Loading...
HomeMy WebLinkAbout2022-01-24 PACKET 06.5.STAFF REPORT CASE: ZA2021-074 & PP2021-075 ITEM: 6.5 PUBLIC MEETING DATE: 1124/22 TENTATIVE COUNCIL REVIEW DATE: 2/2/22 APPLICATION APPLICANT: Manley Family Trust REQUEST: A zoning amendment to change the zoning of property generally located on the southeast corner of Jamaica Avenue and Military Road from AG-1, Agricultural Preservation, to R-4, Low Density Residential, with a PUD, Planned Unit Development; and a preliminary plat to be called McHattie Landing that will create 79 single-family homes and 4 outlots. SITE DATA LOCATION: 9119 and 9165 Military Road South ZONING: AG-1, Agricultural Preservation GUIDED LAND USE: Low Density Residential LAND USE OF ADJACENT PROPERTIES: CURRENT GUIDED NORTH: Residential Low Density Residential EAST: Residential Low Density Residential SOUTH: Residential Low Density Residential WEST: Agricultural Low Density Residential SIZE: 34.85 acres DENSITY: 3.53 units per acre RECOMMENDATION Approval, subject to the conditions stipulated in this staff report. Cottage COTTAGE GROVE PLANNING DIVISION Grove here Pride an6P,Osperity Meet Planning Staff Contact: Mike Mrosla, Senior Planner; 651-458-2825; mmrosla(q_)_cottagegrovemn.gov Application Accepted:. 10/28/2021 60-Day Extension Letter: 12/7/2021 60-Day Review Deadline: 12/27/2021 120-Day Review Deadline: 2/25/2022 City of Cottage Grove Planning Division • 12800 Ravine Parkway South • Cottage Grove, MN 55016 Planning Staff Report McHattie Landing Planning Case Nos. ZA2021-074 & PP2021-075 January 24, 2022 Proposal Manley Development has submitted an application for a preliminary plat, rezoning, and a Planned Unit Development (PUD) for a project to be known as McHattie Landing. The subject property is located at 9119 and 9165 Military Road. The applicant is proposing to construct 80 single family homes on approximately 34.85 acres. The property is currently zoned AG-1, Agriculture Preser- vation, and the applicant is proposing to rezone the subject site to R-4, Low Density Residential, with a PUD. Location Map Review Schedule Application Received: October 28, 2021 Application Accepted: October 28, 2021 60-Day Review Deadline: December 27, 2021 60-Day Extenison Notice Sent: December 7, 2021 Planning Commission Meeting: January 24, 2022 Tentative City Council Meeting: Feburary 2, 2022 120-Day Review Deadline: Feburary 25, 2022 Planning Staff Report — McHattie Landing Case Nos. ZA2021-074 & PP2021-075 January 24, 2022 Page 2 of 18 Background Site Conditions The 34.85-acre site consists of tilled fields with existing homesteads and agricultural buildings adjacent to Military Road. The proposed site has an overall topography that increases in height towards the center and northwestern corner as shown below. The site also has some shallow bedrock (karst) that will need to be addressed during grading. 2020 Aerial Photo and two -foot contours Neighborhood Meeting The Applicant held a neighborhood meeting on November 9, 2021. Notice of the neighborhood meeting was sent to surrounding property owners within 500 feet of the project area. The intent of the meeting was to give neighboring property owners the opportunity to ask questions and present concerns they might have to the developer in the early planning stages of the proposed project. Seventeen property owners attended the neighborhood meeting. The majority of the res- idents lived in the adjacent Ravine Meadows development. Below is a summary of the comments, questions, and concerns received: Planning Staff Report — McHattie Landing Case Nos. ZA2021-074 & PP2021-075 January 24, 2022 Page 3 of 18 • Landscaped screening between the proposed development and the existing Ravine Meadows neighborhood • Questions about bedrock onsite • Questions and concerns about site topography • Concerns about the housing product type • Concerns about lot design and roadway layout • Concerns about no home builders being identified at this time During the meeting the developer made several commitments to the residents in attendance. The commitments included the following: • Planting 10-foot tall pine trees on the properties adjacent to Ravine Meadows to assist in screening. • The nine lots adjacent to Racine Meadows shall be restricted to ramblers or villas. • Study the road alignment to see if the lots adjacent to Ravine Meadows can be increased. • Study and consider enlarging the proposed southern pond adjacent to Ravine Meadows and relocating some of the lots to the west side of the proposed roadway. • Study the existing lots in Ravine Meadows and make sure the adjacent lots in the proposed McHattie Landing match or exceed their lot sizes. • Hold a second neighborhood meeting. Prior to the second neighborhood meeting the Applicant worked on addressing the concerns raised at the first meeting. The developer was able to address the majority of the concerns raised by adding landscaping buffering along the property line adjacent to Ravine Meadows and revising the site plan to this current site plan. In addition, the developer worked with the potential builders to restrict the product type to ramblers or villas. On December 9, 2021, the developer held a second neighborhood meeting. The neighborhood meeting notice was mailed to surrounding property owners within 500 feet of the project area. Five property owners attended the neighborhood meeting. Below is a summary of the comments and questions received: • Landscaped screening between the proposed development and the existing Ravine Meadows neighborhood • Question and concerns about site topography • Questions about construction timing Planning Considerations Plan Review The dates of the plan set utilized for this review were submitted by Sambatek and are dated 12/29/2021. Planning Staff Report — McHattie Landing Case Nos. ZA2021-074 & PP2021-075 January 24, 2022 Page 4 of 18 Rezoning and Comprehensive Plan The subject property is currently zoned as AG-1, Agriculture Preservation, and is guided as Low Density Residential in the 2040 Comprehensive Plan. rroposea mezoning ana cu4u %,omp. rian Lana use The Applicant is requesting to rezone the subject property from AG-1, Agriculture Preservation, to R-4, Low Density Residential, with a PUD, Planned Unit Development, overlay, which would be in accordance with the long-term growth plan for the parcel. Low Density Residential allows for 2 to 4 units per acre density and the Applicant is proposing 3.53 units per acre. The proposed preliminary plat and the land use map from the 2040 Comprehensive Plan are consistent in the following ways: • The Land Use Map in the 2040 Comprehensive Plan identifies the future land use devel- opment of the subject property as low density residential land uses. The Applicant is proposing single-family lots for the subject property, which is consistent with the 2040 Com- prehensive Plan. • The proposed density of 3.53 units per acre is consistent with the 2040 Comprehensive Plan. • The proposed development helps provide the city with a diverse mix of housing types that are needed to serve all income levels and stages in the life cycle. • The proposed preliminary plat and grading plan are consistent with the low -density resi- dential land use designation for this area. • The proposed trail along Jamaica Avenue as well as the proposed sidewalks within the development are consistent with the 2040 Comprehensive Plan's Planned Parks, Open Space, and Trail Plan map. Planning Staff Report — McHattie Landing Case Nos. ZA2021-074 & PP2021-075 January 24, 2022 Page 5 of 18 Preliminary Plat The preliminary plat, as proposed, depicts a logical development of a viable property given the adopted performance standards of the zoning district. The proposed plat consists of 80 single family homes with four outlots. Outlot A will be used for the future trail head park. The PUD allows for deviations from the minimum setback requirements. The preliminary plat is detailed below. Op NO � [woo Preliminary Plat Planned Unit Development The Applicant is requesting PUD flexibility on the following zoning performance standards as shown in the table below: R-4 Standard McHattie Landing R-4/PUD Minimum front yard setback 30 feet 25 feet Minimum side yard setback House 10 feet 7.5 feet Minimum side yard setback Garage 5 feet 7.5 feet The requested PUD flexibility is consistent with the approvals for surrounding developments. The R-4 requires a minimum of 7,500 square feet. The proposed development meets and exceeds this standard as the average lot area is 11,651 square feet. Besides the setback flexibility, the proposed development meets or exceeds the R-4 zoning district standards. Access Initially access to the proposed development is provided from Military Road and Ravine Parkway. However, Military Road will be vacated in the future when the majority of development in the area Planning Staff Report — McHattie Landing Case Nos. ZA2021-074 & PP2021-075 January 24, 2022 Page 6 of 18 is complete. At that time the roadway will be removed and a trail corridor constructed. Following the removal of Military Road, the site access will be from Ravine Parkway. The proposed subdi- vision has two proposed accesses onto Ravine Parkway. A full access is proposed at the existing full intersection of 66th Street and the second access will be a right-in/right-out as shown below. Short term accesses to Military Road \y CShort term accesses to Military Road 3 a 32 LOT1 D A Lon El z �o �- W-- W t�q� ❑ 1 Proposed Sdewalk \ `I Proposed Trail Full III Existing Trail _ access _ I Existing Sidewalk Access and Pedestrian Plan Phasing The proposed subdivision will develop in two phases. The first phase of development consists of 48 lots and is located adjacent to Ravine Parkway. The second phase consists of 32 lots and will provide access to Military Road and the Cardinal Reserve development. Sidewalks and Trails The Applicant is proposing a five-foot wide sidewalk as depicted in blue above. The proposed sidewalk will connect to existing sidewalk stubs from the Cardinal Reserve development. The proposed development plan includes an extension of the exiting eight -foot wide bituminous trans- portation trail along Jamaica Avenue to the north where it will connect to the future Military Trail. The Developer will be required to pay half of the costs for the removal of the roadway and instal- lation of a trail for the segment adjacent to the proposed development. These funds will be collected with the development agreement. Park Land and Open Space A minimum of 10 percent of developable area shall be required to provide residents with public recreation facilities, including parks and open spaces, as part of development projects per City Planning Staff Report — McHattie Landing Case Nos. ZA2021-074 & PP2021-075 January 24, 2022 Page 7 of 18 Code Title 10-4-3. The East Ravine Master plan shows a trailhead park for the future Military Trail Corridor on the northwestern corner of the subject site. The Applicant has set aside approximately .6 acres in that northwestern corner for this proposed park, which is identified as Outlot A on the submitted plans. The intent of the park is to be a gateway to the trail corridor and will include a small park shelter. Final design will be determined by the Parks Director. Tree Preservation City Code Title 11-6-19 requires completion of a tree inventory (all qualifying trees) for the entire project area of a proposed development. The Applicant submitted a Tree Preservation Plan that included a tree survey of the existing trees on site. The existing site has 1,783 qualifying caliper inches of trees. The Applicant is proposing to remove all 1,783 caliper inches. The ordinance allows removal of 624 (35 percent) caliper inches without replacement. Removal of the remaining 1,159 caliper inches of trees requires mitigation at a ratio of 1.2 replacement, or 580 caliper inches. As a condition of approval, the Applicant shall work with the City to mitigate 580 caliper inches of replacement trees on the site or pay cash in lieu of the required mitigation or a combi- nation of both. This shall be addressed on a final landscaping plan that shall be approved by planning staff prior to approval of the final plat. Tree Removal Plan Landscaping Tree preservation and mitigation is not required as the site has no existing trees. City Code Title 11-6-5 requires a minimum amount of landscape plantings to be installed as a part of development projects within the City. These required plantings include boulevard trees, building perimeter plantings, and landscape requirements. The project will include a minimum of 91 boulevard trees Planning Staff Report — McHattie Landing Case Nos. ZA2021-074 & PP2021-075 January 24, 2022 Page 8 of 18 that that are identified on the City's boulevard tree planting list. The landscaping plan shows the required four trees per lot or 320 total trees. In addition, each lot shall have 10 understory shrubs. During the November 9, 2021, neighborhood meeting, the Applicant made the commitment to plant a minimum 10-foot tall conifer trees along the eastern property line adjacent to the Ravine Meadows development to assist in screening the proposed neighborhood from the existing neigh- borhood. A 75-foot landscape buffer is required along Jamaica Avenue that would align with existing King- ston Fields development. These plantings would be required to be planted outside of the ROW within Outlots B and C; the proposed species required to be reviewed and approved by the City Forester. Ordinance requires one tree per 40 linear feet or 78 trees. A homeowner's association (HOA) will be created to maintain the landscaping buffers. As a condition of approval, a final landscaping plan shall be approved by planning staff in writing prior to approval of the final plat. Landscaping Plan Fencing Any fencing proposed on lots abutting Ravine Parkway and Jamaica Avenue shall be uniformly designed and have color similar to the Kingston Fields development to the south. Fencing along Ravine Parkway must be a minimum of five feet from the sidewalk or trail and the property owner Planning Staff Report — McHattie Landing Case Nos. ZA2021-074 & PP2021-075 January 24, 2022 Page 9 of 18 abutting the trail must still maintain that strip of yard that they own between the fence and trail/sidewalk. Stormwater Management Plan Storm sewer will be extended from streets within the development to the stormwater basins pro- posed on the west and south side of the development. Outlots C and D, which are proposed as storm basins, will be required to be deeded to the City for future maintenance. The proposed basin areas require access points, which are to be a minimum of 20 feet wide to allow for maintenance of the infrastructure in the future. The preliminary stormwater management plan and wetland de- lineation was submitted and reviewed by the City's engineering staff, and their comments are included in a plan review letter dated January 14, 2022. The developer's engineering consultant will continue to work with the City Engineer and SWWD to address stormwater storage basins and drainage. Grading As with all new development projects, site grading is necessary to provide on -site stormwater detention, street and building pad elevations, and drainage swales for routing surface water runoff to appropriate storm sewer systems. The Developer is proposing to mass site grade the develop- ment. Each building pad will be graded above the street elevation and at least three feet above the ordinary high-water elevation for stormwater basins. As noted on the preliminary grading, drainage, and erosion control plan, silt fence will be installed along the perimeter of the grading limits. The preliminary grading plan was reviewed by the City's engineering staff, and their review comments are included in the January 14, 2022, memorandum. Additional grading review will be required upon submittal of final grading and utility plans for the site. Utilities The property is currently located in the Metropolitan Urban Service Area (MUSA) and has public utilities available for service connection. The installation of the on -site utilities, roads, and sup- porting infrastructure will be privately designed and constructed to meet City specifications in the engineering memo dated January 14, 2022. Area Charges and Development Fees Area charges and related development fees for this project will be based on the acreages shown on the final plat. These fees and charges will be accurately adjusted based on the final plat layout and be provided in the development agreement. All fees and charges will be memorialized within the development agreement. Payment to the City will be required at the time the development agreement is fully executed by the City and Developer. Development The Applicant has indicated they have not selected a final home builder for the proposed devel- opment. However, at the December 9, 2021, neighborhood meeting the Applicant committed to restricting the five lots north of the proposed stormwater pond adjacent to the Ravine Meadows development to only ramblers or villas to address the concerns of the neighborhood. As previously mentioned, the proposed development will have a homeowner's association (HOA). This HOA will be responsible for all yard maintenance of the landscaping buffer and to ensure the uniformed fencing condition along Ravine Parkway and Jamaica Avenue is enforced. Planning Staff Report — McHattie Landing Case Nos. ZA2021-074 & PP2021-075 January 24, 2022 Page 10 of 18 Public Hearing Notices Public hearing notices were mailed to 107 property owners who are within 500 feet of the pro- posed subdivision and published in the St. Paul Pioneer Press on January 12, 2022. Staff has not received any comments at the time of writing this report. Recommendation That the Planning Commission recommend that the City Council approve the following two appli- cations: A. A zoning amendment to change the zoning of the subject property from AG-1, Agriculture Preservation to R-4, Low Density Residential, with a Planned Unit Development. B. A preliminary plat for a residential subdivision to be called McHattie Landing, which will consist of 80 lots for single-family homes. Approval of the preliminary plat is subject to the following conditions: General Development 1. The developer and builders must comply with all city ordinances and policies except as may be modified by agreement of the developer and City staff. 2. The project shall be completed in accordance with the plans submitted as amended by the conditions of approval. Any significant changes to the plans, as determined by the Com- munity Development Director, shall require review and approval by the Planning Commis- sion and City Council. 3. All grading, drainage, erosion control, and utilities must conform to the final plans approved by the City Engineer. 4. The applicant receives appropriate building permits from the City, and permits or approvals from other regulatory agencies including, but not limited to: South Washington Watershed District, Minnesota Department of Health, Minnesota Department of Natural Resources, and Minnesota Pollution Control Agency. 5. The Developer shall incorporate into the final plat the recommendations, requirements, and evaluations noted in the Bolton & Menk memorandum dated January 14, 2022, subject to modifications that are agreed to by the developer and City Engineer. All comments shall be adopted herein by reference. 6. This approval does not include monument signs. A separate sign permit is required for all proposed monument signage. Platting, Land Dedication, and Easements 7. The project shall be completed in accordance with the plans submitted as amended by the conditions of approval. Any significant changes to the plans, as determined by Planning staff, shall require review and approval by the Planning Commission and City Council. Planning Staff Report — McHattie Landing Case Nos. ZA2021-074 & PP2021-075 January 24, 2022 Page 11 of 18 8. The final plat and the City's approval of the final plat are subject to additional conditions that will be listed in the City resolution approving the final plat and included in the develop- ment agreement. 9. The final plat must be recorded with the Washington County Recorder's Office before any building permit can be issued. 10. The developer must enter into an agreement with the City of Cottage Grove for the com- pletion of the public improvements required by City ordinances. Once the development agreement is completely executed and all cash deposits and payments are paid to the City, the City will release the final plat to the developer for recording at the Washington County Recorder's Office. 11. All outlots shall be deeded to the City at the time of recording of the final plat. 12. All conditions of the Ravine Parkway assessment waiver must be addressed at time of sale of the property and prior to the recording of a final plat. Construction and Grading 13. A grading permit and financial guaranty is required prior to approval of grading activity related to the project. 14. Prior to Council review of the final plat, the developer must submit for staff review and approval a final construction management plan that includes erosion control measures, project phasing for grading work, areas designated for preservation, a rock construction entrance, and construction -related vehicle parking. All emergency overflow swales must be identified on the grading and erosion control plan. 15. A pre -construction meeting with City staff and the contractor must be held before site work begins. The contractor will provide the City with a project schedule for the various phases of construction. 16. Erosion control devices must be installed prior to commencement of any grading activity. Erosion control shall be performed in accordance with the recommended practices of the "Minnesota Construction Site Erosion and Sediment Control Planning Handbook" and the conditions stipulated in Title 11-6-12, Erosion Control During Construction of the City's Subdivision Ordinance. 17. Upon completing site grading, four copies of an "As -Built" survey for the site grade eleva- tions must be submitted to the City. An electronic file of the "As -Built" survey must be sub- mitted to the City Engineer. 18. The Developer shall be responsible for constructing the trail segment through the remnant parcel to Parkview Pointe. Lot Performance Standards 19. The architectural standards of the homes shall be consistent with the following: Planning Staff Report — McHattie Landing Case Nos. ZA2021-074 & PP2021-075 January 24, 2022 Page 12 of 18 a. The minimum attached garage floor area for dwellings shall be 440 square feet. b. Architectural design is required on all four sides of the principal structure. c. Architectural materials must be varying on the front fagade of the principal structure (shakes, board and batten, accent siding, shutters, window boxes, etc.). 20. Setbacks required: a. Front: 25 feet b. Side (house): 7.5 feet c. Side (garage): 7.5 feet d. Rear: 35 feet 21. Additional home styles and floor plans that meet the intent of the PUD may be offered subject to administrative review and approval from City staff. 22. Minimum single-family detached lot width shall be 60 feet at the building setback. 23. Once a house plan is approved for a given lot, no identical house plan may be constructed on the five lots surrounding it; i.e., the lots adjacent on either side, the lot most directly across the street, and the lots adjacent to the lot most directly across the street. 24. If fencing is installed by any property owner adjoining Jamaica Avenue and Ravine Park- way, the fence design, materials, and color shall be uniform. The fence must be placed on the house side of any earth berm or landscaping and must not encroach within the Ravine Parkway or Jamaica Avenue rights -of -way or Outlots A, B, C, and D. Fencing along Ravine Parkway must be a minimum of five feet away from the trail/sidewalk paralleling Ravine Parkway and the adjoining property owner must mow and maintain that five-foot area. This condition shall be memorialized in any HOA covenants documents. Utilities 25. The Developer is responsible for providing the necessary easements and costs associated with road and utility improvements serving the site. All drainage and utility easements, as recommended by the City Engineer, must be shown on the final plat and dedicated to the City for public purposes. 26. The water utility plan shall conform to the City's water supply and distribution plan. 27. The sanitary sewer utility plan shall conform to the City's sanitary sewer comprehensive plan. 28. All stormwater designs shall meet the intent of the City's Surface Water Management Plan and the SWWD water management plan. 29. The developer must make all necessary adjustments to the curb stops, gate valves, and metal castings to bring them flush with the topsoil (after grading). Planning Staff Report — McHattie Landing Case Nos. ZA2021-074 & PP2021-075 January 24, 2022 Page 13 of 18 Streets 30. The City's curb replacement policy must be complied with during home building. A bitumi- nous wedge shall be maintained on the street until 90 percent of the homes are constructed in any phase or in three years. 31. Future road connection signs shall be provided at the future road access point in the north- ern portion of the development. Landscaping and Irrigation 32. Irrigation systems installed within City right-of-way are solely the responsibility and risk of the developers, or individual. The City is not responsible or liable for any damage or costs related to installation, damage, or replacement of lawn irrigation systems placed in the boulevard as a result of City use of or future changes in the right of way. 33. The City Forester will mark the location where boulevard trees must be planted and ap- prove the tree species to be planted. The final landscape plan must be reviewed, coordi- nated, and approved by the City Forester. 34. The Developer is responsible for establishing the final grades, topsoil, and seeding of all the lots, outlots, and boulevards within the subdivision. 35. Landscaping shall be installed as approved meeting the City's Zoning Code minimum land- scape standards unless reviewed and approved in writing by Planning staff. 36. Conifer trees planted on the lots adjacent to Ravine Meadows shall be a minimum of 10 feet in height at planting. 37. Four (4) trees and ten (10) shrubs shall be installed within each lot per ordinance. 38. The homeowners association (HOA) shall own and maintain Outlot B. Maintenance also includes the repair, replacement, removal, etc. of any and all landscaping amenities. 39. The Applicant shall work with the City to mitigate 580 caliper inches of replacement trees on the site or pay cash in lieu of the required mitigation or a combination of both. This shall be addressed on a final landscaping plan that shall be approved by planning staff prior to approval of the final plat. 40. No trees shall be planted in the Washington County right of way on Jamaica Avenue. Surface Water Management 41. The lowest opening ground elevations of all structures shall be a minimum of two feet above the emergency overflow elevation, and three feet above adjacent pond high water levels. 42. All emergency overflow swales must be identified on the grading and erosion control plan. Each fall while home building is occurring, emergency overflow elevations shall be sur- veyed to ensure the emergency overflows are properly graded and maintained. Planning Staff Report — McHattie Landing Case Nos. ZA2021-074 & PP2021-075 January 24, 2022 Page 14 of 18 Onsite Infrastructure Improvements 43. A street lighting plan must be submitted by the developer and approved by the City Engi- neer. 44. The developer must place iron monuments at all lot and block corners and at all other angle points on property lines. Iron monuments must be placed after all site and right-of-way grading has been completed in order to preserve the lot markers for future property owners. 45. The developer is responsible for the cost and installation of public land boundary markers at the corners of private properties abutting Outlot A, B, C and D. The boundary markers are $115 per marker and are to be picked up at the Cottage Grove Public Works facility. The boundary markers must be installed before a building permit is issued for the lot that abuts the recommended marker location. The actual number of park boundary markers is outlined in Bolton & Menk plan review letter dated January 14, 2022. 46. The developer shall contact the electric, telephone, gas, and cable companies that are authorized to provide service to the property to ascertain whether any of those utility pro- viders intend to install underground lines within the development. 47. The developer is responsible for all street maintenance; upkeep and repair of curbs, boule- vards, and sod; and street sweeping until the project is complete. All streets must be main- tained free of debris and soil until the subdivision is completed. The developer hereby agrees to indemnify and hold the City harmless from any and all claims for damages of any nature whatsoever arising out of developer's acts or omissions in performing the obliga- tions imposed upon developer by this paragraph. 48. The developer will provide to the City copies of test results, suppliers, subcontractors, etc., relating to the work to be performed by the developer. The developer agrees to furnish to the City a list of contractors being considered for retention by the developer for the perfor- mance of the work described in the development agreement. 49. The developer is responsible for the control of grass and weeds in excess of eight inches on vacant lots or boulevards within their development. Failure to control grass and weeds will be considered a developer's default and the City may, at its option, perform the work and the developer shall promptly reimburse the City for any expense incurred by the City. 50. Developer is responsible to require each builder within the development to provide a rock entrance for every house that is to be constructed in the development. This entrance is required to be installed upon initial construction of the home, but a paved driveway must be completed before the City will issue a certificate of occupancy for that property. See City Standard Plate ERO-12 for construction requirements. The water service line and shut-off valve shall not be located in the driveway. 51. Developer will be required to conduct all major activities to construct the public improve- ments during the following hours of operation: Monday through Friday 7:00 A.M. to 7:00 P.M. Saturday 9:00 A.M. to 5:00 P.M. Planning Staff Report — McHattie Landing Case Nos. ZA2021-074 & PP2021-075 January 24, 2022 Page 15 of 18 Sunday Not Allowed This does not apply to activities that are required on a 24-hour basis such as dewatering or bi-pass pumping, etc. Any deviations from the above hours are subject to approval of the City Engineer. 52. The developer shall weekly, or more often if required by the City Engineer, clear from the public streets and property any soil, earth, or debris resulting from construction work by the developer or its agents or assigns. All debris, including brush, vegetation, trees, and dem- olition materials, shall be properly disposed of off -site; burying construction debris, trees, and other vegetation is prohibited. Burning of trees and structures is prohibited, except for fire training only. 53. The Developer grants the City, its agents, employees, officers, and contractors' permission to enter the site to perform all necessary work and/or inspections during grading and the installation of public improvements by the developer. 54. Upon acceptance of the public improvements by the City Council, all responsibility for the improvements must be assumed by the City, except that the developer is subject to a one- year warranty on the construction of the improvements from the time of acceptance by the City of all public improvements. 55. The City will not have any responsibility with respect to any street or other public improve- ments unless the street or other public improvements have been formally accepted by the City. Upon completion of the improvements, the Developer may request, in writing, their acceptance by the City. This request must be accompanied by proof that there are no outstanding judgments or liens against the land upon which the public improvements are located. Upon the City's receipt of a written request for acceptance from the Developer, the City Engineer will conduct a final inspection of the public improvements and will furnish a written list of any deficiencies noted. The City Engineer will base the inspection on com- pliance with the approved construction plans, profiles and specifications, as required by the city ordinance. Upon satisfactory completion of all construction in accordance with the approved plans, profiles, and specifications, as certified by a registered engineer in the State of Minnesota, and receipt of reproducible record drawings and satisfactory test re- sults, the City Engineer will notify the developer in writing of the City's approval of the public improvements and schedule the request for acceptance for review by the City Council. 56. Upon completion of the work, the Developer shall provide the City with a full set of as -built plans for City records and transmitted to the City in a DWG Autocad format and pdf format. Developer must also furnish the City with a pdf format of the final plat and four prints of the recorded plat. If the Developer does not provide as-builts, the City will produce them at the developer's expense. 57. The developer is responsible for completing the final grade on all lots and ensuring all boulevards and yards have a minimum of four inches of organic topsoil or black dirt on them. Placement of organic topsoil or black dirt, sod, and shrubs must not be transferred to homeowners. Planning Staff Report — McHattie Landing Case Nos. ZA2021-074 & PP2021-075 January 24, 2022 Page 16 of 18 58. Notwithstanding any other provision of this resolution to the contrary, the City will issue building permits for model homes as noted in the developer's agreement to be approved with the final plat. An unobstructed gravel surface road extension from a paved street sur- face to the proposed model home's driveway. 59. No additional building permits beyond the model permits as noted in the developer's agree- ment will be issued until such time as adequate public utilities, including street lights and streets, have been installed and determined to be available to use. The City will require that the utilities, lighting, and street system have been constructed and considered opera- tional prior to issuance of any building permits in the development. Also, the City must have all the necessary right-of-way and/or easements needed for the property to be serviced. 60. The Developer acknowledges in the development agreement that prior to the construction of the improvements, site conditions, access to paved roads, and fire hydrants will be sub- standard and will not be optimized until the improvements are completed. To the fullest extent permitted by law, Developer agrees to indemnify the City, its officers, employees, agents and others acting on its behalf and to hold them harmless and defend and protect them (with counsel of the City's choosing) from and against any and all loss, damage, liability, cost, and expense, specifically including attorneys' fees and other costs and ex- penses of defense, which result from, or otherwise arise in connection with any actions, claims or proceedings of any sort caused by or arising from the construction or use of the model homes by Developer or its contractors, employees, agents, or assigns, prior to the improvements being completed. Such claims shall include, but not be limited to, claims that the model homes could not be accessed properly or in a timely manner by fire equipment and/or police or emergency vehicles due to road or site conditions or claims based on lack of proximity to fire hydrants or lack of adequate fire protection. Although indemnification shall cease for claims arising after the improvements are completed and accepted, indem- nification obligations for claims arising prior to the completion of the Improvements shall survive the termination of the agreement. 61. Adequate dumpsters must be on site during construction of streets, utilities, and houses. When the dumpsters are full, they must be emptied immediately or replaced with an empty dumpster. The developer is responsible to require each builder to provide an on -site dump- ster to contain all construction debris, thereby preventing it from being blown off -site. It is the responsibility of the developer to ensure no debris blows on or off site. 62. Adequate portable toilets must be on -site at all times during construction of utilities, road- ways, and houses. At no time shall any house under construction be more than 250 feet away from any portable toilet. Toilets must be regularly emptied. 63. After the site is rough graded, but before any utility construction commences or building permits are issued, the erosion control plan shall be implemented by the developer and inspected and approved by the City. The City may impose additional erosion control re- quirements if it is determined that the methods implemented are insufficient to properly control erosion. 64. All areas disturbed by the excavation and back -filling operations shall be fertilized, mulched, and disc anchored as necessary for seed retention. Time is of the essence in Planning Staff Report — McHattie Landing Case Nos. ZA2021-074 & PP2021-075 January 24, 2022 Page 17 of 18 controlling erosion. If the developer does not comply with the erosion control plan and schedule, or supplementary instructions received from the City, or in an emergency deter- mined at the sole discretion of the City, the City may take such action as it deems appro- priate to control erosion immediately. The City will notify the developer in advance of any proposed action, but failure of the City to do so will not affect the Developer's and the City's rights or obligations. If the developer does not reimburse the City for any costs of the City incurred for such work within thirty (30) days, the City may draw down the letter of credit to pay such costs. 65. The Developer is responsible for erosion control inspection fees at the current rates. If the developer does not reimburse the City for the costs the City incurred for such work within thirty (30) days, the City may draw down the letter of credit to pay such costs. 66. Dust control measures must be in place to prevent dust and erosion, including, but not limited to daily watering, silt fences, and seeding. The City Engineer may impose reason- able measures to reduce dust at the site. 67. The Developer shall comply with the 1991 Wetlands Conservation Act, as amended. 68. It is the Developer's responsibility to keep active and up to date the developer's contract and financial surety (e.g., Letter of Credit, etc.). These documents must remain active until the developer has been released from any further obligation by City Council motion received in writing from the City Engineer. 69. The Developer must provide to the City an irrevocable letter of credit for on -site improve- ments to ensure that the developer will construct or install and pay for the following: a. Paved streets b. Concrete curb and gutter c. Hard surface driveways d. Street lights e. Mailboxes f. Water system (trunk and lateral) and water house service stubs g. Sanitary sewer system (trunk and lateral) and sanitary house service stubs h. Storm sewer system i. Street and traffic control signs/signals j. Shaping and sodding drainage ways and emergency overflows in accordance with the drainage development plan approved by the City Engineer k. Adjust and repair new and existing utilities I. Trails and sidewalks m. Erosion control, site grading and ponding n. Surveying and staking Planning Staff Report — McHattie Landing Case Nos. ZA2021-074 & PP2021-075 January 24, 2022 Page 18 of 18 o. Stormwater basin, and open space boundary markers p. Landscaping These improvements are all in conformance with City approved plans and specifications and will be installed at the sole expense of the developer in conformance with Title 10, Chapter 5 of the City Code; or if in lieu of the developer making said improvements, the City proceeds to install any or all of said improvements, under the provisions of Chapter 429 of the Minnesota Statutes, the City Council may reduce said Letter of Credit by the amounts provided, upon the ordering, for those public improvements so undertaken. The Letter of Credit must have the same expiration date as the Developer's contract. The bank and form of the security is subject to the reasonable approval of the City. The security shall be automatically renewing. The term of the security may be extended from time to time if the extension is furnished to the City at least forty-five (45) days prior to the stated expiration date of the security. If the required public improvements are not com- pleted, or terms of the Development Agreement are not satisfied, at least thirty (30) days prior to the expiration of a letter of credit, the city may draw down the letter of credit. The City may draw down the security without prior notice for any default of the Development Agreement. The minimum amount for this financial guarantee will be included in the devel- opment agreement. 70. The Developer must post a cash escrow with the City's Finance Director to cover engineer- ing, legal, and administrative costs incurred by the City. If this non -interest -bearing account balance becomes deficient, the Developer must deposit additional funds. This must be done before final bonding obligations are complete. This escrow amount will be included in the development agreement. 71. The Developer must post a cash escrow with the City's Finance Director to cover engineer- ing costs and other City services, expenses, and materials provided in reviewing and pro- cessing of the final plat, including but not limited to staff time, legal expenses, office and field inspections, general inspections, and all other city staff services performed. This es- crow amount will be included in the development agreement. 72. Temporary parking during construction shall be permitted on only one side of the street. 73. The park dedication requirements will be satisfied upon dedication of Outlot A and payment of the remaining cash in lieu of land dedication as detailed in the development agreement and at the time of recording of the Final plat. Prepared by: Mike Mrosla Senior Planner Attachments: A. Preliminary Plans B. Engineering Review Memorandum 1/14/2022 CONSULTANT CONTACT LIST: BENCHMARKS CMLENGINEER Preliminary Site Development Plans aoLaERTArvo wlwAMs, eoTa RETERErvceo TROM THE MrvooT aEooenc oATAeasE DEVEMANLEY DEVELL NERPM S12800 AMBATEK MANLEY DEVELOPMENT MINNET NKA,BAN RDRIVE, SUITE 300 YvIUTAMI ELEv-1.111 1915 PLAZA DRIVE MINNETONKA, MN 55343 ' EAGAN, MN 55112 TEL 763-476-6010 EMAIL EMAIL EWth@Sambatek.com E11ITEIT mEDv. 1— CONTACT:KURT MANLEY CONTACT :ERICLUTH,PE fo r SHEET INDEX Mchattie SHEET DESCRIPTION 1-11 BRAUNIHTERT SURVEYOR (—T)oBRAUNINNICALL SAMBATEK Landing NsMoarH)Ns 11001 HAM PSHIRE AVENUE SOUTH 12800 WHITEWATER DRIVE, SUITE 300 Ivs (w Esr) MINNEAPOLIS, MN 55438 MINNETONKA, MN 55343 —(E—) TEL952-9952000 TEL 763-476-6010N-1(111TH) E MAIL lon—intemoc.com EMAIL: MSaIo@Sambatek.co. ITE— CONTACT : CONTACT: MARK SALO, TIES -(NOHTH) Cottage Grove, Minnesota wIv (w EST) w (EAST) w (So TH) LANDSCAPE ARCHITECT C ,N11 11y�1 SAMBATEK Presented by: NS(NoaTH) M INN WHITEWATE R DRIVE, SUITE 300 TEL 763 ONKA,10 55343 IvrE(WEST) TEL]63-4]6-6010 NrE (E°ST) EMAIL: ]Workman@Sambatek.com IvrE (11E TH) CONTACT: JOHNNIE WORKMAN, PLA Manley Development AnIN� NOTE oL (PHnsE S) S (PE S) WEST (PHASE S) 7 (PHA E S) SOUTH (PHASE S) oL (PHASE 2) TH(PHA E2) WEST (PHASE 2) 7 (PHA E 2) H (PHA E 2) I(NO TH) rv(w EST) rv(EPST) 2 Tv(SOUTH) Ive (-1m) LIGHTING (SOUTH) S(STR 2) S(STa 11) SITE TO 01 TREE PREIER-10— SN(WET) LAN (EIT) PIN (Io TH) N.T.S. ATTACHMENTS PP1-PP5 PRELIMINARY PLAT PREPARED BY SAMBATEK 1/1 ALTA SURVEY PREPARED BY SAMBATEK VICINITY MAP — GOVERNING SPECIFICATIONS NO SCALE CITY OF COTTAGE GROVE SPECIE ICAT IONS (2021) CITY ENGINEER'S ASSOCIATION OF MNNESOTA STANDARD SPECIFICATIONS (2013) MNDOT STANDARD SPECIFICATIONS FOR CONSTRUCT ION (2018 EDITION) tFa1— Ian s eclflca RELININKRY URAvvN BY �o°pv eE�z)�g(�� 1 FTITLE SHEET 1SHEET 1 e1 Nm>.mes<aee or M���e�o:^Inal, t:v a Wambatek MCHa Dev Landint e1.o1 MCHattie Landing R,ITE aOCUe 2 www.sambatek.com L]PROLEc1\10az2T�.o]avILsHEETI\10a2z-a-TITLE .owe. C101 TITLE SHEET z ) orvsrRualoN oocu��Eu Engineering �5urveying�Planning�Envlronmentel Cottage Grove, MN REV. DESCRIPTION DESCRIPTION FROM TITLE COMMITMENT: PARCEL N1: THAT PART OF THE W EST HALF OF THE NORTH W EST QUARTER OF SECTION 3, TO W NSH I 27 NORTH, RANGE 21 WEST, WASH I NGTON COUNTY, MINNESOTA DESCRIBED AS FOLLOWS: BEGIN IJING AT A POINT AT THE CENTERLINE OF COUNTY ROAD NO. 20, SAID POINT BEING 368.01 FEET WEST AND 968.45 FEET SOUTH OF THE NORTHEAST CORNER OF THE WEST HALF OF THE NORTHWEST QUARTER; THENCE SOUTH 39 DEGREES 8 MINUTES WEST PERPENDICULAR TO THE CENTERLINE OF COUNTY ROAD NO. 20, A DISTANCE OF 272.25 FEET TO AN IRON STAKE; THENCE NORTH 50 DEGREES 51 MINUTES WEST PARALLEL WITH THE CENTERLINE OF COUNTY ROAD NO. 20, A DISTANCE OF 160 FEETTO AN IRON STAKE; THENCE NORTH 39 DEGREES 8 MINUTES EAST PARALLEL WITH THE EASTERLY LINE OF THIS TRACT 272.25 FEET TO THE CENTERLINE OF COUNTY ROAD NO. 20; THENCE SOUTH 50 DEGREES 51 MINUTES EAST 160 FEET ALONG THE CENTERLINE OF COUNTY ROAD NO. 20 TO THE POINT OF BEGINNING. PARCEL 42: THAT PART OF THE WEST HALF OF THE NORTHWEST QUARTER OF SECTION 3, TOWNSHIP 27 NORTH, RANGE 21 WEST, WASHINGTON COUNTY, MINNESOTA LYING EASTERLY OF JAMAICA AVENUE AND NORTHEASTERLY OF RAVINE PARKWAY SOUTH; EXCEPT THAT PORTION LYING NORTHEASTERLY OF COUNTY ROAD NO. 20, AND EXCEPT THAT PART DESCRIBED AS FOLLOWS: BEGINNING AT A POINTAT THE CENTERLINE OF COUNTY ROAD NO 20, SAID P01 NT BEING 368.01 FEET WEST AND 968.45 FEET SOUTH OF THE NORTHEAST CORNER OF THE WEST HALF OF THE NORTHWEST QUARTER; THENCE SOUTH 39 DEGREES 8 MINUTES WEST PERPENDICULAR TO THE CENTERLINE OF COUNTY ROAD NO. 20, A DISTANCE OF 272.25 FEET TO AN IRON STAKE; THENCE IJORTH 50 DEGREES 51 MINUTES W EST PARALLEL WITH THE CENTERLINE OF COUNTY ROAD NO. 20, A DISTANCE OF 160 FEETTO AN IRON STAKE; THENCE NORTH 39 DEGREES 8 MINUTES EAST PARALLEL W ITH TH E EASTERLY LINE OF THIS TRACT 272.25 FEET TO THE CENTERLINE OF COUNTY ROAD NO. 20; THENCE SOUTH 50 DEGREES 51 MINUTES EAST 160 FEET ALONG THE CENTE RUNE OF COUNTY ROAD NO, 20 TO THE POINT OF BEGINNING. T 'T =LEGEND • FOUND MONUMENT WATERMAIN ------- EASEM E NT LI NE O SET MONUMENT SA N ITA BY SEWE R ---------- SETBACK LINE MARKED ITS 43933 STORM SEWER ---- RESTRICTED ACCESS ®ELECTRIC METER ET— ro­J FLARED END SECTION CONCRETE CURB LIGHT S,—TELEPHONE PEDESTAL S BUILDING LINE AIR CONDITIONER ELECTRIC ----------- BUILDING CANOPY —GUY ANCHOR o-UE TRANSFORMER BITUMINOUS ,HANDICAP STALL GAS METER 0 SURFACE O, UTILITY POLE OVERHEAD WIRE CONCRETE 0 .p POST CHAIN LINK FENCE SURFACE a SIGN ------ IRON FENCE ------ WIRE FENCE LAN SCARE SURFACE ---- WOOD FENCE PROPERTY SUMMARY 1. SUBJECT PROPERTIES ADDRESS ARE: PARCEL 1: 9165 MILITARY ROAD, COTTAGE GROVE PID: 03-027-21-23-0001, PARCEL 2: 9119 MILITARY ROAD, COTTAGE GROVE PID: 03-027-21-23-0003 2. THE GROSS AREA OF THE SUBJECT PROPERTY IS 34. 852 ACRES OR 1,518,146 SQUARE FEET. 3. THE SUBJECT PROPERTY IS ZONED AGRICULTURAL PRESERVATION LAST), PER CITY OF COTTAGE GROVE WEBSITE. 4, THE BUILDING(S) AND EXTERIOR DIM ENSIONS OF THE OUTSIDE WALL AT GROUND LEVEL ARE SHOWN ON THE SURVEY. IT MAY NOT BE THE FOUNDATION WALL. _BENCHMARKS 1. THEVERTICALDATUM IS BASED ON NAVD88. THE ORIGINATING BENCHMARKS ARE HU LBE RT AND WILLIAMS, BOTH REFERENCED FROM THE MNDOT GEODETIC DATABASE BENCHMARK#1 WILLIAMS. ELEV: 787.71 BENCHMARK #2 HULBERT. ELEV: 933.08 SURVEY NOTES 1. THE BEARING SYSTEM IS BASED ON THE WASHINGTON COUNTY COORDINATE SYSTEM, NAD83 (1986 ADJUST(. WITH AN ASSUMED BEARING OF NORTH 01 DEGREES 01 MINUTES OS SECONDS EAST FOR THE WEST LINE OF THE NW 1/4, SECTION 3, TOWNSHIP 27N, RANGE 21W. THE ORIGINATING MONUMENTS UTILIZED TO ESTABLISH THE HORIZONTAL POSITION OF THIS SURVEY WAS THE NORTHWEST CORNER AND THE NORTHEAST CORNER OF SAID SECTION. 2. FIELD WORK WAS COMPLETED ON 09/1312021. e -_... / .: / 1� N \ \\ vreouuo,.rvo vrzovasno^lulvnovanoar�sllo,✓ry 1 rxw ovnaxcao. a uvrro-� c oc uo rvrs -nnxo, ur rss nrvolrrunrlu_urvnu✓Rlvcrvo oreeiuriu_sunu onaenrlum ✓�Iruouraaaaovenraoul run NORTH 11. ory runa�eus ern.uwumrs ununns,✓Hl�x murunr,nrn rxn SLq®o �rvOVERALL drnatl ama a�nd5 r°P ie; a�IfNI1er,mv ��NAy �NamernrsU�o,M�xx.o� �` RE°N°NARY rv�aE o v I jF Sambatek www.sambatek.com Engineering Surveying l Planning l Environmental EXISTING CONDITIONS SHEET c2.01 REV. DRSIau RPCIF�v Mlr:Re n aL ovsrxurnolr oocuR�EUTSn_ Manley Development McHattle Landing Cottage Grove, MN i / E.\PROIEcrs�so3zzlcno�avlLTSHEETSTsoszz-a-Excrvo.Dwe: aoE ovEaALLExlsTlrve mnlolnoNs N36°0501 46_1_____ ________ - __ - �___ _ _ NDIy // / / \\ •02 \ C .03 C2. 4 C2.05 / v_A zb, VAT. >zz 4 �°A V�9g AAA TT", 0 —21 7 A ar � 3 .sae., / \ \ \ \ l \ ) \ \ `e S1 Lu J TT I (.368.01) 370.35 I mnorresoxrr ra I �s ��T�— JEDOssao NORTH ma�IT HISn, serve o tluVI--eal^ —N &e, A" Is C tName`ne ��� PnEumwna o v ksambatek www.sambatek.com Engineenng l Surveying l Planning l Environmental EXIST. CONDITIONS (NORTH) SHEET c2.02 REV. nEs,2/29 Gu nEulEPv M1i5uB 1 nP Manley Development McHattle Landing Cottage Grove, MN iD—TRUCTIONDOCUDENTS L.PROJERS\E0322\CAD\CIVIL\SHEETS\50322-a-EXCND.owG. aoz EXIST. muoiTiDNS (NORTH) /v v v v v v � � v v (3�- V A.,,� II -ems �.s�e .srls 11 1 V v—A C .03 C2. 4 nA v i i v ..,,, v 1 � li I I l � I I� i I ��.seop 1 i.sss�1 ses, �� �✓ C2. 05 ii i as,s v �IPA�CEC",� 0 v v aP, v v. E 1711 e1( vvv% Enos oo mEci+ ��--�sia+�-rt�=—J--PsA\ PE m l \ NORTH ors a� may—pian,serve o tlueLeendeaMn N=°e7 v.A" e�`"ame,nes��oEN�����o^ �� PRE umN o v CCCCC m p 'ambatek www.sambatek.com Engineering i5urveyingi Planningi Environmental EXIST. CONDITIONS (WEST) SHEET cz.03 REV. nEs,v29aE au nEulEPv PEPM1i51BM1111 —TRUcnON DOCUNIENT Manley Development McHattle Landing Cottage Grove, MN i � L\PROJER5�50322\CAD\CIVIL\SHEETS\o322-a-EXCIE In. aoi ExisT. CONDinDNs(WE.ST) urvey, nesorPp4or"'e�t+, tuNllnHx n ye� tau N Pe1�NamF��o�� P�atn eExM�.��xM�„at n�L\` ovsrxucrioir oocuv�EUTs \ q9y\ n ` Wambcatek www.sambatek.com so3__ Engineering I Surveying I Planning I Environmental C2 EXIST. CONDITIONS (EAST) Manley Development McHattie Landing Grove, MN t NORTH T I i THE 'T P, DPW E� Ay a�a ,SEEEE�TE< I � a t 11T_�,_z aasz �E �_ 21;PgEs tr ---= s IP�TE)GfNo f ET i E ' -1-7' 11_ AEA\ �. wPTEa raE�i' `.V „��� III ,EU' 'Ea �o�Uso� I II ces�ss, n�.a — l 02 C .03, C2. 4 C2.05 NOR H On 11 I'll mi�Pian, serve o tluVLeendea^ �N=e7 s P PHO el`"a'°`[M1eS��orNl�nn��o" �� PRE "I �aVambatek �� �� wwwsambatek.com Engineering Surveying Planning Environmental EXIST. CONDITIONS (SOUTH) SHEET C2.05 REV. ,v29aE au nEvlEPv nEsPEPM1i5uBM11aP o�srxucriDu oocuPIEUT D v Manley Development McHattle Landing Cottage Grove, MN v.yPnoiEMa503zzycnDyavi�\SHEETS\5o322-a-EXCNE.Dwe: aas EXIST. CONDITIONS (SOUTH) am i a ea 503LL LEGEND PROPOSED EXISTING STANDARD DUTY -- --— PROPERTY LINE ASPHALT PAVING — -- EASEMENT LINE HEAVY DUTY \ ASPHALT PAVING EASEMENT LINE BUILDING LINE CON RETE PAVING RETAINING WALL CONCRETE SIDEWALK WETLAND � r I TREE LINE (SEE ARCHITECTURAL PLANS) SAW CU TLINE SIGN }_ _ _ i �_l-�__, —i I i i ® BOLLARD �. y lip STALL LAR COUNTPARKING STALL COUNT ,E KEYNOTE ' i PROPERTY SUMMARY f aV � C3.02 � LE==a1aTASI 1E11Ar 1OMeLETON 13 T 51SS1I S F. (NET) 22 A9A1(NET) J --LOT SUMMARY IF PE G NMUM ----------------- ---------------- MNMUMEO a FT �- ,,✓� - �' �\ SITE DENSITY A ASEMENTUNE e EooENSTY 3sa UTs eEa AC E(GLASS) aE (NET) - y'.VAA� DEAD osos zn y . A� O sETeAauNE SITE SETBACKS oN C3.04' o P O v O YA 1 AA SIDE U /OTNE o. �T .— _ - I BUILDING PAD DEVELOPMENT NOTES /. hAEOTSEoAOMENS ONShAE AouNOEOTOTMENEaAEST./owoT. /.+ � a GnAINAGEAND LUIN`Y oVEGEENSG STED Olal ALL P ALL m IDEDITIES ouPTo/ DSAINAOLL GETaEaoa LED ,r S.Ow,NhSE hNOmaTV EasEMENrsSahAaEPAo�oEoas AEnu AEO.Ow, NhSE hNOmaTs EasEMErvrsw AaE PAo - __� — — — — — �EEOFhAPON�. �I I � I � a.wA/oT/oTO Maus oNs vrTnsESfETaEVAE/M NnAvvuT. PARE T 4 I TYPICAL LOT —KEY NOTES DETAIL A. SURRMOUNTABLE CONCRETE CURB AND GUTTER `� ' /� B. B£18 CONCRETE CURB AND GUTTER OANNAOE.ANO ESaowN Taos. C. CONCRETE sioewALK ( ) _----__—�-_L1_--_—_—_--_—_—_—_—_—s—,o nnENTSAa a: \� D. ACCESSIBLE RAMP E. RE LOCATE STREET LIGHT/SIGN O / \ TIE suesuaEAcc uT cry rvcoamAT ory snowry ory Tncsc awrvs s O.TnsGO nuAcrvccvccwns OCTcam rvconccoaO rv�TO Tnc �u Occ rvcso °sTArvm / r? Fu TRADT Eoa TnccoMF uccTorvG'WDArvOOcacrory ETEN rTrvTsE e FT AccuTCN HILL TIE / / "'Po INE ------------ mrvTaacroanrvO/oasuemrvTaaooass�w TOErcam AEFNROA c oonr N oEAueanirvs / / IL oE E DRUG FEET IN WIDTI, UNLESS OTIWISE aar,EavEArvv ArvOAccuriuTia urvocnI HMG csaourvonrvOovcnnIA EAO. HER niwac TO ExAcrcv cocATC ArvO HE Fo EGA ANY aNG NEERORTH THET APPROVAL A A, NTnE aaolEV Erv�irvEEa nvvE. N oaAirvTiL AT eE N uNEs, As saowNONTaEewT. A NORTH irvGuTiuPA,Ticn SCALE® IN DATE 11 CIDor PRELIMINh0.v a�l�uE�°de�wNe p°°'�oa OVERALL SITE PLAN SHEET N ds Q, oESI NA IEAv o Manley Development eIDName/ne=��o,M �o��T/ITae ambatek C.o1 McHattie Landing n.A/EL wwwsambatek.com z / orvsrAualoN oocumEN Engineering Surveying Planning Envlronmentel Cottage Grove, MN E/eAO/ERSmaEee/�O/CIAI//SaEETS/saEee-osILE OwO o 11 OVERALL FILE PIN ee REV. ........ �'°���o „�;g��, � �� SITE PLAN (NORTH) SHEET d I—. -1Same«e eo,Ml W oE=I R IEv o � Landing �ambatek Ma�evoe ,t c3.o2 MCHattie Landing W� wwwsambatek.com L \Pao1Eas\s°azz\—\aviL\SlEETS\s°azaosITE.owc. o.°z SITE 1—NIITH z orvsrnualonl oocu��Eu Engineering �Surveying�Planning�Envlronmentel Cottage Grove, MN REV. Z25 q I 1 BLOCK 1 la i 23 21 F. V��> m1s7s.F. OUTLOT C _ 15 18 r/ C 7 A BLOCK 3 s—LI A,p \ 10 �aa<<a�,P�a�, ,�rvev, , port ��Naa� SITE PLAN (WEST) SHEET mva�,���p ame«enaeo,M e oE= Rw1 Ev o1111111111 <Sambatek ManevoeeoPTet e3.o3 Mc'attie Landing p o oEL www.sambatek.com �/Pao/Eas�soazz/wo/avi//sHEErs/soazaC s11TE owc. o.oa sirE PwN wEs z / Engineering Surveying I Planning I Environmental Cottage Grove, MN REV. 25all 1 6B 1 s.F � \ 1 \P2 \ 15,.3s. i� \ �\ i I .OL n03 3.04 u �3. BLOCK 4 1,5 �/i�s �� A z� s. /oa61s.T.��� 3e\3o-- s i $sE. ssms.E. �O A BLOCK 3� 13.T. � t�Rbe �v r 14 r------ it n,1¢s. ' jg I� �- J NORTH 14 12 L__� �—_ — ®o PREaMINtia SITE PLAN (EAST) SHEET amIvoI«e,�aydlsu eQ�" 2 /A' `^[Na of mesr�ve or �*QL oEsis n rw n v Wambatek Manley Development e✓.oT�24E111 McHattie LandingTRUCTE aMlT.ar � wwwsambate L/eao/Eas\soszz/wo/avI//SHEETS/soszaosITE.owc. o.oa SITE ewIVEAST z / orvsrnuaioNoocuv�Eu Engineering I Surveying I Planning I Environmental Cottage Grove, MN REV, .02 I ' C .03 C3.04 C3.05 NORTH no I h by tnattnisplan, curve REIIMINA0.V EURINk SITE PLAN (SOUTH) SHEET v es�ry e ame nenaeorM e=o� a/UT �v n Qambatek McH'a DevelopmentLanding e3.05 PEA�,�Ts�a���,.ar � wwwsambatek.com MCHattie Landing /Pao�sas�soazz/wo/avi//sHssTs/soazaosTE.D—o.os ATE PLso1TH z / orvsrnuaioN oocuv�Eu Engineering �5urveying�Planning�Envlronmentel Cottage Grove, MN REV. _LEGEND \ \ PROPOSED EXISTING — PROPERTY LINE STAN DARD DUTY ASPHALT PAVING \ \\ \ /// /\ \ r \ \ ' CONCRETE CURB STORM SEWER DRAINTILE 111L� 1_ul� BUILDING LINE RETAINING WALL � HEAVY DUTY ASPHALT PAVING CONCRETE PAVING CONCRETE SIDEWALK — WETLAND LIMBS TREE LINE PAVEMENT BY OTHERS (SEE ARCHITECTURAL PLANS) SPOT ELEVATIONS —E2 _ 90 CONTOUR 0 RIPRAP Ell OVERFLOW ELEV. SOILBORING C4.02 ACE; 12,TT—E 1T--Ei1irEGE1o°ENS' DEiIoa �� o,A,°,I 1T11 EE GE— IE I°o;oE=" _T_T_G'ET eE°�CE�AE=eoN=�e oAAN°ANo°r�oAM��E�M�GI �a11EaIgE,��=oa�EarA�r�aETo �r�ro�TEANaeAEl VE �ANa1r�T�EiT�E=L�NaEAGAo�NIII untie, r2i29Ev eLp,n 1111-1-TrEl C Rambatek www.sambatek.com orvsrnuaioN oocuNIEu Engineering I Surveying I Planning I Environmental —NOTE TO CONTRACTOR THE EROSION CONTROL PLAN SHEETS ALONG WITH THE REST OF THE SWEEP MUST BE KEPT ONSITE UNTIL THE NOTICE OF TERMINATION IS FILED WITH THE MPCA, THE CONTRACTOR MUST UPDATE THE SWEEP, INCLUDING THE EROSION CONTROL PLAN SHEETS AS NECESSARY TO INCLUDE ADDITIONAL REQUIREMENTS, SUCH AS ADDITIONAL OR MODIFIED BMPS DESIGNED TO CORRECT PROBLEMS IDENTIFIED. AFTER FILING THE NOT ICE OF TERMINATION, THE SWEEP, INCLUDING THE EROSION CONTROL PLAN SHEETS, AND ALL REVISIONS TO IT MUST BE SUBMITTED TO THE OWNER, TO BE KEPT ON FILE IN ACCORDANCE WITH THE RECORD RETENTION REQUIREMENTS DESCRIBED IN THE SWEEP NARRATIVE. OVERALL PRELIM. GRADING Manley Development McHattie Landing Grove, MN t NORTH ®0 SHEET C4.01 REV. 1-1aamene=°eofeMP eoP �.—P., dnE=` RE E n '�Sambatek au�"�Q` 11 `�l www.sambatek.com 124Pn�' orvsrnuaioni oocuuIEu Engineering I Surveying I Planning I Environmental 22 C4.02 t 3 A C4.04 C4.05 PRELIM. GRADING (NORTH) Manley Development McHattie Landing Cottage Grove, MN t NORTH ®" SHEET C4.02 REV. .OZ � I - I - - 2 I C .03� C .U4 — iF �v I N I m = C4.05 9 - I I "w' i ' I /�V 1 r i� �•� 13 1 r 1m SQL' T \ i 1 \ ViF s;a 7° s3 t Ti v n$5a,a � am9.n /Q i r r P 3 I� Rs NORTH ICALI IN FEEL ®o �g "`�°°'�oP 'n;;I MI„0.° DRAWN BY PRELIM. GRADING (WEST) SHEET t- DMIro'r��Rean"nE Ev n 2 �ne�eo,M����o�eta,a EVambatek Manley Dev Landin C4. O J MCHattie Landing Plitt N��Y wwYF w.sarnbatek.corn z orvsrnuaioN oocuIIEu Engineering Surveying l Planning l Environmental Cottage Grove, MN �' PtPaoEERPvaEea�e� IVIIIIEETI\sa3zz- GaeE ewe A, 11 PRELIM GRADING 1EAT se REV. .0 2 SA ' C .03 3.04 C3.05 s\� aEnoows o PER RAy �� � P I ��� � 13 II — �� a !s a I s T NORTH ®0 �g " a`�°°'��op PRELIMIN;a° � .� PRELIM. GRADING (EAST) SHEET �����°�r���o�a� «eeo �o�� a nE= Nnr ry n<SambatekFManley�evelopme tPA e4.o4 MCHattie Landing �IName oN au eN oN N `�lwww.SaMbatek.COM z Engineering Surveying Planning Environmental Cottage Grove, MN „' ��PNOEERPvaEeaCAat����rtPNEE,��saEee- �aaEaM� aPPaENM �aAa�N� EAE, se REV. L � I II �I I r4�—-- i 7 —-- �I .02 I ' C .03, C .04 C4.05 J en 14 NORTH ®� 1— IN 111T no 11 hafh1 -I,1 ""� de, sI""R PRELIM. GRADING (SOUTH) SHEET e ameheE ceofMPP-oP GE= RE E G MaoeyDeveopment e4.05 II NE1'REa M,.a Wambatek www.sambatek.COM l MCHattie Landing L�PROJEas\soazz�wo�avir�11EET1�soazz-C4 GPRE.owG C411 PRELIM. GRAouve GoUTR z orvsrnuaioNoocu��Eu 2 PlanningIEnvlronmental Engineering �SurveyingI'0Y3F2 Cottage Grove, MN REV. Ii Iis� NOTES: ��- I I 1.4'TO TOPSOIL BELOW 1. PROVIDE SEPARATION FROM WALKOUT ELEVATION OR EXPOSED OPENING TO FINISHED GRADE AS SHOWN IN EACH DETAIL. OU WALK T ELEV FINISHED GRADEI AT REAR PAD LINE I GARAGE FLOOR AFTER HOUSE 2. THE DESIGNATED HOLD DOWN SHALLBE COMPLETEDACROSS THE ENTIRE WIDTH OFTHE LOT (SIDE LOT UNETO SIDE LOT LINE). 11 CARRY 2'.1T0 --- —_—___________ 3. SOIL CORRECTION FOR EACH BUILDING PAD SHALL ASA MINIMUM BE COMPLETED THE FULL WIDTH OF THE LOT (SIDE LOT LINE TO SIDE LOT LINE). ON ll J BSMBIT ELEV ' as Tov10 L _ _ _ _ - FIN ISH ED GRA OE CORNER LOTS, SOIL CORRECTION FOR EACH BUILDING PAD SHALL BE COMPLETED ALONG BOTH SIDES OF THE LOT, TO ALLOW HOME TO BE CONSTRUCTED FOR PAD ALONG ENTIRE FRONTAGE. DS TovsoiL� _ ,' zaoin Dowry 4. SO M E BUILDING PADS MAY BE GREATER THAN 60(80 FOR SOG)FEET IN DEPTH (FROM FRONT TO BACK) AS SHOWN ON THE GRADING PLAN. CONTRACTOR ------/// ENGINEERED FILL TO CONTACT ENGINEER PRIORTO COMMENCEMENT OF CONSTRUCTION TO REVIEWTHIS ITEM. IF REQUIRED(TYP) 1. FOR PAD TYPES CONTAIN I BIG TWO HOUSE TYPES, THE PAD SHOULD BE HELD DOWN ACCORDING TO THE FIRST LISTED. HE. A PAD SHOWING LO/SLWO SHALL 1 BE HELD DOWN ACCORDING TO A LOOKOUT TO) HOUSE TYPE.) TYPICAL SINGLE FAMILY WALKOUT (WO) BUILDING PAD GRADING DETAIL N.T.S. 6. FINISHED GRADE SHALL BE ESTABLISHEDTO THE 10' FRONT EASEMENT LINE BEFORE STARTINGTHE PAD HOLD DOWN FORAILL LOTS. 7. PROVIDE DRAINAGE FOR ALL PADS. IF NECESSSARY, CUT TRENCH TO DRAIN PAD TO THE FRONT OR REAR YARD. -1 f 1.4' TO TOPSOI L BELOJV I�I LOOKOUT ELEV FINISHED GRADE AT REAR PAD LINE AFTER HOUSE CARRY 2,1 TO GARAGEFLOOR LOOKOUT ELEV _ as T01101L 7 s TovsoiL FINISHED GRADE 1101D0 1 ry FORPAD ENGINEERED FILL IF REQUIRED (TYP) 2 TYPICAL SINGLE FAMILY LOOKOUT (LO) BUILDING PAD GRADING DETAIL N.T.S. 2.0' TO TOPSOIL BELOW i i I GARAGE FIT ELEV I 1 AT REAR PAD LINE —s s� I II asETana J I 11 FINISHED GRADE 1 AFTER HOUSE DsTovsoiL, Ds�TovsoiL GARAGE FLOOR I I I I I I To.s'TvsiL� 0 0 �FI NISH ED GRADE FOR PAD ENGINEERED FILL �' IF REQUIRED (TYP) TYPICAL SINGLE FAMILY FULL BASEMENT (FB) BUILDING PAD GRADING DETAIL N.T.S. 1.1' TO TOPSOIL BELOW GARAGE TER ELEV AT REAR PAD LINE GIs i- - slf I I 11 FINISHED GRADEI 11 TOv Oi AFTER HOUSE TovsoiL I Ds s L� I I I I -"\ GARAGE FLOOR 'TovsoiL FINISHED GRADE II L.s aoLD Dowry FOR PAD ENGINEERED FILL /T 1 IF REQUIRED (TVP) TYPICAL SINGLE FAMILY SLAB ON GRADE (SOG) BUILDING PAD GRADING DETAIL NORTH N.T.S. FAT III, ----, Ian _ -----P °MI"La HOLD DOWN DETAILS &GRADING NOTES /SA'HEET e^[Na oernes�ceor MP�P�e oPe�nal-[T'�w-ee� oEs�cuaEV Env e v �qwww.sarnbatek.corn ambatek MEN V Development e4.06 MCHattie Landing MR.AEL LLeaoLEasLsos11\wD\aviLLsHEETsLsoszz-rn-eaoE.owc. C4 Os HOLD D—N OETAILI eaADINe NOTES z L orvsrnualoN oocu��Eu Engineering ISurveying IPlanning IEnvlronmental Cottage Grove, MN REV. C5.02 C5.03 j A I A l —LEGEND PROPOSED EXISTING CONCRETE CURB ®�•—•-0 �•—�•-0STORM SEWER ----- -------- DRAINTILE CONTOUR RIPRAP OVER FLOW suss ELEV. SILT FENCE SILT DIKE ...... LIMITS OF DISTURBANCE TEMPORARY DIVERSION i f DITCH DIRECTION OF OVERLAND FLOW ��-�• ` / RIP RAP \ \ 1111Y BID ROLL l TEMPORR ARY STONE \ \ CONSTRUCTION ENTRANCE #1' J LIMITS OF DRAINAGE �4 — —EROSION CONTROL MATERIALS QUANTITIES SUBBASIN �oeamJL G/'J �`, '•, ,�, I � _ �,\\ � IP} INLET PROTECTION DEVICE TEMPORARY SEDIMENT BASIN 7S _ TEMPORARY STORAGE AND PARKING AREA TEMPORARY STABILIZATION MEASURES (SEED, MULCH, MATS OR -Ci,,• O CEOs-D-arvoE11HEao-i cE (le-z)- ary OEiaL Eao-s C5.0, REFER TO SHEETS C5.11&C5.12 FOR GENERAL NOTES, MAINTENANCE NOTES, LOCATION MAPS, —TSM BLANKETS AS OUTLINED IN THE AND DETAILS. SWEEP) I i tit 1; `d C5.05`- I� L THE asUaEA�UiL NEoaMAioNSHowNONiHESEessAUiL aUALi���LaiHsaUAL LEVEL -- — �CE,CE T FOITHE AN1/oANEs rt� — TrE°Fo' Ea=iFE`oNEFOAMI'NNE=eA°;HE`°NMAAROA , . , A o/OA N C MaHiaE ANTOVEaHEAo,HIs Oa HEaFAILUaEiOE_CTL'LO�iEANTeaE=EavE�ANOAL UTI�i�EsTUNTEaaaOUNT THE HEOIIHIIH�Ll�OTIFITHEE�Gl�IEI�ITH t 4HE nFrOFFOIIC 'EFIT HE L FaF, THE saoJECT EIvaIIVEEa. HIVE Is.aCTIVE. Ho Oa.4lly TILE IF— eEe OwIiHOUi NORTH v THE PTOPOSEO IMP" I"' FrissH OYJNONTHE OL%' HF—z—EFFITING UTILITIE1 w H ICH OCIVFUCT w ITH sCIEm FEET —NOTE TO CONTRACTOR THE EROSION CONTROL PLAN SHEETS ALONG W ITH THE REST OF THE S W PPP MUST BE KEPT ONSITE UNTIL THE NOTICE DETERMINATION IS FILED W ITH THE MPCA, THE CONTRACTOR MUST UPDATE THE SWEEP, NICLUDINGTHE EROSION CONTROLPLAN SHEETS AS NECESSARY TO INCLUDE ADDITIONAL REQUIREMENTS, SUCH AS ADDITIONAL OR MODIFIED BMPS DESIGNED TO CORRECT PROBLEMS IDENTIFIED. AFTER FILING THE NOTICE OF TERMINATION, THE SWEEP, INCLUDING THE EROSION CONTROL PLAN SHEETS, AND ALL REVISIONS TO IT MUST BE SUBM ITTED TO THE OWNER, TO BE KEPT ON FILE IN ACCORDANCE WITH THE RECORD RETENTION REQUIREMENTS DESCRIBED IN THE SWEEP NARRATIVE. —SOIL EROSION/SEDIMENTATION CONTROL OPERATION TIME SCHEDULE NOTE: CONTRACTOR OR GENERAL CONTRACTOR TO COMPLETE TABLE WITH THEIR SPECIFIC PROJECT SCHEDULE 1 3"11 CIIIIIIENT I N.PIa"',Pe"" OVERALL EROSION CONTROL (PHASE 1) SHEET m.ce�eSI,i,n ,ems, de, r'- Evi �► a T oEsla a EEv o vManley Development �meAnel��o,M���o�TrpiR Wambatekif—c5.o1 McHattie Landing�` TE a T.aJ www.sambatek.com LIeaOJEa1\11a11\wolCVILIsHEEislsoalI Cs-Eaos.owc. Cs.11 OVEII E1011 vmlviaOLITAIEL zJ orvsrnualonl oocu��Eu rveying�Planning�EnvlronmentaCottage Grove, MN REV. I C5.02 C .03 C5.04 I / A C5.05 n I / r wRE ------------------- \ \ V- / / \ \ t "r \ / s .- 1(368,01) F1E11\1N RTH NO�o e1aame«eE ceofMPP�eoP �;: de, PaEa s�"tia Qambatek wwwsambatek.com Engineering ISurveying�PlanningIEnvlronmental EROSION CONTROL NORTH (PHASE 1) SHEET C5.02 REV. R111-1E.E1 orvsrnuaioNoocuNIEu c McHattie Landinc Me Landing Cottage Grove, MN z L�PaoIEa1\11azz�wl�avir�IIEErs�IlalI C1 Eaos.owc. C111 EaosioN mivraor NoarHPH I - i�% „ (D vv �r 1� ' a` .02 vr�E�rE� i ' — v C .03, v C .04 C5.05 IP2 \ v IP2___, IP2 T IP2. l \ !� IP2 \ \ \ \ \ \ 0 0 o C— \ ---------------------------- IIII �\ `'&o \\\ \�'1 � ♦.`\ \\ \\ `\_� �/ � NORTH hafh1 ��" ""� �P �r E����:°deg e ame«enaeofM e=o LUTH 'aEa s1""a BY oambatek � wwwsambatek.com Engineering Surveying Planning Envlronmentel EROSION CONTROL WEST (PHASE 1) SHEET es.o3 REV. w PEA1,1,E�a���,.a� orvsrnuaioN oocuIIEu Maoley�evelopment MCHattie Landing Cottage Grove, MN z L\PaoIEa1\soazz\wD\avir\IIEErs\IlalI Cl Eaos.owe. Cl10 EaosioN mNT-L-S11AIEi .02 ------------- i C .03, 5.04 C5.05 oa,� rPEc� .%IN NORTH �8i N o so 100 ° g1NF0. EROSION CONTROL EAST (PHASE 1) SHEET ��d�d�e-fe-� En?W °de, oEr����PE��rw o R 1he-1Name«e�e°,o�e�"TP Rambatek Ma"ievoeveioPmePr cs.o4 NE"McHattie Landing www.sambatek.com /PPo�Eas�soazz/wo/avi//sPEE/s/soazaCs-EPos.owc. rs.oa EPosio"m"/Po/Ensr (PPnsE 1) °� z r- en o"srnuaio"oocu��Eu 5032 Engineering �Surveying�Planning�Envlronmental Cottage Grove, MN REV. .02 'C .03 C .04 ,.a ---------- 'A i C5.05 Jj \ IP2 i�o \ ii / J IP2 / / IP3 \a \ — — — — — — — — — / ®0 ha1h1 , ""� 'aEa sI""aDRAWN BY EROSION CONTROL SOUTH (PHASE 1) SHEET e ameheE ceofLITI MP°�eoP oE= RE E oambatek Maoey�eveopment cs.o5 McHattie Landing www.sambatek.com orvsrnuaioN oocu��Eu L \PaoJEa1\soazz\wD\vi��IIEErs�IlalI C1 Eaos.o. C111 EaosioN mivrao�so1TI(11 1 z Engineering Surveying Planning Envlronmentel aweCottage Grove, MN REV. —LEGEND PROPOSED EXISTING CONCRETE CURB ®---0---0STORM SEWER --------- -------- DRAINTILE —'92 --R2 — CONTOUR RIPRAP sows OVER FLOW ELEV. SILT FENCE SILT DIKE LIMITS OF DISTURBANCE TEMPORARY DIVERSION DITCH DIRECTION OF OVERLAND FLOW CHECK DAM BIDROLL TEMPORARY STONE CONSTRUCTION ENTRANCE —EROSION CONTROL MATERIALS QUANTITIES LIMITS DRAINAGE SUB-BASISI N IPl INLET PROTECTION DEVICE f SB TEMPORARY SEDIMENT BASIN TEMPORARY STORAGE AND �S PARKING AREA REFER TO SHEETS C5.11 &C5.12 FOR GENERAL NOTES, MAINTENANCE NOTES, LOCATION MAPS, TEMPORARY STABILIZATION AND DETAILS. fTSM MEASURES (SEED, MULCH, MATS OR BLANKETS AS OUTLINED IN THE SWPPP) L. 16) ) U`�`°' � —NOTE TO CONTRACTOR V 1.�,' • , A�V�� THE EROSION CONTROL PLAN SHEETS ALONG WITH THE REST OF THE SWPPP MUST BE �X ref y ��^�-� KEPT ONSITE UNTILTHE NOTICE OF TERMINATION IS FILED WITH THE MPCA, THE CONTRACTOR MUST UPDATE THE SWPPP, INCLUDING THE EROSION CONTROL PLAIN SHEETS AS NECESSARY TO INCLUDE ADDITIONAL REQUIREMENTS, SUCH AS ADDITIONAL OR MODIFIED BMPS DESIGNEDTO CORRECT PROBLEMS IDENTIFIED. AFTER FILINGTHE NOTICE OF TERMINATION, THE SWPPP, INCLUDING THE EROSION CONTROL PLAN SHEETS, AND ALL REVISIONS TO IT MUST BE SUBMITTED TO THE OWNER, TO BE KEPT ON FILE IN ACCORDANCE WITH THE RECORD RETENTION REQUIREMENTS DESCRIBED IN THE SWPPP 1 � L 1 NARRATIVE. I _________ —SOIL EROSION/SEDIMENTATION CONTROL OPERATION TIME SCHEDULE CONSTRUCTION SEQUENCE JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN t '7TEM101DOYCODDIOLIDEIIIIE1 I I C5 I �r— ll _ � Li � IEIIMEOL of/SfDIMEM CONTROL rc w — iiei T ` M101.4RY CONSTRV CTION Ro.4D5 VND.4T ON/aV LD NG CONSRVCnON I5.4 VTIL VSCE/C3 a AVDMOR FSwRTHE COLLECT ONIN 'FILE HILL IETEIM THE XACT FE ME NCI HE FEE CT ON OF E' 'TING�EAO(GOHEF5T.4TEONEL Ty PFHE IEUEOTOFMINNTH E5OT.4)�THECHONT"OTOF COLIT11CHON �o W.CON CONTPCT THENOTON ' 4ND/OR SVaCONTR.4CTOR.4GREE TO BE FVLLYRESPONS FILE FOF.4NV.4NO.4LL O.4M.4GE5, WH CH MI GHTBE OCCAI O E OF HER Fa LURE TO EXACTLY LOC4TE ANY FRESE— INY IND ILL UTILITIE1(UNDERGROUND FEFM.4NENT CONTFOLSTFVCTVFES / / / '---'-"-------- FINISH GFPOING RIIEgF)H IT NDSCAPING / SEED/ FINAL STINLIE.ATIo AeeRovoI FROM THE eROJECT ENGI NEER. L I5.4CTIYE. NO DRAINTILE sH.oLLaE e.AaHLL<D WITHOUT. _ THEHILL I ESED MHE 1E11ON PROYEMENTY Y OFTHE CONLONIGTHE10NTTO . LO—E IT EwsING UTILITIES WHICH FONFUCT NORTH WITH sCIEIN FEET NOTE: CONTRACTOR OR GENERAL CONTRACTOR TO COMPLETE TABLE W ITH THEIR SPECIFIC PROJECT SCHEDULE aP IT "°° L�e "'PIE, eTnel��°,M�°��°D. a A TrpTR �� ° sl"Fa Evi o v �1 �ambatek wwwsambatek.com Engineering I —eying l Planning l Environmental OVERALL EROSION CONTROL (PHASE 2) SHEET cs.o6 REV. is oEsln R Evv Mn.aT o"srnualo"oocuNIEu Manley Development McHattie Landing Cotta Grove, MN 6e - L/eRDJE TvRELL/­D/CIAIL/THEETT/sRELL-Ce-EROTD GC11GOAERALEROTIONCONTRDLe 2 z / C5.07 �— C5.10 F --— u T a 3r d2 9` oah \ 1 \ IP2 e s \ a i LU wa IPl 2� \ 1 NORTH rru AESA � �z�� ,. �� ®o °ceoSPtlnP`°rr��� g�„0.° EROSION CONTROL NORTH (PHASE 2) SHEET oesinwnEmEvv Manley Development MCHattie Landing p, eiaws ormesraee or 'a�i 4 wru �������� ° (CC�ambatek i� Awww.sarnbatek.com es.o/7 EL —®./ „' r\eao,ERat aEEEt�atCIVILtaaEE,ateaEEE-C-Eaoaawa C a,EaoaIoNCMaoENoa,a ea z orvsrnuaioni oocuNIEu Engineering I Surveying I Planning I Environmental Cottage Grove, MN ge REV. I 'rah \ _ ��J / Il 1 Il T .07 lcI/'` /� (1.' (� .V� 7 C5.10 IP2 \ '�'lI\ e IP2 �\ I � o-• \ /��°` S S+' \ IPl IPlx S �D Vla P2 I 0 % � o r✓ / \ 6 \ � I \ �si✓ I IPl �,. 1 IPl � �O a. 1 \ a3\ �i I I ,,� �L•__t _.a_@________/Il °'�C�, \a� \ �\ \ / \� .l I LLeus. /\ y69 J ri IP2���� s9� .00\xrc !� NORTH I N "°�� lan"�� dp by -de, y � �� � `^[Na ofinesea�eo Mm�eme^Ial, LUTH aMI"tia Sambatek `�wwwsambatek.com Engineering Surveying Planning Envlronmentel SION CONTROL WEST (PHASE 2) SHEET es.os REV, owlsa ew nN RUCTIONooeaa,Ea D111 v Maolev geveloPment McHattie Landing Cottage Grove, MN Lf a / s\eaoaEas�soazz\wo\avis\sHEErs\soazzEL ss-Enos.—. ClI EaosioN CONraos wEs 11AIEz GV a .07 C .08 5.09 C5.10 "sue a «d / / \ � I / L O I I w �L� ° r ` e a � ^'� o , •G7 i. � i ; � . � � � �� O � I I I I — � ��s Z IPl� <v�" � �� � 9 � � A A � ✓� � �' -�� � � � � g � S � �� I I I ' I IPz —7i gq� [5 k i ,yni Imo. m i � i � o so io ��\ti aVe WO' am""a° EROSION CONTROL EAST (PHASE 2) SHEET g N alEQn�iredentl RE YF oa'1 eiaws ormeseao Mam�4w nesiu ew o i Sambatek Manley Development C�.OJ McHattie Landing ��1tiameau�°fir 1a1saaM1,.a/ �`�wwwsambatek.com Engineering Surveying Planning Environmental „'Aeao�easlsaazzVrnoAovigsaees\saEll C1 eaos.o—C111 eaosiom C-11�easreansez z / nrvsTnaaiomnom��eu Cottage Grove, MN REV. - n: BL 140 IPl [�eIP2 I1 la IPl q4 1 ai O IP2 i IP2 IPl /«�•• cl i� IP2 „ I 11 ' .07 t 'C.08 C9 C5.10 co fro �r�s=;3rerC) NORTH ®0 DRAVVN BY g BeI h. y I I h P L"�' "P PRELI I ;0.° EROSION CONTROL SOUTH (PHASE 2) SHEET ce ed ° r� a e, oErl nE lE v n h. �ambatek ManleL y Development nt C5. 1 10 ta,a MCHattie Landing www.sambatek.com z orvsrnualoN oocu��Eu Engineering Surveying Planning Environmental Cotta Grove, MN PaoEERavaaea�a,����E,aaEE,��saaee--EaoaawaCraEaoa�oNIMaoEaoP,a Pa�Ee 6e REV. EROSION & SEDIMENTATION CONTROL NOTES & DETAILS / "SITE MAP" SEQUENCE OF CONSTRUCTION GENERAL EROSION NOTES: PHASE X 1 SITE 1 I LAike RDbL,-�- - - SITE LOCATION MAP � USGS MAP STDRAGE AR EA. rciriw o. R rrKR s .now. O s , vTl o s Laa ROLVUJese"wxl.rry sr,.rvoaxo oeT,.IIs, RURDJ ANDA�NNIIIAINI R°DNLEEDDS..I... CDJTRA °� °`Lub' oE° :ion nILL OTRERn Tn C�E,RANB OR, THE ITE4NETUFrvTTrze,rz�TE 11TIDI ��SBE 'LED;°°�.�LE�EpY4B.E:&E" IEo1P."Erz"ono"d�a9afiwa>PP�WEooPPEIv 111ITaHALNOISIII�NE.Es. ETT PHASE L NS RUC ON OF GU LU JG VA E5 1TxTnp JJS EFWRsu FJT1 x"e ET n�orT11Gmxela ANG cuTTERs. LET STRUCTURES. Eolzas�Escrm nv vsauln J�p.,sxcvaEovJSE. Oulrzsnu rzsnsrvr, on ulAJu cra,e olcmJTnacrons pu ul"lculsareooraupl 3, INSTALLRIP RAP AROUND e Tez vluTry lTs oemel lEC. .11TH ce. E`1 111.,.,LTIDI•=. nc� or m E EEI ElovMeul srE eewxE vonK ees xs. enou JE osunewe AN D INSTALL EE DI Re AND PEA on NE, a GRADNOARY EROSION AN D SEDI ENT CONTROL DEICES ION LE F SITE IsLE UPF'RE s1EEa IenEJT tuna STAB LZED)LFEREnu RED BY THEmNTRACT IT ALL CIA CA1L`LU11"LTCL1,AI1IRG, cul ssT uFn EEFa oFTIE srEnuos LE TIT I au asoam AREA SUMMARY IN ACRES -BUILDING AREA 11 �J rosr(r- AnAa rAaRlcrorosrs e_.NM SRNCLNG. DRUM , A Rnxsn, NranDEnEN', maxG BED. FLELD Up faits, Nsx pxiGx, � tm la";�sn�'raa rosf Me xc«TLAmExrOs°TDm BU t� QED Down FAewc cePERrRe�reAc�'Te �ENEsuc UGHT US ED oM o E� ° Or =EENftI>oSTR-°OSo. RLAMDNTG�LE.DAaucrmmrv°°T mARLmOm sRAaxG. n�,APETCIPER i"°s_T—S�-imEnvr reFSL REx °OsrwroR a•wmE oTa�s —� FAn1I".1 TRErxx, «n EAawc �uATT niar,R`RCTrroEs cso LR"�T"uTe nw LA.s GAUGE vG'E. °uTrlp OCAERE. AMPLAY TOP B. OF R ALB mssxro Rsv R°Osr"sAaR wl BEALLTOnO _w LxOm 3 OB pa- so�,aERPM �`x LA�xwT1Po�TME/REEN TO j�Tl c. / ///��� ANuvwEERE ' nL � wR AND COM ENT01T�v°SINNI"Im aF /�C°EmExr OFTnE SNLIxFore SPERN REST BE HGmEcBEG ar rel�ALu nETx°GS sxauLD xE GSEG REGnENT°osr enaEwn ED arm BERESULD ME USED WHEN or— . THE — �CO G. STANDARD DETAILS CE ExxE��DyLTBx m, ��l\ CAtt STAI — DETAILS `j(+GED ° xNG1N�D�BEETRxO 0 Cott STANDARD DETAILS �mie x� mA =llTF0 COTTAGE GROVE, MINNESOTA ERO-1 "" °"jCOTTAGE GROVE, MINNESOTA ERD�x ~' "° COTTAGE GROVE, MINNESOTA ERO-R MAINTENANCE NOTE TO CONTRACTOR ELI titled ;"" El EROSION CONTROL NOTES SHEET PoESIGU REVIEW ° v Manley Development erzl[Naoelnes°aleo,Nllrzrze�oa^ �'�r� ambatek McHattle Landing e5. MIT:uR TAL °EL wwwsambatek.com L.ERR O1ECFsyso\CAOVCVILESHEETSESOazz-CSEROS.OwO.CF.0 EROSION CONTROL NOTES a DETAILS em i a ea11A71 ONSTRUCTION OOCUPEUT 50ST In Engineering I Surveying I Planning I Envlr°nmental Cottage Grove, MN REV. PLAN VIEW ANCHOR TRENCH (SEE DETAIL I. SPACING REQUIREMENTS R OF Arvo xDTES eELOl4) PLAN — FACE F SURFACE FLOW S 1/ NOTE: SPACING DISTANCES OVERLAP END JOINTS MNIMUM OF In AND STAPLE OVERLAP AT I.S'INTERVALS. 2" X 4" HORIZONTAL WOODEN LATH SHALL BE MEMBERS CONTINUOUS NAILED SEOLP-TOTHE AROUNDTOPAND BOTTOM. POST MEMBER TO SECURE FASTENED TO EACH POST FLIER FABRIC. USING 2-20D COMMON NAILS V X I- X 2.5' LONG �r C6. M WILL VARY, BUT ARE NOT MAR' TO IXCEED 100 FEET PER 0.25 ACRE OF DRAINAGE - " �R ON ,III111��\ MONOFlLAMENT GEOTExTILE TABLE WOOD POSTS, FABRIC AS PERCHI E SLICED). B REQ'D. ADDITM86-1IONAL ONACHNE SOF FABRIC PABIUC ADDITIONAL BOTTOM FLAP AT BOTTOM OF BOX PROPOSED CURB '� go°OtPn Or II. SIZING REQUIREMENTS: 315,125 UP-UNADIEDW SILT FENCE AND ]-HOOK 15'R PItE ONECONTINUWS LINE 1 25'R 10' 16' - STARLEDENSITYSHALLBEA OVERAP MI LONGINDU—I.— rvNUm OF 3 OSHPPED E", 11 GAUGE METAL STAPLES 11R MINIMUM OF 6- SQUARE YARD (THIS MAY VARY AS DIRECTED BY THE CITY). _ y N 8-10" FABRIC FLAP- WRY = pIRECTION OF SURFACE FLOW B-1Y' MINIMUM DEPTH 112"WASTED I GRAVEL FRTE0. AGG1ECATE BASE `1Y START DOWN-GRNI SLUE AS LINENE AS CLOSE PS PoSS]&B � PREVENT \ UNDERWABIUNG � 112" WASHED ROCK ]16-FOR CATCHMENT TD THE UPGRADIENT TES- FOR OATCHMExi NRE4,a"ACRES1-HOOK AREA>0.25 ACRES ANCHOR 1'T03' 1. DIG 6" X6ENCH TRTR ET IN TRENCH\\\ 2 IAV BLANKET 3. STAPLE AT IS INTERVALS - 6" 1'DE®%]'WIDE , STEEL J �IGREE�lN OFNOTE:]-HOOKS SHALL BE FENCEUSED IS INSTALLEDATAN N THE BUT ANGLE OF 30 DEGREES OR GREATER FROM PARALLEL TO THE CONTOURS. q. BAOO]LLWIwNATUPN. SOILANDCOMPARFLOW S. B IIHOUTAN NCHHOR TREE GEED 100' fi —I w � ITT AROU E NUEET ALLTRNSTRUCT UCTURE W ITTH 66- MN M CLEARANCE TO EDGES OF STRUCTURE. SILT BOX TO BE PLACED ON N EVEN SURFACE 6- BELOW STRUCTU0.EOPENING.TOPOFSILTBOxTO `AGGREGATE WTCKF LL IN PACE CATCHBASIN CONTOURS EXTEND 11" MINIMUM ABOVE SKIS LNG GRADE. STANDARD DETAILS J-HOOK SUIT FENCE unrzvmgEROSION STAN=DITAILS STANDARD DETAILS �(�oTEroNsT Boxw,I_FDAcATcn"ININ INLET PROTECTION R/ COTTAGE GROVE, MINNESOTA ER04 °"µ'npCOTTAGE GERGS *'^^w'^°a COTTAGE GROVE, MINNESOTACOTTAGE GROVE, MINNESOTA ERpB WOODEN LATH SHALL BE 2'XBEHORIZOURI NAILED SECURELY TO THE MEM NDTO1ANUUOUS ARWNDTOPND BOTTOM. POST MEM rUC SECURE FASTENED TO ACU POST FILTER FABRIC. USING 2-200 COMMON NNLS 21x q"X ,''LONG MONOITLAMENL GEOTE%DLE 6aT FEx[E iNSFAunnOnnEFx0O5 \" / oOOO�O�Oo EXISNNG CURB OVERFLDw IS HUF OF THE CURB BO%HEIGHT WOOD POSTS, FABRIC AS PER MNDOT TABLE 8 0.EQ'D. 38R6-1(MACHINE SLICED). O �00000 ADDITIONAL B-10" OF FABRIC RAP AT BOTTOM OF BOX NST 11T obo oh "'Y 00 00 00 00 �O �O �O NOTE: USE WIMCO RING ON CA TENE TYRE) CG-3290-VB (OEPENDBYG qtl GAST[xG TYPE) FENCE R=IX 'MINIM UM DEPTH O O O O WODDCHIPS-18' MINIMUM DEPTH �Q oO0 HIGH FLAW INLET PROTECTION CURB AND Op (O� 00 Do 00 0�o GUTTER MODELS, OR CITY APPROVED EQUAL. nRIOROUL - STAKE WASHED ROCK OR 00000 0 O WOOOCHIPS PER 0 / HAFOF rr�// &10" FABRIC FLAP- BURY UNDER ROIX TO FLOV! 2"x T'x 16"LONG WOODEN STAKES SPECFICATIOxS ZDMCURB 18' MINIMUM CUT OFF BERM JVhTER TO MINIMQE RUNOFF FROM HEIG TOP ASSEMBLY CURB PREVENT UNDERWASHINGSH_ 11/2" WASHED ROCK OF S� 4ME 1'DEEP X I'WIDE NOTES: THE STAKE POINTING UPST RFa\gam\q�\ NOTa: 1. FILTER FABRIC SHALL BE PACED UNDER ROC( CONTFOCIOR SHALL CONSTRUCT SILT BOX TO ITT AROUND THE INLET STRUCTURE WITH B" MINIMUM CLEARANCE TO EWES OF STRUCTURE. SILT BOX BE PLACED ON AN EVEN SURFACE fi" BELOW STRUCTUREOPENIW.TOPOFSILTBOXTO ._�-_�_ - ALLMo.PREVENT OR WOOWHIPS TOSTOP MUD MIGRATION THROUGH ROCK .ENTRANCE MUSTBE MAINTAINED REGULARLY TO SEDIMEMATION TRACKING. A ASSEMBLY ETER,TO N GRADE T LOW PoIM IIp END IB" MINIMUM ABOVE EXD:RNG GRACE. ROLL ENO.OSED w POLYPROPYLENE HIGH -FLOW FABRIC / /� COIIBge STANDARD DETAILS INLET PROTECTION SILT BOx ///y_�_ STANDARD DETAILS CIEC. `iW Grove STANDARD DETAILS ` t = = GOCTBge OUNSTRUCCON ENTRANCE �y�A Grove ROa ND w000C11P STANDARD DETAILS GOII�e INLET PROTECTION CATCH Grove BASIN IISEf(I COTTAGE GROVE, MINNESOTA ERO-10"` °"dY�v COTTAGE GROVE, MINNESOTA ERO-11" '"AAa COTTAGE GROVE, MINNESOTA ERO-12'^x""dPAtl� COTTAGE GROVE, MINNE50TA ERO}9 -�ceII�hesdotlla,o`T�, era �-oflHes��orNl����oC' PRE"IRv 12TZBiz1 11 �ambatek www.sambatek.com ERginee"q ISurveying Planning l ERvtronmental EROSION CONTROL DETAILS SHEET C5.12 REV. "'C R 11v MFEDPM Al o�srxucrioN DocuK�ENT o v Manley Development McHattle Landing Cottage Grove, MN 2 / L.TPROIEcrsysD3zzycnoyavPTSHEETSTsoszz-csERos.owG. cF.1z ERosiox mNTRoIDfrAils SECTION 1: SITE EVALUATION, ASSESSMENT, AND PLANNING 1.1 PROJECT/SITEINODRAIRTION Ta jvwc III uem[rF-111TIF-1-h[vxo/[vcocanox awo m[suxxouxowcaa[as/ _ rvvTc�vmvix uuvi prwxsrwucTlarv.vivirvlrvp FrvFRai —T-as sa 6FNF s 111-x ON/RES „nory xnxs. ¢nnATm Paelccr coM I'M 11-1 xx/xx/xx So :ne1R. vvE1sI,,ILs pR rip RFcpnvlFrFo ar GinFRRlcprviRncrpRF iuFaRulnnpu/mrvnRurnpx e,u-ropxrxFGFeTFa PFrparal uxve ns. xxue[ixivucrFe GV GRaDirvG AcnvmEIJ, I I TF_/1111111 sox. T11T T.-11111 iwe�i nxupi wxx:F, uioxcinnry pxcarcne iox ai sxry GMDINGeou c A111Rr1 N. Fnrvv 1H N111 FIFlp ' RFILLACTIVITICSI 1 tr,R/sIw�IV T1,1 slnpuuoEvlTno�iii v'Hlo"wvo�1Gkiox oLxne^n1s �e X II escTiRe rvo:✓ s ev_T,TTiory xT iu ne roil /�cnu xr eousrreu<norvl pn 1— r111Fs .VINE4 N1 r✓m THE RmuRen I—H Txs OF. s 1-11TE TE, ✓cr¢ THE uw ETC FOR THE 171 lslr�M11srll FolrlllIFA Pp' ir eTi ........1. wunxuexprvsiTFaxFu rp es oisruxaFo. /xawez ouoTE au PRFIEFI urvDER 11-11-1ue11-H_Pe1111T IPPI Fn lsirvG THE Prn pR FIACRS, FES' ANDiwvice Dua wnecPeirvTxs inxus MilTprA PRmccrm x/errnaese - epryraucriery Rssl. xxxx iruvsRvipuseRAAFiEl sleassl. 4ODIT 11111THFa—FN. 111 as Dewree INDEITxc IT —I 111111 110Es. 1.6 RECEIVING WATERS Tp ISCIIIE THE IF xucnaslx/RDNI—NI— THFCo"TRA F'pAR paysancR me p `F1T`E PAiRmwnrcu,oavvvs xusrvuexso oarsorTxsuixixursoAaxu�Tiou. Dae)xi nvltT.n NEIIIusxen. REFERTpG1-41 PERViT'n, ADD ineNnl Rlsv R[¢uiR[rricur9 eE xsspx�F—I xucxpx si axic nxlsuoniTrro.nlxilnuxi pF so DeF ,T SITE FEATURES AND SENSITIVE AREASTOBEPROTECTEO pR lRssvOxsleli Fpa lulPlsnnsrvnrvGs rxoTrerrxsss �TaTu sl xni exs x. xs Pxsssxv�D,.unix�vx,.suxss vxpPpsse ip pal' npry Iannnc 1.8 POTENTIAL SOURCES OF POLLUTION Re.1 sis �[nPic[w[�snrvDIT luxwcnursAcx[nvca.Lsesspc.'rED IV DURp�uG sax/vxprvL uunRrnHTY IcescRie[arv�nooinorvAsnrvnavaTEnsouRcrsorseniln[rvT/POLwrxxrs/ xF pR lsee vARi s.l pFixls sw PPV FOR w7pRc 1.9 ENDANGERED/THREATENED SPECIES pal: TPA/rvanP�xlxxs pwc/as[nwcxperin,E1 THEIE xrve// a F ITFRiesraarvpR"I'"IR wwsxurnorvsir[�'�/i iH11111 rve 1.11 APPLICABLE FEDERAL, Ti STATE OR LOFAL PROGRAMS iecsrnixl x11*11Gu1 RGgplRsraFxn: citt, v✓eTTRsxm. s/✓ro, Irc. Rlpu Rcxnurs/ 1.12 MITIGATION MEASURES FROM ENVIRONMENTAL EWS/TMOIS/I MPAIREO WATERS 111 awaaaFaas (twFaupAvp�r--caxD� pxa �Draeuunpxs) TEP�norvasze FrP; I'llcrxoF' [ uarac[wn rtry oa prva urns c.smlxurr IFS/xLV Fpa PROPGiFo MP5 puaanpxpFFxspsmmry SECTION 2: EROSION AND SEDIMENT CONTROL RMPS 11 11E 1UT-v.Tearx1x THE Frvrspe FrsR TnE cpusrnucriary Acnvm NTTi IFITT 11 F xlaiLaleuorxr Rs .Tsa pecxPT "' 9s�... AxeEtivos ixe GeneRnl Pe11 xvx nrx rnau iT psrx�s me0'undorm°dxa`E•��rr,e — ;zizs„"" SWPPP NARRATIVE 10F 2 SHEET P DEsi�u REVIE�v D v Manley Development ex[Naoelnes�aleo,Nl�xxe�oa^ � ambatek VcHattleLanding e5.�3 �� MT:uR n AL °EL wwwsambatek.com L.yPRIFOTS�50322\VAoyaviLySHEETSysoszz-05 EROS.OWG. C.13 W—P NARR—E1OF2 xm i / a ea O-RUCTCIr COCUNIENT 1—In1-In Engineering I Surveying I Planning I Environmental Cottage Grove, MN REV, TION 3: DEWATERING & BASIN DRAINING 3.1 DEWATERING AND BASIN DRAINING I'll "IT II-ITTIT11111TI-1111 IT'­ Ox)aEaurir0.aourmEnirvnaornorva Eoa oerva�ExirvvucrrvinEsmarnru GOOD HOUSEKEEPING BMPS 4.4 ESTABLISH PROPER EQUIPMENT/VEHICLE FUELING AM. MAINTENANCE 6arv151oNETF,'_vus,_11 En niry 4.5 L EQUIPMENT/VEHICLE SECTION 5: POST -CONSTRUCTION BMPS ryEscarer Pcawnxcrvrsmaw we masrsrznv uxornauPcaTrtacxcc ro orsrcn raccuwnoxs. amrracaurarsmmmena� ormr warzre nunuTr voEumc ry^avcre mrrvswlrvmmvrouslsirc SECTION 6: INSPECTIONS 6.1 IN6PECTION6 L `� F� iorv�4�U[C�aa[svorvsel[wa wsrcrnorvsl Ironou z� owxmnvsvansei[wRrxswtnarvsl SECTION T: RECORD KEEPING AND TRAINING SECTION B: FINAL STABILIZATION / PERMIT TERMINATION wrvs/sv[on�Pnorvs aiorzIll �� EaoaoEGUE you, F,El REF Rio �xCSG�IN6 En. pnooEry rnuirE�.n To eESEESPEgnEV c o� EaErEaErvcEs All 11FT1AA L Ill THE 5T­ nsl—ExrvisHEo rvro TEnvoren RIEreosiDw areo �Escnou,arvo oOI.NT6,aoIENTFPEn m111V Pdorm°d,a«, titled ;zizs„on,"" SWPPP NARRATIVE 2 OF 2 SHEET e—dP BEsi6u RLVIL�v o v �� Manley Development "nl��amelM1es[ eO,NllaaPSo��� �aVambatek McHattie Landing C5.14 �� MT:Be n aL °EL wwwsambatek.com L.\PROJECTS�50322\VAUyCprySHEETsysoszz-05 EROS.DWG. C5.14 SWPPP NARRATivE 2 OF 2 am i / a ea O­RUcnON DOCUMENT 1­In Engineering I Surveying I Planning I Environmental Cottage Grove, MN REV. IiiiiiiiiiiiiiiiiILEGEND \\� PROPOSED EXISTING FUTURE SA ITARY SEWER I — FORCEMAIN (SAN.) STORM SEWE — DRAINTILE `\\ /��� ✓ \ \ —I— �� WATERMAIN UNDERGROUND ✓ \ / \ 1 ' �✓ ` us a GAS LINE UNDERGROUND TELEPHONE HE = E ELECTRIC h• — I _ CONCRETE CURB -- EASEMENT LINE �I UTLOTA Iij I —UTILITY CONSTRUCTION NOTES I PIPE C6.0 2 .—RIENEICE oPPEIRrBRANTLLAESI ✓ nmTAaysESSEa ,a -Ca BEPTH, TL B V ✓ �� CE a�ouL15G(ARTMIGI.) L �� i✓ ��SO sroamsfwEa o. rC ✓ - ✓ - ATTIME OE i L i/� aR IS smNeTo eE oomE IN 'ATANOAa A CO CELLY TH IEECEom oomA'IE' J f aTo M mNsxD a,v oFCOTTAGE RAOVESrANBAaaT NBTHE ENGINEERS AssoaanaI of l >�. I ❑1 `� E�"ITEAMI,E;"r oaEaE�NCNTaARoa"LLOSTA�NAI TaESESPETT�G,,,o�s ELLVATUC"NE ANYPR Or. El C"R,RTEALL'J N HE E NNECTIONra�,DaNRANBINVERT ;I 10"I'LACTIR TO I EL' MECIA 3 CONTACTUDUTrsERVICEPROVIBE IELLrOCADONOESEav1TEsnaouESPRIIRToaEGINNING. — �� ✓ �� . .IN IEx�srNGUNESCONTACTENGINEERIMMEBIATErrIFANr�NwrsAREB'CavEREB IESTavERIFrBEPTRaF �✓ �I �� ✓'��; V vre ea FF, INTERFERE PSTI IF ALLACI ANY PIP E IF I CAE TO IF TAP PSALGRMAI IN 0> `I✓R auTEaaauNEraEauTEaa�EauP aNEaEEEav�rETaTMEPuaurAaETaEUAa�uIN naEIF TMEraNT�ITEl aa. �� �%� ✓ Goy GO ITIESRDCTIONOFARISPRLOE `GT��I�j T ✓ �� a aANroAMAE To EAGA�NTPaoPEaT o�aaNEouaNE C6.03 C6.04 p B,I a� AS aLe° E= oa��w�° 6�IF oP o �BE�EaTM��E=oo�o�=:au� o�r=�a��e a aaEa �N �� INGTHIHOSSNAREFROMCENTERIFSrRU�RETOI CENTER IFSrRUCTUREIFFOR IFENBIECTIIN. CONNECTTaCITY DDaTESNACCIRBANCEwTHCITY aFCO,TAGEvxiavESTANBARES. ✓� Ir I I ��� �I — �` 12MA-1NTSMIN ,wERODERPSATESMAIN CENTS RPPELLNG�'sTaPaavaEGaEATESTSEPAR,TaNaE,wEENAaNn. N`PEa�TrsrANaAaaaETATwAT�. y J AN ECTANICAL III PHI E REITHANTS N ALL E5 CCIAT:CHe N NCURIANIIUIERAREIUMPESE a POwT E°DnERGPABEMAIN,aIN PESTHE ✓; U,o ; , _ IsEIODOIINIE.IT RI �P:I.IPao BEE.�RII—RAL—ANOTOMMUNI—IINEINaow. ��� o I _ � awEIENITI EeIIMINoJRFI°s��:aaysES°EaaPawATERMAINCONNECTIINI -1 ` waERERANEC6sARYTRAFFI«oNTaEUoIRTaEv�C6saALLCoNFIaMTRTaAIIPPHINLaoPLA,EMNRHaoLLRC TSTANaAaG OPOUAENTCF ENITTBRIIEC FE CP HIN PIi IT HO TFCLY C6.05AI I, �` OUTLOTE EL'PERO CININuAGOETME N CIT OR � � 1 CONTRACTORss�FFLYME,>=ua �HEINoaNE.TaEToNSTUCTIONITE. NIN ONSIaLLFORCaaRB�NADNGALLRELLDIREBSOILL S ANBSOITINSPECDaNwI ETHESOILE"TiNEER E E IF ELL �AE;EIF OR TSAGEOTECHM.TENGINESRINGREPORTH.aEENCOMPLLTEBar, LE EL ANo�oA°�N _:r .EN oura ANC�oN. ONTACT NG THE I M�NEFIEEI �EEA� IOTEAE.A E ONE FOR MINNESOTA) THECON RACTAA _ � MHPEa OLS, /ORS"CONACTORAGREETOBEFA�AIaESPONsIaLLEoaANIANaALLaAMAGEsw���M���TaE �� — — — � PTO I��Ts��M� OCCCPS OCBavESEGBYIHISORHERFAITaaETOEP�TIToCATEAIRPRESERVEANIANaALLaTI=C(aNaEaGaoaNa CONTRACToasHAIOBTA�NACOPY OFTISSOILEREPORT AMTRACATE,TORaaAL��EMT—oCOPIESoFSHOPI—IN.FOaMANaoLLANaCATC BARNsTRuCTuaESTO RA T TH APPROVAL FROM THE PR OBE CTE N IF N ER AN EF HE"T. uHE NE ISACTIAE.NO BRAIN TILE SHALL BE BACI<HLLEB WITHOUT / NORTH CS,CONTRACTOR ANB MATERIALSUPPUERTO DETERMINE THE MIN, FLY RECHIREo FOR EACH STORM SEWER STRUCTURE. RELOCATE AL FISTING UTILITIES W HICH CONFLICT W I I ® H THE PRO no SE HIM SIR GAP M ENTS IF_ ONTHE PLAINS SCALE IN FEET "nI, IaR �DICa °MI""R OVERALL PRELIM. UTILITY SHEET AIIamEneS ceofMpre,P°�eoP � de, BE= RE E B �ambatek MaRIeYDevelopment e6.o1 McHattie Landing ES,ITSDRMITTa www.sambatek.com BLPROIEas\soazzLwl\CVILLSHEETSLsoazaCs-IFIVIG OVERALL PRELIM. UTILITYz � oNsrnualoN oocuMEu Engineering Surveying Planning Environmental Cottage Grove, MN REV. I I � OUTLOTA a- 3 \rS i s ss i i 2 r i 2 .. OUTLOTB.��-- {.. ssMx ova � - T 1 3 In I e_.non 7 j,�EE,5358,'Nn, 3 \ \ ti E�o 27 =4 n 9 r� _ zaEE EP i A peso- I L 26 )� v / ye . g - x e_ 5 / sH� L r v�aa / rr r �J / 9 YYY i i ry rr r m ;. i i o6� a I i �2 i � 1 ssE3a 7 r 23 reE 2 aE s9�3 3 iI E-SAC�,�ss \�Ess v .� � � r � E — —ter CUE- _ �! a s i � J �q ' cenx 4 1S = o r v 9 Ees - s 12 y.�� 21 20 A s_ `'�w 5 / NORTH hafh1p1an'YF �P "`� ° s�"tia PRELIM. UTILITY (NORTH) SHEET e^—oeene- or MnP�e o�^�nal,[Q' �•uoeef LJTI oes�cu aEV Evv o v �ambatek ManleV Development e�.o2 �4 MCHattie Landing M,.ar www.sambatek.com LyeaoIEasysnazzywoyavirysHErsysoazz-a-vnr.owe. eaEUM. vnury NoarH z y m-RUaioNoocUNIEB Engineering Surveying l Planning l Environmental Cottage Grove, MN REV. 7 I I 23 10 — ceMx UB Cfl SAS 2 � Es 19 2 2 �a�_ a F 9 ass�� 21 Pe oases. I zo \ e B11�xIn r 13 aEt A 10 ev/III IF xi aa. C� � 1 sm � ) xww- sE r /��ioo,r � 11 �� i i ii r TTTT 15 SET l/ T �� �E'--asio oa z x / , i 12 13 r r 14 \ e cUio v� � 'I Lzavz_ — E ,ox i 15 OUT C co� `� 16 17 18 2 19 r r D P i far _/ T l 1 eenx �T I D vv Ds Ex. REM / / wMr 91.11I iE Ms � \ I IF III LF "I r .a NORTH yw ®0 1C4LE IN FEET ----�---'- ---`-- - E° s�"tiR PRELIM. UTILITY (WEST) SHEET _� �xe � o M���e��o�a E relp'1nE11Ew n V x— a� n.ar Kambatek ManleyDevelopment e6.o3 MCHattie Landing so www.sambatek.com a�g z orvsrnxC-11—UNIEu Engineering F&,',ying Planning I Environmental Cottage Grove, MN WEER voEzz �o\M vvxEET soEzz-C-ITIEow� PxEEIM ITIEIry WEFT se REV. �. 24 23 3 5PC2 WEI\ BE 11 \c19 e�22SI ✓ �o, 1< x a 4 �aaa�P 21 20 iEbs9 5 \wo I.n 17 � xrE- Ell .SS \ \; , 16 � 7 12 ie i 13 14 ��� �� \ , c. j 5 S r �r-141 Er irr r �r 1g �� r S 10 r . r / cuxr 3 c�sos �r s' C rr r r wi x's t ox� z r 6 11 s 3c 3 7 In —a : S. ` _ ___ q\ 9 -/ �� \\\\pogo I �, - 10 i = aB " 10 -Aos Ew���� i 13 ne—� ® — — — —� cao.aave �� r ,y 1- - A ox. 14 �Ex� .4 NORTH ®x m FEET ME ha"h�, '�° .,`"" 'xEa sI""a PRELIM. UTILITY (EAST) SHEET e,1N-1heS ceofMP°�eoP de, LUTH oE= RE E o �ambatek Maoey0eveopment e6.o4 MCHattie Landing �� M,.a www.sambatek.com r \PxorEaS\soazz\wD\Cvir\SxEETS\soazz-cc-UnS.D— PRELIM. eTLry EAST z orvsrnuaioN oocu��Eu Engineering Surveying Planning Environmental Cottage Grove, MN REV. /9 I 1 1 2 1 1 5 E � I I ��p n 111 /- .aP 10 �4zzo LII 13 I o"I"IIII, F — — — — — — — — — In ra" E I - An � a m 2wien -came , N a FE-s4 ao iE v�Nev a �E iE-z3a.00 NE i � mzooe. E�5az1511 o 71LE-ac ® a a \ E le E.w7aP .q 2 �___________� I16 I I v f �� ` �Fs3es, aw�,m �4E ss win mI Ill OUTLOTE co IoTo - ��oIn — — — i -In NORTH no I <<n�� 'a" ""aP PRELePRELIM. UTILITY (SOUTH) SHEET e^[xa oeIne s1ceor MP�P�e oPe�nal-[w�ee� oEs1cu aEV Ew v Wambatek IF MzirleV Development e6.05 MCHattie Landing www'sambatek.com z�eaOJEas\soazz�—�aviz�11EErs�soazz-cc-vnz.owe. IIILlM Onury soOZH z orvsrauaioN oocua�Eu Engineering Surveying Planning Envlronmentel Cottage Grove, MN REV. OUTLOTA Esouac ExceLENERev L SLIGHTING NOTES �/ / uenxuae � 2MElER A°°RESS. COnAGE GROVE, MN LIE HHE TINGmNT0.A5Y5rEM WI NTxCEL�ENERGY� oOR°NATNG TNE�P 11N CON�NE 0.IN 11 TTHE 1-1°EON nNG UN 3 I rJ i '.OF OUTLOTB 'T o 00 T ITT 27 \ I i T �090 7O 26 > i r � 1 BLOCK 2 I r r 6 24 rr � 9 I 2 BLOCK 1 i 10 23 L_---- _____J SAC 3 I 11 II $ �J� rr—,�� 22 'r TT '✓ 4 r 12 rr r 9 6 aN �� �\ .. \ i TT `�r-- �� T \`� 16 T�\ r \� BLOCK 4 r 11 i t j r 1 T T 15 2 \ \ � \ �� � NORTH OUT C r'�'15 a sw.E w FEET PRELIMINF0.V WT'�°ea�rm°d°�°n on STREET LIGHTING (NORTH) SHEET P °1161JRE0ambatek ° rMinnrs°�'��T'LUTu Manley Development „°Name PER�,�TE°aMn.ar �� C8.01 n MCHattie Landing � wwwsambatek.com 9 L.\eaolEC1\11311\CD\CIVIL\SHEETS\50333-ce-sTaTowc.C—ITREETucHTINc No z oNsrRualoNoocuMEu Engineering Surveying Planning Environmental Cottage Grove, MN REV. 1-1 a OUT C ✓� 15 Ir `�e <v v - 8 18 i vv LI 1 vv v 2 v _ I — 12 I S I V�� v BLOCK 3 I r----------- z I i 14 I \ I LIGHTING NOTES // ❑ \\\� \\ L___--___—J zME\Ea nooaowE� AGEE�aovE, MN o; w UN nARETYPICnLLYSETBnCK 3b"BEHINOTHE I I I. THE �TM ueH,wesysrEorn wi,H xce�eNeaw. moaown,werHe \.•• BAa:OFaEM RB TO CER OF mNNernoN OF,Hevoweawa,He � \ / L----------- \ v v A v i I 16 � LEGEND xxx� � 17 I I I III T I 18 \ vav V 19 i OUTLOTE I - I L I......� .e \ 1 NORTH I ° Be I h by e1 NmemesLaee or M�°°e�ov 24 ° sl""R o ambatek www.sambatek.0m Engineering Surveying Planning Envlronmentel STREET LIGHTING (SOUTH) SHEET e8.01A REU. oEE�p�"RE��Ew orvsrnualoN oocuv�Eu McH'a tievLanding MCHattie Landing Cottage Grove, MN22 z oE3L L.\Pao�Eas�soazz\wo\avi�\sHEE\s\soazz-cesa\.owe. ce.oiAsaEE\ueHnNe soe\H STREET 1 970� a, $� $ 970 & 965 �� n' 965 960 _ �� 960 955 — 955 950 950 945 _ — — — — — — 945 940 940 935 935 930 930 Fm 8 gx m mg mg Pq Pir 980 J I REU.4t6.5o 8" $8 g g8 &" 980 975°� s�� z 975 970 a $���EE ��raw 970 965 965 960 /n' V // 960 955 8 955 ��� 950 —' �'� z 950 945 945 940 y 940 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 a+11 4+50 5+00 5+50 r", r", 7+00 7+50 9w0 r", 5+00 5+50 10+00 10+50 11+00 11+50 11+00 11+50 —11 13+50 1a+00 1a+50 15+00 15+51 Ir", hafh1P'bp—d by '�" ""� ° s�"tiR STREET PROFILES (STREETS 1 & 2) ha e ame ne= ceofMPe oP de nE= nE E n EQambatek Mani V Development McHattie Landing TRUCTImbDOCRar P JTI www.sambatek.com z\wo\aviL\sHEErs\soazacesar.owc. saEEr PaoFiLEs z orvsrnuaioN oocu��Eu Engineering I Surveying I Planning I Environmental Cottage Grove, MN NORTX SHEET C8.02 REV. STREET 3 965 I I 965 960 21 T 1111 �P STA 2,4 �5 960 -43 ITA 1� '111 955 955 950 950 945 945 940 935 935 930 930 CUL-DE-SAC 3 985 CUL DE SAC 3 - CL 985 980 980 CUL-DE-SAC I 975 975 965 CUL DE SAC 1 - CL 965 CUL-DE-SAC 2 1 970 F97 0 975 CUL DE SAC 2 - CL 975 960 - 960 965 970 970 955 955 960 960 965 965 950 Ej� 950 955 955 960 960 945 945 950 950 - 955 955 940 940 1 945 945 950 935 935 2111 2111 I'll I'll I'll I'll I'llNORTX 1", 2111 2111 I'll I'll I'll I'll I'll 1 I —I 121 m "IT "o—fi-,­ 11 C.11111i'm D1111a 11 STREET PROFILES (STREET 3, CUL DE SACS 1 -3) SHEET 1he 1—s 1he 11- P-1 N— LITI C8.0 111111T 11—TTIL Manley Development MCH'attie Landing www.sambatek.COM lWambatekir ay L\PROJER1\11122\�D\CIVIL\IIEETI\11122 CI STRT III ITREET PROIILEI (2) 12N/�l — LL11 n Cm-RUCTInd DOCU11111 PRO— 110Engineering , o322 Surveying I Planning I Environmental Cottage Grove, MIN REV. 965 aw za 950 STFEREM TtJOCE POST (T-POST), NUC TO POSTS 6 MAJOMUM "AaNG. UM 3 an, TIES (BO IBMTENSIIE) PE0. POST TOP MONOFIIAMENT GECO'IE%TRE FABRIC PER MNDOT TABLE —I (MAaIINE SLICED). P0F N0tW Ey RJE SLT Faa4 FANuc. MUST BE O s^ PURE TRENCH QUIPMEn� Dev DIRECTION PoSr EMBEDM DETLS NDARD CoGrow¢ttage MAon [sI .SR.TFENEE °a•.mr.w°"'°"�NN.x COTTAGE GROVE, MINNESOTA ERO-1 STEEL FENCE POST (T-PoSQ, MABRBC Mer"NT TeraN`E 6' MAXIMUM SPACING. 3996-1(HAND INSTALLED). —111— To POST ofUY MGM . T 5 (SO IB. SI )PER POST IN TW a' FAeR¢ ro A�Awav FROM FABRIC FABRIC IN THE TRENCH, o KFJLL WITH NATURAL IL, AND IPMNTMar x HT ENTO Im ERIORTO MACE OF THE Po5T3. OURECTiON OF 'MINIMUM I _EDMEhff I.—U.1NDA1D ErAI� U Grov"� O HA SILT FFrvcE i COTTAGE GROVE, MINNESOTA ERo-2 STEEL FENCE POST (T-POS ), MESH REINFORCEMENT, SID. HEW no FENCE, MIN ID"HIGH, AY 6 NAMMUM SPACING. MIN 14.I GAWE WIRE.µ POST NOTFACE WES TAEOTEXTILE FABRIC PER MNWT TO F-9a61(HFAVr DUTY) - FROM 'FABRIC EIgP1TOP-1—AND Z n�RvnLs wIREM mJ NIrv6s Da WIRE nT�ncn Aerw ro IroinREMUNUMun 3 nv nEs (sB LB. M Ens PER POST. N TOP PE— B'OF FABRIC CP IRE MESH IN NAT PP1501E AND COMPACT PRIOR WNHD TPVJ3MENi OF THE IRECUON OF SQUIPMENT i° SURF ESTEND _TREFJpI REM6H��� 6" NOTE: MACHINE lip— HFAYY WIT SILTSHOUW BE USED — DIRECTED BN' THE FENCE STANDARD DETAINS Groveg¢ DUTY saT rENCE ' COTTAGE GROVE, MINNESOTA ERo-3 PVJN VIEW I. SPAQNG REQUIREMENTSMIRECTURN OF I an —ROW / 1 T— SPACING.—C. Y, BUT ARE NOT TO J— 0.25ACRE OFORAINAGE. II. SUING REQUIREMENTS: 315,325 FENCERADIE", 5R F E ONE 1 srti"Terve urve As cLosEE I -FOR Possmle FOR Jl6 -GTa1MENT 1�NLPGRPBIEM CATCHMENT >30 DEGREES DIRECTION OF KS SHALL BE caNrW / Rr-Aa Flow AEREST AN I 30 DEGREES cOL To THE CONTWRS STANDARD DEE NAILS Groveg¢ - W%s a \if��TN COTTAGE GROVE, MINNESOTA ERo-9 DETAIL CURB TMERFLOW IIHAIF OF TS �ONOTEBB��CHOR TRE-H ERIAP ATDISOINTERVALS. DMEPS.AUIRNETS1OH URE1TLCCURE FPSiNTiFND EWLS STOM p1R0 BOx XEIGHT pE�0.ELT—THE MWND TWPNDUBOI.. °'°'""° roB 000000000 POSTMEMBERTOSe— FASTENED To —FORT USING 2-20D COMMON NAILS LTER FABRIC USING 2 20D WMMON NAI NL IR I Al2.5 LONG Mr—MENTGEOTE i 2' A" %2.5' LONG ABRICAS PERMNDOTTABLE WOOD POSTS, FA&U gSPE MD'1 T6LE e RWD — 3996-i oMACHINE SLTCID). BREAD. 3a96-((MACHINE Si N� of W% WIMW ROAD OPA[N W-23 OR ADDITTONAL�B- TSO� roPBNC - V•B(DERErvDING Ox GiSNNG TYPE) SPA .N CURB AND G GUTTER MWELS, ORCITYAP RWED EQUAL. 4--E-L. r "A"' DEASUPY PLED In M OF JDINTES ETPLSTAREBPER MINIMUM MINIMUM WUGE M HT .Waen�YOARD 'crr YaPAY AS h SSEMOBLY'FABRIC FUP-BURY S. lo• aewc �Rr rTo unoewNAsnm0�E�� DPReVEDERNT wASLRD.. J Ia•—ED Roar UNDER —HUNG - _ I Dunxl WNOE I DEEP XI wrDE 6. a. e�Acnr fW;'I n TUA=X-L AND COM— NOTE _ WRHOIRANAHaSAm NOT E EED I00' 6„� CONSTLUCTSRTBO%i FIT ME METER ,T CONTRACT° CIXJSTRURSILTW%TOFR RE.. r AROUND TIOE NLETLSTRUCNNE WfTH 6 MINIM OLTPAOUNO THE INIETLLSiRUCNRE WIrH 6' MRAN ro eE RACED QY AN EVEN WRFACE 6"SBELOW%UM PA,PoIM 1BE PIA¢ ONM�PN EVEN SUAFA�6'BELarVxM STRUCTURE OPENING. TOP OF SILT A. TO —To ND IS' MINIMUM ABOVEE%--GRADE. NIGH FLON FABRIC ND Or MIFRMUM ABWE IX6TING GRADE. STANDARD DErpILS STANDARD DETAILS STANDARD DETAILS STANDARD DETAILS Cottage ERosroNwNraW NxET Cottage IrvleTmo-eOn SINTBox Cottage IN��IrvEIN oT�Ta Cottage wleTraoTErnoN saTeo% Grove Grove FORD, Grove Grove FOR BEEHIVE camNG COTTAGE GROVE, MINNESOTA ERO-5 �1"�°n4FCOTTAGE GROVE, MINNESOTA ERO-] °R1°'°COTTAGE GROVE, EMINNESOTA EROA COTTAGE GROVE, MINNESOTA Efi0-10 II PP LPREHNINkR FCONSTRUCTION DETAILS SHEET I2n Evi Q 1 e^[Na oeeneslaee or Mi��e,oe^Ina �p,L neat R111 R IT D v Wambatek Manlev Development C9.o1 �i MCHattie Landing MNTAI www.sambatek.com I.yPROJEasysBazzywDyaviLysHEETsysoazaa-DETL.Dwc. a.Bi mNSRNIn IN DETaIs 2 L oNsrRuaiGN oocuv�EN Engineering �Suweying I Planning I Environmental Cottage Grove, MIN REV. wOODC MTNIaUM wImuN 008000�0 HIPs1 D �BO�°00°08 O O�gOoo WOODCH PS FEAR O SPECTMCATIONS v18"pSN 5� MI2E RUTO­ NOFF FROM 1.ON w000Qlrrs To STOP n�D�Mlf�gnaorv�K THROLXD3 ROCK. aLrro ICY Cottage A�NDRD DETAILS GTOYe ROCK nNDOWOaOcH V E COTTAGE GROVE, MINNESOTA FRO-12 OFF cariPALTEo FI- PAT - - iii-rt-i AWR. MNDOT Ix[REMENT5OYq DIP+n MIN. SPEC 3I49.2N MOD. OUR = OUTSIDE DIAMETER OF PIPE an' Pre %P_ D1 Nu.PAY DEPTX 6• DU+24' MIN. �T INCREMENTS CTYP) SPEC 3149.2.H OUTSIDE Eva- OF PIPE STANDARD o DroEnAILS Vf� Gro�e IMPROVED PVIPET FOR CH COTTAGE GROVE, MINNESOTA BEP3 TRFPDS OU RRTOSL PEry CW. roxove oiaErnax. NOTE: REQUIRE ssDTFq(M]NG 3PE. s OL WRn aGaADE MD THAN 3:1 REQUIR SLOPE TRUCKING IF THE STAHILITATION ME1xOD 15 FRUCER N Co —BLANKET OR Hr MULCH. STa—TRACE „G LS �_ G �� L.oPE COTTAGE GROVE, MINNESOTA ERo-13 l 1==Ct ge Di Pre,R AND MDR PIPE BEOENG U �,f® G1Dve IN O COTTAGE GROVE, MINNESOTA gm.q COMPACTED BPOt:ILL REC 31-2e.1 POD. DI W*- G11AMi IF PIPE Dop PUCEDI UNCOMPYRICID MATERIAL. ITANIRI FIRE rvoAnOn ��� U GroV�e PIP N Ra.EDDING oD N COTTAGE GROVE, MINNESOTA 0OF �oFTowaao THE IrvvERTE siav11 EIER ANHOLE STEPS SHALLBE PLACN HAT PLAN CONE Is FACING oowrvsTREPM. 47777777 VARIER 1�2T 36" MANHOLE STEPS I6"MAX ON CENTER. 2AR12 IL VARIES DETERMINED BY PIPE SIZE R PIPE SHALL BE CUT Mi MA HOLIEVOULLAND VARIES TIGUTBFAI. uF<PFn[IC.ATInu. 1 SECTION iNSID ONEAUEOUtt DEBE MORTARED ((//(��(������ STANDARD DETAILS MN_ \x�Grovege SANITARY SEWER MANHOLE COTTAGE G ROVE, MI N NESOTA UNd COMPACTED —I 0.5 MNDOT $Me, 3193.1.B.I DW24 BUT .. GOW3 WIDE. hem LESS THAN 3 Du+24• MIN. PLA® INSTALLATION TYPE 1 = CCrNPACTm-1L a Di Nn «•BEDDING DW3 WIDE. NOT LESS THAN 3" DV.+N MUN. OOSELYPi UNCOMPACI®MFT9UAL. INSTALLATION ttPE 2 _ MPACIDDAa i DWnNn_..._.__....«_ BEDDING DW3 WIDE. OTLESSTNAUN Du+24 mw. EDIUNCDMPACIED INSTALLATION TYPE 3 IA=: DERV—MEfE'ROF IPTE E FOR NOAD h.TAILS Grovel PI nETHDDS Naacnaoia COTTAGE GROVE,MINNESOTA BFD2 PRECAST INVERT MUST BE 111-B OF THE PIPE AND __E�IPIEU 1 MANHOLE STEPS SHALL BE PLACED " THATOF CONE ISFFACING DOWNSTREAM PLFN SPECIFIED. PER DETAIL PLATE STR-23AS �21' spAN.,MANHOLE STEPS I6"MAX ON CENTER. 12 �24 { VARIES PESZE MANHOLE WALLAND HAVE Par To VA 1RIES 1 TIcxT SFAI. sFF BPFnOCAnnN. 1 ALL DOG HOUSES SHALL BE MOHTARED SECTION ON INSIDE AND OUTSIDE. STANDARD 1EfAH5 \x� G r SANITARY SEWER (UNCTION MANHOLE -" "— COTTAGE GROVE, MINNESOTA 7N:2 ai­ I e^[Na oeenenaee oT Mi��e,oe^Ina �p,L neef �i PRELIBINkRY mE FRAVVN 11 D v lWambateklF rveying�Planning�Envlronmente CONSTRUCTION DETAILS SHEET Q REV. DEsiG R EW oNSrRuaioN DocuR�EN Maolev DevelDPmentC9.o2 MCHattie Landingwww.sambatek.COM Cottage Grove, MN 2 LOPROLEa\1II22\w\OVI011EET1\11122 Cs-DETLDwe. C912 CONSTROa1ON DET Ls Ger— ONION OFTEf alLPun72'' EI 4X5 MANHOLE TRANSITION MANHOLE STEPS l6"MNf ON CENTER. oA 2zo'c"4as LINED TO IS¢E VARIES TEEM E DESS OTHER 'LINUWIS ENOTE BRA ISEEABOVE)Y STAINLESS IXET (MIN x REquIRE0, I5' SPACINGI TORN D1fo Rm PSITION OFAMIOOVE D PIPE SHALL BE CUTTO BE 2 -A" INSIDE MAMHIII III All HAVE A N. INVERTAND BENCHES PREFIELDAM, TO BNELu THE Sn' LEND.REGUREDINTEEiNVERT SHOULD BE 1/2 DIAMETR OF PIPE AND BENCHES SLOPED TOWARD INVER EE SPECIFICATION AD LNLI'�`11DEn."D OU ORTAREO S SECTION STANDARD DETAILS �Grott'a SANITARY SEWER DROP INLET MANHOLE COTTAGE G ROVE, MINNESOTA SAN> DROOP LID GRADE TOP TO 1/2' BELOW —DE. B2"OF DOUSTHE PROVIDE 12" OFAOJUSTMEN. IS MINIMUM COVER REQWtEO I Of WATER HISEN. IXTEN40NGATE EFNVTHEDAPTEV: I/9'SIEE GATE vgLVE ALVE AND AoaPTEN, COARSE HLTER AGGREG4TE BOTTOM PER MNOOT SPEC. 3I99.2.H. COVE0. WRH MINIMI.M 9 MIL. THI IE MEWLWS(M.) PROW DE CONOL ECTVRT (TYP.j. MJNIMUM 1"] 3/4- WIDE FLAT E B EONC. SWTAENDARD DETAILS CottavE Grovege IrsuxPnon COTTAGE GROVE, MINNESOTA WqT-3 2"MATT o (\ WASHE�yfl"T. O,3/4'ED. OF PARESELE / 2Ri BCLT B"L GALVPN¢ R PO/9"0 4-1"DOA VENLY LT OREQUIRE D TPANE EL10161N �ANHEMINE Po SPACED LING PIN VIEW TOP COVER REMOVED 4 E DOWNO I ANDOEVEROR EQUALWITH m p 2 GONE.- PICK HOLE v MANHOLE STEPS 16" ON CENTER ECCENTRIC WATERTIGHTMANHOLE RnDRO DETAILS Vf� G�'� vNTraar ffwT—nxH� "' A,— COTTAGEGROVE, MINNE50TA 5qN-5 IS MINIMUM COVR REWED QR � � OVE0. TOP OF WATER N. 1A I O A PLAN L. � STAINIESSSIEFLTAPPINGSIFEVE I—E uMT111 '111' / DE FUT COPPERSTRUP. 1, SECTION A_A FRIER LINE I� PR MNDOT SPEC.AG 3lH2HE BW Devi WITH POLYETHYLENE THI BM41,11 TCar— THRUST BLACK 8"CONC.&OIX (TYMC4L). STANDARD DETAILS W G..'r WATER_r wET TAP COTTAGE GROVE, MINNESOTA WqT-5 Il RE Il FCR CURB STOP PND Po%TINT FKL WITHIN _NPLE oRppmC m *EXTEND CURB STOP x BEYOND Rqv WHEN SIDEWALK IS PRESENT 4 RPW A-BLE lH Ell PLAN) ARUBLE (SEE ) x0' 9'%4 O'WOOD FENCE POST 1S PLACE STAPP IN CU�no�o00% PER CURB�DJGUTTFA PLK p4 m 'd SEGMENTALMANHOLEBi 4 ��EWERRR / TYP RSERVII�� 3'PYCT RLFRJ J 3LgE-I/L4'vER Fr. PSI&EPoLYETiYLENE SUPPORT PoR�RPOMn�AFO SLEFTE IINCIDENAL) WOOD 2'#"MPIiKER TO EUnni.iECONRNUOVS-6"TOoT3laHE B BELOW SPRUTICE TO 1S' (M—) THROUGHLY COMPACTED ABOM: THE GROUND TAN IRO GroTrege REsne C.MNEgWPC SRWCE COTTAGE GROVE, MINNESOTA SERa BIITTRE55 DIMENSIONS VARY AS LONG AS POURED AGATNStPIPE 32 v2° DEND 46° BEND 90° RM UNO 0 CSHOULD RBEQ RIxT. SE LE BI N B2 Dx B3 B D2. 3 6 EQ GE ENOUGH TO MKE ANGL PL TO OR LARGENAT1PN 95E0 Il 3. DIMENSIOASS—EASN A1,a2•A35HOULD MTRPERING WOHBMJ BOLTS 4.9-45°MINIMUM. NOtENILPIPE NE BETWEEN O-SEE NO 0-Sff NOTE MEGPLlKS(TYP.) PLAN 90° SEN DS PLAN 45° BENDS LE a FBI B 6FE M INVO= C 3 QUADRANT UND�PRE A,; CON SECTION A -A PLAN 22 1/2° BENDS CottGroveage mNTRE TTNR05T.—NG COTTAGE GROVE, MINNESOTA COAT-6 Dv- 1. MINIMUM O6TANCE @ BE TAMPED In LTER AGGREWTE PER. "N SPEC 314n UP MUM EGALUGS OYPJ o� -TH —R 8"CONCRETE BLOC% 0.0WDE COwDUCTVIIY $TRAP TWo, 31C Dun, wLav¢ED ODE).rewwum�Vl6'x3pa" RODSfl MEGALUGS RAT [OP STRI. STHNDADAmn O DETAILS MO %i�� Grottage COTTAGE GROVE, MINNESOTA µDR 45 BEN Ln/E•RODS 45°�'10 -6'X3/FLAT RSri P MIN. 11STRIP Cottage SWAAN�DHRMDNDErgILS Grove. — U COTTAGE GROVE, MINNESOTA COAT-] 11 e am,Nena,eolMl e,o,eL de, PREaMINARGUF Ixn E�� D �ambatek www.sambatek.COM Engineering �5urveyingIPlanningIEnvlronmentel DETAILS SHEET e9.03 REV, DE51G R EW INITIAL oNSrRualonl DocuR�EN FCONSTRUC MBDIeyOEvelDpmeNt MCHattie Landing Cottage Grove, MN 21 L\PROJEa1\11111\wD\CVIL\IIEETI\11111 C1 DETL.— C911 mlvsRUIION DET-1 Cottage wn xsxo DETAILS GN DE L U Goo COTTAGE GROVE, MINNESOTA WAT-9 24'AE6' SUB OPENING FOR CAITINCIIECINED ® IR OF MH P3PBEHIRN BgCKK Mv. ME 3 IN FROM BAIXOF CUU0.BB H -B" BEHIND A[KOF CURB B DIA.MH =6 BEHIND BACK OF CURB PLAN AS SPECIFIED. PER DETAILP N23 TR-. TOP OF BARREL SEON BELOW TOP ATTOP EDGE SEALED IES� WITH2BADSOFRAMNEKOREQUAL. l2 VARIES MANHOLE STEPS LEE MAX ON [ENDER. VANIEI Ao DOGHOUSES SHFIL BE MORTAREDBO H INSIOEANDOUi61DEOFMANHOI£. T PCE EAD' E. SECTION EFIUAL2aiT_N BOTTOM sue D BARREL SECIRDS. STANDARD DETAILS ,-- G¢ CATCH BASIN MANHOLE ".nnN...N^..eMUTN. COTTAGE GROVE, MINNESOTA 5Tp_5 TOWARD INVERT,AN, RE SLOPE MORTAR MAN NEVICIN HOLE STEPS SHALLeE PACED AC F IN D EA PIAN SPECIFIED. PER DETAILPLA UvG'R523. �. �2T MANHOLESTEPS I6 MAX ON CENTER. VARI2 VARIES DETERMINED BY PIPE OBE2i INSIDE PIPE SHALL BE CUT MORTARED MANHOLE WALL. INSI EANSD OUTSIDE ORMA NODBDTH 3 BEADS OF RAMNEK Oa EQUAL, SECTION BETWEEN B—.SLARANDBARRELIECIRCXI STANDARD DETAILS Grove Cottage STORMSEWERMANHOLE °"•.Mn.a^°'°""Y N.x COTTAGE GROVE, MINNESOTA LSTO-1 CASTING AND A-11.ENT MNGS AS SPECIFIED. PER D-1. PLATE - TOP IF AST. HAVEEUTTIOP EDGE SALEED WITH 2 BEADS OF RAMNEK OR EQUAL. MANHOLE STEPS 16" MAX ON CENTER. ALL BE VIOITARED BEH NSIDgUTSIME OF MANHOLE MDTAR BTT 3'-0' A:Tu URE 6 L E'DIA. STRU-IRE 9 3 �~ SKTION �eErv+EEx eoPLACE I onoM SAO AN, BARRELLSEEnOx (M Gro�e STANDA ,— CATCH BASIN MANHOLENHOLE WITH SUMP 1'M.nm.sA�.P�WN� COTTAGE GROVE, MINNESOTA s_T i MORTAR T MANHOLE TO =/2 DIAMETER AF TP PE AND SLOPE MORTAR2 TOWARDINVERT. A. / OF CONE IS FACING DOWNSTREAM. PLAN USING AND ADIUSTMENT RINGS AS 6A� MA OFIFD. PEP DETAIL PATE STR-23. MANHOLE STEPS 16 MAX ON CENTER. V �VARIES' DETERMINED RY PIPE III /_ PIPE SHALL BE CUT TO INSIDE VAR. A ES MOARTTRED MANHOLE WALL. SIDE AND OUTSIDE ORMArvNOU:BOi OREQUA1 SECTION BETWEEN eOTTOMSUe AND ARRELSEeTI STANDARD DETAILS GroV¢E� STORM SEWER Vf� 'DIN ON MANHOLE COTTAGEGROVE, MINNESOTA STP2 NOTE: VANE GRATE SHOW 1-3'-0"724 FACECA CUR. .,a ECTION OF FLOW �6. PLAN PER DETAIL PLATE S-23. ,A_ Mo r°wEoou aoT THE °° 13-MQRTAK INNEKi INSIDE AND EQUAL BETWEENN BOOF RTTOM SUB ANINES OR SECTION A" BARRELSEeNoN. Cottage STANOARDDETAILS U Grov¢ CATCH BASIN COTTAGE GROVE, MINNESOTA ST MODAR2 TOWARDD IINVERT. PAN 2^� VARIES'MANHOLE IIIINIA" SPEQPIEO PEER UETAIL PAIERSTR WITH 2 BADS Of RAMNEK -E- Ll' MAX DETNCENTER. NII 33. OR ED AEL. VAS PEE SHINED ALL BB CUITE O BE 2.1" ANHOLE WILL. MDOGHOUSES SHALL BE MORTARED INSIDE AND OUTSIDE OF MANHOLE. INSIDE BOTH 3 SECTION EQUAL BETWEEN BOTTOM SAB STANDARD DETAILS �GUroC 1UN STORM SEWERIUNCTIDN MANHOIE WITH REINFORCEDTOPSL US COTTAGE GROVE, MINNESOTA STO 3 oTE: VANE GRATE SHOWN 1 FACE DI CUB ®®®�� RECTION OF FLOW PLAN PER DETAIL PLATE STE-23 PRECAST R INSIDEANDOUT ofrHE 01 EgAL 6ETW EEN BOTTOM E_ AND BARREL SECTION. SECTION 3 MORTAR INVERT Cottage STANDARD DETAILS Vro Grov¢ CATCH BASIN WITH SUMP COTTAGE GROVE, MINNESOTA L m1. f I e^[Na oeenenaee or Ml��e,oe^Ina L neef PRELINIINkRY I2n Evi ERA.N 11 D v www.sambatek.COM jWambatek,[_ rveying�Planning�Envlronmente CONSTRUCTION DETAILS SHEET Q REV, DESI6 R Ew RualDN DocuR�EN Maolev nevelDPmentC9.o4 MCHattie Landing�� Cottage Grove, MN 2/ LOPROLEa\1II11\w\OVI011EETs\11111 CP-DETLDw CP.oa CONITRO1ION DET L1 — MO MR BOTTOM OF MANHOLE TO 1/2 DTAR2 IAMETER AT PIPE ANO SLOPE —M00.TOWARD INVERT. PLAN ASDN IEAS TOP VIEW -GRATE FRAME 111E AS 11, �33Z5"� COADJUSTINGRNGS ASESPECIFIED. SPECIFI TOP OF BARREL SECTIGN BELOW TOP I I WITH 2 BEAD50F FAMNEKKOOR EQUAL. 12AMva 1�27- MANHOLE STEPS I6 MAX ON CEN TER. 1016 VARIESPIPE SHALL BE CUT To BE 2- 0 INSIDE LP MDDEBR INSIDE OAND OUTSIDE OF MANHOLE. 3 PUCE 2 BEAo5 OF RAINNEK OR SECTION EQUALIO BETWEEN BonN. oM sue STREETRDCATCH BASS Vf���VeB WITH CONCRETE STOOLGRATENFIIAME q'1p^^A"`MAN COTTAGE GROVE,MIN NESOTA STo-9 xCHOR4-1 -IS IAT STEEL IMF$@4"01 DOL uTER UN Liss THAN ai' Dian srflu'—RR Fs HOT -DIPPED GALVANIZED GRATE IN 2 SECTIONS LBSRF nx BE Aa E TonEMDO E DNENM HIGH SHOP DHAWINGSTO ENGINEER FOR REVIEW SIM P . MANHOLETSTEPS SHALL B E PUBIG SO THAT ON mH OR EQUI 16" MAY ON CENTER. ALUMINUM STEPS APPROVED. GRATE DETAIL DI40"DIAR'O(roP OF LOPE) 8"DIA ELDL=axxx_�—D FOR SPECIFIC smucruRE. NWL ELEV—K.K HOLE FOR KK DR. RCP EE SC= 6' UTSIDEOFSTRUCTURE RI R. 5- AGGREGA IMN Ec 3149,H MOD.I SECTON �G=g' —STA..—ILS STANDARD SKIMMERMERSTSTRUCNRE M^^pM`M.nv'NM COTTAGE GROVE, MINNESOTA STD-36 \ MANUN130TH4. TOP OR roTTOM WISIDE OF PIPE STORM SEWER SHALL BE RCP. I'MUUAD 1" ISOMETRIC PIPTP 2E r0'• yr 3--- R /TS " 14'" SEE CITY PLATE Be. STO-12 AND—ra 98 R t /4"6 6 E FOR RIPRA➢PIA ra— FLARED D IN. sErnary DETAILS 'sXLtlw,2^,2, Grovel AN.0 TRASH GAUSD "B,i ".eMn COTTAGE GROVE, MINNE. STO.yy RESIDENTIAL T28' F-FI R/W Q RAN =)—E 20NPESP9 5PEURSEMnNDRE(3,n TYPE SP �IL COURSEw OC7-Ef9.s nG COURSE KTURE (3, C) ISPNEA33D 0' CLASS 5 AGGREGATE BASE (VRGRD NER(IF NECES &112'MINA` THSKNESS REQUIRED) NO 5: . TOP OFo 31' WOVE eELOw I9GND,GNACI ON. RD cu PUSTD E1REETFTSSU LS Grove�e rrPl RaIDExC Can FL ary COTTAGE GROVE, MINNESOTA STR-y PLAN PFGPRAREASICIES FEE 4Na' 26 16 l IS I 25 22' lS. (15'MPI.) O — CU55 EP1H 22'TO. 20 T011 C13 3' 36TO 0' 25 TO 30 CL3 3' " AND (.ME CUBIC YARD ISAPPRe%2,0'O LBS.J �0.1FRM UNDERFIARro SECTION A FABRIC IRE END SEMON L HRH SECTION B-B FABRIC TYPE 1V RPP ATVDR RPREaINDSECII Grovel RW ory COTTAGE GROVE, MINNESOTA Bro-12 —CRETEcuBB&GU- RBU IF/CI R60' 14•BOULEVAna LF/C) RIC-1-WAY R20'(F/C) 20'F-F STANDARD CUL-DE-SAC 5UPMOUNrABEE R418 Moo, CONCRETE CUR R31'(F/C) .1 R49yyG1 NGHTOF-war BEQUIRE 16 BouLEvagDIF/cl CURB®GUTTER T —i APPROACH ROSE HE'IF/C)— Ran IF/C)'DErau PLATE SIR 39. NOE aF CUNBAND GUTTERTO BE B618 (GUTTEN OUT). w��RR�� ISLAND CUL-DE-SAC Cottge STANDARD DETAILS Gneri TYPICAL CUL-DE-SACSERIONS RESIDENTIAL(28'F-F) COTTAGE GROVE, MINNESOTA STgy D P9OY/DUTLOT LINE AT HNAL rr NTENANCE —CH SKI�MMER / AQUATIC VEGETATION BENCH T:l ALgR. CAL SIDE SLOPE PROFILE �M BITNIN Iff OnDEr PIPE — OFSIG - NDN TYPICAL BENCH DETAIL WITHIN NO—. 10' OF SKIMMER OUTLET %tOP I/OUROT LINE NI£NANCE BEN. 54ftTY/ AOWTIL VEGETATION 10:1 BEPICH TYPICAL BENOI DETAIL BLIND No IM M ETANDARD DETAILS G2owttage COTTAGE GROVE, MINNESOTA STO-15 snWLOER1 SEETYPBSECIION 'I u 3••G ESP 9.5 WEARING COURSE M—re ('e) (SPN5V30q aA L-i GaE)caTEBac LL (AS DEA RED BT THE ENGNIN ER) BITUMINWSTRAIL VVUDE INOILUE— WIDE slwouLnEli s D E: Ds . o PUL BE�Too a o.rW M 1 �VwM S 3� BA E AU_) EXCAVA (ASDIRECIEO BD ALGA' ReGATE BACKFTLL /THE ��\� CONCRETE SIDEWALK ( (rA C e THRI—MINECUS' DETAILS N Grove DEwALKSErnAND COTTAGE GROVE, MINNESOTA STgy -IHI, IaH �PICa e amelHeS ceGMPP�eGP LUTH PREaMINAR Wambatek www.sambatek.com Engineering �5urveying�Planning�Envlronmentel CONSTRUCTION DETAILS IF SHEET e9.o5 REV. R111-1E1EW RR,ITSUBRPITTM oNsrRualNN Docufl�EN D E Ma-IeyOEvelDpmeNt MCHattie Landing Cottage Grove, MN 2 / L�IIIIEa1\11a11�wD�avlL�IIEETs�soa22-Cs-oETLowe. C111 CINITI IN DET-1 1111 a E t/2"R R 3' SLOPE 3l," t/2'R PERET MxpOT B918 IN - ma. FACE BE ORB ux•P SNORE Br9• �- urR PERET \ MxDOT B61a Map Ba.R 4° AR / SUP" i14 � D112 MOD vz"R �uO 1a"R RMDumAwe . . " 119 �D428 1211" " M00 L.—An GI-P Pr:A?L- -11 ON FACE—RBwHERn—AND GUT1E0. CROSSESA WATER Oa Sa"ARv SEWER SEA . CGroveottage STANDARD D C CURB AND COTTAGE GROVE, MINNESOTA C INC ..... .a GITTBi � z� SECRON A�O— V PRON) BNO" ryVWE SS 'fro S 9Y CONCRETE PAVEMENT /TO =—UDaB.'n; -1 rolNr ISOMETRIC CONTROL 30INDS IN CONCRETE CURB LS CONCRETEDADrsrvEwRD D av�AYR Grotivege RESIDEN_ COTTAGE GROVE, MINNESOTA STR-18 PRAIR Dw CURBA�SHOWN•B-PIN�o SSExSERVICE w¢ wrE�nons Sawa a BE 2 nor BE ACURBCC-EN MINISBEREDINCIDENTTHE PRICED SS NO PLACED BY SPECIFIED STAMP BmE CZ IN LTNE WITH CLEANOD La —en MP'w• IN THE FACE w ORB IN RREH OAR TO THE ERWI CUMTo CURB EON, w 5 Ala SURRHOUNTABLE oF—P ""'AN 1a^l z" ATEERAPN�O SDEWER �EA�Vf C \its GOB e W LounoN _1 IN In. COTTAGE GROVE, MINNESOTA .STR-11 �pxpGATIN EOSHAB BE URNISxED WOH AND A- MAX OPENING. (HORB INLET BOX AND 3- DIA FRDNT FACE DPE)ADIUSTMENTTRINGa.E MIN HEIGHT 3', MAX HEIGHT 12". TOP—BOX-3— NON— FILTER FABRIC NEENAH R16428 MANHOLE FRAME AND COVER. ANY SE EOR MPEO CONCEALED R'-STORM PIR HOAND SEWER". (M NPHEIGHT 3 , MAX HEIGHT 12 . ESTFULICILIF WITH B OR CORE 5E�TICXJ STANDARD DETAILS GTOT Cg¢ C-01 SIN ANO MANHOLE OVE ADJUSTMENT COTTAGE GRUST-ENNNESOTA STR-23 CATCH BASIN AT P.C. ORPT CATCH BASIN IN RADIUS a GURER CORBa GJTTER L 6^ La e M.N.OvBfiIa CONC CwG� SECTION A-AABIe CflG COtteg¢ STANDARD D .AILS Grove roE�P�TRnarvsmax �� ti°" N..MxAm COTTAGE GROVE, MINNESOTA O STR-12 � a MORE IRAN r GATE 4�vE __2 gg • S� l/s, HPN HOLE ADuD Groee (�URmEADTNTA laSA COTTAGE GROVE, MINNESOTA yTg-25 I AT eala FRAURE urwasslR. rown �� —IBID COAND VER/ c69� y �N a qRE G „6 '9 a 2.4 BONIUM ORB INLET OPENING QAq� —mo CP bty pCON ORBaaTraR CRETE ISOMETRIC p10'M TRANSETON p rU. Ix 1a MLrv, SECTION A ERAN-CASING STANDARD Cottage DUN1DUUECURBEA.N TG GTDve AILS 5JCrn1STRUCTION AT urcxMSINR COTTAGE GROVE, MINNESOTA 51R-13 LWEDGE. TO BE TOP OF T011"ABOVE � SEED AND MULO-I IsvwEn33aNCR-CUU`7 JD"UR` aGURE0. c7uRsE MEDC NON MIXTURE (2 e) BPNWA2320B1 UPSE STANDARD DETAILS UI �C-i CONCRETE CURB PROTECTION �•i� BITUMINOUS WEDGE 4"°°xW °nj°.w^LxHr COTTAGE GROVE, MINNESOTA STR-26 II e amlenaleOlM e,OII de, �� PREDMINAR nE Wambatek, www'sarnbatek.corT rveying�Planning�Envlronmente DETAILS SHEET REV. DE6GR EW DrvsrRuaioN Docu6�Eu D FCONSTRUCTION MxDI¢yDevelopmeDte9.o6 MCHattie Landing Cottage Grove, MN 2/ LIPROIE—\Soazz\—\aviL\11EETs\soazz-C1 DETL.DIc a.os CINSIU11IN DETALs S g, 6' Ideal Ave. S. Flay.No.. �IERsa.r• B z SUFFIX-NUMBERSH STREET PUBLIC -THROUGH STREET Inward Court PUBLIC -CUL-DE-SACS RO CER-1CTfO�N NOTES MONO GRADEDGIF IF SIGNS 34 2.:WGT—A OF SUFFw SHALL GE UPPERCASE WITH ALL MAINING LETTEAS TO BE Lam- NAME BLADES WILL BE CANDEGAT 1. STREET GROUND.SIGN5SHALL I U FEET LONG,4FEET DRIVEN INM 5 SIGN POSTS MR STRECT NAHE ELADES SHALL DE ROUND TU 1PRowMETER 2G-3/BIf DIPPED HIXNFSSTE" maESE INTENSITY, "WHITE" IN COLOR. I. E B1PDE5 SHALL BE HIGH l¢ SrRNNE BLADE — 1 GroveEETPUPMBDE anREETs COTTAGE GROVE, MINNESOTA 5Ig-2g �_---m DRANAGE-----3-1AC-IT --- NFGH­ LINE L cECANETHEPHONE, EECTRIC & GASFOR (NOTE: ALL UTILITIES IN SAME TRENCH) 17— CERB&GUTTERMI) ENTE N TYPICAL PRIVATE UTILITY PLACEMENT PLAN VIEW NOTE: ABOVE GROUND UTUTY BOXES SHALL 1 CLEAR q IE LOCATED TO ALLOW 20NE FOR SIDEWAU(S AND TRAILS CGASEXFINISH RADE RAW R NVARIABLE FENCE POST RIE �E scHEDULEm mvlTDttP)1 PVC ErvD CAPS (FUTURE USE) TRENCH CR055 SERION ww�� CROSS SECTION AT CONDUIT CROSSUIG Cottage STANDAROOETAILS Grov¢ PRIVATE UTILITY CONDUIT CROSSING COTTAGE G ROVE, MI N NESOTA E STR3a WOF�smEEioin « oOPPEPNI OUT NOT 2' MILL AND OVERLAY EA (T-CAL) (NTl'➢ICAL) N RIGHT-a—UNE WFVER­ Rii Na STREET SECTION PIE THAN VATr Groi BINuMArtiWSDA RDEMOVAL�UM ETS COTTAGE GROVE, MINNESOTA STR-35 ONmAON SGLIIR r,RNGIGEENE zGuvTEUSPAI AwaED slaw PEST INTERIBORM5IEEve ANCHOR 645E G �� INsrAIIAnoN MFouN U COTTAGE GROVE, MINNESOTA SIR-gs NCRETE CUR8 }—� cD TOOLED NNOWCOON]OLNT A {f VARIABLE t` B„ EDnE..UrT A M e.Ze R AN i K DESIGNGwi �a N (a NRB1� — DAx GRADE ¢ o P SFmDNAA rME NARROW NOSE LOCATIONOFMONUMENT a MAXIMUM NRB&a1Ti A�'r MNOOT Go MNORETEODOR PROPERIP'noe ERFIttP) CO ECRETE SED LAN SIB CURB & GUTTER NOTES: RAi r ME �'WC!N"1R.r`1 0 1.1 SIGN PANEL: L "ING RK DR OPEN SPACE FS I,. HFOR SANITARY-LL O UETmRSONREENHIP SHEETNG CIIPCMETE PADHAVE_ED FENISHal T,1/a' DEPTH 1TALL, OYXION J O 105 SPACING BAE AIENS WiFrtEq�,15'2ON%.`EHIP AGING BETWEEN ExPANSIONIOINr A osTARTOS FROM TOPOF POSTRan �a oLFTreRINO —LY— —�'— O 1.1. eriroEpSar. N IF HIF FREEING — — F NT0.DO�IOINiS Ste) iOP OaRAISEp OIN •EOGESANDCORNERS SITE POST WITH ROUNDED lV B f^ O WITH WHITE BORDER VY 2. U{HANNEL GADSADEED POST, ._A. PANVELB� GN GPAI>E �P M AN `i ITS VI O HE IN SLB/Fr 6'-6'ING, L�IE ANSION IOINT PROPERtt RH ETTERING FACING PRIVATE I✓u 3. REQUIRED FORSTRUCTURESLDUTED I HTER N DIRFCTF NEElSAS G SERION A -A WIDE NOSE ON 21' RADIUS RAISED MEDIAN FRONT SIDE STANDARD nD DETAILS STANDARD DETAILS � /X\GO STANDARDDETAILS (/(��\Cottage STFUnuSIA,XURE MAIER SIGN ^„^^••�•• Grotv�Gg¢ Grove�e ¢ CITY MONUMENT POST \jam G[OVE l� 'E^N• �•^'^ev°'L"N" COTTAGE GROVE, MINNESOTA SIR-gI``COTTAGE GROVE, MINNESOTA STpEgg X°°W COTTAGE GROVE, MINNESOTA STRE40�"`"alR COTTAGE GROVE, MINNESOTA yTTy-ql "HI, Ian"I`aQp °MI""R CONSTRUCTION DETAILS SHEET % e^[ Na oeenes1ceor MPlPne oPe�nal,[T'LUTH of DEs�cu REV EW D v R ambatek MaRlev Development e9.o/ McHattie Landing EK,ITSDBMITIAL www.sambatek.com L�PRDIEas\11a11�wD�avILsHEETI�soazz-cs-DETLDwe. cs.11 CINIT1E 1DN DETAILS z / owsrRualDN DocuRIEw Engineering ISurveying IPlanningIEnvlronmentel Cottage Grove, MN REV, 90 o p In In IS .x® 0 0 on o aAg. X,.=;o �.� ,waw�Tuua.neacwm.°°x.� �Q ®ryi 1-23-2017 STANDARD PLAN 5 -297.250 1 OF 6 In TL a o,aE<.,ox.I A.MP ..Lx,eIE «,RE oMa xEo oTREITTox,T o o a o IT.— or— oTxEITIo— o oxE w.Rrv8xc <T e.cx of mRe a`E TYTI­ II Y. ..Tx.x .xTEa=E .oxir �xCT xEa °po,Tm° e��o- „„g��, CONSTRUCTION DETAILS SHEET ItNameTxe e��TR o Wambatek McH'attivLandin e9.08 MCHattie Landing www.sambatek.com L\PROJEas\soazz\wo\avic\IIEETs\soazz-cs-oETL.owe. cs.oe mNSTRUaioN OETais z orvsrnuaioN oocuxIEu Engineering �SurveyingIPlanningIEnvlronmentel Cottage Grove, MN REV. LEGEND c�na a cDTre a nsrHALT P,PmNc 0 EASEMENT niTs -- coNCRLTEsmEvanLR o—.—.—.� A�.ELstiN1 �..._.._..�� O aLnL�n�En RD COTTAGE GROVE TREE PRESERVATION CODE ocLp�. �sav�Enirrml I EEPuc1MEN,�L "' cnRroL��o�zi �LEMopEOL,�cED alloaeRviII i NtiIE coNi�E R"T..... aE4LNnNiHi'Niow vV E ET`tIrTILL 1E1M TreDTREE REMD1 ALI1 11 urvrts/AruEl' Es., = esici oev,nTTMOF.w000 oeciouous oD og losaoaAT T .. ous ie�en. Ernsr.Eu rEE. uoliN vEien._ rr, IT9 eieHTiex, or P wNiErvousnrsxRn nr moNTrn Ps wNTnivoTivaoNr iNcr n'r To TREE PRESERVATION SUMMARY EnE—IoD R NORTH ®a tFat 1hA plan survey o ytli tluleLeendea� 'N=e7 a NamfLnes��o,Nl o " PO " �` PRELIMINARY GUREN oEsi R Env D v EL �• e ambatek www.sambatek.com Engineering �Surveying�Planning�Envlronmental OVERALL SITE PLAN SHEET L0.01 REV. Manley Development McHattle Landing Cottage Grove, MN PERM1TE1RM TaL o�srxucriDN DDcuRIENT i L.\PROJERS\E0322\CAD\CIVIL\SHEETS\To322-TO TREE . DWG. m.o3TREE PRESERVATION PwN �o oE EP 22 14 o �o _ "' tIPBG,ERSB3 ° °"`hh°Ian's°"e p°" eI d mPhe °ed�R sup e7 °r[M1estate°, r'°`Name. PP A�` PRELIM INARV 2/2 N Sambatek www.sambatek.com Engineering Surveying Planning Environmental TREE INVENTORY SHEET �0.02 REV. "SIGN a EAv PEAMITE1111„at o�srxucrloN oocuMENr o jw e EL Manley Development McHattie Landing Cottage Grove, MN se / 1LAnt6lyltlsHEErs6a322-TOTREEDSvG.m02TREEINVENrnaY Tag No. Common Name 6cientiTc Name TVPe Status Notes 3109 American Elm Ulmus amer(ceno Hardwood Remove 3110 16 Norway Maple Acer ple[enoides Softwood Remove 3111 10 Colorado Blue Spruce Picee pungens Lon(Jemu Remove 3112 20 Scotch P'me sylvesMs Conrferous Remove 3113 16 Colorado Blue Spruce Picec pungens Conrferous Remove 3114 16 Crabapple Melus BE Softwood Remove 3113 20 Coloratlo Blue Spruce Plcea pungens Coniferous Remove 3116 10 Crabapple Malus sp. Softwood Remove 311] 19 White Spruce Piceo gle uce Comfemu Remove 3118 15 Apple Malus sp. Softwoods Remove 30% top dead 3119 6 Green ASM1 Fraxlnus pennsylvon(ca Hartlwood Remove W hlte Spruce Piceo gip uce Comfemus 3121 20 White Spruce Picee gle uce Con(Jerou Remove 3122 22 WM1lte Spruce Picec gla uce Conrferous Remove 3123 way Maple car plp[anoldes Softwood 3124 1] Pa per Birch Be[ule poyrifere Herdwoed Remove 3123 18 White Spruce Picee gla uce Coniferous Remove 3126 21 WM1lte Spruce ec 9la v[c Conrferous Remove 312] 24 Green ASM1 us pennsylvpnlm Hardwood 3126 22 Green Ash Froxinus pennsylvanim Herdwoed Remove 3129 30 Norway Maple Acer ple[anoldes Softwood Remove split at base up to two main leaders E' uP 3130 20 Green Ash Froxinus pennsylvanim Hartlwood Remove 3131 12, 10,9 Pa per Birch erula peyrrferc Hcrdwood Remove 3132 12 Bun Elder Acer negundo Softwood Remove 3133 12 Box Elder Acer negundo Softwood Remove 3134 16 8ox Eltler Acer negundo Softwood Remove e Elder Acer negundo Softwood 3136 10 Hackberry Celtis occiden[elis Herdwoed Remove echo dlral damage along trunk 313] 16 Box Elder Acer negundo softwood Remove 3138 12,12 8ox Elder Acer negundo Softwood Remove 3139 1] Bon Elder Acer negundo Softwood Remove 3140 20, 1E,12 Box Elder Acer negundo Softwood Remove 3141 1912, Box Eltler Acer negundo sof[rvood Remove 3142 Green ASM1 us pennsylvanim Hardwood Remove 3143 2E Norway Maple A er plotcnoides Softwood Remove 3144 22 Green Ash Froxinus pennsylvanim Hardwood Remove 3143 11 White Spruce Picee gleuco Coniferous Remove W hire Spruce Picec glc uce Conrferous 314] 23 White Spruce Picec gleuco Conrferous Remove 3148 26 Norvvay Maple Acer plo[anoldes Softwood Remove 3149 9 WM1lte Spruce Picee gleuco Coniferous Remove 3130 8 White Sprure Picee gle uce Comfemu Remove 3]51 10 White Spruce Picee gla uce Con(Jemu Remove 3132 6 WM1lte Spruce Picee gleam Coniferous Remove 3133 WMlte Spnrrx ea glpvcp Coniferous R 3134 6 White Spruce Wee gle uce Comfemu Remove 3158 fi White Spruce Picee gla uce Coniferous Remove 3136 WMlte Spruce ea glovco Coniferous R does not quality 313] 14 White Spruce Piceo gle uce Comfemu 3138 11 White Spruce Picee gla uce Con(Jemu Remove 3139 6 White Spruce ec gloom Conrferous Remove 3160 1] White Spruce eo glc uce Comferous 3161 1o,9,as mrh¢e cedar mule o�denmli= mniferor Remove 3162 20 Sm[ch Pine Pinus sylvesMs Coniferous Remove 3163 20 Green Ash Fraxlnus pennsylvanim Hcrdwaod Remove 3164 12,12 x Elder Acer nag undo Softwood 3163 24,22 Box Elder Acer ne5 undo Softwood Remove 3166 1E Box Elder Acer ne5 undo Softwood Remove 316) 10 HackberrV Cel(fs ocUCenMI(s Hcrdwaod Remove 3168 20, 10 s Elder Acer ne5 undo Softwood Remove 3169 12 Box Elder Acer nag undo Softwood Remove 31)0 11 Hackberry Cel(fs occldenMl(s Hcrdwaod Remove 31]1 1) Box Elder rnegvndo Softwood Remove 31]2 12 n Elder Acer nag undo Softwood Remove 31]3 22 Scootch Pine Pinus sylvesMs Coniferous Remove 31]4 12 American Elm Ulmus emencene He Nwood Remove 31)3 22 Box Eltler Acer ne5undo Softwood Remove 31]6 15,12 Green Ash Fraxinus pennsylvanim Hcrdwaod 31]] 18 Green Ash Froxinus pennsylvpnice Hcrdwood Remove 31]8 ] Hackberry CelOsomidentplis Hcrdwaod Remove 31]9 14 Green Ash Fraxlnus pennsylvanlca Hcrdwaod Remove 3180 17 HackberrV Celtl octldenMl/s Hcrdwaod Remove Hackberry celNs oo7denmlls Hcrdwood 3182 ] Hackberry Lel[isowden[olis Hcrdwood Remove 3183 28 Hackberry CelOs ocndenMlis Hcrdwaod Remove 3184 B ackberry Cel(fs ocUdenMl(s Hcrdwaod Remove 3183 17 ackberry Celtis ocdden[el/s Hcrdwood 3186 6 HackberrV Cells ocUdenrPl(s Hcrdwood Remove 318] 16,10 Green Ash Fraxinus pennsylvonice Hcrdwood Remove both in poor health 3188 14 American Elm Ulmus amenceno Hcrdwaod Remove 3189 9 Hackberry Cells ocddenmlls Hcrdwaod Remove 3190 12.10 HackberrV Celtls ocddenMl/s Hcrdwaod Remove 3191 9 Hackberry Lelfis omdenMlis Hcrdwood Remove 3192 6 Hackberry Celtis ocodenmlis Hcrdwood Remove 3193 19,10 Green Ash Fraxlnus pennrylvonlce He Nwood Remove 3194 12 American Elm Ulmus emenceno Hcrdwaod Remove 3193 18 American Elm Ulmus emenceno Hcrdwaod Remove 3196 12 Green Ash Fraxlnus pennsylvanim Hcrdwaod Remove In decline 319] 10 Green Ash us pennsylvanim Hardwood 319R ]] Hackberry Celtis ocddenml/s Hcrdwood 3199 8 Green Ash Fraxlnus pennrylvonlce He Nwood Remove 3200 18,16 Green Ash Fraxinus pennsylvenice Hcrdwaod Remove 3201 24 Green Ash us pennsylvanim Hcrdwaod Remove 3202 16 HackberrV Celtis ocCiden[elis Hardwood Remove 3203 24,19, 16,13 Box Elder Acer nag undo Softwood Remove 3204 6 Hackberry Celtis occldenMlls Hcrdwaod Remove 3203 19 ackberry Cel(fs ocUCenMI(s Hcrdwaod Remove 3206 9 HackberrV Celtis ocdden[el/s Hcrdwood Remove 320] 9 HackberrV Celtisowden[plis Hcrdwood Remove 3208 6 Hackberry Celtis ocndenMlis He Nwood Remove 3209 12 American Elm Ulmus emericeno Hcrdwood Remove 3210 12 Hackberry Cel(fs ocddenMl(s Hcrdwaod Remove 3211 23 HackherrV Celtls ocddenMl/s Hcrdwaod Remove ij F L1.02 7 Y 1 � L1.03 :,� L1.04 k f, �.. it IV Namf-Sl- fM em` P� FPoa n / OVERALL DEVELOPER TREE SCH EDULE PLANT SCHEDULE OVERALL a � o.ea ain *Mi�..ae.=iRn �a...m,...... ra.umm ..... .., a .......... �JAMAICA AVE BU F FER TREE SCHEDULE PLANT SCHEDULE JAMAICA BUFFER ........... �eaaa�nw�a wb..M,a®oe. Fi ...... .......... ........... ry so.. e...aiao.rn�isn.e oa� .. n.res.. iso,,.esr.. a.eappe i STREET TREE SCHEDULE LEGEND NR'NERT' 'MT R AE HAFT vA, RE 0 EUEMENT-------- euiinirvo mNaETE VAvirvo irs -- mNI ETERDE—IR po—.—.—,� IANIUARII-ER =1AN1 IARDDRAIN O TREE NALDIION FENCE EN RA 11ILDERREINI Mu_TREER COTTAGE GROVE LANDSCAPE CODE a oTTLE REM imAx. a°m E AOIAcervENDEETmEEVERDWEaous mEE wRiovEu-roavT eE lMnx.z) LINE NTHE "MIRE, EN, ME 'IN M"T N'.DEA'1FER1DI1.E.NINE "ENTE`T(h) ,D`R'NED ESEMu ER ITR ANUERIA,A DIRM11R E AFTER jaoj of �NisreN vEaa-RODND LANDSCAPE TREE SUMMARY RVID ENTAL DREP,rslRE orsp REN EMENT TREV TIMRDE 1.IN11E=, 5ME(NOV) ANILICATIN DI AvvHER OL, pTo ornE o:Mu ENCM Rcc c/u"csuPE m ILEEHINE 11ILDINo SOUTHEAST STORM WATER TREE SCHEDULE PLANT SCHEDULE SOUTHEAST STORMWATER GROUNDCOVER SCHEDULE GROUNDCOVER SCHEDULE OVERALL NORTH ®M I—E IN FEET OVERALL SITE PLAN SHEET Maoley Development L 1.01 McHattie Landing Cottage Grove, MN REV. J A N E R O A V E L1.02 LANDSCAPE PLAN (NORTH)L1.02 LANDSCAPE PLAN (NORTH)::L:\\PROJECTS\\50322\\CAD\\CIVIL\\SHEETS\\50322-L1-LSCP.DWGL:\\PROJECTS\\50322\\CAD\\CIVIL\\SHEETS\\50322-L1-LSCP.DWG 12/29/2021 3:01:22 PM12/29/2021 3:01:22 PM | |AARON FELDBERG, PE (MN, AZ)AARON FELDBERG, PE (MN, AZ) | |22.0S (LMS TECH)22.0S (LMS TECH) L1.03 LANDSCAPE PLAN (WEST)L1.03 LANDSCAPE PLAN (WEST)::L:\\PROJECTS\\50322\\CAD\\CIVIL\\SHEETS\\50322-L1-LSCP.DWGL:\\PROJECTS\\50322\\CAD\\CIVIL\\SHEETS\\50322-L1-LSCP.DWG 12/29/2021 3:01:22 PM12/29/2021 3:01:22 PM | |AARON FELDBERG, PE (MN, AZ)AARON FELDBERG, PE (MN, AZ) | |22.0S (LMS TECH)22.0S (LMS TECH) L1.04 LANDSCAPE PLAN (EAST)L1.04 LANDSCAPE PLAN (EAST)::L:\\PROJECTS\\50322\\CAD\\CIVIL\\SHEETS\\50322-L1-LSCP.DWGL:\\PROJECTS\\50322\\CAD\\CIVIL\\SHEETS\\50322-L1-LSCP.DWG 12/29/2021 3:01:22 PM12/29/2021 3:01:22 PM | |AARON FELDBERG, PE (MN, AZ)AARON FELDBERG, PE (MN, AZ) | |22.0S (LMS TECH)22.0S (LMS TECH) L1.05 LANDSCAPE PLAN (SOUTH)L1.05 LANDSCAPE PLAN (SOUTH)::L:\\PROJECTS\\50322\\CAD\\CIVIL\\SHEETS\\50322-L1-LSCP.DWGL:\\PROJECTS\\50322\\CAD\\CIVIL\\SHEETS\\50322-L1-LSCP.DWG 12/29/2021 3:01:22 PM12/29/2021 3:01:22 PM | |AARON FELDBERG, PE (MN, AZ)AARON FELDBERG, PE (MN, AZ) | |22.0S (LMS TECH)22.0S (LMS TECH) L1.06 LANDSCAPE DETAILS AND NOTESL1.06 LANDSCAPE DETAILS AND NOTES::L:\\PROJECTS\\50322\\CAD\\CIVIL\\SHEETS\\50322-L1-LSCP.DWGL:\\PROJECTS\\50322\\CAD\\CIVIL\\SHEETS\\50322-L1-LSCP.DWG 12/29/2021 3:01:22 PM12/29/2021 3:01:22 PM | |AARON FELDBERG, PE (MN, AZ)AARON FELDBERG, PE (MN, AZ) | |22.0S (LMS TECH)22.0S (LMS TECH)