Loading...
HomeMy WebLinkAbout4.1 Development Update 2022-08-09 TO: Economic Development Authority FROM: Christine Costello, Community Development Director DATE: August 9, 2022 RE: Development Update Building Permits Building Permit Statistics: Between July 1 and July 31, 2022, 508 building permits were issued with a total valuation of $50,791,467, including 15 single-family homes valued at $4,434,377 and 9 townhomes valued at $1,970,300. 0 20000000 40000000 60000000 80000000 100000000 120000000 Commercial/Industrial Construction Activity year valuation Economic Development Authority Development Update August 9, 2022 Page 2 of 6 - 5,000,000 10,000,000 15,000,000 20,000,000 25,000,000 30,000,000 35,000,000 40,000,000 45,000,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Commercial Permit Valuation Comparison By Month 2021-2022 2022 Valuation 2021 Valuation 0 100 200 300 400 500 600 700 1995 2000 2005 2010 2015 2020 2025 Residential Permits -New Construction 1996 to 2022 Economic Development Authority Development Update August 9, 2022 Page 3 of 6 Current Project Updates Building Construction Projects Cottage Grove Logistics Park (NorthPoint): Full building permits have been issued for the first two buildings in the Cottage Grove Logistics Park. Building #1 – the walls are completed, and the roof is being installed. Building #2 – footings and plumbing underground work have been completed, with tip- up panel installation to begin in August. Innovative Chemical Corporation: The exterior is substantially complete. The interior space is en- closed, and the trade work has begun. 3M Projects: o Building 150 – The floor slab and trench drain work continues. The plumbing underground plumbing work is nearing completion. o Building 151 – The footings and foundation walls are done being constructed. This building is on hold as the primary focus is Building 150. o Plans have been submitted for Bid Pack #6, which includes pump houses, processing piping, and a new clarifier as part of their water treatment processing. Permit is ready to be issued for the clarifier. The Engineering department is reviewing 3M’s response to their plan review comments. Renewal by Andersen: The building permit was issued for the 343,000 square foot expansion. Park Place Storage: Plans have been submitted for their fourth building. They requested a change in materials due to supply chain issues, which requires submittal of revised plans for review and approval by Building Division. The Planning and Engineering Divisions need to verify compliance with the original 2017 resolution approving the project. Hemingway Industrial Center: Plans for both buildings have been revised and will be reviewed in the next couple of weeks. Building #1 is 146,000 square feet and Building #2 is 96,000 square feet. Tradehome Shoes: The permit for a minor remodel project has been issued, but no inspections have been conducted at this time. Leafline Labs: The footings/foundation permit has been issued. Economic Development Authority Development Update August 9, 2022 Page 4 of 6 Design Plus Cabinets: The permit has been issued for a tenant improvement project located at 8599 West Point Douglas Road. Inspections are ongoing. Cottage Grove Apartments: Footings and foundation work have been completed, with wood framing starting. The View: Footings and foundation work have been completed. The permit, with a construction value of $4,500,000, was issued for the rest of the apartment building located off Hardwood Avenue. Con- struction of the wood-framed portion of the building should begin soon. Starbucks: Final inspections on this remodel project should begin soon. Pizza Ranch: The review for the 6,700 square feet restaurant has been completed by all departments. Construction has been pushed back to start in fall of 2022. Mister Car Wash: The foundation and exterior signage work continues on their vacuum modification project. Commercial Remodel Projects: Inspections have been ongoing for Dunn Orthodontics expansion, Van Meter Electric remodel, and Bieter Eye Center. Park Senior High School: Demolition work has begun in the Field House. Bid Package 1 involves removing and replacing the floor and the rooftop mechanical equipment for the Field House. Bid Package 2, which includes the remodel of the sound rooms, library, and auditorium, is nearing com- pletion and will be ready at the start of the school year. Bid Package 1 is near completion with the new wood floor in place; however, the mechanical equipment is on backorder and will not be ready by the start of school. Temporary air conditioning units will be provided. Hamlet Park Shelter: Exterior is complete, and the trade work final inspections are ongoing. Oakwood Park Shelter: Slab and finishing work should begin soon. Ice Arena: The permit has been issued for a remodel of the mezzanine for a “Dryland Training” area. Economic Development Authority Development Update August 9, 2022 Page 5 of 6 Planning Division June 27 Planning Commission Meeting The Planning Commission met on July 25, 2022, and reviewed the applications below: Cottage Grove Logistics Park Building 3 – Case SP2022-051: NP BGO Cottage Grove Logistics Park, LLC has applied for a site plan review for Phase 1a of the Cottage Grove Logistics Park Master Development Plan. The application is to construct Building 3, which will consist of approximately 520,000 square feet, on property located south of 100th Street and west of Ideal Avenue. One resident asked questions about the project. The Planning Commission unanimously recommended approval of the site plan. The City Council will take final action at their meeting on August 17. Preserve at Prairie Dunes Comp Plan Amendment – Case CP2022-031: This comprehensive plan amendment application was pulled as the project has been cancelled by the developer. The Planning Commission unanimously voted to table this application indefinitely. August 22 Planning Commission Meeting The following applications are scheduled for the August 22, 2022, Planning Commission meeting: Thai Garden – Case SP2022-057 & V2022-058: Integrity Building LLC, on behalf of Hang LLC, has applied for a planned unit development site plan review for a proposed restaurant to be located at 7470 East Point Douglas Road South. Economic Development Authority Development Update August 9, 2022 Page 6 of 6 Endeavor – Case PP2022-054 & SP2022-056: Endeavor Development has applied for a preliminary plat to be called Glengrove Industrial Park 11th Addition, which will create two industrial lots to be located on the southwest corner of Jamaica Avenue and 95th Street, and a site plan review of two industrial buildings consisting of a total of approximately 350,000 square feet.