Loading...
HomeMy WebLinkAbout4.3d 100th St Extension Utility Study Bolton & Menk H:\COTT\_Proposals\100th St Extension Utilities\100th St Extension Utility Study.docx December 7, 2022 Mr. Ryan Burfeind, PE City Engineer/Public Works Director City of Cottage Grove 8635 West Point Douglas Rd Cottage Grove, MN 55016 RE: 100th Street Extension Regional Utility Study City of Cottage Grove, MN Dear Mr. Burfeind, Thank you for providing the opportunity to assist you with the 100th Street Extension Regional Utility Study. The proposed extension of 100th Street from Jamaica Avenue to the Keats Avenue interchange will provide a new roadway alignment and railway grade separation filling a freight and commuter system gap. This investment will establish 100th Street as the Southwest Arterial connection necessary to open over 2,000 acres of developing industrial and residential projects while supporting existing businesses in the area. With this project, a review of the necessary infrastructure to support development is required. Bolton & Menk, Inc., has the technical expertise, experience and resources to complete this project for the city, and we appreciate your consideration. Based on our understanding, the study will consist of the following major components: · Identify trunk sanitary sewer needs o Review of trunk sewer locations and capacities o Review of potential alternate sequencing/routing for possible development scenarios · Identify trunk water distribution needs o Review trunk watermain and required connections o Anticipated crossing of TH 10/61 · Identify trunk storm sewer needs o Determine storm sewer oversizing necessary for conveyance of adjacent development stormwater to planned regional facilities · Preliminary review of permitting needed for utility installation o Railroad o MnDOT o MCES o Northern Natural Gas, etc. · Coordinate and review preliminary geotechnical exploration and evaluation · Preliminary review of private utility facilities We anticipate that the project schedule will be flexible based on the City’s needs, and we are prepared to begin once authorized to do so. We propose to complete the above services for a total estimated hourly fee of $85,000. Date: December 7, 2022 Page: 2 H:\COTT\_Proposals\100th St Extension Utilities\100th St Extension Utility Study.docx Thank you for the opportunity to present this proposal. We look forward to continuing to work with the City of Cottage Grove. If you need any additional information or have any questions on the above, please do not hesitate to give me a call at (651) 968-7674. Sincerely, Bolton & Menk, Inc. Mike Boex, PE. Project Manager Hi g h w a y 6 1 100th Street Jamaica AvenueCSAH 19 (Keats Avenue)Mil l e r R o a d Cottage Grove Business Park 3M Property Langdon Village Master Plan Shoppes at Cottage View ≈ 40 Acres NorthPoint Commercial Node H:\COTT\0N1126878\CAD\C3D\FIGR-126878-100th Street Concept2.dwg 12/7/2022 2:55:39 PMR 100th Street Extension Regional Utility Study City of Cottage Grove, MN September 2022 R FEETSCALE 0 300 600 100th Street Alignment 100th Street Bridge LEGEND Local Road Realignment