HomeMy WebLinkAbout2022-07-25 PACKET 06.1. (COTTAGE GROVE LOGISTICS PARK BUILDING 3)STAFF REPORT CASE: SP22-051 ITEM: 6.1 PUBLIC MEETING DATE: 7/25/22 TENTATIVE COUNCIL REVIEW DATE: 1/17/22 APPLICATION APPLICANT: NP BGO Cottage Grove Logistics Park, LLC REQUEST: Site plan review for Phase 1a of the Cottage Grove Logistics Park Master Development Plan. The application is to construct Building 3, which will consist of approximately 520,000 square feet, on property located south of 100th Street and west of Ideal Avenue. SITE DATA LOCATION: ZONING: GUIDED LAND USE: South of 100th Street and West of Ideal Avenue 1-2, General Industry, with a PUD, Planned Unit Development Industrial LAND USE OF ADJACENT PROPERTIES: CURRENT NORTH: Residential & Ind EAST: Agricultural SOUTH: Agricultural WEST: Agricultural SIZE: 520,000 square feet DENSITY: N/A RECOMMENDATION GUIDED LDR & Industrial Industrial Industrial Industrial Approval, subject to the conditions stipulated in this staff report. Cottage Grove COTTAGE GROVE PLANNING DIVISION � here Pride and Prosperity Meet Planning Staff Contact: Emily Schmitz, Senior Planner; 651-458-2874; eschmitz(o-)_cottagegrovemn.gov Application Accepted:. 6/29/2022 60-Day Review Deadline: 8/28/2022 City of Cottage Grove Planning Division • 12800 Ravine Parkway South • Cottage Grove, MN 55016 Planning Staff Report Cottage Grove Logistics Park — Phase 1a (NorthPoint Development) Planning Case No. SP2022-051 July 25, 2022 Proposal NorthPoint Development (NP CG Logistics, LLC) submitted a Site Plan Review application for a project on 29.18 acres of land located south of 100th Street for Phase 1 a of the Cottage Grove Logistics Master Site Plan with proposed construction of Building 3 (520,000 square feet) for warehouse, manufacturing, distribution, and office space. Location Map Review Schedule Application Received: July 29, 2022 Acceptance of Completed Application: June 29, 2022 Planning Commission Date: July 25, 2022 Tentative City Council Date: August 17, 2022 60-Day Review Deadline: August 29, 2022 Background NorthPoint Development (Developer), a Kansas City based development company, received Master Site Plan approval in December 2021. The Master Site Plan (Resolution No. 2021-166) for the Cottage Grove Logistics Park consists of approximately 252 acres of land encompassing an assemblage of six separately owned parcels. The Master Site Plan approved nine separate warehouse, manufacturing, distribution, and office space buildings. The Developer proposed a phased development, and therefore requires a site plan to be reviewed and approved for each proposed phase of development of the Cottage Grove Logistics Park to ensure the proposed phase aligns with the approved Master Site Plan. Planning Staff Report — Case Nos. SP2022-051 Cottage Grove Logistics Park — Phase 1 a (NorthPoint) July 25, 2022 Page 2 of 12 ----ice= il�- Ili iU III Oil III A Master Site Plan — Cottage Grove Logistics Park The Developer subimtted a site plan application and received approval for the first phase of the development in April 2022 (Resolution No. 2022-058). Phase 1 of the development includes Buildings 1 and 2, a total of 700,000 square feet of warehouse, dristribution, and office space. Phase 1 also required a final plat creating the two separate parcels for each of the buildings as well as construction of 105th Street, and the 100th Street and Ideal Avenue improvements. Grading began in the spring of 2022, and the Developer is working towards completion of Phase 1 in late 2022. -- - � - -- -I -- - - - -- — - --------- -- *+ — I BUILOING1 +2284N9685.F. FFE=3137 I III I i I � I I, i' I 2 I I+lye _ % IIII !1! IIIII II III IIIII lil.11 III I' 'i BUILDING �A} 1 - - ±497,BWS.F. III$, �\ III III]] I ll l l l l l l l l l l l l l l l l l l l f l l l l l l l l l l l f l l l l l l l l l l 11 l l l l l l l l l l l l y''I 1, s20xa3c x� iL-RCTI�M1 �._ ......_ -... ......� ..... FFE-813.2' i-'.. F 8.451N9 III3_ INFILTRF'If3N BASIN 7--- FunxtEClttsTaEET T' II a�xa .wn- =_ 161�1 Z� .Zlx w'r elxeecl t�1.=_ I I 2� — 5 I1 \ v\ ---------- ---------- Phase 1 Site Plan Planning Staff Report — Case Nos. SP2022-051 Cottage Grove Logistics Park — Phase 1 a (NorthPoint) July 25, 2022 Page 3 of 12 Planning Considerations Comprehensive Plan - Future Land Use Designation The City's approved 2040 Comprehensive Plan guides all proposed properties involved in the proposed Cottage Grove Logistics Park Master Site Plan as Industrial; therefore, the proposed Phase 1a Site Plan use is consistent with the guided land use. 2040 Future Land Use -- Major F.1— R—c—w AghCUfUle Preserve R—IROWentipl Low Density Revdennol _ Medi— Deruwty Re9d-14 - Kgh Densily R.Oftntlol cornrnerca - M led Use ® M led Ufe'.v M1 n 3W OI Ar—1 Rootl ays 0 Intlustml - P.W/S.—ftbk Ag Al —I _ Parks/Open Space - GeV Cane In-1-11--g A— Open Woler Stteol and RO&Ood Rlghl-ot ay 2040 Land Use Map Zoning Part of the Master Site Plan approvals included rezoning of parcels proposed to be included in the site plan area. The six separate parcels within the assemblage were rezoned from AG-1, Agriculture Preservation, or AG-2, Agricultural, to 1-2, General Industry, with a PUD, Planned Unit Development. The approved PUD overlay allows for flexibility in land development for a more efficient and effective use of the land including loading docks to face a public right-of-way and flexibility in building height. The proposed warehousing, manufacturing, distribution, and office uses within Phase 1a are permitted uses within the 1-2 zoning district. Phase la Site Plan The applicant is proposing a site plan review for Phase 1 a of the Master Site Plan area. This phase includes one building (Building 3) at a total of 520,000 square feet. II - F �r y � F Building 3 Location Planning Staff Report — Case Nos. SP2022-051 Cottage Grove Logistics Park — Phase 1 a (NorthPoint) July 25, 2022 Page 4 of 12 . . d: VI .51 Building 3 Site Plan Setbacks The minimum front, rear, and parking setbacks for the 1-2 zoning district have all been met with the proposed Phase la Site Plan. Side Side Rear yard Side yard yard Rear yard Front yard setback Building setback adjacent yard adjacent setback adjacent height interior to a setback to an R toanR street district district 40 feet 40 feet 125 feet 80 feet 60 feet 100 feet 45 feet Height City Code requires a maximum building height of 45 feet; however, the approved PUD provides flexibility in building heights ranging from 48.6 feet to 51 feet. The proposed heights allow for stacking of materials, which is typical of distribution operations. The proposed height of Building 3 in Phase la will be required to align with the previously approved building heights within the City's Business Park. Architecture The conditions of approval for the PUD require that all buildings within the PUD and Master Site Plan area shall be constructed of complementary materials. The City's Zoning Code requires new Planning Staff Report — Case Nos. SP2022-051 Cottage Grove Logistics Park — Phase 1 a (NorthPoint) July 25, 2022 Page 5 of 12 structures within commercial and industrial districts to be composed of at least 65 percent Class 1 materials as outlined in the Zoning Code (brick, stone, glass) as well as a variation of materials every 100 feet of wall length. The buildings within Phase 1 a are proposed to be Class A tip -up panels, glazing along all sides, brick, and canopies at each corner or main building entrance. The proposed materials provide a variation every 100 feet and increased visual impact from public rights -of -way. Proposed elevation example below: Cottage Grove Logistics Park Building Rendering Parking The Developer's Master Plan requires the Developer to meet the City's minimum parking stand- ards for warehouse/manufactured uses (1 space per 2,000 square feet of building area). The Phase 1a parking is proposed to provide the following parking spaces consistent with the mini- mum required spaces per the approved Master Site Plan: Building 3 Required Parking 257 Proposed Parking 276 Given the property lines are proposed within parking and access drive areas, an agreement shall be in place to ensure the parking/drive aisle areas are maintained equally by current and/or future property owners. Tree Preservation As with all developments within the City of Cottage Grove, a tree inventory is required to be com- pleted identifying all qualifying trees on the development site and indicating which are proposed to be removed. The Developer completed an individual tree inventory as part of the Master Site Plan process. Planning Staff Report — Case Nos. SP2022-051 Cottage Grove Logistics Park — Phase 1 a (NorthPoint) July 25, 2022 Page 6 of 12 Inches Total Replacement Remaining Total Permitted Excess Replace- inches replacement permitted Inches replacement existingremoval inches ment proposed — inches to be removed inches inches threshold removed rate Phase 1 removed required 27,906 60% 16,743 24,957 8,214 50% 4,107 376 3,731 The Developer is proposing to replace mitigation inches as part of the Phase la. The remaining mitigation inches will be required to be planted on site as part of future phases. If at such time the final phase of the Master Site Plan is proposed and all mitigation has not been planted on site, cash in lieu of for remaining mitigation inches will be required to be paid at the current mitigation fee value. The Developer, as part of the first phase, planted 376 mitigation inches on the site, leaving 3,980 inches to mitigate throughout the remainder of the master site plan build out. The Developer con- tinues to work through the landscape plan for Phase 1 a. A final landscape plan will be required to be reviewed and approved prior to Council approval. Landscaping City Zoning Code Title 11-6-20 requires the following minimum landscape requirements: • 15 percent of the proposed developed space to be dedicated green space in a commercial or industrial development o The Developer is proposing 19.7 percent green/open space within the Phase 1 site plan area. • 8 percent green space within parking islands and bump outs. o The Developer is proposing 10.9 percent of parking islands and bump outs to be landscaped. • Building perimeter landscaping on building sides facing a public street or parking lot. o The Developer has proposed building perimeter landscaping on all sides of Building 3 that face public rights of way and are not proposed with loading docks. In addition, the Developer is proposing to plant the minimum required landscape plantings required per the City's Zoning Code: Required Proposed Deciduous 171 206 Coniferous 160 160 Shrubs 478 513 Screening The Developer has proposed several screening measures for the entire Master Site Plan area. Berming as part of the first phase of development was constructed adjacent to 100th Street and along the western edge of Phase 1 (Building 1). Planning Staff Report — Case Nos. SP2022-051 Cottage Grove Logistics Park — Phase 1 a (NorthPoint) July 25, 2022 Page 7 of 12 Proposed Phase 1 Berms Given the location of Building 3, which is adjacent to Xcel Energy's power line easement areas, no additional berming will be constructed with Phase 1a in order to avoid impacts to the lines on the south and west sides. Noise After concerns heard at each of the neighborhood meetings as part of the Master Site Plan review process, the Developer adjusted several components of their Master Site Plan to provide addi- tional mitigation measures to prevent off -site noise: 1. The Developer plans to install berming, up to ten feet in height, on the north and east property lines when adjacent buildings are being constructed. Additional landscape plant- ings will be installed on the berming as well. 2. The Developer conducted a noise study at the boundary of the proposed Master Site Plan area. The average dB(A) currently at the site ranged between 51.9 and 56.4 dB(A). The Developer has indicated noise on the site is not anticipated to exceed 60 dB(A) at the property lines, meeting Minnesota State Statute minimum requirements. 3. The Developer is also proposing construction of a sound wall along the southerly and west- erly boundary of the site to block additional noise pollution to the residential parcels to the south. Staff recommends additional landscape screening/landscaping along the proposed sound wall. Sound Wall Example Planning Staff Report — Case Nos. SP2022-051 Cottage Grove Logistics Park — Phase 1 a (NorthPoint) July 25, 2022 Page 8 of 12 The Developer constructed a portion of the sound wall on the south side of Building 1 and the west side of Building 2 as part of their first phase. Additional sound wall will be constructed along the west and south sides of Building 3 as part of Phase 1a. - - AL ° -. _.. ....... . .- _. ... .. Phase 1 Sound Wall Proposed Location Phase 1 a Sound Wall Proposed Location Lighting Per the City's Ordinance, no more than 0.5-foot candle of light shall spill at the property lines abutting residential districts and no more than 1.0-foot candles measured at the property lines abutting commercial or industrial parcels adjacent to the Master Site Plan area. Lighting proposed as part of Phase 1a is downward directed and does not exceed 0.5-foot candle at any of the property lines. The photometric plan submitted by the applicant for the Master Site Plan area meets the City's minimum ordinance requirements. Planning Staff Report — Case Nos. SP2022-051 Cottage Grove Logistics Park — Phase 1 a (NorthPoint) July 25, 2022 Page 9 of 12 Signage The Developer has indicated signage is proposed at build out for tenant spaces; therefore, signs will be reviewed as part of building permit submittals. All signage, including monument, directional, and wall signs, shall be consistent with existing signs in the Cottage Grove Business Park. Traffic/Site Access All adjacent required public improvements are being completed in conjunction with the construc- tion of Buildings 1 and 2 of the Cottage Grove Logistics Park. At this time, the Developer is not proposing a use for Building 3 with a greater traffic impact than that contemplated in the original traffic study provided as part of the overall Master Site Plan. A revised traffic study will be required if at the time of built -to -suit permits are applied for that the proposed tenant has a projected trip generation exceeds that which was modeled in the original traffic study. Utilities As part of the construction of 105th Street with Phase 1, the 18-inch trunk watermain has been extended to the 105th Street future roundabout following the City's water supply plan. Connection to this watermain has been completed and will be extended around Building 3 to provide the required looping. Connection to the sanitary sewer along 105th Street to service this building was also completed with Phase 1. While the watermain and sanitary sewer within the site will be privately owned and maintained by the Developer, City Public Works staff will be granted access to the Cottage Grove Logistics Park through the Development Agreement for annual hydrant flushing. Drainage and utility easements have been provided over the water main and sanitary sewer, except for any private irrigation or building services, so in the event the Developer chooses to sell portions of the development to another entity, the City may take over ownership of each of the systems. A private maintenance agreement will be executed between the City and the Developer for maintenance of the private systems. Surface Water Management/Grading The site grading for the project is proposed to meet the surface water management requirements established by the State, Watershed District, and the City's Surface Water Management Plan. Storm sewer will be extended from parking areas within the development to the privately owned and maintained stormwater basins within the Master Site Plan. The Developer will enter into a maintenance agreement for private stormwater infrastructure. The stormwater management plan was submitted and reviewed by the City's engineering staff, and their comments are included in the plan review memo dated July 14, 2022. The Developer's engineering consultant will continue to work with the City Engineer to address the surface water management plan and drainage design. Park The City's Zoning Code requires dedication of 10 percent of development area as park and/or open space. Total park dedication for the Master Site Plan area is 25.52 acres. The Developer dedicated Outlot A to the City as part of Phase 1. The remaining required dedication for the Master Site Plan area will be paid in cash per acreage of each phase as outlined in the development agreement. The City will require the payment prior to the release of the final plat for Phase 1 a as outlined in a development agreement. Planning Staff Report — Case Nos. SP2022-051 Cottage Grove Logistics Park — Phase 1 a (NorthPoint) July 25, 2022 Page 10 of 12 Development Fees The applicant would be required to pay area charges and connection fees per phase of develop- ment. These fees will be calculated and required to be paid prior to recording of the final plat. Public Hearing Notices The public hearing notice was published in the St. Paul Pioneer Press and mailed to 236 property owners within 500 feet of the property as well as the River Acres Neighborhood on July 13, 2022. Recommendation That the Planning Commission recommend that the City Council approve the Site Plan for Phase 1 a of the Cottage Grove Logistics Park Master Site Plan with proposed construction of one build- ing (Building 3) consisting of approximately 520,000 square feet, for warehouse, manufacturing, distribution, and office building space, subject to the conditions listed below: All conditions of approval within Resolution 2021-166 shall be complied with. 2. The Developer is permitted to construct approximately 520,000 square feet of warehouse, light manufacturing, distribution, and office space within the Phase 1a site plan area. A 10 percent increase in square footage may be approved upon administrative review and approval by the Community Development Director. 3. The Phase 1 a Site Plan approval shall expire one year from the date of City Council ap- proval unless a building permit has been requested or a time extension has been granted by City Council. 4. Permitted, conditional, and accessory uses within the Planned Unit Development shall be consistent with the underlying zoning districts except that uses as reviewed and approved by the Community Development Director may be permitted. 5. The Developer shall be responsible for dedication of or cash in lieu of 10 percent of the developable area of the proposed Master Site Plan for park and open space. The Devel- oper is dedicated approximately 7.95 acres of land for park and open space as part of their Phase 1. Additional required park dedication will be calculated per Phase 1 a of the Master Site Plan area and outlined in the Development Agreement for each phase. 6. The Developer and/or landowner shall be responsible at any time for the maintenance and upkeep of the proposed sound wall on the south and west side of building 3. 7. The Developer shall be responsible for installing sod and irrigation within the berm and land- scaped areas of the Phase 1 a site plan area. The development shall mow and maintain all site boulevards to the curb line of public streets. 8. All HVAC and other roof- or ground -mounted equipment shall be hidden from view with materials that match materials and colors used on the building. 9. No exterior storage shall be permitted within the Phase 1a site plan area. Planning Staff Report — Case Nos. SP2022-051 Cottage Grove Logistics Park — Phase 1 a (NorthPoint) July 25, 2022 Page 11 of 12 10. A right-of-way permit shall be required for work performed within the City or County right- of-way. 11. A maintenance agreement shall be required for all proposed private stormwater ponding, interior lighting, and private utilities within the site and recorded with the Phase 1a final plat. 12. No storage of snow within Phase 1a is permitted within stormwater basins. 13. A cross access and parking agreement between proposed buildings and adjacent parcels, if necessary, shall be required and recorded with the Phase 1a final plat. 14. Final architectural plans, lighting, and exterior construction materials and colors must be re- viewed and approved by the Planning Department prior to the issuance of a building permit. 15. All applicable permits (i.e.; building, electrical, grading, mechanical, right-of-way) must be completed, submitted, and approved by the City prior to the commencement of any construc- tion activities. Detailed construction plans must be reviewed and approved by the Building Official or City Engineer. 16. All comments outlined in Stantec's letter dated July 14, 2022 shall be addressed as well as any subsequent review letters by the City Engineer. 17. Prior to the issuance of a certificate of occupancy, the applicant shall submit as -built survey plans in electronic format (pdf and dwq) for the site grading and all public and private utilities. 18. Water main, sanitary sewer, and storm sewer improvements proposed as part of Phase 1a shall be constructed per Cottage Grove standard detail plates and construction speci- fications. 19. The traffic study shall be required to be updated with each build -to -suit building permit if the proposed tenant projects more trip generation than what was reviewed and approved as part of the Master Site Plan traffic study. 20. If trash collection/service is to be located outside of each building, an enclosure/screening will be required. A detailed site and material plan will be required to be submitted with the building permit application and an updated parking stall count. 21. Truck dock doors on buildings within Phase 1a are required to be closed at all times and shall be proposed to match the color scheme of the buildings to blend. 22. The applicant shall ensure that each building located within the Cottage Grove Logistics Park has adequate radio coverage for the Minnesota Regional Radio Communications System, including but not limited to firefighters and police officers. The applicant shall have each build- ing tested for 800 MHz radio coverage at the time the shell building is completed and before a Certificate of Occupancy is issued. Re -testing of the entire building for 800 MHz radio cov- erage at the time the building is 70 percent completed with tenant finishes. If radio coverage Planning Staff Report — Case Nos. SP2022-051 Cottage Grove Logistics Park — Phase 1 a (NorthPoint) July 25, 2022 Page 12 of 12 testing fails within a building, the installation of the bi-directional 800 MHz signal enhancement system shall be completed within 180 days of the testing report. 23. The final grading and erosion plan for Phase 1a shall be approved by the City Engineer. The grading and erosion control plan for the site must comply with NPDES II Permit requirements. Erosion control devices must be installed prior to commencement of any grading activity. Erosion control must be performed in accordance with the recommended practices of the "Minnesota Construction Site Erosion and Sediment Control Planning Handbook" and the conditions stipulated. The grading plan and site grading of the property shall be consistent with the approved surface water management plan. 24. All concrete and bituminous surfaces including parking areas, drive aisles, sidewalks etc. within Phase 1 a must always be maintained in good workmanship -like condition by the prop- erty owner. 25. Any fencing on the site shall be constructed with materials meeting the ordinance criteria related to industrial fencing and shall be reviewed and approved by the Community Devel- opment Department prior to installation. 26. The Developer is required to mitigate 4,107 caliber tree inches prior to the Master Site Plan area build out. 372 inches were mitigated as part of Phase 1. A revised landscape plan is required to be submitted, prior to Council approval verifying actual mitigation planted as part of Phase 1 a. 27. Prior to the release of the building permit for Phase 1 a, a bona fide cost estimate of the land- scaping improvements for Phase 1 a and site plan approval must be submitted in conjunction with a letter of credit approved by the City in the amount of 150 percent of such estimate. 28. Landscaping on the site must always be maintained in good health and dead plantings shall be replaced in a timely manner. 29. A light matrix study shall be completed and submitted with the building permit application for the building within Phase 1a. All outdoor lighting must meet City Code requirements. All light fixtures must be downward directed with cut-offs. The specifications of all light fixtures must be provided with the application for a building permit. 30. Fire hydrants and watermain valves shall be placed as per the approval of the City's Fire Marshal, City Engineer, and Public Works Department. In addition to granting public drainage and utility easements over the water pipe infrastructure, the applicant shall guarantee the City's ability to access the fire hydrants to flush the water system and valving in the event of an emergency. Prepared by: Attachments: — Civil Plan Set Emily Schmitz — Cottage Grove Logistics Park Second Addition Final Plat Senior Planner — Stantec Review Memo Dated July 14, 2022 00r% IorT TCAM Crv�Irvttrc KIMLEY-HORN AND ASSOCIATES, INC. Kimley>>> Horn PREPARED BY: RYAN A. PHIPPS, P.E. 767 EUSTIS STREET, SUITE 100 ST. PAUL, MN 55114 TELEPHONE (651) 645-4197 LANDSCAPE ARCHITECT KIMLEY-HORN AND ASSOCIATES, INC. Kimley* Horn PREPARED BY: MITCHELL COOKAS, PLA 767 EUSTIS STREET, SUITE 100 ST. PAUL, MN 55114 TELEPHONE (651) 645-4197 OWNER / DEVELOPER NP CG LOGISTICS, LLC ONorthPoint' DEVELOPMENT 4825 NW 41 ST STREET, SUITE 500 RIVERSIDE, MO 64150 CONTACT: MARK MILITZER TELEPHONE: 331-251-3111 EMAIL: MMILITZER@NORTHPOINTKC.COM GEOTECHNICAL ENGINEER BRAUN INTERTEC CORPORATION 1826 BUERKLE ROAD SAINT PAUL, MN 55110 TELEPHONE: (651) 487-1812 CONTACT: STEVEN MARTIN, P.E. SURVEYOR WESTWOOD 12701 WHITEWATER DRIVE, SUITE 300 MINNETONKA, MN 55343 TELEPHONE: (952) 937-5150 CONTACT: CHRISTOPHER FOLEY. LS SITE DEVELOPMENT PLANS FOR CG LOGISTICS PARK BUILDING 3 SECTION 29, TOWNSHIP 27N, RANGE 21W COTTAGE GROVE, WASHINGTON COUNTY, MN IV V I CJ: 1. CONTRACTOR SHALL CONFIRM THAT THE EXISTING CONDITIONS FOR THE SITE MATCH WHAT IS SHOWN ON THE DRAWINGS INCLUDED PRIOR TO CONSTRUCTION. 2. IF REPRODUCED, THE SCALES SHOWN ON THESE PLANS ARE BASED ON A 22:34 SHEET. 3. ALL NECESSARY INSPECTIONS AND/OR CERTIFICATIONS REQUIRED BY CODES AND/OR UTILITY SERVICES COMPANIES SHALL BE PERFORMED PRIOR TO ANNOUNCED BUILDING POSSESSION AND THE FINAL CONNECTION OF SERVICES. 4. ALL GENERAL CONTRACTOR WORK TO BE COMPLETED (EARTHWORK FINALUTILITIES, AND FINAL GRADING) BY THE MILESTONE DATE IN PROJECT DOCUMENTS. ;EA DRAWING INDEX SHEET No. SHEET TITLE C000 COVER SHEET CHOO GENERAL NOTES C200 DEMO PLAN C300 EROSION AND SEDIMENT CONTROL PLAN -PHASE 1 C301 EROSION AND SEDIMENT CONTROL PLANPHASES C302 EROSION AND SEDIMENT CONTROL DETAILS C303 SWPPP C400 SITE PLAN C401 SITE DETAILS C402 SITE DETAILS C500 GRADING PLAN C501 GRADING PLAN ENLARGEMENTS C502 STORM SEWER PLAN C503 GRADING DETAILS C504 GRADING DETAILS C505 GRADING DETAILS C600 UTILITY PLAN C601 UTILITY DETAILS C602 UTILITY DETAILS C700 WATERMAIN& SANITARY PROFILE C701 WATERMAIN& SANITARY PROFILE C800 STORM PROFILES C801 STORM PROFILES C802 STORM PROFILES C803 STORM PROFILES C804 STORM PROFILES L100 LANDSCAPE PLAN L101 LANDSCAPE DETAILS 15. Know what'sbelow. Call before you dig. W W ,_,^ V/ w W O U M (n U Z rc F Fp oV) LU 0 ca J t7K 'U UQ 0 a LL IL z t LU k D U U) SH C000 ER GENERAL CONSTRUCTION NOTES I THE "'T'AITII A UP .... . I A 'I"' INALL IlTA I A N ... I. I" I " 'E'A"ET TIA NE 11 FIAT IN ETA I IAII F PEI , OFF I NE ", "NFTlITI11TE ST EITIINI AND FEII.E PAN LAI IT" THE IIITENTI 1111 TO 11""Ell 11 111C A UP INUE - 'I' El"' I CITED ALL _CENALL"D... ABA ... ABLE I, THESE STANNA REPAY I FEE I . I AT INS I THE "' IFF 'I' I FDA LL BE IS .. 11 11 111 1111 F" 11 ALL OFFER AL All FFFII TO IINFTIlIT I, I CAI L I, A F F_N A UP I I F 1, BE, I THE "NET .. I IN .... ENDS PAIIIIII, I IEI I" I" I A11111 I ATE A 11 AITTI I TI BE FEE D II VATI NE AND SEA HIRE. END F CONTRA 'I" FDA LL 'LEA, AN, O"S ALL AREAS UNLESS 'T'E- BE UP AFTER IS. IIINC TIE BE FIT. IS 11 ITS I III EP STI I. SAVE. END AND ALL ITIEI DELETE I I HE KATE IIAL I THE EIRT 11 ..... IF I I 'T ILTIIIIII"ATIIIIT"IIIIIIIIALTILEIEL I FOLEBBITIERBSIBE PC I TI I I I FDA I I I 1 11 1 1 1 N`='N AElAE-ELNTT' I" I IIEEI A " I I I ` I" I ... BASIN FIIIEI AND HAVE PIT UP UP ITT AS ED ED F, I, I _CE I OR TIE EN. HE ED "' NUEE 11 111 "AIR THAT ALL EPETIN. ... I ...... . I ITT BE ARE F .. I OR I HAT TIE TO CAT'D " THOSE F_ I A I I ENTIELI AIIIIATE ININ. TIE AITIAL DIIATIN 11 ANY E.RTINI THLITIES IS I , I I IN_ IS ` IIN­ ANI=lE IINEEllIEE�"N�"�ELNEIINIANANIIANNA"ElA.NAT.IE�llITE"ETI,"IIE "' IFF 'I" ` IF L" I I' ElAITLI DIIATE AND BAR ANT AND ALL FNIEICIIINI THLITE F TIE I _1 11 EN. NEED _ A ,.E NO L AS LT=E AN, NACCA.EE F I ETA NEI IS 11 ST I HCURRED SECA US I " THE I IERATTE I THE I�N 111 11 EIRTINI UTILITIES OR F TR"TRE F NOR FOR IS IS IRARI FRA I IN I AND FlIRNC 11 OR I IT IS NECESBARI TO 111RE IRACE SCSINI IS RELICATE A UTILTI TIE UTILITY CI.PANI IS DEKARTNENT AFFECTED SNALL BE CINTACTED AND THE I 'ER. F FIIN OBTAINED RE.ARDIN. TIE I ETLID TO USE FOR SUCH _C I ` THE CC NTRA CTIR ` REllINl:lYNTlR=CT TICIONSTRIUU1 UTILATRIEACI.IANIEB SHCl AT HAVE PH RED I I AERAL UT 'I BE I, THE CT"N FEIIRE Cl""ENC PC 'PRO THE CONTRACTOR '"A' IRIIIDE IIE LIURE INI.U. NOTICE TO ALL UT LTC I .. ANAE IRIRTI FE.NNN. CINSTRUCTI I I THE CINTRACT' I "' BE REIIINIILE 11RISTAININCALLRE.HRED CONSTRUCTION IER.ITFAND PC UP F , RE AT RED ED IS I, CONSTRUCTION I THE CC NTRA CT' I FDA LL " I AVALAILE AT THE I" I CC HELD LOT I I RICH. ENDS I CLUD NO 'LANE FIECID CA4TE ATIAT'CIN BE ASIR E`l'E CA L CINDITINEAND COPIES 11 ANT REFUSED CONSTRUCTION IER.ITE TECHIN 11 TIE I AN' I ` CRE 'AN I I ` I I THE DRA=C"NA.LL�'IER�""EDIAETLEDL'CIAN.E'�"T TDATUETAFFNE FRI. DESI I _NER AND BY I NEER F I " RE I UP IS A I ARE TO BE ADE —111 INIR AIIRIIAL 11 TIE —NER AND NITIDICATIIN TO TIE EN.INEER E ALL III BE 11 CI=T IS I NCRETE AND ITTER RECHRED TEST RESULTS ARE TO BE SENT TO TIE _ER I RECTL, I, TESTIN. A.ENCI I I" I CINTRACT IS '"A LL ` I SEE SO I ` ` LE III I 'CU" ENT NI AND "A 'A I PC AS 'U LT I " SOFT IN MIT FDA LT BE REC I BRAD AS I INSTRUCT, I , RI.REFFEE I I AT I, I I .. LET INIIA , ED IS I ATE C=RCR INY I CHERIA LEE ANCD 'T'I' IERET1,11UT ` ED IFIR ERC.E DO I =LTUDRAALLAT' I LT I I U DEC F ED CAT I L BE CIA A NO A RED U DATA '"ALL BE CLLE CTED 11 A STATE 11 .. IRIKEHIINAL IND SURVEIIR MISE FERlICEE ARE BY A.ED F, TIE CONTRA ITS " AN' 'ELL' I 'CC IERED IN ITS THAT I I HAVE UP USE "ITIT BE l=EE%1I A LICENSED —L DR LIN I CINTRACT, I OF ANNERA"R"EDSALLTUREDCT'NALA CINTRACTIRSIALL F SEE IINFI FILE I IS I Ell NIN. ANT —L APANDIN. ENT PER. ITS RE.HRED T AN' 'ELL D"C"ERED DUR NI EARTH "IlINI IS ICAVATIN SIALL BE REIIRTED TO TIE AKIR11RATE—EDCTICAL A.ENCE_,TN,�"UR:ATERD�C"E,��.A BE " THE CC NTRA CT' I ` "ALL ` I REll=NNIR TIT R",ETlRIllRlEDI" IRIIE. ENDS E—N IN TIE " I F I I I 'I CIN LCT UN=FEI.N�l I NO I HER SED—RI—ENTED ANT CINIL I ARE I ICIIERED I" I CC NTRACT' I '"A LL UP T"T" I I'S PER ` RIRTI HELP LFFT' I " AN, SO 9 IN " THE F IS MRK THAT IT LD BE AllE CTED IF LURE I, I 'I " I MER 11 AN DENT LIABLE CINILICT INIR I, IRICEEDINI 11TI INSTALLATION RELIEVES IINER 11 ANT IFL.ATIINTI PAT IIRA RELATED CHANCE ORDER 11 FlIULD CIN RACTIR ENCIUNTER ANY DEPRIS LADEN FIll STRUCTURES NIT IDENTILED IN TIE D,CU.ENTF IS ITTER SOURCE 11 POTENTIAL CINTAINNATIN LIST SHALL —EDIATELY CONTACT TIE EN.INEERAND MHER EROSION CONTROL MAINTENANCE TYPICAL OWNER/ENGINEER OBSERVATIONS CINTRACTIR SCALL NITICI —NERANDIIR EN.INEER . LIURE INADVANCE 11 TIE NO ACTV TEE IRE CONSTRUCTION EETIN. F—RADE IREPARATIIN BASE INSTALLATION =TN�I FNDER.RIUND , 'NO ANDITTILITIES INSTALLATION , I RUCTURES CIECKVALFEE HYDRANTS ETERE ETC FIDECSFALK INFl—TIIN CINNECTINST—FATER A UP BEISER.AINE TESTS 11 UTILITIES EROSION CONTROL NOTES I THE SLID" 'A TER "LLUT IN PREVENT I I BAN I ...... . I..R�IED THE ED OF IN CINTRL " I THE STANDARD DETA LE THE " I NAB. I AS AlACl.ENTF CLU ofRED I THE FEE I , I, NE 11 TIE -111 BLUE TIE IER.IT AND ALL SUFFE.UENT REIIRTEAND RELATED DICU.ENTE A LL CINTRA IT IRS AND 'UC' NT RA CTIR ` HVILVED " I" 'FORK 'ATER "LLUT IN 'REVENT"N F NA LL FTA I A COPY I I TIE ST IS I _TER "LLUT, IN IREVENHIN STAN AND TIE STATE 11 . NAT OF L­LUYANTD 'CUP SIR ELI.INATIIN BIBLE. CENERALIER.ITINIDEB IER.IUAND FECI.E A II L A—TITIER I INTENTS I FEFT.ANA—ENTIRACTICEE CE-SIAND CINTRILE FIALLCINIIR. TO FEDERAL SITE IS LOCAL 'RACTCE A' A .. CABLE THE ADD �RE.ENL R,.AUE A C_ERACTIR SIALL —FRIEND I CUTS A DRECTEDISITTE IER.ITTN.A.ENCIIR I SITE ENTRI AND EPT LOCATIONS SIALL BE AINTAINED IN A CINDITIIN THAT —L PREVENT TIE TRACKN' OR 'L"N' " 'ED"E' INTO 'U"C RADA" ALL ` ED I ENT "LLED DRI ` IED -FIED IS TRACKED IN A lUFLC RIADPSAI UFT BE RE I OVER I EDAT I L, —EN S F I I RE.NREb TO RE.IVE FEDI.ENT IRIIR TO ENTRANCE INTO A PUBLIC RIADPVAI IT SIALL BA DINE IN AN AREA ETA ` LIED 'I" I RU ` "ED 'I' HE " " I " DRA I ` CUP AN AKIRIVED IED "ENT 1411 ALL , HE F 'IS ED " I I SCLAR I I I F ED OR CH INTO 'UFLC AREA F FDA LL BE 'A I F, THE CONTRACTOR TEN IIRAR' SEEN NI IS OTHER AKIRIVED "ETLIDI 11 ITAIULLATIIN PLAILL BE INITIATED —LIN DATE " THE FAST I STUREA NCE IN ANY AREA " THE F IS TIE CINTRACTIR SIALL INI. ISE CLEARIN. TO TIE A.I.U. E.TENT PRACTICAL IS AS RE.HRED PC TIE ENERAL 'ER. I CINTRACTIR SIALL DENITE IN STAN TIE TE.11.1 IARKIN. AND FTIRA.E AREA —INI SIALL A L" BE U IED A ` THE I AT ` I ENT ANCE AND CLEAN PC AREA I I ITIIEE KARKINO AREA AND AREA " I LOCAL I I SO RTABLE 'ACnNT�EN ", CETICHER F ANDT, LET LAC 'I I F E ALL —1 MHER (CONCRETE TRUCKS VEHICLE CLEANIN. E.Nl.ENT CLEANIN., ETC) PLAILL BE DETAINEDAND IRIIERITREATED IS DIRIISED STE IS READ T ANIP lEAlF, I I ATCELR A AND ` 'TACUEN.ClAlL I I AANDEREAKUTAINED IN L, A A F LE CINTA I AND SAN UP US L F ELLE F 11 THE CC UTRACTIR I REIIINI ILE III DUST CINTRIL IN SITE I " I USE 11 1 ITIR I I AND 'I HER , SIR .U. =ES I I I. I L AT I F FOR IT ST F USERS. IN OPERATION F F 'ROD F TED 11 RUSS El TRABI ARBA.E LITTER IS ITIER SUCH ATERIATE SIALL BE DEIISITED INTO PEALED C,NTA HE BE I ATER AL' ` "ALL BE ED EVENTED IRI" LEAV NI THE IRE" FEE TLRI LOU I HE ACTI IN —D IS STIR. _ER DI F CLAR.E CUP DRA PACE DITCHES OR _ERE " THE F TATE 11 ALL STIR. MHER 111TUTIN IREVENTIIN EAFUREE PRESENTED IN TIE STAN SIALL BE INITIATED AS FIINAE F PROOF CABLE 11 ALL PLAINS AREAS STICKELES FIIILF ETC SIALL BE LOCATED SUCH THAT LIST — NIT ADVER ` I L' AllE IT ATER IUALTI ITILE—FE CIVERNO IS ENCIRCIN. THESE AREAS MITI PON I , RITE IT A I =E' � LL BE NECESBAR, I � CINTRACTIR SIALL BE REEIINSIBLE III RE ESTAFFIFILIN. ANT EROSION CINTRIL DEVICE —Cl I" E' I FIT RE EA IT CC NTRA CT' I '"ALL I 'I " I" I "PER I REIREI=VE 'IED' BE HAS NC I ` I TIE EFTA EYE, ED ED IF, I CIN— I EASURES I LAT I A, HE AD I, UPS I F I I I I DEwCo;RARS LNIT IN DEDIT'NI ICR ICTREER lILYlANT UK CCITT I ED, A�1S1 I ` A U I I ' "IFUT TO I - IN IS DUN NO I I I I SEE DUE PA FILVENTE REAFEE IUELANDLUFRICANTIL PESTICIDES ANDAND FIlDCSAFTE ATERIATE 11 ED .. I CC UT I IT DEV�E ` l"IlNlRNTTlCT�E PLANE SIALL BE INSTALLED INIR TO TIE START 11 FA UP I STUR F I I A IT A BE I I THE I I A LL ED I ` I I CC OUR I L DEV CE ` ARE I' ` I I 'TA TIED I A CC IRDAN I I "T"T LEA ` SRI VED " NIAND F BE I , CAT, INS " I THE , I _ IT CIAN I I F ARE I, F I A BE I V ED FEIIRE CC I SIR LOT, IN F, I, I DEFI.N EN.INEER AND TIE CITY 11 ....... EN.INEERIN. DIVISION 1� 11 TIE EROSION CINTRIL STAN AS AKIRIVED CANNIT CINTRIL EROSION AND III SITE IED I I ED ADD I" EN.AL ER I FIC N`CTl"PTR ILEEI I I ERIBI IN CINTRI L STAN �l I HAVE III NE TVTBEDEAND I I I L CE F " TY F I RE I U RED IN SITE ANY REV F HE SO F� IN CINTRIL PLAN ADE PC TIE CINTRACTIR I UST BE AKIRIVED PC TIE ENC NEER PAVING AND STRIPING NOTES I A LL PAV I I CIN 'I SUIT IN "ATERALI AND IIRK"ANI"l ITLN IU=ATIN(IRITT IF " " I F FA LY F I OF CC, RNANCE VITT LOCAL OR COUNTY FEC , CATIONS AND F RD F IS F EDIT ON) N) II 111DOT BE ECIDICATINI AND STANDARDS (LATEST EDITION) 11 NOT COVERED Sr LOCAL OR COUNTY RE UFAT ONE I ALL I INS lAVE"ENT "ARK NIB ON UP DID I TRAFFIC RA"I CONTROL DEVANDEOTHUR I TIAID CIONTTSTANDARDS I "ALCONIOR. TO nnANUAL CC NTRA CTOR FDA LL `U BY ` " ALL SAVE I ENT "AR OF FOR I RE TA NEI I I A -AC LANE ` I ETA TLE A CC I . F LE BASIN I F,.FoLF A CC I . A DO LEE STOP FARE AND F I NE AND I F I I L=N U F STRIBIN. —11N TIE IARKIN. LOT AS SIMN ON TIE PLANE ALL—ANSIO—INTS BIAIE.TENDTIROU.ITIECURB I TIE INI.U. LEN-01 011SE—INTEATRADIUS POINTS FIALLFEI FEET ALLTONTS INCLUDIN. E.IAN�ION�OINT—ITIRE.OVA�LEICK�TRIIF SIALLSE BEALE-1—OINT SEALANT THE "ATER A L' AND ED IS BRIEF 01 ALL l"ALL "EST THE APPLICABLE RECURE.ENTS IN TIE A I (A I ED I CAN CC NCRETE'NETTUTE=E o' CoNCRETERACTCE I CONTRACTOR FILL AIILI A 1ECONDCOATNI OVERALLPAVE I ENT I ARK I OF ` I I I TO A CCEITANCE F, _ER 'oLLOSSED F, A COAT o' OFF. FEARS A F A .. CABLE , ED I, I , ROLE IT I CCU. ENDS I ANT ED IT NI SAVE" ENT CITIES ANDIOR I DElALKl=ENE0NERER"A0N`V%lNI BE REPAIRED PC TIE CONTRACTOR AT , F E.lE NEE To THE PAT FACT ON ED 11 BEFORE 11C NO lAVE.ENT CONTRACTOR IIALL VERICI SUITABLE ACCESBIRLE ROUTES (PER A I A) CRAD NO OR ALL F BE E'ALK' AND A CC I "LE I I YTEI NCLUDNI CROIINI DRVEIAII l"ALL CONIOR. TO CURRENT ADA STATE'DAT ONAL F TANDAR DE NNo.BEB.,ACCEHB.RA.,BLoEB E.CEED, VERTCALTo" FoR'oNTAL NNOCAIEI"ALLIIDEIALK I ROSE 'Lo' SEE ' CEED " I No CAPE F HALL LON. TUD NAL F D-A TO FLoEE E.CEED � I No CA F I SIALL A CC I H PLE PARK, NO 'TALL' OR A ELSE `CEED " N 11 TARIEl IN ALL RECT I ` DEALK ACCE TO I I FU IF NO DOORE AND CAUSE SNALL BE A RA CO.OUT CoNTIFE CIO I F FA LT N`0`UI " ED I I =AToERI I A. CRITERIA CANNOT BE NET IN AN' LCE`H ON PRIOR TO PAVINE NO CONTRACTOR I BE BE — PEACCEITED CORA DA CO.ILUAN USE 11 A.I.U. MIND SPAIN. F—ICETIE DEPTH 01 TIE CONCRETE lAVE.ENU IN FEET GRADING AND DRAINAGE NOTES I I ENERA L CONTRA CIO BANDA LL STRIP NTRA CTOR ` ` "A LLV ED " I I `U HAS L I' o' A EA%TT UNCTAND lRo,oE ED F I I I OUR I I I F NCLUD I I I RA BE F AND I KEY F� ON FLE ElORE START 0 1 1 TIE EN.INEER SNALLSE NOTIFIED —EDIATELY 01 ANT DISCREPANCIES THE CONTRA CIO I '"A LL I BADE THE I IS To THE I LEVAT ON ` UP CAT ED AND '"A LLAI LET AS PACE ART AND RE I BADE _ FoUFE � HERE I, E, OCCUR A 'TER EV EST RA CIA LL U CH L A IRA FIND IS —L ESTABLIBILED OR ADE.UATE STABILIATION OCCURS CC NTRA CIO I INALL BY IT RE I ERE ` So' IT AS DRAINA I I E=loEUFLRU LDIN III CIO I SURIA I I I TO o" LL DRA I F, I RAV IT To NEIS I I ED =TDR F I ` "A LL BY ` UBE I I OUR PC oC CURB I AND INALL NOT IT BY EER 11 ANT IRADINI I PC RE 'AN I I F ARE LOU UP I THE ED= =IRooBED RADEE 'R�N I To 'FACE. I CH o' PAVE.E TORITTILITIES F "ANITOLE COVERS VALVE COVERI�NAFAUI YDE FIRE FIDRANTF C=lOLR`�'.='RETECNDATLELLEl I I , HE SIDES THAT ARE To RENA FACE AND FOR BTU I F ED DURIN. CONSTRUCTION EPETIN. CAFTIN.E AND STRUCTURES TO RE.AIN SNALL BE ADIUSTED To .ATCl TIE PROPOSED IINIFIED RADEE I IF I KI I FOR LILL NEI "' ` I PLACED TALI I ` AND FEE I ` ICAT I US So THAT THE UT FLY ��T F I ETA SHE � HERE UT L I, L= ICE I I. T,=D NO LOT I, I TO I IT BE FDA LL BE CO.PACTED SIDNIRLY TO TIE RE.AINDER 01 TIE LOT FTLTI DTClEE SNALL BE VISUALLY INEIECTEDDURIN.TIE E.CAVATIONIROCES F To ENSURE THAT UNDES BASLE , LL F NOT USED I CONTRA CIO I I ` RE "o I ` 'LE FOR I" I RE I OVALAND REPLACE I ENT 01 1 01 TO110 LAT CO I ILETION o' _ SO A LL ITO PAVED AS EAS I ED F TN. SO FLE o' SFAC I STUR F ED F I CoN STRUCT ON F 'ALL BE RE.RADED AND BORDER THIRD PARTY TEST REPORTS REQUIRED TEST REPORTS RE.HRED FOR CLOSE OUT INCLUDE BUT ARE NOT —TED TO FACTE`0TTO.lRE'oRTTF 01 SATER BIBLE. LRAK TUETETE"BECS'RT�ElR'TE.ARD I REASE LIVES ANT OTHER TESTIN. REFUSED PC TIE A.ENCII. UNICIPALITI WATER STORM SEWER & SANITARY SEWER NOTES I I HE CC NTRACTOR ` "A LL I ON' TRUCT IRAV I lElER LATERATI "ANITOLE1 IRA TY FE,SER LINES AND DO I I ST I _TER AND , RE 'RoTECT ON BIBLE. AS PLC_ ON THESE , 'FACE THE CONTRACTOR ` NA LL `U RNIH A LL PACE ` IF BY "ATER'AL' EIUl"ENT "ACHNER1 TOOLS 'EAN, o' TRANSIORTAT I I AND FA F I I NECESBARY TO Co.,LETE THE ­RK IN FULL AND CO.ILETE A CC ORDAN CE I TH THE ` IT III DEICRIED AND REA=LIE.NTENDE DNRTHEU' RE"ENI I THE I ONTRICT RICH. ENDS AND _RDCToNAL A.ENC, I ENTE EVENT I HE CONTI IT DoCU"ENTIAND I HE 1UNINCTIONALACENCI REANRE.ENTF ARE NOT INA.REE.ENT THE .oFTE TRY I END F NALL.oVE BY I OR IT LL I ALL ED IT I I U NDERIR = N' F LITO`R FUTCAT OLo CIA TO 'N ARECA `0FRNoNA TAo NIN HE COoRDANCT TU TA Co. _ � I LA LL RE AT LTC I ONAND I A I I I HE NOTES CO CHAINED I I THE ENERAL CO NETRUCTI ON BE CHIP 101 TH F F FEET I THE CO PURACTOR SNALL RESTO RE ALL DISTURBED VE. ETATIO I I I KIND UNLESS SHOM OTLE—I BE I BE ` LECT ON o' ` I ` I To DUE A UP CURVATURE o' I BE INALL NOT EICEED THE "ANUIACTURER I BE I I , CATo NE BE I UBE L, CLOSEALLOIEN END F o' "EAND 'TTN._TH_ATERT.HTLU. ITEN 'o SO ` I IT I ` SO I SAFE THEINTEROROIALLIIEIIHALLIE CLEANANDIOND 'U I 'ACE ` _ ED CLEAN AND BIT A , TER THE , BE HA F F EEN _ ERED CUP THE TRENCH VALVE F BHA LT F I ILU.E AND LOCATED ACCORDIN. TO THE PLANE ALL ` BE AND "' N" "LL BE CAREFULLY 'TIRED `oLLo" PC "ANUACTURER' RECO..ENDAT ONE CARE SHALL BE TAKEN TO AVO I DACCA.E TO THE COAT NO OR IN NO I ANY I BE I `�T N" CA WON SE, oHELENC NI OCR MIA "A CENDER PITH CN LTA 'OR"" `U I I IERIE IT oER MCH I I , I ED I U USE F ALL I IT BE UP AN' I BE I IT 'AT EPA CIO BY FOR USE ILALY BE CLEARLY ARKED AND IN. ENATELY RE. OVER PRO. I HE _FTE AND F UP ILL BE RE 'FACED AT THE CONTRA CTOR F E.lE NE I I IATER FOR I RE ` IHT PC ` HAI BE ADE AVAILABLE FOR USE PC THE CONTRACTOR PRIOR TO Co.FUFTF.FE AN IS SOL ITT ON F IS I ALL UT 11 AND ITOR" BRAIN TREN CITE ` To OFFER UNDER AREA ` TO RE I IAV NI ` LA LL BE Co.,LETEL, BACK , LYBD IN ACCo RNANCE � TH THE CIA ERNIN I �U XV ECT I OF L A I SUIT F BE SO ` 'I ON ` I I HE EV I " I HAT THE CONTRACT DOCU"ENTI AND THE 1UNENCTIONAL ACENCI RE AT IRENE CUP ARE I IT IN A I RE E.ENT THE oFT SIR N.ENT FHALL.oVERN E UNDER.ROUND LINES SHALL BE SURVEIED PC A SITE 01 .. IROIEFBIONAL IND FURVEIOR PRIOR To BACK , TY NO CONTRACTOR "' I ALL TESTS RE.HRED PC THE BIECI.TONBANDIO=R"ENACI FICN� ED�IDECTE ANY AND HA I _ �F CTUEUETEEBI NAL.ANDRUT AT I IT AND S F F F SHALLEEIROVIDEDTOTHE UTILITY lROVIDEIRTEI'MER IV NT`EToRNRCT"AL0olNTANDE STIRETRAT ON TELE FLY AND�URI�DICTIO.LA.ENCIA�RE.UIRED CC UTRICT OR BHA LL lRoV BE 'OR A I BE A I ` 11 AND A VERTICAL CLEARANCE o" E BE_ EEN —TER AND ��"TU"lHoE�EoN.TANLHCLEARANNDCINoF 11 1 ANY ED 'I I I ` IS LOT USES To =RNAAREOR=CEDTUHRENE'l�ToN.T�RTURCUTCoURE A��NALL BE THE CC NTRICT ORB SEE So USE L IT To NECE HARI I RETURN ITTO E.IETIN. CONDITIONS OR BETTER A LL'To I I ` HE ENTER I I SIR FILL RE ` "' BE I I OUT ED To A EST RE CC NNE IT I NATTR LOT UBE ` _ERT. ITT TO LE H IT FERPS F I STATED PC I IT AND FIAT EDE F IN STANDARDS AND F BE CC CAT I NE 11 F= I I HE - I E, NTAT I I NACRTI A ND ILTLAU�EE DELUI I ETA NDA RV R.AENNDT BA PC I `�CATIO NE A ILL STO I I F ANHoLES PAVED EAS HA BIT � TH 'A I HAVE TRAFFIC I EA = LRE I I �l OR I E�RE% I A I TO LETIN I U NSA VE.DAANED IS I LA ILL I I I A I OV I I I I I I IT I I BE L I F SHALL BE I To ED ED I CAST TRUCTURES —LIN PROTECT FINDS SHALL BE ADIUSTED TO EET THESE CONDITIONS AND THE PROPOSED FINISHED RADE LISP CRASH I I ` OR"AT ON ` TAKEN RASH I IURVEI 11 IND IURVEIORI I THE COOK CTo I I I I F NOT ACCE 'I E.=ATToOlo0.l.,UY AS ED_ ON THE STAN F S 'THoUT EICEIT ON THEN THE CONTRACTOR FUllLI AT THEIR E.IENFE A TOlO.RAlHC SURVEI PC A RE. STERE PURVEYOR To THE=L I IND ED OR REV EIS 11 CONSTR UCTION SHALL CO.11 —H ALL APPLICABLE OVERNIN. CODES AND BE CONSTRUCTED TO SAKE 1� ALL STOR. STRUCTURES PLAILL HAVE A F.00TH UNICOR. POURED I ORTAR PRO. INVERT IN TO INVERT I TY 11 1 oo' DRA US ` HALL ` I I ONCE CTED To 'I OR I IE' ED PC ` RE 'A ` RICATED IIEI OR AT=` STRUCTURES I oo I I RA NE AND IS U CK — LL I RA I F HALL I TO AT A I I U. � PLO, I NOTEDOTHER—E ANDTIEINATTHECENTERINEOITHE�TORI AIN ALLROOIAND IANITARIIEIERDRAINI IHALLIEINIUITEDII I 01COVERCANNOTIE PROVIDED THE Co' RA CTOR ` LA LL ` I oTECT ED ST NO UNDERCROUND UTILITIES AND APPURTENANCES THAT ARE To RENA I , SO I DA I ACED U I NO CONSTRUCT ON oERAT ONE 11 THE To CAT I I o' E"T PC TY LTIEl ITOR" DRA PACE STRUCTURES AND OTHER A EPA I AND F I LOSS RADE IR CA E.ENTF A RE A PER I. KATE AS ED_ IT F THE CONTRACTOR F RE BE ON BE I LTC TO DETER. HE THE ECACT LOCATION FIDE AND INVERT ELEVATIONS 01 EACH PRIOR TO THE START 01 CONSTRUCT ON 11 AZN DU. 01 1 SEPARATION IS RE.HRED FE-EEN UTILITIES AND TREES UNLESS A ROOT PARRIER IS U E 11 OFF PHONE AND ELECTR I IERV I BE IHOIN 'o I =ATEVNAL 'CURN'To'E' oRNT' DOOR' ITT Co. 'AN BE AC ALTER THE I I F IN "OUT DUR I I I EIS 0 RACTO 0 1 DO IS PUNAL DEFINN AND INSTALLATION MTH UTILITY CO.PANIEE 11 COORDINATE ITTITY INSTALLATION —H IRRI.ATION DEFINN AND INSTALLATION 11 ALL I KEYS ONE ARE TO LOSS L HE 01 CURB UNLESS OTHERSPIRE NOTED PER I ETER IALL I I BY ` I I US ARE To HERE _T ACE REFERENCE ARCHTECTURAL "NE OR ECACT MLL DTH AND SPECIFICATIONS 11 REFERENCE ARCHITECTURAL PLANS (BY OTHERS) FOR ECACT BUILKINI DIIENIIONI AND IATENALF "EC'CAToN, 11 REIERENCEI BE PLANE (BY OTHERS) FOR IECHANICAL EIHBI ENT DIIENSIONE AND SPECIFICATIONS I ` I 'TRUCTURIL D=OT OR HEALD EREFERENTCo IFFUNE (BY OTHERS) FOR ECHANICAL E.Hl.ENT F AND RE ARA I FIEC F CAT 0 1 11 CONTRACTOR lHAl REFERENCE I I P PLANS (BY OTHERS) FOR LIIHT POLE IIRINI 41k, E U) Lu 0 z -i 9 Lu z Lu (9 �i DEMOLITION PLAN NOTES , - y \I\\ 0-ELC 0-ELC 0-ELC ELC 0-ELC 0-ELC a i d q4 1 o-ELc o-ELc o-ELc o-ELc o-ELc o-ELc �,��11 qv TME o-ELc O-ELc v o-ELc '� ouere..oereeOEwP"ACLres,LTETLeaLECIMPAC.RES­EO EILLMA"t RE.ERI PERUNDERCUT TIE PR,ECT \\ IO-ELC 0-ELC 0-f LC �0-ELC o-fLC 0-fLC 0-ELC �(KELC �EI C� socuMEN/s. --------- 1-TIT� lT T_4I+-ITi l_�i �l�l�ili i�l�l�i ili �i �I�EirTL'ILI�rr171�l�rrtly�l�rr+�ti--F+T T-- +��--Lk1J_I_ L1J-+ PERMIT MD p It I I H I I II +=I� LJ eEaEia.E OE oiEaoEes of MATEreiesE.o.nE o_Ere ervo o�rvrvereE reEareEEErv.AT �I I� I�I�I T�I R IrtITI TT Y-t Irt ly-I �I H I-LI�I J-I L1 I�I�II�III�IIr�III�II�r IIrII III �I4I LT4.�ra I I, IIIIIIIII III III I` IIIvIIIIIIIIIII w III Ir-I r-r Irt lltnIlr-I ICI +i II�b 14I ICI IIIIII II L I �r I� 14iI �I rLr IT r1 r-I rn �I F-+ 11 I/I III „NAOERMDCOORDIINA.IONu THEe ACENTPROPERTIEse-RTHECI.0 °°C'°" - III I I I I ICI I I I I I I I I I I I I I I I I I �I'I III I I I O,C 'I�I�IIr�IIn Irt1 rI R.EC.ExIE.IrvO.reEELIrvE O"f I IEEE.reEEIrvuErv.OreCPLervI COrv.reAC.Ore1EreEEPOrvEIreLEEE OR To OrePAOIrvOILEEEEMOCANYTO �reEER�CEE..„E CEE A C a. sr Rre UME1 NO REsoors Ore ORT THEIR PRIOR TO M.reE E EAL OrvEEONLery HAVE BEEry OE. 11 OMP rvIEEEOreLOCA.I0rvE0E —�-'-------�-------��,------���--------------�-----------`�---------------------------------------------------�. I'EI=°IE'N°���.����oEIPlrvcervlrel,IIEI�EE�re��°�"Ere�Pre re.O.reEE.ere.OE \ - - ocA/orvry TIT ory ereourvo ervvoerv/AYOXC J / a______am \� -a- \s ___ a a- a O a a a -- a , reAs O voccOEA:reEsc z I a ___ 1 PROTECT EXISTING UTILITIES__) a _ �sP A/EreE Hcry ES Eorvc co Ere xAc/ °N° Co�LRED \ I - oreEMove/oE nL SEre Eury ervo Cl ALL L _ / EEEoreE PreECEOIrvcwlm cnE worex ETMMOEID 0 TO ATE 0 O XTHEL osE T AccErvclorvcoExlsclrvGITTLTEswicnlrvervvreoPRrelcnc-oE+�,AVDURINGCorvscreuCClorv. 2 _ 1 ory I IIIT HE ^ CO..AOEcreO,,1-INc.ONCOurv.CervOMrvOO.. COOreOIrvA.EOIrvACCOreOervCE�.re ITIL NOTIFY IT ROPErecIEONTO NSIE AACCECCEss" TowIPITLL BE lrvcErereuP CPROEo ore'TER ED A/ervv/IM E DURING a m Corvs.reucnorv. \✓ io. NOR TO oEMounory occurerelrvo IT Ereaslory CONTROL OEHces AXE TO eElrvsreuEo. � G, s H V / I cloAcnE corvcsnuAc LLEBENYreeIS�IrvEcourererelcsEoreEoMrvorvvAvLorvE oiicorvcreAccore MAY uMlcsecuc rvo PAVEMENT REMOVAL co orvLvcnasE ereA-ERG IT is urvorvnEsurereoq -G aEPwre. 12 Z I \ \ I \ I sEPerecMErvc coPwrvPreoaosEO IMPReRWAEMErvcservo co ErvsureE roEouACE EIreE PRO cED HE cnoryATE R ls \ I \ y nesEs II l � I - b 4 I \ I LeE cnE reESPorvselurvoEcnE corvcreAccore ervo rvo � I I xrreA mMPErvsAClory vxLLeE PreoHOEo. O 1 is. DEFER cosureeEvrore PLLExlsnrvo lrveErec AND RIM ELvAClorvs. cEssnowry ereE ExnE e oreoco// EeIssPEaEllrvo crvomreoHoirvo ervvreEoulre[o /ucIMAlrvsncnwACEre Mary reuNLLEE uonoucm cLV Avwwe�coc os uu o sPorvs � Fore erereervc V � oReE oure orvsrreucc orv. ervvcascs mo e - m ICI ISTry IuclEs. _ �VI-I l i = al MM s.A.E OE Mry EEouIreEMErv.s. e/Eo evnuN THE E THE cErvsEowELLcorv.reAc.orelry AccoreonrvcE wi.n _ ryi Else c/sEo of ATAPERMITTED LANDFILL PER THE PROIEC. oocuMErv.s. corv.wrvEressneueE --_ ---___ reEo ory slcE. rvo IIII` / / AccleE orewrvclLEsneu BE reEMovEo wicnouc APPreove/EreoM mE ErvolrvEEre. L - � I I i I - I LEGEND -_ o / I - / _ / IIv v 11 �sEE.SEEIrvuErvroRPaM PROPEre.vurvE _ CE / O / REM COrvCreE.E s,REACE III r _ REMOVE BUILDING - IEI IreI reAI�I r IaI tea-+7 I� /I 1 I I A l _ IIi IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIII�IIIIIIIIIIIIIrrTIIIII�I_IIIIIIIIIII IIIIII 1 I - \ o 9 4 V r I I I I I I I I I I I I�,l I�f �tJ I I �I / �, 0 c�erelrvoa oreueelrvo 3 12 Iiil Ip o I/ IIVII �111 I�!I i�'I W Tl�trrrt-r I�I�`I II� IIII I I I I I I vi I I I I I I I I I I I I I I I I I+ I I I I I I T.I I I I I I I I I I I I I-�-+-r�-L1 ( I I I I I I I I I I I I I.6-*I FULL O�.resewcu. v Irl+li �I �I s _ X reEMovE TREE �v / iii reEMOVECOrvCreE.ECurereacuTTER IS, o " " x x x .Iu.OurvEE Z / j ®®®®® x R 0,ureLLa-ervaDR.Iu.YOuNEI a ON _ - i lol m E a O i�T, - w IIIIII b D C 11 11 / `v�EXITING UNDERGROUNOeEE TELEPHONE 4 E K III i — --� I 11---"°-x---- IIh a - -11 OVER US OBY ® INDICATOR fA f7 U Ervsrlrvc Au.OMA.ICSPreI-Ere a V Z TH _ICIMP NDE EPllecren1Ervc WELL GRAPHIC SCALE IN FEET _ _ F Ere D 3D 60 120 0 2 _ i N 0 + _ 88 I E- - FI/ x�=_'.—O Exlss.rvceMEE.ce.cloVre- _____r-____-___________-_---~______________________________________________________ a0E�lNG �receMETER 7 Y I � (L �I�.IrvO.reEEurvE LU muMaE o Know. wharsbelow. j Call before you dig. J) / /� �d / x x EC200 p¢ F ES / « OSION CONTROL PLAN PTLI ,ioF1��T"EN°E-°"°°tl°°NST"°°.------------------------------'--- TE"TR�TEAA"-L EI"AT�LE°""�°".° -------------------�-ELc ------------------------------------------ o-ELc o-ELC G-ELc 0-ELc O-ELI o-ELc -�"" ' s"�EaorvsreuaT °rearvroEewsirvs are ore Tos TE oren°irvo —-LC O-ELC D-ELC 0-fLC 0-ELC o-CLC-e" \ \ / s Asr"E"Os°"c°"T 0-ELC D-E'. -LC D / \ / a. -ore Ere IwASFOreGnr R°�"� s"ALL RE ITA31LIAI vxT" REED, AOD, \ -ELc o-EL a-ELc _ o-ELc 0- PLC o-ELc �-€Lc `�� / ------ CITY ---- r__------- _ __ SILT FEmcE(rvv) / eE'ssIONAL A �� 1 LEGEND ,l �l "O«ENT"ATE ao � \ \ E"OAONAONT"OL°aN"ET REPDEP I STORAGE � v �----INLFTPRA.E�TIAN- v —S,— AILTEENTE -- -- -----------_ CS----------------- ---- I . _ I"EILTRaTIA"�EA � �I EIO"ALL NAL ULTEMATTEFALSLCHARGE VIA VARIOUS °"a" AE E1EA°O"IA"Y / / ro HeE MS oAi�sSSGOTHE 7RIVEP SSTHAmI MILE y� Z- LF \ _-._._._ L - ' - A NOT TO BE USED FOR STORAGE, i i ! TO THE v / i STOCKPILING I I+I OFCONS SOUTH "--�- v/ --- I� NPE TRUCTION ACTIAITY , MILE TO THE -------=------------------- ----- Y-Ii�HW tm f'=EE=EE= H Jbll M7 R A CET �r " / d � �� —..—.. m ST SE AL o�A ----------------------------------- s PIT NT NIIITHEI EEAPRDA"ME"TAAPP"TARL �MEEAT'N"eETTER"RE O°E�TEE� °NE s°"� °EPTA•RONT° 4� , EEA�°�°PE"M" .AETIHTATIINUA TI"AA<"EI°G°FLOW PROIM TOAN~—CIN.R°C:o Man 11FIEA INI.I. r°°"""�°"N°TI� °vTHE °Tv EROSION CONTROL MAINTENANCE: COMPLETED — O" THE END OF AAAD BY RANEALL _AE"T M° =LEAHEA ONCAD EE".REA " A<T°"AmCE RIERA A"ALL EE REPPRED OR REP-ED E THEY E"OwsA"A OF T. �bTO ER aE°G AR- T N"`�A.ECHECKED RE F° o`er°EEOEd""bR MaNRENANNE REo�IREMENTI REFER I ' IT PENCE1 OM THEALL IT PENTEA,APEN.-RED TO T REAA"EA ANE_THIRD THE REIA"T. OF THE IT-ENTE OR CONITRUCTIONENTRMCEIAICONDITIONIDEMMD DIC TOP DR—ING OF THE / AA<E"DA" MONTENMCE 'PERAT NER"AP RIOICT O DONE IN A TIMELY MANNER BUT IINVNO ARE ATERDIHM"I SWPPP UPDATES AND AMENDMENTS HTE Io ER. ExoixEEREo �TEMe M�eT eE e��.Eo A.o sTAMaEo e. T"E ExoixEER De RETDRo eDR T"E =+ TRSEQUENCTE OF CONSTRUCTION: SEEDING INSTALLATION AND ESTABLISHMENT SCHEDULE 4DAYS RING"'TINMRATES APRIL,-LULYSD a Z J a 0 W X W z d W O U SEE FOR DETAILS AND SPECIFICATIONS FOR ABOVE REFERENCED SEED DESIGN M N U) (, U PFANTNG OUTSIDE THE PFANTNG DOVOSI SHALL NOU_UyT OGGUR UNLESS IRRIGATIONAND ESTABLISHMENT OF VVEED CONTROL PREVENTION AYTIATIES 0 o F11NUVI11IrGHAPPH ALGrPwNUNO CUTSPEOFOa N O PH.I BAP QUANTITIES TABLE coO J J Y �U dR�KMTEUCTION ENTRANCE 2 EA t7K V¢ a GRAPHIC SCALE IN FEET 0 30 so izo 0 a z Lu Lu sH ER below. x� Cdll bei y C300 ' LEGEND m e--T---------------------- ------ \ w � I —��a— III - o-eLc o-E�c o-E�c o-E�c o-ELL o-E�c - -0-E�c o-E�c o-E�c o-e�c o-e�c 0-' �° Al\E a 0 E \\V o EEc EEc o-EEc O EEc o, eE� E ,e ­[Lc,o- - ic�w, o eEc�-c-',f �� 0 °IEAre�A,E �w�°IE°LwsIII °o1"°E,aE ---- Y t-- --� --� ---- ---g -----c-sia--�— �-@ g- - ---- _ - -- - ILL "ENEE M� 1-CE"° OE oLL EROSION CONTROL MAINTENANCE: IT B� - OOEA°E 1-1-=-T v POLL°..ON EVEN.�ON PEAK E"ALL EE MaN.aNEON "°LLA-°N,.ON� EONIE O�.�ON °N.�E NO EONOE" "EO°�"EO EO" A EOMPEE.EO °"�E OE uvO"" O" E�NAE E.�IE��,.�ON O"."E E�.E �, E"OE�ON �° EEO�MEN.A.�ON EON."OE ME,O°"EE E"I, °E,"E,"EO EAA,E".�EIEO =E"EON A. ��--------------� -- ----------------�;-� -- -------------------------------------- -------E.q a LL°E"EPa"EOO""EPE EO"."EAE"Ow �� A �� _ \ - sE."EN°EM�EN�.EEAr"ENDONE."�"O."E"E�O".OE."ESE. S.. � OI FENCE O" °101OLL o� O°�"EPE"�OO�,.OP Z / O° "E PER OD O"EEE�NO OE."E .EMPO"A"A MEEA NANNE" BUT IN NO , E EA.E" / ° NA �ENOAaPONAOE.�° ON. P°. DEMAND ( °EC EROSIONC`oN No ��°NIMA, UREP Or�oNs °ArsFoi�o",°ryNG TH N oo iE"ALL ^ z i P "TROL PLAN NOTES � o �- / \ PROPERTY SUMMARY = ' N°EAND "o«�Nnwo.IoN EN."M�sO,IP°EwnA�°PRIOR - �� / \ ccEocisricsPnRKeuiEoiNcs - 3 .„EOON."Ar.O"s~.,EOA.O"°,��NE"OSONOON."OEME,�,"E� - �E�NM rnEPROPER,rnREn ,z9.,enc°gO / A ."EEEO oO"O6&o�.2a�E''REEE"a°"oc b�fE�'E"P`n°� RM RNl'0R o V A E. �."OTv,OTA*EANODLWEE�"EOO�A."BO.°E"M�.E. OMaN.aNEO�NAr�O"OANOE O.THE ,ON."Ar.O"IHIEMA�N.aNALLE"�ONOON."OEME�,"EMINOwOINO."E \ _ ,EMoO EOF '"IE,.�NE"ON.RO EENOEMO°"�NO."EO°0, BOE."EOON=r"°O.ION. r i Fo � ° a RE MRAT N_H I BE ExisFiNCPERvious ,z9.,enc o O ��Pv OA���I ON_E"�ON�N."o�ME�"E=�.E"�°E.A.�oN�=E A°°E o" �==o �1 REA" To ----- — PICOPOSED P� EN.n"EETI�NECE1­1N RE" "E CONTRACTOR E"ALLIPLIwCE" FROM A.AN" "1 —� „ � NTOE�EOTRER�oR"EON.RATORE"��°RO°�°EM�N�M°M - I — - 43 2 TOUR NOTICE TO CITY — BUILDING 3 'C A - - / 1 -_ -ICE ORTOANvwO"".CON.FARORM°nP"OMOEAMNM°MCPRO°RPROR 520 000 . F. , I I 520 X98� o,< SWPPPPUPDATES AND AMENDMENTS = _ FFE=812.0' /' /e I'L�F To 13 I .ATio. ETc c�ARi.o oR�aai.o oR oRAoi.o oR reMPORAR. oR \ - to / I E.T�RE coMP�iA.cE wT� TEE PERMIT A.° PRorecTio. o, i s �' / /T \ \ \ a.TxEExnixEERorREcoRoroRTxEPRo,ECT. ExnixEEREoiTEMSMusTeEsinxE°A.°,.AMPS° Q Z SEQUENCE OFoCONSTRUCTION: Q Z d »A / IIA N s W III I / m P"OOECMD N TN'OE N OOA.ON ." rO«°".""OO E ON 0 0 Q IFj t jj�.. °MP AND EROE ON CONTROL NETICAT ON EEO°EMCEE"ALL BE W p O PERFORM RAONORO-H-AOE TRAPI W 0 / IIIII��i 11L" I i �, — U ��, TRUCTION ATCOECOTTAOEORO,O"=NODERMT MORE OR O°REO°CNPOEM OOR <,O PH. II BMP QUANTITIES TABLE M -- ---�---=--------==--------- -- �o ��, N�EF VROFECF ON ,e EA. °Bo`T°T°M ;a�oo \ °_ iNF ETaAT ON ansNs°° P.° eOROLL zTE,000 F 0 m O J g W $ _ _°°° m a — y , 0 > o Lu m a°° / aOg1 r J �� GRAPHIC SCALE IN FEE' �l xNow wntsbelow. U) 20 CallanerorevoN ale. U) eH C301sE STAKE TO til TxEsraKE PO11=111 ,I RoA� �Rok\ STAKE �ACO1tBge eAG STANDARDB FlLTER BERMSEF.B COTTAGE GROVE, MINNESOTA ERO-11 ':!i;�7 NOT:: USE M. ROAD DRAIN 23 OR D� (DEP NDIN CG- DN STING PE, HIGH FLOW INLET PROTECTION CURB AND G R MODELS, OR CRY APPROVED EQUAL. DEFLECTOR PLATE OVERFLOW IS HALF OF I DIERRF<DHW W A OF FlLTER ASSEMBLY LY IO" AT LOW Po[NT rtow FABwc INLEfAv0.OTECNND oCATS G � e BasIN IN. a COTTAGE GROVE, M11414 TA ERO-9 ANIB xaTTH NIBB I- DETAIL A OW) STAPLEDENSTYSHALLBEA J MQ�M MDWPLJOINTOF 6" MINIMUM OF 3 U-SHAPED 1, 31 GAWE MEFAL STAPLES PER SQUARE YARD C— MAT VPAY AS IRECTED BY THE CITY). AN.ON TR TRENCHENcn 1 T03 3. STAPLE AT I.S INTERVALS 1 4. LRAL BOIL AND COMPACT 5.BIANKETLENGTHSHALLNOT IXC'•EED100' 6„T STANDARD DEFAILS COttege ROLLED EROSION PREVENTION G[OVQ PRODUCTS INS[ALIATON °^�^•"i4����� COTTAGE GROVE, MINNESOTA ER0�5 L PLAN NEW _ DDIPE, MM. S DN. 3 fL CRAMAGE WA 3 L=M' 6'MIN. II. SECTION A -A D sUlq �ft� TIXNLE FABRIC D LT%MIN. REVERSE GRADIENT NO E: D=z• MIN, , MA% W=1PMIXD% w(Fr.)=1III AGEAREA WC.) Cottage TETMPODRARD �D Hens Grave TRAP)BAsln A"°"'n°M` COTTAGE GROVE, MINNESOTA ` ERO 14 STEEL FENCE POST (T-POST), WIRE MESH REINFORCEMENT, NIMUM 5• LONG, FENCE, MIN 36• HIGH, 6 MA)(IMUM swING. MIN 14.5 GAUGE WIRE.AND POST NOTCHES GEOTE%NIE FABRIC -OVERLAP TO FACE AWAY WIRE MESH AT T INIE2VAt5 N T FROM FABRIC. ev1Ti RINGB OR w1RETIES. —STSH­1 FBI WITH MINIMUM ATTACH FARM N TO 3 POETWITH MINIMUM FABTENED WIRE 3 FASTENEPB PER FASTENERS PER POST. POET C. TOP B" OF RC' Lqy FABRICAVIRE MESH IN FABE TRENCH, BACKFID WITH ATu _14 AND COMPACT wrtHu ¢I:,E mE DIROrn OF Iro SURFACE FLOW 6" IP MINIMUM POSt EMBEDMENT IXTT WIREMan INTO TRENCH 6" NOTE: MKIDIE SLICED III ONY SILT FENCE BHDULD BE USED WHEN DIRECTED BYTHE CDY. ER -DI DSUBT FEK VfA Grottve e COTTAGE GROVE, MINNESOTA ERO-3 PM� R �DCHGI� NEQ tlQN MINIMUM OR OFF BERM TO 1. FIL 1 OR WOODOIIPs TO STOP MUDEMIGRATIONOCK ROIJ TRANRMU 2 ENCEURT BE MAINTAINED REGUTARLY TO PREVENT SEDIMENTATION TRACKING. STANDARD D FBAILS Cottage cDIrsTR—ENTRANC= G[oVe ROCKANDWOODCHIP COTTAGE GROVE, MINNESOTA AREA—S S MR I 24" 15' 15• Y 6" 19' IS' 48" 20' A' 2z 13 PLAN (IS MIN.) Cy155 UEP1H 2'TD.' ISTOW 3 T J'TO 33" 20 TO 25 0C3 3' 2' B4"AN NP RPfID UP IT 4' -- (ONE CIIBIC YAR06 APPRO%. 2,ADD IBS.) FIT 3 GEOTIXIILE D FABRIC FBOND LINERE N D uPRAP SECTION ARED (IF ry rorvD) END SECTION �I pgpR GE TYP E E FPBRI<PE IV SECTION R-B BOND UNER (IF PIAOEDIN POND) STANDARD D DAILY Cottage Grove aPUPAT NAKED Ex E aN COTTAGE GROVE, MINNESOTA ST}12 A FPERSPECTIVE /I FABRIC REOUIREO uNOER RIP RAP. 111111THINIRFIR SECTION A -A CURB CUT WITH RIP -RAP SWALE V/ J LA a a z W Z W O E 0 Lu,^ X V/ Z W O U M (n N t9 U 0 u N 0_ W O ca a (�K a O`'o > G_ ¢ z � U a 0 k w J) C302 ER DESCRIPTION OF PROJECT AND CONSTRUCTION ACTIVITY PROJECT INFORMAL ON HFULF IF T11 NIATI11T­AG1 IF 11ITI IN 19 TIIN1111 1� RANGE 21 I IIEWIT111111T 11 .. T" E111 �2,0,L�AEF=MOAD, NOR TH �T PAUL ON 55, 11 1111 OF 'o`YA`E WOUTH ARAIH N=ERIHED DIATRIAT PROJECT DESCRIATI ON LOR T H OF N T `oTT" E GRO " L OF IT C1 PROPOIE1 TO DEVELOP THE EHATING AGRICULTURAL LACD PEAD INOTH ITREET WoU TH ACD DEAL AVE WoUTH A0 THAGE GRoVE ON THE DEVELOPMENT PHIL CON111T OF AN INDUITRIAL —LAING AND THE Co RRE Tpo ND=,=N 'ARALECRI'HE DR "R � T EUIPAo N" UMLLTE ITE ' PH A �HTEoRMWAETCETRITBMIPP�RTHPEOIETDE � LoCA ERDOWTATN THE Wo UTH FS N A A IT CO ON F T PROJ 0 �HAT III . I ELI 11 01 ACREI APLL BE DIATURBED A AT T "oj"T I TI DO" N IT NITIDI IT11 OF =TOMMol T1IG"E1o0LLoONA WAG N D.DF_NOT.RALO PC E CHAN. BE ED I _EATE ME I FGEEE GAB HOT F L E =NEIETN N I WATEIFOWLIONIENFRATIONAIER 3EE1.NFGlIN.AlEAFO1WUULFEIO1lIDO1E CONSTRUCTION ACT A TY TIMING OF CONTOL MEASURES TIE FOLLOWN. 10 RLIOL.. F 11E— 1 7 E EDW I T' ON BE I FTOR. F EWE, NLETOROTET O=TIELTIETOTE'. lONT�IIAI'TTEVTND�.�1E.A�N�Nl�IEI��LIEI.AN 'TA"'TON"TA'EN"'E 2 F IT FENIE P.1 BE IONFTRIITED 11101 TO ANY FOURET11FAMIE AND F.LLIPIAN IN IIIE INTHIER.ANENT FICAUFFTION.BTAGENODFIE I FT1IIT11ALF.1E EIIIABOVEIBIONE AND FEDIMENFTRFEE 01 BASING pF 1E.11ED1 F.IBEINEFOLUED11101 .FCO, Bo L I P ILEADIN. .1 'AD ET=BACE.ENT IE.OVALWILL NOT 01111 IAN AREA IL IT F NEIEFEARY FR IONFTRIITIOI I INFUTRATION Al. (F IE.IIIEM P.1 NOT BE E.CAVATED TO F1N NFL GONE IND NTIL TIE IONFRE11 ONO DRAT PACE FEE, BEEN ETA 'NEED I ADD TONI 101011 EDGE ON IIEVENTION AND BEHMENT IONFIOLE I— BE 1. ­ENFED TO I 'IN 0 FF AND BER I E MY OUT OF THE UP TRAT ON .IT HE E BOB ON AND IED I ENT `0 UTIOU DEVIE1 WHY BE FACI EFACTONLY MAI UFAINED INFIL TIE IONET11ITION E IO.OLETED AND , OTE MY A L F 0, E DOE 0 1 MAE RAEGED CERTIFICATION OF COMPLIANCE WITH FEDERAL, STATE AND LOCAL REGULATIONS THE ITo" I A ENT ON PLAN CAP 'IT' I NNEIOTA 10 'IT ON 'o"oL AGENCY " DEL NEI FO A 'To'" .A NO I E. E = ElOLONoA NO BE ED I F F ENT Go NFRoL DID NO Ro NET .. T ON FIT A T BE TIE FToR. WATER Po"T ON FEES "111 BEEN IIERAD ED CARGO EGA NO E 'T"T"E HE GABON 'o F THE IT OIL IOLLIT ON I 11111A=,L)oNEYETE BE R. T F.GE ECALL F E NAo"oRATED CARGO RGA DOE WTTEN IDEABDE FToR.WATE, BEEN T FOR I MAINTENANCE AND INSPECTION RECORDS TIE OWNER AND IONTRITO1 FIALL BE IEFIONFIMLE FOR TIE FOLLOWING IMBIBITION AND MAINTENANCE ISITHEE TO Al EDGE ON AND 'ED I ENT `oNT`o" I BEEN FTE E F I I BY I I E I ATE I I N DATE El F 1 0 10 F E.1 0 F ED F O� LA 1,EMA I AN�DILOY",IlTEIT�A'ILN'TIO N1 T, 1 11 F AToNFRoL'EA, 11E FWHF,� NN= ANT LEFFAT O`N�E ARII 1EEG AND WITHIN 21 UOURI OF TIE END OF A FTOI I F " 'o —CARTER N2'"oU" THE NIIE IT ON "'E 'o""TED By THE EROIION I o"`oL 'U' BE =N` I ALL.E= BE I A NFA NED I GOOD Wo'. NO I IDEA FAIERAI F NEIE FGARY T., BE NTATED W `oU'E OF MoBT P F 0 ROULE W I BE INFOEITED FOR DEITI OF BEDIMENT FREE TO FEE IF TIE FABIN F BEAUIELY ACTAIIED TO TIE IONIIETE FAIRERE I NLET 'TEoDTETEo I D, EA L'EAC ' 'E1�EGNU1,1EEL1yTENDEA'EA1T1 OF BEHMENT AND FREE OF AMC TEARE DEVINEE P.1 BE NFIEI T BU R F IT FENIE P.1 �E�N,�MILEYITNEDHFOIDEUINTUI OF BEDIMENT TEARE FABI I ACT ENY TO BIBLE AND TUA BIBLE Al MAG I FULT UP BEDIMENT FIALLEE REMOVED FROM PUT FENIEWIEN IT ONE T, DTE 1EINUT OF TIE FENIE SPILL PREVENTION PRODUCT SPECIFIC PRACTICES ALTO I STEVEH CLESWLLBE MON RED FOR AN� GECLEYVEREGUIPR PA REV ENT I I =Yy0,REDUCE, TA HE CA MARCEL, BAGED I ATER ALI UIED I I I TE W LL BEA HE I ED AND 'FIRED ACCo RD NG To THE MANU FACTURERRECoMMEN'ToN' ANY F P 'ED p ED oFEUM PRODUCTE OF I OF 'ONE I A No RE F HALF BE RE PC ATED To THE I NNEBOTA POULLY ON CONFROLAGENCY AT R11 ALL Co'A HERE W FIT BE T GULLY SEAULE ORED WHEN NOT REQU RED FOR US E EDC EBB OF OF AND BILLY ON LLNOTBE OR PLATE AND ­ REGUITIONE CC NCRETE CoN CRETE Too' AND TRUN A LLMUTWAIH o' I I A BE ` GRATED AREA THE DE1 I NTEDAREA MU BY BE CLEAR Ty BE MY F ED ON THE F TEAND COMM UN CATED TO ALL PERFo NNEL NAoA ED W TH CAFT RLDOCE CC MIDDLE AR THE WAE HOLY AREA TH 8 DES I NTEDAREA MU BY I El THE I PCA AND EPA REGUITIONE OF A DEFINED CONCRETE WAGUOUT AREA THE FOLLOWING 1 1111 NI ALL 1IN111 I I GGSIHIU I FILL III I AIN11 AND 111 UINII I I AN INIU1 I IIAL 11 11 1 1 11 11 IN A III APPROVED MANNER I PA` I NG A PR CC NCR BLE WAIHOLL CONFAINER TUATALL CONCRETEWABHOLL CAN BE COLLECTED IN THEBE CC NTA MERE F H =D NTA NED ONA REGULAR BAB F I OR EAT MCA BE LF MNETRM HE I WAINHEORIT FACUTY WITH AN IN PERMEABLE FREE AN ENGINEERED CIFY I PER WILL BE CC ME DERED AN p BLE FORADD To'L POOR MAT I I I I CC NCRETE WAIH I I REG UYET ONE PIAIEIEETHEMPIIMEMOINDUM CONCREE WAE HOLY GU DAN CE AND THEE OF FTo RMWATER BEET I ANAGEM ENT PRACT CEF CONCRETE WABHo, 1VFH "`OGFG FM FN AGF"A C HFU 0 1 H, LOOZ C ` I— UFC I FU MU,T BE CLEARLY =T FIEDON THE I TE AND 1 0 11 UN CATED �O A I P`E`R =EN AVO A`E DNA ARNA'F`FAC A OH�T`H`= I I I UFT BE CONFAINED I I A BEGIN ENT BAGIN OR OTHER El NICE CONTROL I ETHOD AND I UFT BE PROPERLY DIPPOEED OF INSPECTIONS AND MAINTENANCE CONTROLS LMRTA GLAR HE ZRN HIF ZOCNTA ETAB I To I BRACT CEE HAR AR LL El AI OTHER CONTROLS MA` AS OFF FITE V— AJ�NH E M LMJN�� AAKANFL4YEE0pNRToHRE LOON'SLRMUE 'To MON Y'N P ALL A M HA PROD HT.S WASHINGTON COUNTY, MN MR UNIT SYMBOL MAP UNIT NAME F SPARTA LOAMY SAND 0 TO 2 PERCENT SLOPES ME SPARTA TO 6 PERCENT 327 DI CKSAN SANDYSLLOAM 0 TO 2 PERCENT OPEL 327B DI CKSAN SANDY LOAM 2 TO 6 PERCENT SLOPES z ENGINEER 0 KI!tLEI-I-F�NRAND�ND AC)SSOCIATES, INC. F- PR RE BE p -EUBTEETREET FILE III D BY PAUL TEMN"", P HOME S PIP DESIGNER J) KII!tLE I­F�NRANPAND ASSOCIATES, INC. 'o PR REHIPPIE BE -EUBTEETREET FILE III BY PAUL MN55114 TELEPHONE (151) 1411111 0 DEVELOPER UL NOREFIRPOINT DEVELOPMENT 0 LU 4E25-41BTB= ENTE511 D RVEREDE No J) TELEPHONE (111) 251 1111 J) NUBCOU I — SITE PLAN NOTES --------------------------------- ______--------------------- I. ALLuuORA ENRMATEaA��L,OMPLAUNTR �L,ITA,�DUNTA REOUaTIONS ENR,ORESENR OsrA. -------------------- 0—ELC 0—ELC 0—ELC 0—ELC O—ELL 0—ELC 0—ELC 0—ELC 0—ELC 0—ELC 0—ELC .—ELC bl OATEO �eNUeavLmE, EORc0NSTRucn_SPEaEICATIorvs "L FOR UTIutteNO SREET corvsTRucTION, O—ELC 0—ELC 0—ELC 0—ELC 0—ELC 0—ELC 0—ELC 0—ELC 0—ELC —ELC 0—ELC 0—ELC LITFOaOEMDnRR¢eOM ExacT eu,n No uT orvs. F — — — — — -.� — — a. OUTER C—EO Rro —TO eE o UN,Eg OTIE—ENOTED. _ _ — — — — _ srR PEO Rro _DT Q — s ALL OMENEON1M RE TO TIE—E OF CURB UNLEEE OTTER—E NOTED Al NIITING E,E�ARU�L, LREN,wUEUNR� RU DREG RELOCATEDUDNEU,REMDUEUDR 0 0 k;R111 NG BUT OR 0 TEREC.LDRAEPETETATONEAND ERALLBEIPRDIURAEUTRILLOETER1LBEINCLUDE UN—EBID o O,EL.w�PRO�RERRAET DDRPRDEEEEDN�EER�TEE MNNE TDRAMN0--, AMLEYRDRN—UMEENDLARLTYEDRMYERRDRE I NATTURA EEDRDMEEDNETDNTaNERTREREN -1- NETEEEARYEDRTRETDNETRUTTDNDETREPw0N,MONUMENTEGN �R� REAURERPERMTE 0 CONTRACTORERPLLREFERENCE —IMEP PLANE FOR ETE LIGHTING PNU ELECTRICAL PLM — -- — — R�U Ik I, RPROPDEERUTLTMElEMENTEPNURURTE, REEERTOEENIPLATEORRITAEURIYRORE.ATLOTMDPROPERTYBOUNDARYDMENEIONE I E ALL URE l URE ROUNDED TO THE NEUREET EOUARE E00T U II 1,0 ALL RMENEONE—ROUNDED TOTHE NE —IT TENTH FOOT L,o I ALLPlRNGETILETOBEP INIRTRMR R NLENGTHUNLEEEOTRER EE NRTATER ,00 Loo LL RELNEATER�ETL�NRERETERMNERTORE NERENT tDNETRERAI RMEEOEMTGIIION�E LEGEND z a J a w U) PRDPDEER IT01 ATERM—EMENTAREA Y tY fA Q U ~ rn t9 o rn U Z t9 U F 0 O J LU fA J dJJ 05 rct9 • a LU > Oro da s LL GRAPHIC SCALE IN FEET 0 30 w 7 Z w U o �D Know whafsbOlOW. � SH EC400IvuM EH ET CBII before you dim cSCHlSTEEL lcn WP`ROUD7 2' 4, ENT OR F[NLSHGO GRADE - �c \' fi 3' COVER OVER (DOTING _ \ MINI PSI P.C. CONCRETE MINIMUM (TYP.) T"3 i 3" MIN,i\%� STANDARD DETAILS Grove CotDo tage ^^M�•ndT'v COTTAGE GROVE, MINNESOTA C .—LRlMIIT FOR IF. B11 P PAYMENT BY SQUARE A VARIES �TFGRUI FLOWL 1 �3G j 36"� DER Fi. , t NO.4 REBAR (ttP)� 3^—z'• 4. MIN. AGGREGATE BASE BECNONA THRU CONCRETE GUTTER Cottage STANDARD DETAILS Grov¢ CONCRETE VALLEY GUTTER °^e�nu�"An"P.inNr COTTAGE GROVE, MINNESOTA STRF 16 FACE U 6' 1 D LSTSPN[E TOEk VARWELE 12"R LOPE 3/4' DOT V2'0. i PERK I_ B918 M.8' 18' IACE .1 OURBYABIA@LE R\ .. - SLOPE 3l4 MNDOT ENIN MOD PER FT 14 18. 12"R FACE l SLOPE 3/4� CURB uz'R PER fT SUMNWMABLE lI� OD FA l6OF O3RB l/2•R 1012' BURMCLIN­ uz•R IT- M 121 " ( (__Cottage STroREDANRDDD"' \iRi Grove COTTAGEGROVE,MINNESOTA STR-1B TT�CURB CPNDD CONOt RrvEWAT NR9 MIN /'FRULOVERIAYAREA REMONE E%IS as wRF aN mxCRETE CURB rruMs NG EEMSIING ROADWAY N AND GRAVEL BASE MAC RITUMINOU6 DR — SECTION L ._ GRAVEL NA NG STREET SECTION MITTH MINIMUM USING THE A�IRWS: NuS 5 AECR TC BASE UME I00%NG CRUSHEID C) SPWEA330C SECTION A -A ICITY MG CIF- PERMIT IS REQUIRED PRIOR TO CONSTRUCTION. FOR DIAL SPECIFICATION, REFER TO RIGHT-OF-WAY PERMIT. D Rein ENTIAL�DR�EwA LS CA C ottage Grove cDNNECT To EXISTING STREET _ COTTAGE GROVE, MINNESOTA STR-22 1. ALL 1. LLNEW AND AS WATERAND SEWER SERVICE LOCATIONSSHALL BE MARNEn INCUM HIGH SHOwrv. lEIIMNG OFCERWCE LOCAnONS SHALL BE CONSIDERED INCIDENTAL TO THE PRICE OF CURB, 2. CONCRETE CURB vENELG wDH WS AND 5'5 rv0T MnCED BT SVECIFlED STAMP THE CURB IN LINE GUTLOCAnON STAMP vr'IN THE FACE OF CURB Iry PERPENDICULAR TO THE NE WITH CU. STO LOCH O NRE. PERP SUFMOUNTABUE 5P W'STPMP oEraa �s iJ t^ STANVVATERANOIT-1 RVI Cottage Grove LOCAD. STAMP IN CURB COTTAGE GROVE, MINNESOTA STR-31 , MINIMUM WMUDE SHOULDER- S 85—� SHOULDER OS � f V� 3 AA 3 3' TYPE BE 9.5 WEARING aCE M MTI RE (zA (sPIMEA 3Dq GHIN SAIIID�Eaa�T� E RS REGeTE BACRFIu_ BITUMINOUS TRPIL MINIMUM S VIDE MINIMUM VINUDE wnRnw� 05 �yI All JOM SHALLBE TOOtro � 2%MA% 'A.3 1' � LAPY 6'TYPE3F52AC0NCREJ£ 4" OA65I AGGREGATE BABE IXCAVATION ANDAO AGGREGATE NACNFRL (AS DIRECTED BY 1HE ENGINEER) CONCRETE SIDEWALK �Cortage -".0 u'S-ELAND \�� Grove cNoxs COTTAGE GROVE, MINNESOTA STR-B 5 TES pNH 1.. CATCHBASN TO BE DE PRESSED I' y BDDW O SIGN UM CURB NLET OPENING a MAxM 4t oNJo 2 _BCONC. CURB &GUTTER ISOMETRIC FRAME &CA6TING o _ MIN. TRANSITION 10' MIN. TRANSITION o OP OF CURB, I �I� R LINE GRADE SECTION A STANDARD DETAILS �G.ORge B618 CURB AND GUTTER nls.M^pjptllr,� CONSTRUCTION AT CATCHBASIN COTTAGE GROVE, MINNESOTA STR-l4 T CATCH R451N AT P.C. OR P.T. .GUTTER \�, J �SURMWNI TA WRBfl GUTTE CATCH BASIN IN `RADIUS V G CO. \�\ % H B.10 R I GUTTE \ TRANsrrto I TL I 10 3^ IH M.H.OvB618 CONC.Cfl G� SU OUNTARIE C& G SECTION A -A ANDANR�DAM �rfA G V TRANsMCY GUTTER 1 �.ma.^e°jeiP`�v COTTAGE GROVE, MINNESOTA SIR-t2 U) J a W a L`u r m M UZ_ of W O m O J U z � a 0 k Lu D U) R U) GH C401eE ��-E oIT SUR.R -N T ED�� , TT p S, I.NTED -HE I IETTERINle ACCESSIBLE PARKING STALL LAYOUT -AN 'ED ITEET POLE TH-Ell -- F', LARD P=,6�LOCLATEDll N P -- ARE 4 3W ACCESSIBLE SIGN MOUNTING DETAIL BUIRTHING ,AR1-6' CURB (SEE DETAIL ON SHEET OF05) 2' OR f TAN' N. STALL F-ESS 2% OR LESS �77 OR L SS ARE' 2/1 SLIESS (SE-NDSCAPER-41ESCAPE FORDETAL CONCIEETE S 'E'ALK (SEE INSET A FOR DETA F) EMPLOYEE PARKING SECTION ALL E-01E P -- -ENT TO BUILD- NTENDED To BE � ACO.PLIANT 1 1111 PlI CONCRE HE 1 21 D- 4 -RE GATE O`E p ER M ND oT p E C HC AT o N COMPITED IUBGRIE PER __D 'PEC , CAT oN, SNOOT li�i Ili INSETA CONCRETE SIDEWALK � IN,DONIOT 2IRET""E TYIE .12 (. 1 11H I A11REIATE IAIE (,N,DOT 22") 10 " IAIT TOI 1 01 IUIIRADE TO A IROITOR 1IT" SO ITURE IONTENT OPTIMUM MOISTURE CONTENT INSETC CONCRETE PAVEMENT =°.;Q ------ ---- ---- - H E Li I TV ,RLR TN A N Oil.. O. Fl-T-1 111E -1- IT11 INO ­TIF -0- TI @ u-mumrza -,.IA - -Z @ SW L _j A T­­ I— T­T­T 11TO-oo F A xoss DETAIL I-STO14N 4-- M.m�YP8 # 1-- 1-23-2017 STANDARD PLAN 5-297.250T 4 OF 6 2 BIT -1-1-COURIE MNOOT IPEC 2111 TIPE IP 3 TUM N o` TACK COAT M NDOT 2_ 2 BIT TIPE NON-1- -OURIE MNDOT IPEC 2111 TI E IP 11- .411) 1 C-1 I -E-E OOE COURIE I DOTIPECIIII COMPACT TOP 1 01 IJB-E TO A 0 N M U M o F�oHoM INSET B III Ol ZTRT D " DTE NT ­CTORI E CON -HIN 11 OF OPTIMUM M011TURE CONTENT STANDARD DUTY ASPHALToSECTION 21 BIT TIE-1- OURI MNDOTIPEC2110 TUM NoU, TACK SAT ON- 2- 4C 2 � B T T" E NoN "AR NG COURIE MNDOT IPE C 2110 T E IP (1-40F) I C-1 I AGGR ONDoT 'PEC ,,eGATE OOE COURIE COMPACT TOP 3 OF -G-E TO A 0 N MUM oF I oo, oF __D �RTHC T 03Rl T HoPMTOMIUTM RMEoCOTNUTREENT N oF INSET D CONTENT HEAVY DUTY ASPHALT SECTION SO IS 7 c o @ "7. mum. v mn-n-ft zz --v Q . .... . ... . ME"Ll"I'A "W" I-Wl-.,LLlull �l .71, -T- F R111 11TAILl 73-201T � STANDARD PLAN 5-297.25oT I OF 6 U) LU a LU m U z rcF P p to o o o o LU ig IL 0 LL z 0 LU u) F-77EET 7NI.- DI C402 ----------- ------------------------ --_---- LEGEND --------------------------------------------_F-���e��ai�_ 0-ELC o-ELc V o-ELc ELc o-ELC o-ELc 0-ELC -ELc -ELc o-ELc a- 1 -c o-ELc o-eLc �--o-ELe --�o-eLc o-ELF a-ELc ..a�ELc o-ELc o-eLc o-ELC �o� c ` �e � - - - -- - - - OO �:- — • IJII ° PR°P°EE°�. ° °RM EEER °111CT R°HEFT —° :R°:°snI—_ m� --- ---- ----, _ l� � PPPP°°°IEo°°R°"°.EE'.ELE1ATA01 -- -- ---—�°Po�°wNTRRO— --- ------ RPOR�aE�°S° 'oT :R:=ENC�I°°EwELE°° :10:0—T0:10TT0M0E—ELE-101 °:°°°R-E°�CT°4_:R°:°E-EL°:E 4m 000, F GRADING PLAN NOTES 30� EEE EN—P.ENTI°N EnEET TE°, EEE ENL—EMENT E°N EnEET TE°, m ,.E If_ I E m\ \ sal l / i =11i °: — _ °„ I I . i I BUILDING 3 / <I = 520'x98 — v FFE=81 .0' r -rIloo,— // lLl 10111 \ \\ III I I / sE --TEory IIEEG501 � E inrery of ry 1°ry II E � � �7 I I 7 7 7 7 F1 Is L--� o 71 I I M N U Z rc F F p 11 05 O J w d G p O a 0 a J J aV 2 J Ua - ILL a z 0 GRAPHIC SCALE IN FEET w G 3o so iso Know whaPs below. 0 EET NUM eR Call before you dig. � — C500 %\ �— 97 -,A Z 'Q 'lo 11 j121 ll ") 'loll 11017 ol ol 'loll 81074 ­4 1021 T-1 0 12 rere 81olo 1-1012 810 17 — 7811 T-11 11 1-0807 80710 80177 80171 $ SOUTH EAST ENLARGEMENTp LEGEND `H 'L —I'=TITI-1 -p p- 1L11H P11"11TILI-111 _ a PIIPI:�, �.l 1-11 ILI —1— P11P1 IPIITTI" 11 — ILI-111 L— oo, 11-1 -1 IT- 2201 p"p, —LOPE GRADING PLAN NOTES I �H�LFLOR.EPDERNM�CORD�CMEE�TH THI ITI OF COT—E GR— " 'p, _ , ,=, T RE., RE NT 2 �.NTRN ' ,RR ­DoRoP C �RLOTGo C R � TTATo EN A�oN LOT NR E, C�T lo�NO FO0 2 12 11111 L E � T T RITLTYLOC-rlO CoNT_ToRToFEL_RFYTHE LoCAT_ I TLTE,.DTopoGRHCFEATREpRoR ­ELEVAToN­R`=NG THE TO THE I—T OF I TE G CONT—TOR IHIL MMED ATELY NOTIFY THE PROIECT ENGINEER OF mY D 'CREPMC E, oR _ AT oN, 4 UBGR E E—VAT oN —L BE B' IF LLED MM ED ATE LY ZTE R E ` AVAT ON To HE Lp o FF E T My , TAB L TY P R oBLEM , DUE To — ER E E—E oR ITEE P 'Lop El =AT=NE 'BUB FACF LM AT EPR ' ' ' A CTEON T T o DE 'U ND ENRGMPNAV EGMOE FN � T1 TE N G E — LED ROMPTL N PIEM NT I C ONT—TORIH—E REIPONIIBLE FOR IL HOR-11 AND VEITICI CONTIOL E FIN ' HED GRIE1 CONTRI OR IHIL ROUGH —1 TO ,UBGR E E r VAT oN M D LEA, 'TREET RE_ �oR UB_E G . . . 7 IL EICE " MATER ' B TUM NOU ' 'URF ' NG Co NCRE T E TE M' MYANDONED UTLTY TEM , M DOTHERUN _LE M AT ER " 1H _ BE CoM E THE PRO p ER TYoF THE CONTRITOR MD IHIL BE DIIPOIED OF OFF THE CONITRUCTION IITE C I ONT R 'ToR IREIPoN ' BLE FOR CONITRUCT ON OF PAVEMENTI MD CURB MD GUTTER TH 'Moo TH U N F oR M 'LopE, To P R_E Po' T , DR._ I NITALL UMOF4 C-1 I —REGIE BACURB CoNCR,=W", I�REECT­NLD E OTN oR TDEF I L, D U X C�VEAAT'OoNNM LLNG D;,CTOUNRTBREHLRGUTTER LEBIETORE ALL H RE IGETATED WITH AMINIMUM OF 4 OF TOPIOILIE UNDER_�TOER''I, 11 IL IPOT ELIVAION-ONTOUR—E TO —TE1 IFL—LINE UNLE11 OTHER—E NoTED 12 GR' NG FoR DEW"' AND ACCE" BLE RoUTE' NCLU D NG CR o" NG DR IWAI IHIL CONFORM TO CURRENT — ITATE.AT ON , 'T m—D , N N o Cl 1H ' ­ Ell BLE RI P 'Lop E � `CEED ' ­T ­ To 12 HoR ­­ N NO C = 'Ht I DE W_ C R o' I ILOPEI E CEED 21 N NO —E 1HALL LONG TUDINI ZE.CEED21�1 I=E TN) N N IL D REHC'LO' CIE W— AC' ENIGI'TTO EL.T oR N I LB oN I To E NTR R I N BU =E DOOR ' MD GYA El 'HC 'LTE ' AM 'PLR �� R, EMMTE TC M o OR% EN MM ED AT E L EGR N 0 Tp YLOCAT PAV NG NO CONT—TOR CHANGE ORDERI — BE ACCEPTED FOR AD ACOMPLIANCE "UE, z U) MIN�INAM�N�MUMO � : GUTTER ILOPE TO-1 — PIINT < oE1 M­­ A=EMNT — —P E �N BTUM—Ul PAVEMENT — 0 11 ILOPE IN CONCRETE Z ­­`R `­ RE— PAVEMENT G­ ENT MD CoN=—RPLAC RMB NF ENT ERE PAIMENT DRA NI TO— GUTTE R MD OUTFIL DR.N1 —Y FROM GUTTE R —.1 LU (9 LU Z, LU 0 < aLL z Knowwharsbelow. L,u Call beforeyou dig. U)U) a r ___________ ------------------------------------------ LEGEND w y 0—ELC 0—ELC 0—EL1 0—ELC O—EL 0—ELC 0—ELC 0—EL1 ­ELC 0—ELC 0—ELC 0—ELC d 0—ELc o—ELc o—ELc 0—ELc o—ELC 0—f Lc 0—ELc 0—ELc 0—ELc o—ELc 0—ELc 0—ELc aeoaoseo soI. reM Mnrvrvo� reourvow�r awsrlrvo _1 T — — — _ _ _ _ ® areoaoseo soreM sevuEre c�rvou. �' — — - areoaoseo F,nreeo Ell rysecT ON cn ewsN �curee NET cwsr Noy k„N Ll oPE 0,L — �i k: I�TTOE OPo o�AN.�v� R 3 �CL= F PROPo= owATERMaN ST „- oo�w. „sw STORM SEWER PLAN NOTES L, — x —k- ---- --- ---- ---- — -- --1— ' "ECLRA.HNL oauLoN PERM.REouREMENT= cT1OFCOT—E� 1 ----- a 0,LF_,a HDIE ,aoLF-,a HDI --- - a a s a ---- a a �,�� a a a CORkNooATOROLTO00 cA,IATOE_%OTN,cTONFORUTLT LOC—TT cONTR RTTATF c0 0� c�LONF��Aoo�„�ATLFAnT�0 {�� — — -- — — — — — —I— ono {V oa�,,I0 o,z�o,�oc-0,3 II' r o, of k� k% 0 ONTR TORILaF��0=a�FORILNORINTIANONFRTcIcONTROL a k, �N w w w R _MENT= A A.EORaN E.RENCNE=.OFO oAPROP�EonORM o m �I k — c. wvouTAND F�vnT orvsnrvREFER TO THE ITILITI P­ ocwsTNoswc.ureF NOTnTON. Nseremce IE IE IF �N �N,F ,ANOTcIF�F �F ANo��TN 30Fc0�RN ooOR — CONNECTIDR ON OTFoTCO0THFR�=FRFFFRFNCFMFPP,M=FORRooFORaN s� OLFCONNFCTONT ON==NA�aFoTFo owATFRTIGHT NcwoNo oo" PFIHILBE RTFnFONACCORDANCE THE CURRENT PLUMBING CODE I E I I I BUILDING 3 I - "I 520,000 S.F. 52O'x988' r ,DPE I I RE II - Ii I LLB_ s [I I F800 a 2 W HDPEE80200E aoo, - LU� z 0, �oa IE „wl A1 �1 a - LkkI 'i V) I, ,a oPF oPF oPE .J,11111111 a Io tl� w Illilll 11� P mot, zaL ll�ll i°i �l�tl w `.. - -. ,E `" UZ of NOPF ._3a�, _ �, aoF..—'— —:._.._.._� E _ Fs, aoF_.-lilllF i �r 0� _— �111LLU���� �L 1111LLU1�111LLU�1111L� ,��1 L U111IM-1111IM ��111���,��1 LLU U111LLU�1111 �� � 0 U ` TCTZT7TTTTITT1777771T l T1777Tl�1-TTTl�777 777 7l7 NFILT-TONCASNs717-77Tl-17771-17 r»TTTTI�Tl-8,N � 0, �0— e 'N=tillultillultiltilltill e9°0,llulllllllllllllll l IIIIl Ille7"00,w[llllllllll IIIII lllllllllllllll=°1W,III llllliillll l 0, 0 ; P 'L,0illlillr:r..—..—.._.._..—.._..—..—.._..—....._.._..—.._—.�lllilllllil� �� �o �1 ��lllilllllill�' �lllillllll� LL a z u GRAPHIC SCALE IN FEE; w D aD so 2D Know. what'sbelow. Call before you dig. � EET NUM m _ — sH C502 Ea a(ZDIAMErEBIT 11 ..SL SLID MORTAR 2"TOWARD INVERT. PLAN f AS PECIFIED. PEAl R DETAIL PLATE STR-33. -2]" VARIES 36"-40" MA.H."STOP, ib MAN ON CCNTCA. VPRRIE VAROR AR DETERMINED BY PIPE 512E 2A" ERT - NPE SHALL BE CUT TO BE 2"-A" INSIDE N11LE III /A ES r NV MADOGHOUSES SHALL BE MORTARED INSIDE AN) OUTSIDE OFE. Sl 3 OR RRELSECNON SSECTIONRICEE2 IEADIBUTTI=ANoeEA �COttege STANDARD DETAIL U GrovO STORM SEWER U �Ae maealriw^w�N JUNCTION MANHOLE COTTAGE GROVE, MINNESOTA STO-2 ­X36' SLAB C45TING SPECIOF ED PENIRG FOR M BACK OF CURB TO PEN FROM BACK OF CURB SDIA MH3IN FpJM eACA OF CURB EM ND BACK OF CURB J' DIA MH -9" BEHIND BA[N OF CURB e DIA. MH -1V BEHIND BACK OF CURB ­TING AND PLAN AD—MENT R165 AS TGI Ql BARIE O SECTION BELOW TO' SLAB TO HAVE FLATTOP EWE SEALED WITH 2 BEADS OF RAMNEK OR EQUAL. VARIES MANHOLE STEPS LE' MAX ON IENTEA. CE MORTAR BOTTOM eOs DOGHOUSEESHALI EMORTAREDBOTH INSIDE AND OLUAIDE OF MANHOLE. 3" -I- PLACE 2 BEIDS OF RAMNEK OR EQUAL BETWEEH BOTTOM SUB SECTION AND BARREL SECTION. STAN CARD DETAILS ..,..._,,.,, G[Ct� B CATCH BASIN MANHOLE °M1wLNe,� COTTAGE GROVE, MINNESOTA 5T0-5 V2='-RArRPmEANDn ve MORTARV TOWARD INVERT. PLAN A-R` PEOFIED. PENSTAILPUTESTR23. SEALED WITH 2 BEADS OF RAMNEKK OR EQUAL. ZAN RM NED BYSTEPSAK ON CENTER. EPE SHALL BE CUT TO BE T4"INSIDE ANHOUIWALL VADOGXOUSES SHA 11-11TAREDBOTH INSIDE AND OUTSIDE OF MANHOLE. 3UCE 2 BEADS OF RAMNEK OR SECTION EQUAL BETWEEN BOTTOM SUB ANDBIRRELlICTION. STANDARD DETAILS `j(�Gmre STORM SEWER IUNCTIONMANHOLE 6^asme�..Iv^^'�NaR WITH REINFORCED TOP SLAB COTTAGE GROVE, MINNESOTA LNG FOR CASTING 11DOU ED DIMENSION FROM DICK OF CUB TO ENT SMR -%PEN FROM BACK OF CURB FROBACK OF CURB 6' DIA. MH' H-3"BEIN MHIND BILK .'.HE e DIA. MH 1V BEHIND BACK OF CURB PLAN VARES AS SPECIFIED. PER DETAILPUTf STR-23. 12 L SECTION BELOW TOP k ­B TO HAVE D P ENE SEALED WITH 2 BEADS OF RAMNEKOR SOVAL VARIES—'� MANHOLE STEPS I6-MAX ON CENTER. VARIESUSES SHALL BE / ANE INS IDE ANODUTSIDEOAORTARED H MANHDUE. as +MI 18 �R ORTAH BOTTOM 3'-0'1 STHUCTUE L i 6 DP VRFRURURE 9 3 SECTION �•I=Nlll OF RAMNEK OR EQUAL BOTTOM CO[tRRB STANDARD DETAILS eARR[LV[rnL Grove CATCH BASIN MANHOLE WITH SUMP C w' n.oMrl+.a COTTAGE GROVE, MINNESOTA STO� - MORTAR BOTTOM OF MANHOLE TO 'IF "AIITER AT PAVE AND SLOPE -- _ , _ MORTAR2 TOWARD INVERT. PLAN CASTING AND ADJUSTMENT RINGS AS SPECIFIED. PER DETAIL PLATE STR-­ TOP OF BARREL SECTION BELOW TOP SLAB OHXVEFLATTOPEDGESEAUED WITH 28EADS OF RAMNEKOR EQUAL. LZ'VARIIEAS V ES — MANHOLE STEPS 16' MAX ON CENTER. IN51DE RPE CUT TO BE 2'L" I.•, NHOLfWALLBE L. VARIES RC —HOUSES SHALL BE ..—RED sIDF ooi COF VANHOLE ".MINBOTH ANo -ell 1 3' 3'+� PLACE 20EADSN BOTTOEKLA EQUALBARREL EN BOTTOM STAB SECTIONANDBARREL SECTION. COtteg¢ STANDARD DETAILS 1 GroVB STORM SEWER JUNCTION MANHOLE WITH REINFORCED TOP SLAB AND SUMP COTTAGE GROVE, MINNESOTA STO-6 NOTE:VANEGMTESHOWN 'f 3'-' _ 6.. FACE OF CURB y-0" DIRECTIONOFFLOW- -6 PLAN CAST R R NGS AS SPEC FEED PER DETAIL PLATE STR 23 NSIOEANDo0rs1oE?REI 3' MORTAR INVERT PLACE 2 BEADS OF RAMNEK OR J SECTION �6• EQUAL BETWEEN BOTTOM SUB AND BARREL SECTION. STANDARD DETAILS COtt¢ge CATCH BASIN U Grove °j+.rn'rw"N COTTAGE GROVE, MINNESOTA NOTE: ZNTOM ACOLODKM 10 aaocK LENGTH OF MFE AS SPECLNED AND 4'PLUG - - ERWCF -. ArvO D EQUAL' RR O vLUG 17(I\/ � G PIPE SEWER NNE CONCRETE C=PIENT COMPARED FMA RACKNLL �CDtt¢ge sORw sEw.RSEReLir>: Grove CONNECT ox To MINNREn COTTAGEGItOVE,E.A STP22 TOWARDINVERT. Dl=IGA`T1`BP`E ANDSLOPE MOHTAR — --- FLOW -- MANHOLE V 50 THAT OFFSET ERTICAL PORTION OF CONE IS FACING DOWNSTREAM. PLAN RINGSCASTING AND ADJLJS­llT SPECIFIED. PER DETL PUTESTH 235 A VARIESSIS MANHOLE VTFP516 mlxON c[NTEN. A ES DETERMNED BY PIPE SIZE 12 2A" VARIES PIPE SHALL BE TTO BE V-4- INSIDE VARIES INVERT MANHOLE WALL. DOGHOUSES SHALLRE MORTARED BOTI INSIDE AND OUTSIDE OF MANHOLE. PUCE2BEADSOFRAMNEKORECLJAl SECTION BETWEENBOTTOMSUBANOMRRELSECTION STANDARD DETAIL �G[OVeRe STORM SEWER MANHOLE COTTAGEGROVE, MHNINESCITA STO-1 V/ J `a r W V z V M En EA t9 U F 0 LOAN 0' 0 5 O J � Jow,U 0 Va ¢ a z 0 k D In U) SH C503 Ea PRCMDE 4- 1/2' SE ANCHOR BOLTS FLAT STEEL BATS@9"O.C. NO PERPENDICOLS1 SU RT EARS �OUIEH RING �FFED GALVANRED GMTE IN 2N 8 HOT SECTORS WITH HEAVY DITTY HINGES ABLETU SUPPORT BE LBS/SF AND BE RE�SE BNFSECTION FOR T LOW OM TWO ANOro0.Y REMOVING NUTS SIDE HIGH SIDE TR EOLTE. Will DFAWINCS TO ENGINEER FOR OR To UE TEPS SHALL BE FUCEO SO THAT I Cl PERPONEXCLAR TO THE g, rvEEPLAn R198v OR ECw4 LATER. aUMINOM STEPS APPROVED GRATE DETAL C—ETER TOP OF STRUCTURE SLOPF D OR 11" >48' DIA. 12 OR 29 SEE STORM SEWER SOIEDUIE FOR SPECIFlC STRUCTURE. �� ---- NO BLOCK STRUCTUNES ARE ALLOWED. PNEA� ' "SEIN A WSKETS. TO S PTPE SHALL BE CO, TO BE x"-9"w510E MANHOLE WALL. MINIMUM DOGHOUSES MUST BE MORTARED " BOTH wSIDE ArvD OUTSIDE. PLACE �{ SOUa?BERNEENREADS FRAMNEX BOTTOM O0. SECOW GROUTED INVERT BIAS AND BARREL SK DM CARD RD�o�EARFLav�. AILS STAx CfURE '',ilMfri�W� COTTAGE GROVE, MINNESOTA y7p1R r STEELANCN0R 3 9 1/8•THICK� OLTS2 EACH SIDE GALVANIZED STEEL PLATE 4I r i (B9A7>2"ROUND @41/2°O.c. 4'%3"13/e'L STEEEL ANCHORESS L " )1/2 ROLES 3' 4'� �. RIP RCLASSAP SKIMMER DETAIL PLAN 12'RIUNI 1/2"$TAINLESS STE BARS@ E4O.C. \ STEBOR'LEs ),2'' U 3.. S GRATE DETAIL SEESOMMEPDETNL� OP—PECIENINCIDE IED �3EE1RATEDETAn TOP OF DEER ]8"MIN rSCHILOOREN —FES W/TNASH G ANO STORM WATER POND 4i�4 CP (CL. 6) L N 2'S 2'%3'PRECAST BOX .- f LLI WITH 1 MORTAR BE CLEARANCE RIP RAP 12" DE PIH WRH- RECAST BASE 3.' �_T OT3 E%TILE SEPARATOR FABRIC SECTION C G[avegC STANDARD DETAILS POND OUTLET SKIMMER STRUCTURE STa1] '`-0«.mrweei0�"Nm COTTAGE GROVE, MINNESOTA F i /j—urvomuReED son SECTION A -A ALL SIDES TNTO UNDwTURBEO WIL CONC. SE-CE COLLAR v may,v Cottage STANDARD DETAILS Grove sEErAc�Wuan COTTAGE GROVE, MINNESOTA STa21 PROVIDE4 BARSN@LE—OR4"O.C. ANCHOR BOLTS RU OUTER RING E vTry CTURFS NS LBS/S AND BE ABLE TOA EMOVEO �TN RT NG S �OD LOW HGH AONGEERFOMW SIDE RIOOFABRCT ANHOLE STEPSSHALL DE PLACED SOTHAT -f' LOCATIONISPERPENDICULARTOTHERA15. MA% ON CENTER. ALLNRN STEP°5APPR.L�Eo GRATE DETAIL A S�ETEa a3w i5fG *D(TOP DF DPEI ELEY`NXSG_J—D / FOR SLl PEOFIC STRUCCURI, VAR _ HOLE FOR %%' DIA. RCP SKIMMLER$EV. C I ` \ PROFILE AROUND U CTORE OFFNINGVARIES, 1 SEE CHART DOGHOUSESMUESTBE 85TUCTUINSIDE RE AND RI IOU LOEOF `t F6"BT OF PIAO=DIN L (MNDOT SPEC3199,H MOD.1 POND) SECTION �Co[tage STANDARD DETAILS G[OVB STANDARD SKIMMER STRUCRIflE COTTAGEGROVE, MINNESOTA STO-16 9-10' S' 9' 0' E. OT'' ROUND BARS 112"STAINLESS O STFEL C f CUTLET STNu E NOTES, CP W W Rl�ll OPT' OR Ep1AL, LVON CENTER. CATION. auMINUM STEPS APPROVm GALVAn1xED AFTER FABRI GRATE SEE 3. ALL ANOIOR BOLTS SHALL BE 1/T. S.S. EXP. ANCHORS W/9" MIN. EMBECMENT. \ 4. MAXIMUM SCEE CROFT TAR S. FaasTRuewRES[w �HwL= MAs 2GHT EBGSED IS- PCP WATERTIGHT SFAL AND PIPE TO BE I6". l SET oNS, TDPRDHE - SECTIONS $HALL IXITLET MFE S, GRATEED _ 6E WCw APFROV OP DRAWL SLOE WEW SLUI. GATE OPERATING NOT a ROD SECURE TO L W/MOUNTING BRACKET --�. _4"%3'%3/8" L LUICE —5QOPENIN�FlSIEATTm'_FFCE (3)]/2'STaNLgE 22UARE OPENG NIIT STEELANO1012BWT5 •4111- ORIFlCE W AS SPECIFlED RARSo�c. STEEL2ax " LTS GPATE DETAIL \4"%3/8" RAT PLATE Cottage �E Grove 5 CAE PRTLiL WRH ORIFlCc COTTAGE GROVE, MINNESOTA sro-zD 2 J 1 9"X3"X3/e" L 1/z• sraNuss _ SFEEL ANCFgR MJ3J oPENING T EH SOLID BOLTS LLDEWWIw .1NRN JE0.20NEENAH CASING CJTLET SIInCIURE NOTES: AC036 OPENING 4VI1H SC]DOURETSTROBST SHALLBE ED PREVST WRETE. ALNC roPsrau RATE SEE 2, GRKEw SHALL BE HOT DPPED RCPCTLET cro ;f DETAIL GALVAMZED AFTER FAEWCNOON. PIPE 3. ALL ANCHOR BOLTS SHALL BE _ 112" E.E. RS W/ 4" ENT BE 0.TSNEUCNRE SINVERE PIPE�TH 13 IMUM EWIET FIFE TO L3sEEVLANO aRBBOOL TS —p 1/2" ROUND @ 4 Ol. D.C. _ f 133)111. STALIN ESS ATI'D3/8"FIAT PLATE DET STANDARD DETAILS Gro ounET STUMBE COTTAGE GROVE, MINNESOTA STO 19 L CC 6'I-PENTO PIPE 6 O bG O �'c� O(T r CKFELLASCREGATE O pQ SUBORAD TRENCH DETAIL u4^m HolE== TYPICAL T M PIPE DETAIL Cottage STANDARD FED ETRULS Grove PVC PERWRAT w"^ rdRww�mHn COTTAGE GROVE, MINNESOTA STtr19 M (n U Z rc F � Fp ofA O J LU O m d J J J t7K 'U V¢ LL a a z 0 k D In U) C504 ER E Ell � E-1 IIIEI EUN. ONE 5 111 IETOU 11. El-11 11 IIE11 IEIUII 6 0 1 1 IIE -I E iNr E 1 01111111EIE 11611 E_l.EE o CTURE TR S OL U#5 0 TYPICAL INFILTRATION CROSS SECTION FOR BASIN 11 OUTLET CONTR NOT TO EIALE ET Lu U) 0 z FD 0 0 0 Lu , ig (L 0 LL Z Lu D U) U) csos ER lE �re .sus I oos ,AEI a a a a a a a a a a P . fl.� ii �rereE 11 Llrere�P iii BUILDING 3 ± 520,000 S.F. 520'x988' FFE=812.0' IFarm, ME LNw- 4 �lllllll 11 l lllllll .-Illllll ll\ - 1� 4-L1.1LU l L11111 l y U111L1 L 1111LL ]11I I ILLIII L111tut L11111-L11JJ I I MAIJ A I I LILI III I I MUJJ1 -LI_ W11LL W II l l IT �N� TIT TI Tl 77717 Ll �u TT17 TCIZ TlTa77 _ 1� ��lllllllllll� � lrr jllllllllllll `liiiiliiilll: �llllllllll.� � �llllllllllll!r LEGEND O 1 s0 0 E —I— L soreM SEwere UTILITY PLAN NOTES M (n UZ f �p 11 j O J w O O a 0 a J J U¢ a LL a z LU GRAPHIC SCALE IN FEET w o ao so so Know. whatsbBlOW. :::' 0 SHEET NUMBER Call before you dig. D — C600 HYORPM RAG aS SPECIFIED. BOTTOM FLWGE OF `xroRP / _ BE n�n uMpNDa I$TPNQ � nEGReE ED ER SPEC 3iNN.2.H. h MEWWGS ttR COVER WRH ( %� 4M1L THIC%NESE POLYETHYLENE.R OF J Z I. CON.ROC%HRUST PROVIDE CONDUCTNTY STRP➢ nM'0, 3/4" pWM. GLLVPNIIED MR) MINIMUM 1/16'%3/9' RODS B MEG4LUCS WIDE FWT COPPER STRIP. STDARD AILS U cottage u �F� COTTAGE GROVE, MIMES. WAT-1 1. SHAPE OF eAC%OF BUTDt65 MAv BUTTRESS DIMENSIONS VARY PS LONG AS POURED AWINST IN, 221/1 BEND 2. DImEn'SION CBC2,CW35TROULD BE SQE D1 B2 D2 Bi BED3-0 IARGE ENOUGH TO_11IN11EB B. B1 _ _ _ 2.-0. 2.-D UGH 30DIMEHSIONWx THAN l2' I•-UF I'-DF 3.4•• 2'-0" 4'-9" 2.4i•' f3'A35HONLD BE 2•-0" 3• •' M�ERFEW.POS90DWIIFOUi I6 3'-0 -10 3-0" 6-2 -6 BOLTS. LY' T-6•' YA" 5'L' 3.4- B4• 4'-tl' 29" 4'4" Y0" 6-1P' 3'-30" 9 - 5•-0•' 5. PLACE POLYETHILENE BETWEEN 30" B•-3• 6•-0• 37-0" 6•-0" CONCRETE a PIPE. - - e-SEE NDTE B-$EE NDTE M--(TYPJ PLAN 90° BENDS PIAN 45° BENDS VANIABIE IN.� B -SEE NOTE4 _ C Q.IaDRANTDF MFE f3 E BEDDING MATERLLL UNDISNRBED FARTH CONCRETE J SECTION A -A PLAN 221/2° BENDS CottageG[�� WAT-6 HYGRPNT HAD PS SPECIFIED. BOTFCM RANGE OF NYORANT TO BE ABM ROUNDA HDID$TPNCE — — oFz —LL TO BE TAMIED `_ I FILTER �i / MNOOT SPECP3INIMU. 3 ^ 6"11. eEND / CM111 p [SSIMUM MEGALUCS POLVETHVIENE. R) CONCRETE THRUST Y/ -_ BLOCK �. \�nE, � B CONCRETE p, HIM.UEC M, DE IY SNCP- ) . /l6'X3/9 WIDE FIAT COPPER STRIP WO 3/4• DIPM. GAU AND BODS a MEW—E. C. HYDRANT DETAi N Groe vERnrnLBEND COTTAGE GROVE, MINNESOTA WAT.2 �IN6 _ - UCDON TVARiPBLE DIP BEN D 'WATERMNN x O rBAIXFILLM T 3/E_l 4 - TIE TI RODS RODS uGs (Tm.7 45°BEND� LND nEN LS 95 P(TYR) MUN. ECONOUCTNTYSTRAP(TYPJ MIN.I/l6"X3/4"WIDE FIAT COPPER STRIP =wATA WAT-] DROP UD TO VIC ¢DW aRovi w o11 Faolixi TO TOP OVER TOP OF ­TER nwx.� E%1EN111 WTE VALVE ADAPfSR-1/4�, OA NG]/] ' STUFF 1rIIN 0—­M M(TYP) 1THGOK 55 I D _ _ RAP(TYP)M.MDN VIE XDO_V OAT T- .may-B CCNC RICIX DUAILS Cottage WnEn0 — Grove COTTAGE GROVE,MINNESOTA WAT-3 4 14 WOWM PROP PE GBAGE 1S 7.5 UM COVER ONSTOP IN REQUINEDOVER TOP OF THECENIER OF RUG N-R mArN. 1'CORPO—ON, JOI­ IN THE -TER MI AND W H CmwEn Pl.airoz4° EsrRAcweD ro 3HE TEE. GRADE. R MUN ROW OVCFMTY ECOARBE�LlSEIEAGGREWTE G 3149.2.H. -1/16"%33/ WDENRATM COVER WITH MINIMUM 4 M. PPE STRIP. THIIXNESS POLYEIHVIENE. �..._ THE RODS 8' GUPC. &OIX J IPIGL �F, 3/4° CO0.POINTION STOP UGE. QIRB STOP STANDARD DETAILS Grove D]P SERVICE OR DEAD END LINE COTTAGE GROVE, MINNESOTA WAT-B MMI UM 4'SAND Fll1 N]MUM � INELULATIONID INIULATION RPnN MINIMUM 40 OVE TH OF INSUTATI 4 2 3. 5' 3 6' Cot[Bge `'T �DARD DETAIS Grove m wn N D— IN COTTAGE GROVE, MINNESOTA WAT-4 PRECAST INVERT MUST BE 1/2 DIAMETER OP LO THE PIPE AND BENCHES SPED 2 TOWARD THE INVER . I RUN NUIN1111 STEPS BE PLACED I. THAT OFFSET 1 OF CONE 15 FACING DOWNSTREAM. PLAN CASTING AND IUSTMENT RINGS AS Af IE5 i'-27' 36100 MANHOLE STEPS 11' MAX ON CENTER. ZARIZ L VARIES RMINEDBYPIPESIZE EESHALL BEL BE 2"A" INSIDE NEANPIDUE LAND HAVE A WATER VARIES TIGHTSEA. —SPECIFICATION. J_ ON INSIDE ANDALL DOG EOUTSDE. MORTARED SECTION STANDARD DETARS � Tfv . SANITARY SEWER MANHOLE COTTAGE GROVE, MINNESOTA SAN-1 MACHINECONEDHCRE GSTIRONSPDDIE STAINEE55 STEEL BANDS AROUND EN-3 � THE . SADOLY OBE NO GERWCE CONFECTIONS TO BE AT 2 0Dc—OP 100R10IX HPACH IXE HE GO P/C CORPORATION STOP GREATER THAN REQUIRES SACLYE. COMPLETELY ENE WATEREERVR CONCRETE. TYPE •'R" croT PVC SEWER SERVICE ]TART SOME WATER MAIN WPPONT FOR CORPORATION AND OF A MEINEIMUMCDS cv.LOF —� AGGREGATE EEUAL TO NN/DOT B19B.2 H• (.-) THROWHLT COMPACTS. WATER AND PVC SANITARY SEWER PRVATEEAc M DETAILS L Cottage To Grove PueucEmEnlFs ^m�•'A"" P� COTTAGE GROVE, MINNESOTA SE 'x BE 1n DAMETER OF THE PIPE AN. Z TOWARD THE INVERTES SLOPED MANHDIE STEPS SHALL BE PLACED AT o"S—ERT­OIN 'CoNEISFAONG DOWNSTPR NE 'L 5 PLAN l} SPECIFIED.PER.DETAILFIATS SNR'2 . ' ZT VARIES MANHOI£STEPS Ls"MAx ON CENTER. L 12VARIES CUTT SIEE —PIP WATER MANHOLE WALL AND HAVE A A TES TIGHT SEA. SEE SPECIFICATIONALL 11 HILIES SHALL BE SECTION ONINSIDEANOOUTSIDE. Oaiaar0 ww STANDARD DETAILS C Cottage SAN ITARY SEWER Grove ]UNCTION MANHOLE W^^•'°�R COTTAGE GROVE, MINNESOTA SANx2 PYC S�LWEE LINE «ErSEAL A�E555IEEL PVC MA N CDttagE PVC SANArrorvnKTTVII SADDLE Grave �wNN.wr,rlN� COTTAGE GROVE, MINNESOTA SER-] ERR BENCHES SLOPED 2 FTHE IE TOWARD ARD THE INVERT. � / \ OF CONE IS FACING DOWNSTREAEM. SES AI PEDIREN PEER DETA L PLATE 5VEIRI NR-23. L SECTION BE SEALED 1V E WITH2DEADSOFRAMNEROREOUAL. 1 VARIES •DETENMINE�9YPPIpE"SMAI(ON CENTER. IZE VARES LL BE CUT TO BE 2"1" INSIDE TTGHTSANHEALWSEEI ECCIFICANON AI AND AIR ALL DOG HOUSES SHALL BE SECTION MORTARED ON INSIDE AND OURIOE. STANDARD DETAILS Cottage SANITARY SEWER]UNCTION MANHOLE IA Grove WITH REINFORCEDTOPSI.AB �"*Mw^p°j11 COTTAGEGROVE,MINNESOTA SAN�3 TO zonaK on lw naoCX N0 -N-TEE SERMS E SAN INCH ELOPE CONNECTION APPROVIL EQUAL TR OR L� BALL POURED IN PEACE CONCRETE wPPORT FOR SERVICE DETPIL PLATE BEPr CONNECTION AND RISER D CUBIC YARD) Cottage ST�CEw�NECTEo.NNIT Grove sFRVICE RCP COTTAGE GROVE, MINNESOTA SER-e SERVICE USER 4" OR I' PVC SCH. FINmI.CRETE ErvCfSE vvv STANDARD DETAILS C. SERVICE USER COTTAGE GROVE, MINNESOTA 5py.g FIN6H GRADE LID AND CASTING PS SPECIUED, ARLES Pac DEaxouT f 1 .—NG UTUMINOUS/ LID AND CASIING AS SPECIFIED. coxcRElE SURFACE STEP CURAND BBOX� WATER SERVICE Cottage Grove�NTAIS PRCTD cNGmATu— BDx COTTAGE GROVE, MINNESOTA SECT-11 M En U Z rc F Lu W 0 co �K �U u ¢ U z � a ED 0 k w D U) C602 ER 1 1 383 LF 10 DIP 551 LF 10 DIP iv00 111,00 ,00 ia.ol 1 1 1 1 GRAPHIC SCALE IN FEET D 15� BUILDING 3 WATER PROFILE 1 1 1 810 Exlsnmc cNoumD 1 — ----- 1 - -- RDPD3EPGIDE 1 - -- --- 1 1 _ 1 a� 1 N� 1 800 MIN MIN 1 1 M.NTPN18 MIN 01ER—ERMaN ; 1 1 1 1 780 1U+UU 11+UU 11+UU 13+UU 14+UU 15+UU 16+UU 1/+UU 06 M (n V Z rc F Fp oU) 18 J �0J Om � J p U Q IL ILL a z c Know what'sbelow. w ' k Call before you dig.SHEET NUMBER — C700 — 1 1 A _ A 1 a E,o oIP oNN I oROP..o,=EE T , �o a r e�..oE s.wo s.00 Tr,.or,Ro � �i LooR r, ,aa _ 1 1 s� l E sa, A s..r E^s'�oET �=TI.�=T�a � Il�ll�lll l� _ 1 GRAPHIC SCALE IN FEET GRAPHIC SCALE IN FEET a G i5 30 6G 0 15 3G 6G BUILDING 3 SANITARY SEWER PROFILE ==o 0 8 8 oo z } a< LL LUzo a<a r� N rc F F 0 N G � J g LLl Ct m `s 10+00 11+00 a J Y d 0 > t9 K U g p U_ 2 V¢ a w d 10. p oW Know. what'sbBlow. Call before you dig. EET C701NunGER 1 1 1 1 ExlsTlmc Roumo -------- ----_ 810 1 PROPOSED RAGE 0� 1 1 a� 1 1 a� 800 1 � o�AAA.EAMa� 1 1 7so 810 PPovoseoc oe 810 800 II I I MANHOLE TO G of 800 790 I r � I I-'� uses w 79U - - - - - - - - - - - - - - - - - - - - - - - — — --------------- — — — — — — — — — ----- - ----- — — — — — — — — — — — ---------- GRbPHIC SCALE IN FEET 15 BUILDING 3 SOUTH STORM SEWER PROFILE 820 820 W. 810 810 ----- ------------ ---- ----------------------------------- - - - - - - - - - - - - - - - ------ Lu —j LL 800 800 0 FES 790 FD lo tn 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 Lu 0 > u o� < a0 LL (L z Lu what'sbelow. Know D .0 SHE�8NOUMBER Call bf.,e you dig. J) J) 0 IFF III L ��L LL izroo sr -spa ..... . ..... — — — — — — — — — — — — — — — — — — — — — — — — — 1111111 SCALE 11 FEET BUILDING 3 NORTH STORM SEWER A PROFILE 820 820 - - - - - - - - - - - - - - - - - - - - - - - - - -- 810 810 8 00 800 790 790-------------- LU ----------- LL 0 IE-12 FD T lo tn 7 7 7 7 7 7 7 Liu 0, ca 10+00 11+00 12+00 13+00 14+00 15+00 16+00 o 0 < aLL a Lu Knowwharebelow. Call before you dig. U) SHE�8NOUMBER U) c Ro-�o Rojo 0 I� 7I s E�ao I Hiaoly GRAPHIC SCALE IN FEET D 15 30 So I GRAPHIC SCALE IN FEET BUILDING 3 EAST STORM SEWER A PROFILE BUILDING 3 EAST STORM SEWER B PROFILE G 'I '° e° R d I. i ==o aI E�aos �T-so, Hiaoly _ o s BUILDING 3 EAST STORM SEWER C PROFILE UN J_ GRAPHIC SCALE IN FEET 4 D 15 3D 6D LL O a O H V) M (n U Z rc F F 3 oo G ( � J g L C m $ a Jy rct7 > 0_ �< aV g p UQ a w Li a z _ p o Know. wharebelow. LL1 10+00 11+00 12+00 Call before you dig. J) SHEET M C802 ER 10+00 11+00 12+00 10+00 11+00 12+00 810 810 80o E PROP o ........ � __--_--- E -- �Ea=noE 800 7ss s ,B6u 7ss 810 —_— -- 810 800 ��112 noE 800 7ss 7ss 810 810 800 mew w w s*ow��xxw �11102001 800 795 soRM raa3a� 795 ---- ---- ----- ------------------------------------- ----------- ---- ------ - ------ C804 E BUILDING 3 WEST STORM SEWER PROFILE — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — GRAPHIC SCALE IN FEET 0 15 G 810 - - - - - - - - - - - - - - - - - - - W. 800 LU LL 790 V) 0 U) 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18 0 LU - 0 0 -j Y '-0 w> 0� - <L aw LL Z K—wharebelow. Call before you dig. 14MN- NORTH 810 IT, I'll, 11 800 790 785 muu 1 9+UU 2u+uu I NORTH GRAPHIC SCALE IN FEET 15 3G 6G BUILDING 3 WEST STORM SEWER A PROFILE 810 - - - - - - - - - - - - - - ----------- 810 800 IT, 11+1111 800 790 790 o NORTH GRAPHIC SCALE IN I BUILDING 3 WEST STORM SEWER B PROFILE 810 - - - - - - - - - - - - - - 810 800 2 020 800 790 20 L' 11 ITIR. @ 1 111 L790 iu+uu ii+uu 12+UU 10+00 11+00 12+00 V) LU LL 0 0 V) lo 0 0 LU Ca 1(L LL z 5 0 < . Know what's below. LU Call before you dig. EET NUMBER M) C804 - - - - - - - - - - - - - - - - - - - - - - - ------------------------------ O-Esc 0-Esc 0-ELC ­ELC ELe o-ELC O-ELC ­ELC LAN PSCAP, E,4EGEND i w 0-Esc D-Esc 0 ELC O-fLC 0 ELC ELC 0 ELC0 O-ELC O-ELC O-ELC 0-ELC 0-ELC c-ELC ­ELC 0-fLC fLC EEI-PI I � Ex sT lvc CONIFEROUS TREE (rvP) I I" I-. e EXISTING sHRue(rvP) R ______ ______------------ _________________________________________ ___________________ II ___-� �J`''�:1---I-� EDGED (Tops AEG ____ � SODALLDSTURaEDAREAI,P.)�T olv. SEED/ SOD EDGE RVP(E E ° I I I I I I I I I I I DEEP ovEReoz OEOTExT LE EAeRc aYPs -: LANDSCAPE KEYNOTES O �i OH EDGED(1P� A- DOUBLE SHREDDED HARDWOOD MULCH(rvP) m COCA MULCH(1P7 0' SOD(TYP7 MAINTENANCE STRIP (1P7 I•�_. I '� OT ANNUALS erowNER(TYPs o I . i- SEEDING KEYNOTES _1 I1s 0 sEEDw TH MNDOT rise,. sTORMwATER souTH awEST SEEDMx(1P) �z SEEDwTHMNDOTessa,. MEsc PRARE GENERAL SEED MIX RYPs I I I •- SEED MIXES " ° TERs TH T ED MIX Q BUILDING 3 COSIONCDNTRDLMEASMREs(NPE & ± 520,000 S.F. ..- I LANDSCAPE SUMMARY 520'x988' FFE=812.0' I o it I .............. ....... mlllml IS9 I II� REAL GR EN OPDE°°REENR E u,',°FETE EA E,°�,R•,E LLF RND1INGAL-1 R—QUI NOAREAs LANDS 1E °11E RD L.D IN°REA°RE° IULDINGOR —KING LOT a ANDICAPED FOR EN=ON.,NRA e EQUAL ONE HALF OFTHIBUILDN°REET OIDED J RULINGS1 112 v- I LEAIT4 OF BUILDING LENGTH ICREENIN°REQUIRED ALL E XTER OR RA°ELOADIN°EER ECHANICAL­ TO w IC EENIN°PROPIDE° EEEPL. a ORREEROR CONIF,pR AD R�IRGoU°RED Z.R� TE—A noRMwATER°RNIE,R1,1) N°°,3°° � ,HRUW RE AT REDTE IGA- wATER°ASNs(as,E,1L•nows o ,HRU o.OEDED a .ITIGIION REQUIRED FOR HIN RCL REQUIRED IRE M INCHEIREO°IREDE ,E R J .ITIGTON PROADED°LDO3 E 111 INCHEI Y ° EA s RED EOR R,ss Nw es wR seres.orevTOR °Lnwm Rs�cPLa RNCTnESL 2 Ill Ill IF 22, N M T GAT ON DED FOR °LDO, _21 Ill INCHES LL N V Z F p p J THE REST OEIEQU wsI— wo,E - � -, � W N J a J J • aOm.0 LL O V J u Z w U cenPeic scnLE IN FEE 0 3o so �zo Know whaPsbBIOW. =' Lu � o Call before you dig. NUMBER ET — L100 TURFsoo PLANT SCHEDULE LANDSCAPE NOTES 3n 6 x 5 STEEL EDGER TURFSOD TOP 01 EDGED To E c WFERou AON LL UNBERGROPAT T0NTACT COMMON GSAOUNBALLIANCEAT en oR CAuan coM TovERIw LOCAno soF NB UTIun ES PRIOR TO INSTALLATION of ANY PLANTS OR LANDSCAPE MATERIAL 12 STEEL EDGER SP FwsHwlTH soB AUP a, Pwus NIGRA AusTRIAN PINE B&B 4CAL e. ACTUAL LOCAnoN OF PLANT FIELB ANBSITEcoIVBlnolvs. �.✓�� c AND coNSTRucnoN HAs BEEN coMPLETED IN THE MULCH + FOvovve BIT a1 PICEAGLAUCA DENSATA BLACKHILLSSPRUCE B&B 6HT. 4 IMMEDIATE AREA. LANDSCAPE ARCHITECT PRIOR To SUBMISSION OFANvaID BY THE TUTO MUST BE APPROVED + CBS 40 PICEA PUNGENs coLORABo sPRucE B&B 6HT. AN FOR BY THE INDSCAPE CONTRACTOR. 1 2 STEEL EDGER SPIKE 5 CON TRACTOR SHALL PROVIDE TWO YEAR GUARNN TEE OF ALL PLAIN T MATERIALS THEGUARXATEEBEGNSON a,6 x5 STEEL EDGER + ERc 2e cumwERusvIRGNIANA EASTERN REB CEBAR B&B 6HT.N SO() TD AREA IT MATED AT SHALL HAVE A ONE YEAR GUARANTEECOMMENCINGUPON PI CT,NGT. s DE •� MULCH + WITH 30 PINUS STROBUS wHITEPINE B&B 6HT. 6. - NDIORHARDY. SPECIMEN GRADE SHALLADHERE HE FOLLOWING STANDARDS REE RS ETC SECTION aNTA Q FREE FROM COAVY HEN 0A BRADEAD BRANCH G AND OR DEFORMITIES ST EEL3EDGER DETAIL PLAN ALL PINTS SHALL HAVE PICK 12 AwsloENSIs-PRAIgIERose rIAIRIE ROSE CRABAPPLE B&B AL THAN 3OUS TREES SHALLHAVEAN ESTABUSHEDM LEADERHEIGHT TO WIDTH. RATIOoFNOLESs POPULUS TREMULOIDES GUAKINGASPEN cK(ANs�Dz o.T-2m4 OR MOST cuRRENT VERSION) 1 EETAMERICAN sTANBARD FOR NURSERYSTo 1 SCAN I SI DES AND BOTTOM OF IT OFF(� OEN Ts wR SIZE ANDIYPE SPECIFIES. E NG a RVB 95 BETULA NIGRA RIVER BIRCH MITI TRUNK B&B 1.5 CAL e. PINTS TO BE INSTALLEDAS PER MNLA&ANSI STANDARD PLANTING PRACTICES. O NEC ASHA,TEMEY PORARY ONLYPLANTEB UPON ARRIVAL AT SITE . PROPERTY HEEL -IN MATERIAL6IF - TO 2 8 ETREIAATUED BURLAPS WITH BURLAP BOL 26 TILIAAMERICANA BOULEVARD BOULEVARDLINDEN B&B 25 CAL BBPAORPUO POOL LY E VERIFY THAT THE ROOT COLLARAPOOT FIRE IS LOCATED AT THE TOP OF THE 5 GTR 6 �RV BE EVEN OR SLIGHTLY AWHENBOVE THE FATHER& FINISHED GRADE. PTREE ISPLANTEB, THE ROOT COLLAR/FTHS SNOTTHECASE SOIL SHALL BE REMOVED DOWN] TO THEROOTFLARE SHALL %\ e STOP HCK 33 CELTIS OCCIDENTALIS COMMON HACKBERRY B&B 25 CAL 11. POTSD REMOVE THE Top 1/3 OF THE BASKET OR . OPEN P OF BURLAP ON BE MATERIALS, REMOVE POT ON POTTED PLANTS, SPLIT AND BREAK APART PEAT - O I1 66 GLEDITSIATRIACANTHOSVAR. INERMIs IMPERIAL IMPERIALHONEYLOCUST B&B 25 CAL. ,2. - STANDARD NURSERY PRACTICE AND TO CORRECT POOR BRANCHING OF T� REMOVE OR CORRECT STEM GIRDUNG ROOTS 6 NPR 23 OUERCUS ELLIPSOIDALIS NORTHERN PIN OAK B&B 5CAL 13 WRAP ALLSM AND PROPOSED TREES PER BYAPRIL,ST EXISTING RSTO SWO 13 DUERCUSBICOLOR SWAMP B&B E5CAL STAKING OF TREES ASREQUIIREDREPOSITIONPLUMBAND STAKE IFNOT PLUMB AFTER ONE YEAR O SMOOTH BACKED FABTENTQPANBBQTTQM REMOVE E BACK F VOIDS AND WATER SECOND TIME 2X ROOT BALL WIDTHWALE (�/�J� 15.THE n 10 TION OF TREE TO BEAPPROVEB F' `J UL a5 ULMUSAMERICANA PRINCETON AMERI CAN ELM B&B 4 CAL LANDSCAPE CONTRACTORS RACTO S TS SHALL RE DETER MINED UPON SITE eoILCONDITIA SHIP 'To PLAN TING. NEED FORoNTRAcioR S LALLNOTI FY LANDS CAPEARCHITECT FOR THE NEED OF ANY B OILAMENB MENTS. $ DOUBLE SHREDDED HARDWOOD MULCH 6. I LAND TovsolLTOABHERE TO MNIBOT STANDARD SPEC enP(sEA CT NOPN OEL 6 ACKF OCATION a _ SOD FE ROW)P AND TO BE EXISTING TOP SOILFROM SITE FREE OF ROOTS,R ON �$qm TovsolL o3. Ro sGI 36 JUNIPERus cHINENSIS SEA GREEN SEA GREEN JUNIPER #5 coNT 5ocND LARGE WEEDS UNLESS SPECIE ED NMUM DEPTH TOPsoILFOR ALL LAWN GRASS o„3 R NNA 4 +f TAu 60 TAxusxMEBA'TAUNTONIr TAUTON YEW p5coNT. 5oc. iT AREASAND,2 DEPTH TovsoLFORTREE SHRuas,ANBPE _z F D HARDWOOD MULCH DOUBLE SHREDDED HADD—oD MULCH To BE USED AROUND ALL PINTS WITHIN TURF AREAS PERENN ALAND ORNAMENTAL GRASS BEDS SHALL HAVE 2 _-E— =11 PLANTINcsoIL IlFmll =_ _III BECIOBuou AFD 73 CORNUS SERICEA nRnC FIRE ARnC FIRE DOGWOOD #GCONT. 3Oc. ROVEDBYOWNER MI VPTEMITDU�a5< �TTm DMATCHEXISTINGCDNDITIosR "R°ABR°AaREEAPP 2 TREE PLANTING DETAIL DBH 131 DERVILLA LONICERA DWARF BUSH HONEYSUCKLE #GCONT 3 OC 1e F3s iSTAFFscALE N... ET �oR EOUAK STEEL EDGING N16 THICKX5 TALL No TOP (D GGD 60 COENUS HESSEI GARDEN CLOCK GARDEN GLOW DOGWOOD #GCONT 5 OC AD STAKED WITH BovEw TIT DAMAGE UT w cuRBS ANBS TER wRP OP OF EBGER AT CRABS BLE S ERSTOCUT G 4 FOOT ON s 4 K P oSSI s PROVIBEmue oR NAiN.cARBED aeonTO Be1EATE EPAI ION B:LWEENMULCHANISE E GiniNDIVIDUAT Qm EPTTO H AND B p m A a TREE UNLEss NOTED oTHEEW B GTO MATCH a m 1:7�. O xnnax sraa sy ���11ll�� cottage sr �WDD Df MI O VR� gore MINNESOTA SER-12 3 IRRIGATION SERVICE sEM 4o soRBARIA soRBIFouA sEM sEM FALSESPIREA aS coNT. a oc. - wood Mul'cH nRoumo nLL TRees nmo sHRues. s IL sooBEB WITH SHREDDED HARD OOTOBESTANOARo PALL TovsoKLAREA LED To FED Ls AND PER MNCDOT SPECIFICATIONS. IF NOT INDICATEDESEDToASBESPEAC ON LANDSCAPE PLAN, SEE EROSION CONTROLPLAN. W KEG 154. CALAMAGROSTISXACUTIFLORA KARLFOERSTER KARLFOERSTERFEATHERREEDGRAss M, CONT 30 oc. 20.NGS LANDSCAPE a� ARCH E 'OR IG RR G CONTRACTOR EGA BE BUILTPLANB ANBNQRMALPRQGRAMMING BYGTEMBHALLBEWINTERIZED ANB Pww 44 ECHINACEAX P—W—WILDBERRY P—W—WILDBERRYCONEFLOwER «,CONT 24 0� EAVESPIwNAGN DULIIINGFReTYEAROFOPERATION SYSTEM SHALL HAVE ONE YEAR WA-ANIONOM C.ATION ABOUT OENSOR SCHEDULING PAR�n mo APPR PRATE TECHNOLOGY �0LF SYSTEM SHALL INCLUDE A IN TON v/ a CENTER SPACING AS STATED ON PLAN 21 CHEGENERALCONTRACTOA ATE' TLTHALLP'oVDENEC`YWNOR PLANT I HE N FULLY ESTABIJ SHED ORIRRI GAT T ON SYSTEM IB OPERATI ONAL OWN ER W LL N OTPRGVI BE WATER FOR CONTRACTOR. W Lu EXTEND HOLE EXCAVATION WIDTH 22. REQUIRED FOR ANY ROADVRAYBOULEVARD AREAS ADJACENT TO Q TA MINIMUM oF6 BEYONDHE PLANTS ROOT SYSTEM 23 REPAIR ALL DAMAGE TO PROPERTY FROM PINTING OPERATIONS AT NO COST TO CANCER THE BITE DISTURBED DURING CONSTRUCTIONFINISH J DGIENDE C n= -_ %�EBGER. AS BPEGFIEB _ � F-' -III 1. IIrK INBE FOR LAWN HAV RIOR (STRAW1A on FBERRUS) OR APPROVED EoLAALBANKET TO BE OVERLAPPED AND ANCHORED AREoY wADDING PREVENTUNDERMINING TPL-ANDE SILT FENCE CH A D STAPLES PLACE BLANKET PERPENDICULAR TOP OF SLOPE AS NEEDED. SHREEDDED HARDWOOD MULCH EAT EPE-A 4°DEPTH OF MULCH AT NGANO ERoeION � M V: EIIZEI IIE PREP AREDPLANTINGBEDANBOF NOTES 11Op BA 4 BELOW ROLBLANKETAREAO(PNO FILTER FABRIC)) S AROENDETAI LFOR FURTHERINFORMAT N.RA GARDEN TO PROVIDE PROPER INFILTRATION AND DRAINAGE REQUIREMENTS PER ENGINEERS APPROVAL DRA PAGE AWAY U (� U (THOROUGHLY LOOSENED) UP FOR RICH FROM BUI DOING 25 MAIN LAI RUN NO CASE U2S SP EHNATNS o 2 PROCEED W TH CORRECT VE PRU N N A OF TOP AND ROOT LEEPOOLECTCO'PLETTAIF BY SPEC IT ED RocK Q N J o (� V 3.ES ANDPEVENTCA IABROUBROOTB REMOVE OR CORRECT STEM — = _TAKE MULCH AND GUY SUPPORTS AND IESETTIEESANDSHIUBS TO OR 7 O DDL NG ROOTS PLUMB AND BACKFILLWITH PINTIrc _— _— — — — — —A — — — — — — — — KEEP TREES AND SHRUBS F AOF NSECTS ANDSEASETEPTENSITMULCHTHERE.DEP T w Oro d J o_ y t9 > 5 OROUGHLYWITHIN2HOURSTOSETTLEPINTSANDFILL 6 BACK FILL OIDS AND WATER SECOND TIME III PROVIBEAMONTHLYREPORTTOTHE OWNER ONwEEBwGAND OTHER MAINTENANCE RESPOIvsIBlunes. O D' U rc 0 U ¢ a w FTHESECONDWATERINGUNLESS — — — — — — — — — — — — — — — — — — — — — III 26 SEE ELECT LL a Z a 3. MIX IN34 OF ORGANIC COMPOST /PERENNIAL PLANTING — — — — �SPECIFIED M 2D. SITE FURNISHINGS SUCH AS BENCHES, TABLES AND CHAIRS, AND TRASHIRECYCUNG RECEPTACLES. 0 SHRUB DETAIL 4 MAINTENANCE STRIP DETAIL Lu ET NUM R U) sHEL101 BE um GALE 11rz , COTTAGE GROVE LOGISTICS PARK 2ND ADDITION I- ------------------ - 1- 101- A-MEASIRER ---------------- Faa,gEFN Egan. Field & Nowak. Inc. SHEET 1 OF SHEETS COTTAGE GROVE LOGISTICS PARK 2ND ADDITION N90TlO'OOIE 99&a3 i ---e- 6 1�-7 e7 r-- 1 I 1 I I I I I LOT 1 I I I I I I - I I ICI "I BLOCK 1 n CJ . o� W� �1 li Imo' I J O I I I I L Si CT In ivl � V ^ 'l o 0 'I 4 < to IA I� FI 25W 611.05 - I III /sEmEr.,`v�re vu. cr e E >/ or sca zs _ - sw coavEa or NO N.r. ,/< ..... 20 j on�vr - uve Dr me N. c:ivo ,iz-weH ,I oN PIPE o ,z —y—O�oR.zs 961.- 58956"15'W 198218 - - - - - • DENOTES FOUND MONUMENT MARKED WITH LICENSE NUMBER 53536, UNLESS 0£HERMSE NOTED QQ DENOTES FOUND WASHINGTON D—TY CASs IRON MONUMENT ® DENOTES FOUND PK NAIL UNLESS D£NERMSE NOTED ® DENOTES SET 5/8-INCH BY )G-INCH REBAR MARKED IMTH LICENSE NUMBER 53536 OUTLOT A DRAINAGE AND UTILITY EASEMENTS ARE SHOWN THUS (NOT TO SCALE) --T—� r----- TO I I To -- I I I I I I � To HE VICINITY MAP (NOT TO SCALE N 0 200 400 600 SCALE IN FEET T INCH = 200 FEET EFN.,g Egan, Eleld & Nowak, Inc. Stantec Consulting Services Inc. ® Stantec 733 Marquette Avenue Suite 1000, Minneapolis MN 55402-2309 July 14, 2022 File:193802266 Ryan Burfeind, PE Public Works Director/City Engineer 8635 West Point Douglas Road S. Cottage Grove, Minnesota 55016 Reference: Northpoint Development Building 3 (Plans and Storm Water Management Plan Submitted on 6/29/22) Dear Ryan, Below are review comments for the Northpoint Development Building 3 plans and stormwater management plan submitted on June 29, 2022: General Comments: 1. For the general notes sheet (C100), there are a number of areas that are missing text and labeled with "XV. Please review and revise 2. For the general notes sheet (C100), within the list of third party test reports required, add a note for televising pipeline inspection reports. 3. For the demo plan sheet (C200), the south side of the property is labeled as "Protect Existing Treeline". Please confirm this tree line is able to be protected with the adjacent proposed work. 4. Please provide possible dumpster locations on the site plan for potential future use. The installation of dumpsters outside of the building will likely impact parking stall count. 5. For the site plan (C400), please confirm the need for Note 22. If needed, please review and revise the numbering. 6. There are a number of details that have been included that do not appear to be applicable for this project (ERO-14, SAN-1, SAN-2, SAN-3, SER-9, SER-2, SER-7, SER-8, etc.). Please review and remove those that are not necessary. 7. If the developer proposing to have an entrance sign and/or monument on the property, please provide a proposed location. Any entrance signage and/or monument must be outside of public ROW. Design with community in mind Utility Comments: 8. For sheet C502, the storm sewer between ST-152 to ST-151 is proposed to be 30" RCP, verify since no other RCP storm sewer is proposed. If there is no RCP storm sewer proposed, modify storm sewer note 3 on sheet C502 also. 9. For OCS-5, slope pipe towards basin (negative slope) to improve sediment control. 10. Utility Note 2 (sheet C600): No ductile iron sanitary sewer pipe is proposed. 11. Utility Note 3 (sheet C600): No PVC water main is allowed in Cottage Grove. 12. For sheet C700, show linework for storm sewer within plan view. 13. For sheet C700, deflect pipe under storm sewer crossings near STA 13+00 and 16+00 to eliminate water main offsets and provide label to install insulation. 14. For sheet C701, deflect pipe under storm sewer crossings near STA 19+50 to eliminate water main offset and provide label to install insulation. Water main offset near STA 21 +50 not necessary. 15. Storm Profiles (sheet C802): Adjust labels in plan view for storm B and storm C. 16. Sump elevations should be added to sheet C502, the Storm Sewer Plan sheet. 17. Add storm sewer schedule (include structure number, type, manhole diameter, casting, etc.). 18. Riprap should be added at the inlet of FES-5A and be updated in the plan sheets and details. 19. For sheet C802, the same pipe plan view is repeated for each pipe profile on the sheet. Update to reflect the appropriate pipe plan with its profile. 20. For the temporary channel that will convey flows from infiltration basin 6 through the footprint of infiltration basin 5, where a portion of building 3 drains should have a sediment basin installed prior to it entering the City's trunk storm sewer line to prevent sediment and debris from entering the storm sewer system. If sediment buildup occurs, scarification or other means may be needed to ensure infiltration basin 5 functions properly during full buildout. Stormwater Requirements: 21. An updated rational method calculation, or similar method, for determining pipe sizes should be submitted for the proposed storm sewer layout for this phase of the project that entail pipe depth, pipe cover, slope, velocities, and capacities within the proposed pipe. 22. It appears that the building 3 site plan is following the overall SWMP masterplan. Requirements are being met forwater quality, rate, and volume controls. Design with community in mind Landscape Plan Comments: 23. Landscape Plan (1-100): Trees appear to be proposed over the existing sanitary sewer located on the south side of the building. Deciduous trees should be located a minimum of 5-feet off any utility pipe and Coniferous trees should be located a minimum of 15-feet off any utility pipe. Please review and revise. 24. Landscape Plan (1-100): Trees appear to be proposed over the storm pipes connecting into infiltration basin 5. While the storm sewer and landscaping will be private, it is recommended that appropriate spacing is considered between landscaping and piping. 25. Landscape Plan (1-100): There is storm sewer shown along the west side and south side of building 3 and within basin, proposed as part of phase one building 1 & 2, that was not constructed. 26. Landscape Plan (1-100): Within seeding keynotes, is seed type 35-241 being used? If not, remove keynote. 27. Landscape Plan (1-100): Sound wall to be placed along west and south side of the property. Currently the sound wall is only shown on the south side of the property. Please add the sound wall on the west side of the property as well. 28. Landscape Plan (L100): Sound wall near the entrance from 105t" Street should include a setback for sight distance and lawn maintenance. Provide details for sound wall. 29. Add landscaping notes per the City's Engineering Guidelines (reference planting restrictions on page 9 of the engineering guidelines). 30. Please review and revise the tree mitigation tables to reflect the actual mitigated inches for buildings 1 and 2, and building 3. With the approval of buildings 1 and 2, 376 mitigation inches were provided. With the current landscaping plan, 311 mitigation inches are shown (overstory - 210", coniferous - 47", ornamental - 54"). As the landscaping plan is revised based on the above comments, please adjust the building 3 mitigation inches accordingly. Regards, Stantec Consulting Services Inc. Design with community in mind Tyler K. Johnson, PE Phone: 612-712-2065 tvler.iohnson@stantec.com Design with community in mind David R. Sanocki, PE Phone: 651-712-2124 dave.sanocki@stantec.com