HomeMy WebLinkAbout2022-01-24 PACKET 06.2.STAFF REPORT CASE: SP2022-003
ITEM: 6.2
PUBLIC MEETING DATE: 1/24/22 TENTATIVE COUNCIL REVIEW DATE: 2/16/22
APPLICATION
APPLICANT: Minnesota Pipeline Company
REQUEST: A site plan review to allow Flint Hills Resources to install a new 210
square foot tank foam building to support a fire suppression system.
SITE DATA
LOCATION:
ZONING:
GUIDED LAND USE:
6483 85th Street South
1-3, Heavy Industry
Industrial
LAND USE OF ADJACENT PROPERTIES: CURRENT GUIDED
NORTH: Residential Low Density Residential
EAST: Residential Low Density Residential
SOUTH: Industrial Industrial
WEST: Industrial Industrial
SIZE: Tank Foam Building = 210 square feet
DENSITY: N/A
RECOMMENDATION
Approval, subject to the conditions stipulated in this staff report.
Cottage
Grove COTTAGE GROVE PLANNING DIVISION
�
here Pride and Prosperity Meet
Planning Staff Contact: Emily Schmitz, Senior Planner; 651-458-2874; eschmitz(o-)_cottagegrovemn.gov
Cody Flannery, Planning Consultant; :.:flannery _cottagegrovemn.gov
Application Accepted:. 12/28/2022 60-Day Review Deadline: 2/26/2022
City of Cottage Grove Planning Division • 12800 Ravine Parkway South • Cottage Grove, MN 55016
Planning Staff Report
Minnesota Pipeline Company
Planning Case No. SP2022-003
January 24, 2022
Proposal
The Minnesota Pipeline Company has applied for site plan review for the construction of a 210
square foot tank foam building to support a fire suppression system. The building will be located
outside the existing tank containment system (tank farm) on their property at 6483 85th Street
South.
Site Location Map
Review Process
Application Received- December 28, 2021
Acceptance of Completed Application- December 28, 2018
Tentative City Council Date- February 16, 2022
60-Day Review Deadline- February 26, 2022
Background
The first oil storage tank in this location was installed on the site in 1957. Subsequent construction
phases over the decades have added additional tanks. The existing use for the storage of crude
oil, refined oil, alcohol, and other liquid is a conditional use for the 1-3, Heavy Industry, zoning
district where it is located. A conditional use permit (CUP) was granted for the existing use as oil
storage on the site in 1999 and remains in effect. The applicant continues to submit up to date
preparedness plans and completes annual compliance inspections with the City Public Safety
Department. This building and fire suppression system will support emergency preparedness for
the Minnesota Pipeline Company activities at this site.
Planning Staff Report
Flint Hills Resources Site Plan Review — Fire Suppression Building
January 24, 2022
Page 2 of 7
The City received a request by the Minnesota Pipeline Company for a site plan review to allow
Flint Hills Resources to construct a new tank foam building at their site located on 85th Street
South. The construction of this new building will support their new fire suppression system as a
further precautionary measure to ensure ready deployment of fire suppression equipment and
materials in the event of a fire at the tank farm.
NEW PROJECT AREA
- ........... .. _ t
R`
7-7
i \
Overall Layout
Planning Considerations
Ordinance Requirements
Site plans are required to be approved before a building permit for a new structure or major addi-
tion to an existing structure may be issued. The purpose of site plan approval is to assure that
new proposed development conforms to the city's development standards and ordinances and
provide the most appropriate and compatible site plan for the area. Given the proposed structure
is adjacent to a residential neighborhood and is an additional structure to the site layout and op-
erations from the original approvals for the first development on the property in 1957, a site plan
review process is required.
In accordance with the site plan review procedures required by Chapter 11-2-4 of the City Code,
the city staff has reviewed the site plan for:
1. Traffic and pedestrian circulation
2. Parking
3. Drainage
4. Landscaping
5. Compliance with other applicable ordinances
Planning Staff Report
Flint Hills Resources Site Plan Review — Fire Suppression Building
January 24, 2022
Page 3 of 7
Land Use/Zoning
Minnesota Pipeline Company's property is located within the 85th and Geneva Staging Area as
defined in the Cottage Grove 2040 Comprehensive Plan. The area south and east of 85th Street
and Geneva Avenue is mostly guided Industrial with respect to the petroleum tank farms present.
Most of the property in this area is owned by petroleum companies, including Minnesota Pipeline
Company. There are two rural homesteads and five single-family homes on the west and north
edges of the area, fronting Geneva Avenue and 85th Street. Changes to the Land Use Plan will
guide the western and southern parcels as Low Density Residential to buffer the area from future
Industrial development. Minnesota Pipeline Company's current operations and proposed building
are compatible with current and future land use guidance. Minnesota Pipeline Company' property
is zoned 1-3, Heavy Industry. This zoning classification is consistent with the adopted Cottage
Grove 2040 Comprehensive Plan.
Site Plan
The applicant is proposing to construct a 210 square foot steel frame structure. The building foot-
print is 12 feet, 4 inches by 15 feet, 10 inches with a height of 12 feet 4 inches at its highest
elevation. The building will be equipped with an insulated surface door as well as an insulated,
rolling overhead garage door.
THOMIPSON'S GROVE 7TH ADDITI6N $
LJ '= L-------------1------- 4
—I-------J L------ ., --J I�—1------� ------
N -SOON
$STH 3T_—__—__— _ __ _____ i°rc-0• —� _—__—
�� --- --- --- --- ----_- — ��-� i '' i 1r-- --- - -- -- v---~---h--- - N I a'
PARCEL 2� Nn. °
1 I a I
it a
TK-21 TK-21
1 PARCEL 1
'
wwp- - 1
- -----
's VICINITY MAP
xor ro urc
TANK FOAM BUILDING - CIVIL SITE PLAN NOTES: ISSUED FOR PERMIT
sfxe. i-so-o R-�=.�°^ . s¢ ow. ¢x a �A011' DECEMBER 22, 2021
tia .
asE _ _ _ a�E CgMYfNDNOWnR °+SRuS. Tnxl(FdWO1ME .CNILOVERALL°NEp,pHmx
FLIN�TT WIN""" FHILLS 6 S Q GCS • fATTAf£ Gp4£ MINNESOrA
_ _ _ _ _ m _ COTiACE CAOYE H°' xry
MINNESOTA 51 0
Proposed Site Plan
Architecture
The proposed exterior material for the structure is a brick veneer on all sides. The proposed ma-
terial was requested to be consistent with the City's minimum architectural standards of Class I
Planning Staff Report
Flint Hills Resources Site Plan Review — Fire Suppression Building
January 24, 2022
Page 4 of 7
materials for structures within the Industrial Districts. Given the minimal size of the building, staff
is supportive of the proposed veneer as opposed to a full brick material.
15'-10' BUILDING LENGTH
T.O.S.
4 1/2"m
i
4 1/2-1
BRICK
SUB VENEER
I I
NORTH ELEVATION
SCALE. 1/4'-1'-0.
PROVIDE GUTTERS AND
DOWNSPOUTS 15'-10' BUILDING LENGTH
(INSIDE FACE OF WALL PANEL TO
12'-4' BUILDING WIDTH INSIDE FACE OF WALL PANEL)
NORTH ELEVATION
2. 12- T.O.S. O
T.O.S.
a� 0
0
900
�oo
BRICK c VENEER
Z�
FTO T.O. SLAB
I I OVERHEAD SOUTH EUVAMN
I I ROLL -UP
GARAGE D00R PLAN VIEW
2'-5- I 8'-0' I 2'-5' SCALE: 1/C-1'-O'
WEST ELEVATION
SCALE: 1/4*-1'-0'
SOUTH ELEVATION
SCALE: 1/4--1'-0-
Elevations
INSUU
VENEER
EAST ELEVATION
SCALE: 1/4'-1'-0'
9]
Setbacks
The proposed building location is planned to meet the minimum required setbacks for the 1-3
zoning district. The required setback to the north is150 feet as it abuts a residential district. The
side and rear setbacks are adjacent to the existing facility and would not apply.
Grading and Drainage
The total project disturbance area for the construction of the new building is expected to be 0.11
acres. The disturbed areas outside the new drive and the building will be seeded for a permanent
grass cover (approximately 0.06 acres). Stormwater runoff from the project area is conveyed
across an established section of dense grass, eventually draining to the 85th Street drainage
swale. Because the project impacts less than one acre, no stormwater detention or post -construc-
tion water quality treatment will be necessary
Planning Staff Report
Flint Hills Resources Site Plan Review — Fire Suppression Building
January 24, 2022
Page 5 of 7
Vehicle Access
The new fire suppression building will have vehicle access via an extension of the existing gravel
entrance off 85th Street South. The new drive extension will provide a vehicle path between the
terminal station's existing gravel and the new building's equipment access door. This extended
gravel drive will be compacted graded aggregate base.
MODELED VEHICLE:
• 20' PASSENGER TRUCK.
• GREEN PATH REPRESENTS
REVERSE MOVEMENT.
• RED PATH REPRESENTS
FORWARD MOVEMENT.
Vehicle Access
Parking
The proposal does not impact any current or proof of parking areas.
Landscape/Restoration Plan
The disturbed areas outside the new drive and the building will be seeded for a permanent grass
cover (approximately 0.06 acres). Depending on construction timing, temporary seeding may be
required. If temporary seeding is installed, the contractor will return to the project site and install
permanent seeding at the appropriate time. No additional landscape plantings are proposed so
as to not obstruct access to the structure and the equipment as needed.
Planning Staff Report
Flint Hills Resources Site Plan Review — Fire Suppression Building
January 24, 2022
Page 6 of 7
PERMANENT GRASS COVER
FOLLOWING FINAL LAND
DISTURBANCE (on all areas
outside the new drive and
building).
Proposed Restoration Plan
Rendering
Public Hearing Notices
The public hearing notice for the January 24, 2022, Planning Commission meeting was published
in the Saint Paul Pioneer Press and mailed to 101 adjacent property owners within 500 feet of the
proposed project on January 12, 2022.
City Department and Advisory Commission Comments
The City's Technical Review Committee met on January 5, 2022. At this meeting, staff considered
requiring further landscaping around the building. However, given the purpose of the building is
to aid in an emergency fire suppression effort, the Committee determined landscape trees and
Planning Staff Report
Flint Hills Resources Site Plan Review — Fire Suppression Building
January 24, 2022
Page 7 of 7
shrubs could become a potential obstacle for connection to or deployment of emergency equip-
ment. The Technical Review Committee found that the proposed site plan meets the requirements
of all applicable ordinances.
Recommendation
That the Planning Commission recommend that the City Council approve the site plan review appli-
cation for the 210 square foot fire suppression building on the property of Minnesota Pipeline located
at 6483 85th Street South, subject to the conditions stipulated below:
The applicant and builders must comply with all City ordinances and policies except as
may be modified by agreement of the applicant and City staff.
2. All grading, drainage, erosion control, and utilities must conform to the final plans approved
by the City Engineer.
3. All outdoor lighting must meet City Code requirements and must be downward directed
with cut-offs. The specifications and analysis of all light fixtures must be provided with the
application for a building permit.
4. The applicant is responsible for removing debris from 85th Street South during their con-
struction process. This street shall be swept clean daily or as needed. Parking along 85th
Street South is prohibited.
5. No exterior storage is allowed.
6. The fire suppression plan must be submitted to and approved by the Fire Marshal and
Chief Building Official before a Certificate of Occupancy can be issued. The property owner
is responsible to maintain their private watermains, hydrants, and fire suppression systems.
7. Erosion control devices must be installed prior to commencement of any grading activity.
Erosion control shall be performed in accordance with the recommended practices of the
"Minnesota Construction Site Erosion and Sediment Control Planning Handbook" and the
conditions stipulated in Title 10-5-8, Erosion Control During Construction of the City's Sub-
division Ordinance. The applicant is responsible for erosion control inspection fees at the
current rates.
8. The applicant will be required to conduct all major activities to construct the improvements
during the following hours of operation:
i. Monday through Friday 7:00 A.M. to 7:00 P.M.
ii. Saturday 9:00 A.M. to 5:00 P.M.
iii. Sunday Not Allowed
Prepared by: Attachments:
Site Plan
Emily Schmitz
Senior Planner
FLINT HILLS
resourceso
TANK FIRE PROTECTION SYSTEM UPGRADES
TANK FOAM BUILDING
CURRENT REVISION
PREVIOUS REVISIONS
CIVIL/SITE IMPROVEMENTS
COTTAGE GROVE TERMINAL
COTTAGE GROVE TERMINAL
6483 85TH ST. S.
COTTAGE GROVE, MN 55016
PREVIOUS REVISIONS
CONTACT INFORMATION
FHR PROJECT MANAGER
FLINT HILLS RESOURCES, LLC
CONTACT: MATT DOKKEN
OFFICE: (651) 437-0921
CELL: (651) 253-7987
EMAIL: MATT.DOKKEN®FHR.COM
FHR OPERATIONS SUPERVISOR
FLINT HILLS RESOURCES, LLC
CONTACT: MIKE KOSTELECKY
OFFICE: (651) 458-4860
CELL: (651) 259-6685
EMAIL: MIKE.KOSTELECKY®FHR.COM
PROJECT CONSULTING ENGINEERING FIRM
ESDC INC.
CONTACT: L.B. HERNDON
OFFICE: (918) 949-3670, EXT. 105
EMAIL: LBHERNDONCESDCENGINEERING.COM
LOCATION MAP
DRAWING SHEET INDEX
SHEET
DESCRIPTION
REV.
C-0
1 COVER SHEET
0
C-1
SITE IMPROVEMENTS
0
C-2
IMSION AND SEDIMENT CONTROL
0
C-3
EROSION AND SEDIMENT CONTROL DETAILS
0
C-4
CONSTRUCTIDN DETAILS AND SPECIFICATIONS
0
ALL WORK MUST BE PERFORMED IN COMPLIANCE WITH THE FOLLOWING APPLICABLE LOCAL,
STATE AND NFPA CODES AS WELL AS THE KOCH PIPELINE COMPANY, L.P. (HEREBY KPL)
SPECIFICATIONS AND STANDARDS AND THE CITY OF COTTAGE GROVE, MN ADOPTED BUILDING
AND FIRE CODES. IT IS THE CONTRACTORS RESPONSIBILITY TO ENSURE ALL WORK IS
PERFORMED IN ACCORDANCE WITH THE FOLLOWING CODES AND STANDARDS:
MSBC MINNESOTA STATE BUILDING CODE W/ CITY OF COTTAGE
GROVE AMENDMENTS
MSFC MINNESOTA STATE FIRE CODE W/ CITY OF COTTAGE GROVE
AMENDMENTS
KOCH STD220.120 EXCAVATION
KOCH ES1505.402 DESIGN BASIS — STATION AND TERMINAL
KOCH KPL ROUTINE WASTE STREAM REFERENCE SHEET
KOCH M1606.300 LOADING AND MARKING UNDERGROUND FACILITIES
MANUAL
KOCH TG1430.110 ONE CALL EXCAVATION NOTIFICATION AND
RESPONSE
KOCH ES1505.408 PIPE AND EQUIPMENT SUPPORT
KOCH ES1505.460 SITE PREPARATION, EARTHWORK, GRADING, ROADS,
AND PAVEMENT
I HER BY CERTIFYD THAT THITON. OP REPORTS PLAN.EPECI
PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY
.$'�'y1 EU-4 q. '••;
=
LICENSED PROFESSIONAL ENGINEER
UNDER THE LAWS OF THE STATE OF
MINNESOTA
SIGNATURE:
-
Lp' '•• 53885M
lF •'
NAME: MARIANEL AA BALE
`�-
DATE: a-aa-al
REG. NUMBER: 53—
ISSUED FOR PERMIT
.DTI¢
TXIa 6 p Xm °M Xua ,°.Wtl mX k
IM uM I" . of FELT I,. B:.,l .S,
I.P. -VI. Kmeu, and le II 1° Ar
Mrmrn Im X6 cmikmS°I — mh and I"
cmaMe°INa W IXr km °1 IXa d-9 IXr
Mrmre Mmmfua and °g— IMI X aAdl
nM Xe iryi°dicM, c°pkX, kM a °t.drBe
w m.dly"nalre°nr. "m weX l°`
yedlktllr funlMe0- W Midi It B
DWG NO.
REFERENCE DRAWINGS
FLINT HILLS
r e s o u r c e s
COTTAGE GROVE
MINNESOTA
DECEMBER 22, 2021
esdc
—EN®/NEER/NO
'�erls,a�sas�"X r�s,alsas�;z
COVER SHEET
COTTAGE GROVE TERMINAL
COTTAGE GROVE, MN
C-0
TO
I "I IF
ODPIRV OUR TYPE COVER PERMANENT RAII COVER
'TO OM THE IF O= F=lyR, I ACROII AN
=E�Y PRZ 01.OTIOITI,1,11 IRlll,
N N I I
ITR "I ED UTH IRII-11 POP ROOM ALPTY"K, C Y 0,
dF `IETn'd I
I ME zPROIlCTIMPPCTIFlII
IF
EE_ o=ECIO ON
IlTlUT I =RZAT
-ER CUALLITREATTERYLL VIll 11
PROKO..
I
lk Ilk III, u lik 1, 41k Ilk
ESTIMATED EARTHWORK QUANTITIES
TOTAL CUT C Y
CY
r
VoH,EFN oTED NOT ORKI Vo" 'I Rll,
M E , MY D IE RVo MTHOMI�'N�ONTDEDHRIONV�oTEHED�'OUN�TMIEIT IO'RnlCTo�IRInIREEREE'ITMPONnIT "u E I
CUT IND 1111 IUINTITIA 10 1— 1 COM DIETE IND IFFEDTIIIE PROIECT I � V NITRUIED
TH,EENOTED EIIHIORKIVOIUMEel�RE.1pedOMTPIRNION IDEVM�%lo `NILL `DEp 00�R D Z 'e.� ,NNN"NT'L,C,DAR_ HE oTE oKU No I C =D
M OVINI E110PTI THI I PRUDENT CONTRIFTOR M. INCUR DURINI THE VOIEI I DEVE10CMENT
.ENERALCONLITRUCTION NOTEI
I I" E C 0 NTPR OR '"" COMPLY ' I" ALL PER=�PTR OV' I ONE OF I HE MA- OF 'CC IF NCT
PRE AS NT 0 N N Co NITRUCTON IIUEI IF TH E ON 0, Co RUPFFOL OFF 01 AMER , N
AND TIE IAFETFANI lEAll RE.UFAUONI FOR CONLITRUCTION IIIUEI IYTHE U I PERU 01 LVIOR
I ENDEIRE M INT' , I HE CONTRACTOR AND REITORE=NTOPECol L0_OL
FAIR To 0 R E CUAFTOTUATOTE E,=CT ATTHECOMMEN 0 N, ON
TPUTITE OR A A VIA E� PEEITIFFINT ONTIT"CIOTNIE =N TO EIRET ACCEORIINC TO
I I I RI' N " N I CA 0 ER E IRA A LAS IV
TI IF I N I OR M I ON A I TOT Do CA" N
OF T" E E "I N ' ITT El IF OR TO ANY CONLITRUCTION ACTIVITILI TIE CONTRACTOR R
REIPON R, HE 1 0 R VERI= C THE EAVACT LOCAL ON 01 FIFTY. UTILITIES, PUILIC OR LEAVE,
II—NIEREON OR NOT11—NIEREON
K TI ONTRACTOR IIALL NOTIPY TIE NER 01 ANY ILICREPPNCIEI IE—EEN TIE PLANI AND I E�,CCFOLMTON,
I ALL CONLITRUCTION CONFORM TO TIE IPPICAMIE LOCAL REIULATORYPIENCY $TANIARII
AND 'PEC I CAT ON,
I IF TART N ' CON 'I R HOT ON I I E IENERII CONTRACTOR I 1 11 ME REIPONIIIE FOR AS �Ry ITO LAT ALI RE OU R E I RE RMTEACM PPROV ED SEEN OIL PER No CONTR N A AT AvE A R HOLD
0 R FAIR 'I ON OF 'NY IF M E UNIT I THE Co NFIRICTOR "' RECE AS I "' PLAN I AN,
ANY OUT IER OCU ME NTAT 0 N =' A I ILION I TH E PER M IT N . ARM CLIFF PUT, OR TILI I I E N ICTOR I PROCE CAUIE TIE CONTRACTOR TO VE�A UREFO
I Co To '0"0' 1 LURE "A- ULD F�
RE P ON �FTY I OR ANY IUII ECUENT KDOICCATON 01 TIE RK MANIFFEEI IY ANY
RE.UFACORYAHTIORUY
I THE Co NT
I PCOUNT, TORRUEON.
ONALNOI R ITI"FlLYl COMPANIES AT
SEVENTY
= CT ORII, UIRPI PIIFCOAIITEO C1OOMVEMRENNMCELNIT I E CONTRACTOR IHIII PROTLECTIR TIE PROF CONSTRUCT ON LIMITS FROM I LP.E ALI ADUCCENT ARE. OU TASEASH"DEENSTITNATEI CONST'L UCT ON I M I% AIED 0 R
I STURED 'y THE CONTRACTOR ANEDIOR H I SUICONTRACTORS, SHALL ME RETURNED To AN
ACCEPTAILE COUP TION I M FAIR To _AT KOFS IF IOR TO THE DISTURIANCE
I ACCE IS To I HE I TE ED R E M ERIENCY VEH CLES AND RECULATORY A.ENa INSPECTORS SHALL IF M A NTA NED AT ALL I M E I I I R N. CONSTR UCT ON
I I ElU NO ENT AND MATERALS SHALL IF N A` E I Co NSTR UCTIO NAND STO RA. E AREAS SHALL I�TKEREDCF�ANAREAUFTDM EICNATED IY THE NER
11 CONT HALL IF RESPONSILE IOR=.ENDIDAW E=TRU.DlAY(ve, = ISE N C N , CURE,
URII UTTER, ETC UP N. ON
IS Co ORDINATE ALL I TE CONSTRUCTON ACTIVITIES —H THE MECHANICAL, STRUCTURAL AND
ELE AD CALCO NSTRU CLION DR_UNCS
IS ALL CONSTRUCTIONTO IKE RICE INSIDE THE ITINT HILLS RESOURCES PROPERTYLINE
IS LANDDISTURIANCEIREIRECTEDT011 IIARCRES
CURRENT RVISIDN
PREVIOUS REVISIONS
P'.1W
NEWPROJECTAREA
7
OVERALL LAYOUT
SCALE I -Sl
FILE RACIN. ADD DRANSVE CONLITRUCTION NOTEI
I CONTRACTOR IHALL COORDINATE VSUH EOTECHNICAL REPORTOEN.IUNEER
RE.ARDIN. IOIL FOUNDATION MATERIALI UNDERNEATH ` ITRUCTUREI ADD
ROAD'AY=N =,CUTHFNlTAND/OR EFFECT I —FILL MAY ME RECUIRED
AT EFFECT E
I MALIMUM CROII SLOPE ALONE ` AND MODIFIED IERACE ROPHOURIVER
'HALL IF I./.
I PROVIDE IUFFICIE W TEMPORARY COVER OVERTOP ALL 'U R ED P P EL NEI ADD
CULVERTS To HELP OFFSET THE E C IT I R OM I HE HEAVY CON 'I R HOLD N
ECU PLAENT REFER TO THE IPECIFICAUTIONI FOR ADDITIONAL INFORMATION
FOLLOI PC HEAVY CONLITRUCT ON, ETHIC EACH CULVERT I DEPTH OF COVER To THAT NOTED ON THE CON IT UCTION DRAVIIN.1 Ko, I ANI, p,
TH N THE PROjECL I M III, ACR E.1'U.RIP
PER.ANE W R.1 ITAILIERACTION ( — IT I lhe I, IT
h AoKe, AKIN— w,Il -eve � g,
I RE=EIWICOAFFTOPIO LKI PvleT.URIED=�eNOU CHEDULED TO RECEIVE A
P ( e Ao , p eL
I e`ENERAL FILL MATERIALS ON' TE MATERAL' pped 'op'o e" �Ed d
ehl
UMPI UP DOE
�THATCAR�UNCDMP= ONLY NATURAL ITIONE, CRUIHED COODENCRETE I _10D OF N H
EARTH MAIER vjldIHALL IF UIED AS FILL MATERIALI NO TRASHIRL
RI.HTTO REJECT M�Tg�,�LeIU),�DAFLOLRIFEILLLLO-EFDLL MATFROAINDR RV ER " 'RT HM ALL I, E I �RED 1
0 F�LOT� AD EA ME R.EA R 0 ED EOTE IN 11 1 0 N . F=AD PN AND FVR M`yNEH I CTAI LCEEPT'NL, ENNO' I TH I N
TH APR OJ E CT I M IF I HALL CO LLE =�FRIATTO R MlATERPROU N�OgF F. IU NgLEld AR � ARE NFLENDED To 'TORE ER e 1 0 FIT
beh,Id ,, �IoKg lCCNTHRAA`TORR`MATEF`=TO
THE PROjECL 'ITE AND AM N I I TO v, NI
T—ARDI ALL DEI.NED OUTFALLI — DIFTED - —
CONSTRUCTION DRAVSU ALL PROJECT RE—ED FINAL.RADIN. IHALLALLOv,
ITORMER RUNOFF TO DRAIN UNOIITRUCTED TO A DEII.NUPTED OUTTALL
THFUE
IERACE DRIVE CONTOUR AND IPOT ELEACTIONI REFER TO
THE TOP OF THE DRIV-AY (lop of ded ,eg b—)
— — — — COAPS THE CONTOUR
ELEVACTIONI REFER TO THE TOP OFTHE FINLIHED RADE
— DATE PREVIOUS REVISIONS BY
YTC H 7K
SPOT ELEVATIONABBREVIATIONS:
I, 1 11 111VIL IIIVE F,
TTOR OF OoNRETE IS (TD)
TC , NE' 'RAVELERV CE DR AS
TOP OF GROUND (rnihed) CONNECT ON � TH THE El ITIN.
d
�' A 11111
m
raw
E
A III IF
DEMOLITION
SCALE I -El
WETEE
lhe Wl, ty W FLINT R RESGJRCES
0, U, K.P., IA t 1.1 t. 0,
1a N, E . IF d b
1 DW
. El . d111, 0.
WIN _ U. It dltll
Vol bI, rmrWuced wq 1.1 a .-
It
`2 uz 2
IAFAL DRIVE IIALL IF FL111
OF 21 (111 A 11111 cp
O
A 121 IF
OF 11 (111 A 121 IF
all
IS (I.)
SEE 11 EST ERE) 1111D. IEIVIIE 111AS
ILITALLAT 11 111TIACTIll I"ALL PROTECT N - I IF PROTECT ON
ITC) PEAUDI FROM IAPEAIE —ghl
SEE II(TC)
SEE FIT.)
FIAM
FEE - SEE 21
A 122 IEEE TOITRICTICALARICIE F ECTIN III
ACID11YOUL UFlIPElIlN
EST 21 (T.) 82
` FILL LISEUR
ESCAPE IRA RACE IIALE III EATELPI FLII PEATENALT1 C .. E OT
CILLIFFILEELLIT IIIE ARMI, I IAAEL 11 V'(Z%'
-1—ARIANIAVOFIFIl. TEST P
THE L_ IIIIIIN )
— — — — — — — — — IELLITALLI IFCIII"EIITIIETIALLIIITIIIEI
— — — — — — AREAEALU.TUECUTAUPEEUT_E
IEUYITALLOIEPAIF ALL ILITUIIEI ENITHY. E RAVEL
111VEALLEAS VILD ` IAIEIA..IE.IE FARE
rveon
ILIPE111THATITOILEVEACE1
ICAURVE 'CC...
GRADING, DRAINAGE & SITE LAYOUT A =EI`C`PIllN.
SCALE 1-11 I—EIII—LIIIVEFOLLOwIN.
CLECT
CONLITlICTION
01rallm!7AITI1!
PRO Fps G
I HEREBY CERFY THAT
SPECIFICATION,DTHIS OR REPORT WAS PLAN.
PREPARED BY ME OR UNDER MY DIRECT
S UP RVISION AND THAT I AM A DULY
AWANE,
LICENSED PROFESSIONAL ENGINEER
UNDER THE LAWS OF THE STATE UP
MINNESOTA
BRI.E.
j
SIGNATURE:
HAVE: ARIANELA
DATE:
RED. HUN.CR: S
ISSUED FOR PERMIT
SCALE I -El
REFERENCE DRAWINGS FLINT HILLS
r e s o u r c e s-
COTTAGE GROVE
MINNESOTA
DECEMBER 22, 2D21esdc
SITE IMPROVEMENTS
COTTAGE GROVE TERMINAL
COTTAGE GROVE, MN
C-1
85th STREET SOUTH
&1
[A
ONDs f.-.%
N61Tem PQraCY aB tl/or PEOcT.4II�
�M
DE�`��a� o ��
DING TV1E0 / o
DC I[ ME
ED' G
\ 822
TO a@ \ e
SEDIMENT CONTROL
B�
,.y �iRxa ew, DW�. �eoor un,xaPon.Noo Faa A�,.aas ama
��I:�JF me oes�
a smP azoro�
Memo
Ell—
Fra,xp
s amx. waainMml
wassauaww, ss1seasys,wa nlwarep.,n, xa.eey,aw4 cnwwl
mdusoE mvac'an a', maa�e aeomw .17E �
i..e...n immcwiaeaceia. pma.nw,wm'=a.m.eawmaw.xiuvnem. wecro�Nanmysp .m
ma=.1== L1=4Z.1� =,n I
CURRENT REVISION
PREVIOUS REVISIONS
FINISHED SURFACE COVER
STEEL fENCE POST (T-PoSTJ, MONOFUAMENT GEOTERFEE
MINIM I''SONGAG, 1. MNDOT TABLE
E. 38W-1(HAND INSTALLED).
RDM FABRIC OF IACRIFAeucw5 MIT
9')C ER
PoSr NOT W EG FAB
IA�Y�IFA&UC HNT HE
UGSGIAN
LHT EQU�ENT PRIOR TO
PLACEMENT OF THE POSTS
SJRF—
EONT PAST
E
6"
STANDARDD I
Go= BT�
cBHAND UNEDU
�'NI^axMep� COTTAGE GROVE, MINNESOTA ERP2
PUN VIEW
DERSEETION OF
I. SPACING REOUIREMFNfS
SURFACE FLOW 1
WARE N
J— _ `100 FEET PER
EOF DRA[NAGE.
D. SIZING REQUIREMENTS 315,325
UPGNADIENT SILT
FENCE ANCON� 0
IS. AMOUNE NE L6
1 25'R
10.
16'
.1FEGRADIENT
SILT .ENDN. UE, AS
IS -FOR CaTNN_ IE
PAFA< 25 ACRES IHWK AREA IIL2I AGREE
DIED
111
>30 DCG�-7—ON OF � 3-HOOKS SHIALL BE
TFSNREEETAN
RIM�OMEPAR4 EL
EN TME-' A
REEG ON
L m IEcoNTGURs. LL
I»
/'� STANDARD DETIS
1 l==Groff rHODKv
COTTAGE GROVE, MINNESOTA �_
Ett0-4
PO°goo�o0 sw
WOOOCHIFS-18 MINIMUM DEREENVO UO Do S
�o�����
`�
3E(tDGTIOµ80R
IH
IA'MINIMUMCUY
FF NN WINIMRUNOFF FROM
NOTESE
A&UC I— BE
OR WOODCHIPS TO STOP M'S MIUNDER FDCK
I GRATION
TENTRANCERMUSi
2 TO
PREVENT SEDIMENTATION TRACKING.
O
corvsT�HO
OCCOTTAGE
ERO-12
CITY OF COTTAGE GROVE STANDARD EROSION CONTROL DETAILS
MINNESOTA DOT SEEDING SPECIFICATIONS
PREVIOUS REVISIONS BY CHK REFII NORCE
Th. Em R Aoe lI Been DUNisAM and 4
HM1 . Papa1Y M FLNT HILLS RESCNRCES,
LP. ft It , Koran, Ali i Im1 to the
Kmrwrm IN NM amf-1 uae oI'F. pli M
omabaolim of INs Imn of the W-, 0E
Bmronm P— - agar Ult R aNtll
nol Ne reprPEuatl. 'Wiwi Iml a o1KaA'x
.y p,p of ?rally m MdaaNE mr paM im
mY W,Pae o1Ner INm im xNicA N H
spsRimllY IwnaM1M
REFERENCE DRAWINGS FLINT HILLS
F e S O U f C (3 S
COTTAGE GROVE
MINNESOTA
IATTHIS PLAN,
SPECIFICATION, OR REPORT WAS
PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY
LICENSED PROFES90NAL ENGINEER
UNDER THE LAWS OF THE STATE OF
VINNESOTA
NAME: MARIANEL2A BALES
DATE: i2-d-d-'dI
FEB. NUMBER: 53EE1
��Yp�s}IEW eq��iD•:
F E9flE. •, -
ISSUED FOR PERMIT
DECEMBER 22, ?021
esdc
—LNB/NLLR/NO
EROSION AND SEDIMENT CONTROL
COTTAGE GROVE TERMINAL
COTTAGE GROVE, MN
C-2
ggggggF��g��g�L'.99".f�
�maa
®mom
MINNESOTA DOT SEEDING SPECIFICATIONS
J
I HERE BYOCERTFYrTHAT THIS PLAN.
SPECIFICATION. OR REPORT WAS
ISSUED FOR PERMIT
PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY
LICENSED MDFES904AL ENGINEER
UNDER THE LAWS OF THE STATE OF
DECEMBER 22, 2D21
••'4�
MINNESOTA
Euq
t�'•g�EMSEW '_
NAME:T MARIANELA BALE
WAII[ER
��a�
N
DATE: �2-2d-2
53BB5 .'r.4c_�An
�Vr
9)�'• —EN®/NEERpNO
`oa
REG. NUMBER: 5DS65
`••••'a ag zMN SyreM ulna, ol<Tatta
II 9 ne:lrtel ray-xTo ax:l—tray-.T2
INK
DATE
CURRENT REVISION
BY
CHK
REFS
MK
DATE
PREVIOUS REVISIONS
BY
CHK
REF/
N011tt
6wbg TMa Am nM � HILSAb ma M
m. mM l" OI FLINT HILLS AfmURCE4
UI WMNq Kmeu, mL Ie II to tAa
Norman Im n6 cmibmual w mh me In
cmaMwolbn W IAr bm o11Ae d-9 INc
Nwmrm M ., and ag— IMI N oAdl
M Ne rryradreetl, cop., bM w oth...
d M —, w FEireclly. — — for
y pupmr aPw IAm Iw Midi II Ie
yrN-1, lunMel.
DWG NO.
REFERENCE DRAWINGS
I FLINT HILLS
r e s o u- c e s
COTTAGE GROVE
MINNESOTA
EROSION AND SEDIMENT CONTROL DETAILS
COTTAGE GROVE TERMINAL
COTTAGE GROVE, MN
MK
DATE
PREVIOUS REVISIONS
BY
CHK
REF#
DES. NRR
REFS PR,F004902
DATE 11/2Z/1t
DR. NRR
CH. NRR
AP _
SCALE N A
OLD DWG NO.
-
DWG. ND.
c-
REV.
0
GRADING
wLL.prw u�E sscTmmnv e.�pvyiramAa,awn.�xtrp.l: rnmruiamfrtn nlwswxme con rxucnnx xnEima roxtitincanrurvn Eexm Evnv.rwx ecrrvnits.mEE,winEExsr,uteE xonuEc. nr+o.
Al "Al ex
IA
o.mn, �,w,ao�.. au<.or oMr,Eo ro.
.wtil..r��n LLew �I.eEo
torn.o..e..t:mo.rol.es.atteEl„>T.tttol s. worrsa.oeemra .R o.os:. wrEmoeRaooM m.aMtml�oEo or.m �p:c��tn�e�w �meptm,w.r,rr.�eR4 rem.
�e.eoow.me::eattee rlttEo.r,000MP.,Tmetro.e,.e qa. rlttle.a�to. In'm�,xt.Ro�r,Etao,. iotaAro o.xEe aam�ut. o�Im.eM,m:,orc omq�tewee,w��n-Irv�x�. �rflw �Mc m�E..0 �A�r,E�o �.F:W����.
DEMOLITION / SITE CLEARING
GRAVEL SERVICE DRIVE SECTION DETAIL
I ... 51DU.. E
Al IAN
SPECIFICATION. OR I—, WAS
PREPARED 11 ME OR UNDER .V DIRECT
SUPERVISION AND THAT I AN A DULY
LICENSED PROFESSIONAL ENGINEER
UNDER THE LAWS OF THE STATE OF
MINNESOTA
.."A "RE
NAIVE: MARIANEL A BALES
DATE: )a-ad-a1
RED. NUMBER: 539M
ryF,�p�EW 9q� •,.
91e.... • ia��jW,a`
ISSUED FOR PERMIT
DECEMBER 22, 2021
esdc
—EN®/MEEK/NO
p,...a(V= ... �Nl gassTx
NK
DATE
CURRENT REVISION
BY
CHK
REFJ
MK
DATE
PREVIOUS REVISIONS
BY
CHK
REF/
N.I.
TNb 6 p N¢ .1 — HILS RE me M
m. mMI. of FLINT HNSLESDNRCEs,
I.P. WAMq Kmena, mtl le lent Io 1M
Nmmrn im N6 cmibmual w mh me In
d Ilse bm tNe d-9 IN,
DWG NO.
REFERENCE DRAWINGS
I FLINT HILLS
r e s o u r c e s
CONSTRUCTION DETAILS AND SPECIFICATIONS
COTTAGE GROVE TERMINAL
COTTAGE GROVE, MN
AK
DATE
PREVIOUS REVISIONS
B/
CHK
REFS
cmeNemlbn of
Normre M— mtl agree 1No1 N eAdl
M Ee kM
DES. NRR
REFS PR,F004902
DATE 11/2Z/1t
rryradreM, copFe, a oth..be
al9o»] of drMly a Feireclly. nm ueetl for
COTTAGE GROVE
DR. NRR
SCALE N A
DWG. NO.
REV.
y plrpaes aPn 0- W Mich It Ie
y.dlbmr +mleN.tl.
MINNESOTA
H. NRR
,'_
OLD OWG NO.
_
CL
0
El
THOMIIPSON'S GROVE 7TH ADDITI N
L
z o RDTR LINE DE REIRENTIEL PRDPER, LH
RENGRM�K },
��
—J�
— 85TH.i STREET SOUTH % TME�.ID,�.ER
ESHURI
Ron
SRI
S 89N29535 W 1119. 83
—
'I INT EN SENT IF wnv IFNoFTH NTT sREET sauTR _ ,�
or esrR IT, s
E z,
LINE vnrenuEL m,n Namn LINE
A IN IN
IN
PEE
S PEE
Tso FSFU IETARUl LINE To
reESFELL SH 11-1 LINE, a
5
S 8929'35 W 500.00
_
see— --
exi i rvc
SuiLDirvG P
aW
_--ael----:al----sv.---
canVEL
NEW DRIVE. GxiAVEL
TANK FOAM BUILDING GYtIIEE
&
`
D sNG vaovEaT� LINE
REF. DWGS. S-1 THOU S-8.
GO
PARCEL- 2
GRAVEL
i
'
3
TK-21 TK-21
e
corvTurvnnErvT DIE
CC
ela>TN
0
a�
zw,
�
cRnnEL v �
- FIEVEL
PARCEL_ 1
o
u
'
GrennEL
JII
cenvEL
,
2
—FULL _L
----- cQ-
N
GRAVEL
DreAGE
N 89'2935 E E19. D2
Dnonri n S 89'29'35"
TN 89'29 35 E 500.00
W 1119.02 PARCEL 1
p1./a 1Doo' EI a. TSG, R, z1 BOUNDARY
IF
IND v,w.AicL —H N LINE DE sin%n .."_ .✓, ...
OLF
AC/
NUIRINEFIR
J�
=
H
C
Z
cn
W
J=
W
i S
Z
�
Z
�
W
Q
Q
Q
Q
Cr
o�
s
Ty
02
J
EDEciEicAnoN, OR RE RT WAS
TANK FOAM BUILDING — CIVIL SITE PLAN
NOTES:
ISSUED FOR PERMIT
PREPARED BV ME R UNDER " DIRECT
SUPERVISIONENSEDPR AND THAT AM A DULv
SCALE: 1=50'-0" T
1. CLOUDED AREAS DEPICT NEW CONSTRUCTION.
2. SEE DWG. S-3 FOR GENERAL NOTES.
DECEMBER 22, 2021
UNDER HE prEa
MINNESOTA
scNAnae�
�yqW�1' = 50'-0'
. ?e' sro
Epor�Es"sa+u'.
FNGixFeP
3. CONTRACTOR TO VERIFY ALL DIMENSIONS & ELEVATIONS BEFORE
POURING CONCRETE.
FLINT HILLS RESOURCES LLC SPECIFICATIONS.
4. MECHANICAL AND CIVIL CONSTRUCTION TECHNIQUES SHALL BE PER ����
K c�
GSOC�ETEAFAAIENLOI
cnoN.
NAME. MARIANEL A BALES
DATE -2d-2
P. 53885 :ee d9/J
sF, : �j
E. LIST BENCHMARK }�2:
ORTHING: 129318.3083—ENs�NEER�NB'on
alai E1e° "N°aai F1re Piole""
co.�E. sT..E or+EULL
COMPANIES aT LEASH we 'OURS PRIOR To
,� 2�
FASTING: 463257.0980.
COORDINATES PROVIDED ARE BASED ON WASHINGTON �zmn svrea oi�, ox �aava
REc. NUMBER. 53985
`ia
COUNTY COORDINATE SYSTEMS. Dealsve, savati7o ax level sasasn
MK
DATE
CURRENT
REVISION
BY
CHK
REFJ
MK
DATE
PREVIOUS REVISIONS
BY
CHK
REFJHUFHF,SHE
DWG NO,
REFERENCE DRAWINGS
TANK FOAM BUILDING- CIVIL OVERALLSITEPLAN
A7�7
FLIN HILLS
TERMINAL
MK
DATE
PRE4IDUS REVISIONS
BY
CHK
REFd
1'
I resources®
COTTAGE GROVE
COTTAGE GROVE. MINNESOTA
DES. DIED
Pi1J o5000
T2LDTLT
Tor wnirn A D
COTTAGE GROVE
DR. RL
SCALE
DWG. NO, REV
MINNESOTA
DIE
SO
OLD Dwc _
S-2
0
1 2 3 4 5 6 7 3 1 9 10 11 12 13 14 15 16 17 13 19 20
15'-10" BUILDING LENGTH
NOTES:
A T.O.S. 1. SEE DWG. 5-3 FOR GENERAL NOTES.
2. CONTRACTOR TO VERIFY ALL DIMENSIONS &
ELEVATIONS BEFORE POURING CONCRETE.
3, MECHANICAL AND CIVIL CONSTRUCTION TECHNIQUES
SHALL BE PER FLINT HILLS RESOURCES, LLC
SPECIFICATIONS.
4 1/2`0 4, CONTRACTOR TO VERIFY ALL CRITICAL DIMENSIONS
AND ELEVATIONS PRIOR TO FABRICATION OF STEEL.
4 1/2% 5, CITY ORDINANCES REQUIRE EXTERIOR WALLS TO BE
B COVERED BY BRICK OR STONE. INSTALL BRICK
R - VENEER BY 'TEXTURE PLUS' (OR EQUAL)
BRICK 8. SEE DWG. S-4 FOR TOP OF SLAB ELEVATION.
T.O. SLAB VENEER
NORTH ELEVATION
SCALE: 1 /4- l'-0"
PROVIDE GUTTERS AND
DOWNSPOUTS
15-10` BUILDING LENGTH
D
(INSIDE
FACE OF WALL PANEL TO
12'-4" BUILDING WIDTH
INSIDE FACE OF WALL PANEL)
12'-4" BUILDING WIDTH
NORTH ELEVATION
12"
PROVIDE GUTTERS AND
12"
O S
T.O.S.
2,.
DOWNSPOUTS
E
T.O.S.
_o �d a
�a
�}
o
T.0 A
QQQ ?
-oo
o
w
N
w
BRICK
a 4
I
VENEER
BRICK
3
w
F
VENEER
- -
4 1 /2"0
T.O. SLAB
T.O. SLAB
`"
T.O. SLABuh
T.O. SLAB
SOUTH ELEVATION 3'-Ox7'-0"
THAT THIS PLAN
OVERHEAD
ROLL -UP
INSULATED DOOR
SHEEPPC`ATCoEFTFl
PREPARED DIRECT
SUPERNEION AND MOE' THATOTER)OI AM A DULY
GARAGE 000R
PLAN VIEW
LENSED —REGIONAL ENGINEER
UNDER EA GE HE S A E GE
`
SCALE: 1 /4- l'-0"
"
OTA
2-5" 8'-0
2-5
4-113-0' 4'-11"
sDNATURE
WEST ELEVATION
15-10' BUILDING LENGTH
EAST ELEVATM
NAME. MARIANEL A BALES
DATE:a as-a�
SCALE: 1/4"=1'-O"
T.O.S.
SCALE: 1/4'-l'-O'
REG. NUMBER: 53985
H
9� �y
pNFJlq
. ppprEssIONK•
= FNGINEFe
• 53985
J
BRICK VENEER
ISSUED FOR PERMIT
T.O. SLAB
DECEMBER 22, 2021
K
esdc
SOUTH
ELEVATION
....... ff7M o
SCALE: 1 /4 - l'-0'
eas,a sag "N ,s,alsa� 2
MK
DATE
CURRENT REVISION
BY
CHUG
REFJ
MK
DATE
PREVIOUS REVISIONS
BY
IF
REFJ
NOT 11
ror lIIrn a �s
DwG NO,
REFERENCE DRAWINGS
7 (
�'LI ' HILLS
r e S O U- C e S
COTTAGE GROVE
TANK FOAM BUILDING- EXTERIOR ELEVATIONS
COTTAGE GROVE TERMINAL
COTTAGE GROVE, MINNESOTA
Mu
DATE
PREVI US REVISIONS
BY
IN
REFd
_
_
_
-
-
-
-
-
-
_
-
_
-
_
-
-
-
-
EFH J-0
Pre/N"
DATE 12/m/21
DR. RL
SCALE l -0
DWG. NO,
S5
REV
0
OLD owc No.
11mea.
MINNESOTA
AD
FOAM BUILDING
RENDERING
SSUED FOR PERMIT
DECEMBER 23, 2021
esdc
-ENB/NEEN/NI
PM1one: �918�9as3b]0 Fax:�g18�9as3b]2
Mu
DATE
CURRENT REVISION
BY
IT
REfg
I Mu
DATE
PREVIOUS REVISIONS
BY
IT
DELI
re, wnU n e
DWG NO,
I REFERENCE DRAWINGS
A7�7
I FLINT HILLS
resources®
'TJ
COTTAGE GROVE
FOAM BUILDING RENDERING
COTTAGE GROVE TERMINAL