATED IY THE ­NER 11 CONT HALL IF RESPONSILE IOR=.ENDIDAW E=TRU.DlAY(­ve, = ISE N C N , CURE, URII UTTER, ETC UP N. ON IS Co ORDINATE ALL I TE CONSTRUCTON ACTIVITIES —H THE MECHANICAL, STRUCTURAL AND ELE AD CALCO NSTRU CLION DR_UNCS IS ALL CONSTRUCTIONTO IKE RICE INSIDE THE ITINT HILLS RESOURCES PROPERTYLINE IS LANDDISTURIANCEIREIRECTEDT01­1 IIARCRES CURRENT RVISIDN PREVIOUS REVISIONS P'.1W NEWPROJECTAREA 7 OVERALL LAYOUT SCALE I -Sl FILE RACIN. ADD DRANSVE CONLITRUCTION NOTEI I CONTRACTOR IHALL COORDINATE VSUH EOTECHNICAL REPORTOEN.IUNEER RE.ARDIN. IOIL FOUNDATION MATERIALI UNDERNEATH `­ ITRUCTUREI ADD ROAD'AY=N =,CUTHFNlTAND/OR EFFECT I —FILL MAY ME RECUIRED AT EFFECT E I MALIMUM CROII SLOPE ALONE `­ AND MODIFIED IERACE ROPHOURIVER 'HALL IF I./. I PROVIDE IUFFICIE W TEMPORARY COVER OVERTOP ALL 'U R ED P P EL NEI ADD CULVERTS To HELP OFFSET THE E C IT I R OM I HE HEAVY CON 'I R HOLD N ECU PLAENT REFER TO THE IPECIFICAUTIONI FOR ADDITIONAL INFORMATION FOLLOI PC HEAVY CONLITRUCT ON, ETHIC EACH CULVERT I DEPTH OF COVER To THAT NOTED ON THE CON IT UCTION DRAVIIN.1 Ko, I ­ANI, p, TH N THE PROjECL I M III, ACR E.1'U.RIP PER.ANE W R.1 ITAILIERACTION ( — IT I lhe I, IT ­h AoKe, AKIN— w,Il -eve � g­, I RE=EIWICOAFFTOPIO LKI PvleT.URIED=�eNOU CHEDULED TO RECEIVE A P ( e Ao , p eL I e`ENERAL FILL MATERIALS ON' TE MATERAL' pped 'op'o e" �E­d d ehl UMPI UP DOE �THATCAR�UNCDMP= ONLY NATURAL ITIONE, CRUIHED COODENCRETE I _10D OF N H EARTH MAIER vjldIHALL IF UIED AS FILL MATERIALI NO TRASHIRL RI.HTTO REJECT M�Tg�,�LeIU),�DAFLOLRIFEILLLLO-EFDLL MATFROAINDR RV ER " 'RT HM ALL I, E I �RED 1 0 F�LOT� AD EA ME R.EA R 0 ED EOTE IN 11 1 0 N . F=AD PN AND FVR M`yNEH I CTAI LCEEPT'NL, ENNO' I TH I N TH APR OJ E CT I M IF I HALL CO LLE =�FRIATTO R MlATERPROU N�OgF F. IU NgLEld AR � ARE NFLENDED To 'TORE ER e 1 0 FIT beh,Id ­,, �IoKg lCCNTHRAA`TORR`MATEF`=TO THE PROjECL 'ITE AND AM N I I TO v, NI T—ARDI ALL DEI.NED OUTFALLI — DIFTED - — CONSTRUCTION DRAVSU­ ALL PROJECT RE—ED FINAL.RADIN. IHALLALLOv, ITORM­ER RUNOFF TO DRAIN UNOIITRUCTED TO A DEII.NUPTED OUTTALL THFUE IERACE DRIVE CONTOUR AND IPOT ELEACTIONI REFER TO THE TOP OF THE DRIV-AY (lop of ­ded ­,eg­ b—) — — — — COAPS THE CONTOUR ELEVACTIONI REFER TO THE TOP OFTHE FINLIHED RADE — DATE PREVIOUS REVISIONS BY YTC H 7K SPOT ELEVATIONABBREVIATIONS: I, 1 11 111VIL IIIVE F, TTOR OF OoNRETE IS (TD) TC , NE' 'RAVELERV CE DR AS TOP OF GROUND (rnihed) CONNECT ON � TH THE El ITIN. d �' A 11111 m raw E A III IF DEMOLITION SCALE I -El WETEE lhe Wl, ­ty W FLINT R­ RESGJRCES 0, U, K.P., IA t 1.1 t. 0, 1a N, E ­ . IF d b 1 DW . El . d111, 0. WIN _ U. It dltll Vol bI, rmrWuced wq 1.1 a .- It `2 uz 2 IAFAL DRIVE IIALL IF FL111 OF 21 (111 A 11111 cp O A 121 IF OF 11 (111 A 121 IF all IS (I.) SEE 11 EST ERE) 1111D. IEIVIIE 111AS ILITALLAT 11 111TIACTIll I"ALL PROTECT N - I IF PROTECT ON ITC) PEAUDI FROM IAPEAIE —ghl SEE II(TC) SEE FIT.) FIAM FEE - SEE 21 A 122 IEEE TOITRICTICALARICIE F ECTIN III ACID11YOUL UFlIPElIlN EST 21 (T.) 82 `­ FILL LISEUR ESCAPE IRA RACE IIALE III EATELPI FLII PEATENALT1 C .. E OT CILLIFFILEELLIT IIIE ARMI, I IAAEL 11 V'(Z%'­ -1—ARIANIAVOFIFIl. TEST P THE L_ IIIIIIN ) — — — — — — — — — IELLITALLI IFCIII"EIITIIETIALLIIITIIIEI — — — — — — AREAEALU.TUECUTAUPEEUT_E IEUYITALLOIEPAIF ALL ILITUIIEI ENITHY. E RAVEL 111VEALLEAS VILD `­ IAIEIA..IE.IE FARE rveon ILIPE111THATITOILEVEACE1 ICAURVE 'CC... GRADING, DRAINAGE & SITE LAYOUT A =EI`C`PIllN. SCALE 1-11 I—EIII—LIIIVEFOLLOwIN. CLECT CONLITlICTION 01rallm!7AITI1! PRO Fps G I HEREBY CERFY THAT SPECIFICATION,DTHIS OR REPORT WAS PLAN. PREPARED BY ME OR UNDER MY DIRECT S UP RVISION AND THAT I AM A DULY AWANE, LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE UP MINNESOTA BRI.E. j SIGNATURE: HAVE: ARIANELA DATE: RED. HUN.CR: ­S ISSUED FOR PERMIT SCALE I -El REFERENCE DRAWINGS FLINT HILLS r e s o u r c e s- COTTAGE GROVE MINNESOTA DECEMBER 22, 2D21esdc SITE IMPROVEMENTS COTTAGE GROVE TERMINAL COTTAGE GROVE, MN C-1 85th STREET SOUTH &1 [A ONDs f.-.% N61Tem PQraCY aB tl/or PEOcT.4II� �M DE�`��a� o �� DING TV1E0 / o DC I[ ME ED' G \ 822 TO a@ \ e SEDIMENT CONTROL B� ,.y �iRxa ew, DW�. �eoor un,xaPon.Noo Faa A�,.aas ama ��I:�JF me oes� a smP azoro� Memo Ell— Fra,xp s amx. waainMml wassauaww, ss1seasys,wa nlwarep.,n, xa.eey,aw4 cnwwl mdusoE mvac'an a', maa�e aeomw .17E � i..e...n immcwiaeaceia. pma.nw,wm'=a.m.eawmaw.xiuvnem. wecro�Nanmysp .m ma=.1== L1=4Z.1� =,n I CURRENT REVISION PREVIOUS REVISIONS FINISHED SURFACE COVER STEEL fENCE POST (T-PoSTJ, MONOFUAMENT GEOTERFEE MINIM I''SONGAG, 1. MNDOT TABLE E. 38W-1(HAND INSTALLED). RDM FABRIC OF IACRIFAeucw5 MIT 9')C ER PoSr NOT W EG FAB IA�Y�IFA&UC HNT HE UGSGIAN LHT EQU�ENT PRIOR TO PLACEMENT OF THE POSTS SJRF— EONT PAST E 6" STANDARDD I Go= BT� cBHAND UNEDU �'NI^axMep� COTTAGE GROVE, MINNESOTA ERP2 PUN VIEW DERSEETION OF I. SPACING REOUIREMFNfS SURFACE FLOW 1 WARE N J— _ `100 FEET PER EOF DRA[NAGE. D. SIZING REQUIREMENTS 315,325 UPGNADIENT SILT FENCE ANCON� 0 IS. AMOUNE NE L6 1 25'R 10. 16' .1FEGRADIENT SILT .ENDN. UE, AS IS -FOR CaTNN_ IE PAFA< 25 ACRES IHWK AREA IIL2I AGREE DIED 111 >30 DCG�-7—ON OF � 3-HOOKS SHIALL BE TFSNREEETAN RIM�OMEPAR4 EL EN TME-' A REEG ON L m IEcoNTGURs. LL I» /'� STANDARD DETIS 1 l==Groff rHODKv COTTAGE GROVE, MINNESOTA �_ Ett0-4 PO°goo�o0 sw WOOOCHIFS-18 MINIMUM DEREENVO UO Do S �o����� `� 3E(tDGTIOµ80R IH IA'MINIMUMCUY FF NN WINIMRUNOFF FROM NOTESE A&UC I— BE OR WOODCHIPS TO STOP M'S MIUNDER FDCK I GRATION TENTRANCERMUSi 2 TO PREVENT SEDIMENTATION TRACKING. O corvsT�HO OCCOTTAGE ERO-12 CITY OF COTTAGE GROVE STANDARD EROSION CONTROL DETAILS MINNESOTA DOT SEEDING SPECIFICATIONS PREVIOUS REVISIONS BY CHK REFII NORCE Th. Em R Aoe lI Been DUNisAM and 4 HM1 . Papa1Y M FLNT HILLS RESCNRCES, LP. ft It , Koran, Ali i Im1 to the Kmrwrm IN NM amf-1 uae oI'F. pli M omabaolim of INs Imn of the W-, 0E Bmronm P— - agar Ult R aNtll nol Ne reprPEuatl. 'Wiwi Iml a o1KaA'x .y p,p of ?rally m MdaaNE mr paM im mY W,Pae o1Ner INm im xNicA N H spsRimllY IwnaM1M REFERENCE DRAWINGS FLINT HILLS F e S O U f C (3 S COTTAGE GROVE MINNESOTA IATTHIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFES90NAL ENGINEER UNDER THE LAWS OF THE STATE OF VINNESOTA NAME: MARIANEL2A BALES DATE: i2-d-d-'dI FEB. NUMBER: 53EE1 ��Yp�s}IEW eq��iD•: F E9flE. •, - ISSUED FOR PERMIT DECEMBER 22, ?021 esdc —LNB/NLLR/NO EROSION AND SEDIMENT CONTROL COTTAGE GROVE TERMINAL COTTAGE GROVE, MN C-2 ggggggF��g��g�L'.99".f� �maa ®mom MINNESOTA DOT SEEDING SPECIFICATIONS J I HERE BYOCERTFYrTHAT THIS PLAN. SPECIFICATION. OR REPORT WAS ISSUED FOR PERMIT PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED MDFES904AL ENGINEER UNDER THE LAWS OF THE STATE OF DECEMBER 22, 2D21 ••'4� MINNESOTA Euq t�'•g�EMSEW '_ NAME:T MARIANELA BALE WAII[ER ��a� N DATE: �2-2d-2 53BB5 .'r.4c_�An �Vr 9)�'• —EN®/NEERpNO `oa REG. NUMBER: 5DS65 `••••'a ag zMN SyreM ulna, ol<Tatta II 9 ne:lrtel ray-xTo ax:l—tray-.T2 INK DATE CURRENT REVISION BY CHK REFS MK DATE PREVIOUS REVISIONS BY CHK REF/ N011tt 6wbg TMa Am nM � HILSAb ma M m. mM l" OI FLINT HILLS AfmURCE4 UI WMNq Kmeu, mL Ie II to tAa Norman Im n6 cmibmual w mh me In cmaMwolbn W IAr bm o11Ae d-9 INc Nwmrm M ., and ag— IMI N oAdl M Ne rryradreetl, cop., bM w oth... d M —, w FEireclly. — — for y pupmr aPw IAm Iw Midi II Ie yrN-1, lunMel. DWG NO. REFERENCE DRAWINGS I FLINT HILLS r e s o u- c e s COTTAGE GROVE MINNESOTA EROSION AND SEDIMENT CONTROL DETAILS COTTAGE GROVE TERMINAL COTTAGE GROVE, MN MK DATE PREVIOUS REVISIONS BY CHK REF# DES. NRR REFS PR,F004902 DATE 11/2Z/1t DR. NRR CH. NRR AP _ SCALE N A OLD DWG NO. - DWG. ND. c- REV. 0 GRADING wLL.prw u�E sscTmmnv e.�pvyiramAa,awn.�xtrp.l: rnmruiamfrtn nlwswxme con rxucnnx xnEima roxtitincanrurvn Eexm Evnv.rwx ecrrvnits.mEE,winEExsr,uteE xonuEc. nr+o. Al "Al ex IA o.mn, �,w,ao�.. au<.or oMr,Eo ro. .wtil..r��n LLew �I.eEo torn.o..e..t:mo.rol.es.atteEl„>T.tttol s. worrsa.oeemra .R o.os:. wrEmoeRaooM m.aMtml�oEo or.m �p:c��tn�e�w �meptm,w.r,rr.�eR4 rem. �e.eoow.me::eattee rlttEo.r,000MP.,Tmetro.e,.e qa. rlttle.a�to. In'm�,xt.Ro�r,Etao,. iotaAro o.xEe aam�ut. o�Im.eM,m:,orc omq�tewee,w��n-Irv�x�. �rflw �Mc m�E..0 �A�r,E�o �.F:W����. DEMOLITION / SITE CLEARING GRAVEL SERVICE DRIVE SECTION DETAIL I ... 51DU.. E Al IAN SPECIFICATION. OR I—, WAS PREPARED 11 ME OR UNDER .V DIRECT SUPERVISION AND THAT I AN A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA .."A "RE NAIVE: MARIANEL A BALES DATE: )a-ad-a1 RED. NUMBER: 539M ryF,�p�EW 9q� •,. 91e.... • ia��jW,a` ISSUED FOR PERMIT DECEMBER 22, 2021 esdc —EN®/MEEK/NO p,...a(V= ... �Nl gassTx NK DATE CURRENT REVISION BY CHK REFJ MK DATE PREVIOUS REVISIONS BY CHK REF/ N.I. TNb 6 p N¢ .1 — HILS RE me M m. mMI. of FLINT HNSLESDNRCEs, I.P. WAMq Kmena, mtl le lent Io 1M Nmmrn im N6 cmibmual w mh me In d Ilse bm tNe d-9 IN, DWG NO. REFERENCE DRAWINGS I FLINT HILLS r e s o u r c e s CONSTRUCTION DETAILS AND SPECIFICATIONS COTTAGE GROVE TERMINAL COTTAGE GROVE, MN AK DATE PREVIOUS REVISIONS B/ CHK REFS cmeNemlbn of Normre M— mtl agree 1No1 N eAdl M Ee kM DES. NRR REFS PR,F004902 DATE 11/2Z/1t rryradreM, copFe, a oth..be al9o»] of drMly a Feireclly. nm ueetl for COTTAGE GROVE DR. NRR SCALE N A DWG. NO. REV. y plrpaes aPn 0- W Mich It Ie y.dlbmr +mleN.tl. MINNESOTA H. NRR ,'_ OLD OWG NO. _ CL 0 El THOMIIPSON'S GROVE 7TH ADDITI N L z o RDTR LINE DE REIRENTIEL PRDPER, LH RENGRM�K }, �� —J� — 85TH.i STREET SOUTH % TME�.ID,�.ER ESHURI Ron SRI S 89N29535 W 1119. 83 — 'I INT EN SENT IF wnv IFNoFTH NTT sREET sauTR _ ,� or esrR IT, s E z, LINE vnrenuEL m,n Namn LINE A IN IN IN PEE S PEE Tso FSFU IETARUl LINE To reESFELL SH 11-1 LINE, a 5 S 8929'35 W 500.00 _ see— -- exi i rvc SuiLDirvG P aW _--ael----:al----sv.--- canVEL NEW DRIVE. GxiAVEL TANK FOAM BUILDING GYtIIEE & ` D sNG vaovEaT� LINE REF. DWGS. S-1 THOU S-8. GO PARCEL- 2 GRAVEL i ' 3 TK-21 TK-21 e corvTurvnnErvT DIE CC ela>TN 0 a� zw, � cRnnEL v � - FIEVEL PARCEL_ 1 o u ' GrennEL JII cenvEL , 2 —FULL _L ----- cQ- N GRAVEL DreAGE N 89'2935 E E19. D2 Dnonri n S 89'29'35" TN 89'29 35 E 500.00 W 1119.02 PARCEL 1 p1./a 1Doo' EI a. TSG, R, z1 BOUNDARY IF IND v,w.AicL —H N LINE DE sin%n .."_ .✓, ... OLF AC/ NUIRINEFIR J� = H C Z cn W J= W i S Z � Z � W Q Q Q Q Cr o� s Ty 02 J EDEciEicAnoN, OR RE RT WAS TANK FOAM BUILDING — CIVIL SITE PLAN NOTES: ISSUED FOR PERMIT PREPARED BV ME R UNDER " DIRECT SUPERVISIONENSEDPR AND THAT AM A DULv SCALE: 1=50'-0" T 1. CLOUDED AREAS DEPICT NEW CONSTRUCTION. 2. SEE DWG. S-3 FOR GENERAL NOTES. DECEMBER 22, 2021 UNDER HE prEa MINNESOTA scNAnae� �yqW�1' = 50'-0' . ?e' sro Epor�Es"sa+u'. FNGixFeP 3. CONTRACTOR TO VERIFY ALL DIMENSIONS & ELEVATIONS BEFORE POURING CONCRETE. FLINT HILLS RESOURCES LLC SPECIFICATIONS. 4. MECHANICAL AND CIVIL CONSTRUCTION TECHNIQUES SHALL BE PER ���� K c� GSOC�ETEAFAAIENLOI cnoN. NAME. MARIANEL A BALES DATE -2d-2 P. 53885 :ee d9/J sF, : �j E. LIST BENCHMARK }�2: ORTHING: 129318.3083—ENs�NEER�NB'on alai E1e° "N°aai F1re Piole"" co.�E. sT..E or+EULL COMPANIES aT LEASH we 'OURS PRIOR To ,� 2� FASTING: 463257.0980. COORDINATES PROVIDED ARE BASED ON WASHINGTON �zmn svrea oi�, ox �aava REc. NUMBER. 53985 `ia COUNTY COORDINATE SYSTEMS. Dealsve, savati7o ax level sasasn MK DATE CURRENT REVISION BY CHK REFJ MK DATE PREVIOUS REVISIONS BY CHK REFJHUFHF,SHE DWG NO, REFERENCE DRAWINGS TANK FOAM BUILDING- CIVIL OVERALLSITEPLAN A7�7 FLIN HILLS TERMINAL MK DATE PRE4IDUS REVISIONS BY CHK REFd 1' I resources® COTTAGE GROVE COTTAGE GROVE. MINNESOTA DES. DIED Pi1J o5000 T2LDTLT Tor wnirn A D COTTAGE GROVE DR. RL SCALE DWG. NO, REV MINNESOTA DIE SO OLD Dwc _ S-2 0 1 2 3 4 5 6 7 3 1 9 10 11 12 13 14 15 16 17 13 19 20 15'-10" BUILDING LENGTH NOTES: A T.O.S. 1. SEE DWG. 5-3 FOR GENERAL NOTES. 2. CONTRACTOR TO VERIFY ALL DIMENSIONS & ELEVATIONS BEFORE POURING CONCRETE. 3, MECHANICAL AND CIVIL CONSTRUCTION TECHNIQUES SHALL BE PER FLINT HILLS RESOURCES, LLC SPECIFICATIONS. 4 1/2`0 4, CONTRACTOR TO VERIFY ALL CRITICAL DIMENSIONS AND ELEVATIONS PRIOR TO FABRICATION OF STEEL. 4 1/2% 5, CITY ORDINANCES REQUIRE EXTERIOR WALLS TO BE B COVERED BY BRICK OR STONE. INSTALL BRICK R - VENEER BY 'TEXTURE PLUS' (OR EQUAL) BRICK 8. SEE DWG. S-4 FOR TOP OF SLAB ELEVATION. T.O. SLAB VENEER NORTH ELEVATION SCALE: 1 /4- l'-0" PROVIDE GUTTERS AND DOWNSPOUTS 15-10` BUILDING LENGTH D (INSIDE FACE OF WALL PANEL TO 12'-4" BUILDING WIDTH INSIDE FACE OF WALL PANEL) 12'-4" BUILDING WIDTH NORTH ELEVATION 12" PROVIDE GUTTERS AND 12" O S T.O.S. 2,. DOWNSPOUTS E T.O.S. _o �d a �a �} o T.0 A QQQ ? -oo o w N w BRICK a 4 I VENEER BRICK 3 w F VENEER - - 4 1 /2"0 T.O. SLAB T.O. SLAB `" T.O. SLABuh T.O. SLAB SOUTH ELEVATION 3'-Ox7'-0" THAT THIS PLAN OVERHEAD ROLL -UP INSULATED DOOR SHEEPPC`ATCoEFTFl PREPARED DIRECT SUPERNEION AND MOE' THATOTER)OI AM A DULY GARAGE 000R PLAN VIEW LENSED —REGIONAL ENGINEER UNDER EA GE HE S A E GE ` SCALE: 1 /4- l'-0" " OTA 2-5" 8'-0 2-5 4-113-0' 4'-11" sDNATURE WEST ELEVATION 15-10' BUILDING LENGTH EAST ELEVATM NAME. MARIANEL A BALES DATE:a as-a� SCALE: 1/4"=1'-O" T.O.S. SCALE: 1/4'-l'-O' REG. NUMBER: 53985 H 9� �y pNFJlq . ppprEssIONK• = FNGINEFe • 53985 J BRICK VENEER ISSUED FOR PERMIT T.O. SLAB DECEMBER 22, 2021 K esdc SOUTH ELEVATION ....... ff7M o SCALE: 1 /4 - l'-0' eas,a sag "N ,s,alsa� 2 MK DATE CURRENT REVISION BY CHUG REFJ MK DATE PREVIOUS REVISIONS BY IF REFJ NOT 11 ror lIIrn a �s DwG NO, REFERENCE DRAWINGS 7 ( �'LI ' HILLS r e S O U- C e S COTTAGE GROVE TANK FOAM BUILDING- EXTERIOR ELEVATIONS COTTAGE GROVE TERMINAL COTTAGE GROVE, MINNESOTA Mu DATE PREVI US REVISIONS BY IN REFd _ _ _ - - - - - - _ - _ - _ - - - - EFH J-0 Pre/N" DATE 12/m/21 DR. RL SCALE l -0 DWG. NO, S5 REV 0 OLD owc No. 11mea. MINNESOTA AD FOAM BUILDING RENDERING SSUED FOR PERMIT DECEMBER 23, 2021 esdc -ENB/NEEN/NI PM1one: �918�9as3b]0 Fax:�g18�9as3b]2 Mu DATE CURRENT REVISION BY IT REfg I Mu DATE PREVIOUS REVISIONS BY IT DELI re, wnU n e DWG NO, I REFERENCE DRAWINGS A7�7 I FLINT HILLS resources® 'TJ COTTAGE GROVE FOAM BUILDING RENDERING COTTAGE GROVE TERMINAL COTTAGE GROVE, MINNESOTA Mu DIE aREmous REVISIONS By cuu REEk REF u PNONE z9a ,2ivi2, DRS TOR 111E DWG. ND. R-1 REV. 0 LB OMINNESOTA LD Dwc No.