HomeMy WebLinkAbout4.1b Development Update 2023-02-14 TO: Economic Development Authority FROM: Emily Schmitz, Acting Community Development Director DATE: February 9, 2023 RE: Development Update Building Permits Building Permit Statistics: Building Permit Statistics: Between January 1, 2023, and January 31, 2023, there were 235 building permits issued with a total valuation of $7,460,379, including 10 single-family homes valued at $4,350,419. 0 50000000 100000000 150000000 200000000 250000000 300000000 Commercial/Industrial Construction Activity year valuation Economic Development Authority Development Update January 10, 2023 Page 2 of 6 Current Project Updates Building Construction Projects Hemingway Industrial Center: Footings and foundation work on both buildings have been completed. Onsite construction of the wall panels will be waiting until spring to start back up. GTI (formerly LeafLine Labs): The addition is enclosed with trade work and interior walls underway. Cottage Grove Logistics Park (Northpoint Development): Both Building #1 and Building #2 are nearing completion. They are waiting on materials to complete the electrical work. Air Gas: Full CO pending Electrical approval 3M Projects: o Building 150 – plumbing rough-in work and interior walls are under construction. o Building 151 – plumbing underground work is completed. o Foundation work continues for Bid Pack #6 (Pump houses and processing piping) and new clarifiers as part of their water treatment processing. 0 100 200 300 400 500 600 700 1995 2000 2005 2010 2015 2020 2025 Residential Permits -New Construction 1996 to 2023 Economic Development Authority Development Update January 10, 2023 Page 3 of 6 Renewal by Andersen: The roof is complete, and the concrete slab is beginning to be installed. Cottage Grove Apartments: Framing, insulation, and drywall are underway on the north half of the building with trade work continuing on the south half. The View: Construction of the wood-framed portion of the apartment building continues with the installation of windows Pizza Ranch: Wall and roof framing are complete with plumbing and electrical underground work ongoing Dental Office: The permit has been issued for a dental office in the tenant space next to Sports Clips; no construction has begun yet. Little Village: An indoor kids play area and coffee house to be located in the space that Las Margaritas used to occupy is nearing completion. Ulta Beauty: Plans have been submitted and are under review for the façade improvements for Ulta Beauty located next to Planet Fitness. Economic Development Authority Development Update January 10, 2023 Page 4 of 6 Planning Division January 23 Planning Commission Meeting The Planning Commission met on January 23, 2023, and reviewed the following applications: Holcim Mining Permit – Case MP2023-001: Holcim – MWR, Inc. has applied for their 2023 mining permit to continue mining operations at the Nelson Sand & Gravel Facility at 11250 Grey Cloud Trail South on Lower Grey Cloud Island. Commissioners asked if there had been any traffic and noise complaints related to the mining operations. The Planning Commission una nimously (6-to-0 vote recommended approval of Holcim’s 2023 mining permit, which the Council approved at their February 1 meeting. Day Care at 7781 Hardwood – Cases SP2023-002, PUD2023-003, CUP2023-004: 814 Services, LLC on behalf of Crown Estates Holdings LLC/Joan Eva Stoltz Revocable Living Trust, has applied for a site plan review, planned unit development, and conditional use permit for an 11,464 square foot proposed daycare facility to be located at 7781 Hardwood Avenue South. There were questions regarding the access from East Point Douglas Road, the capacity of students and staff, the retaining wall, location of the play area, and why this is a request for a Planned Unit Development (PUD) instead of a variance. There was no testimony from the publi c. The Planning Commission on a unanimous vote of 6-to-0 recommended approval. These applications will be on the City Council agenda for their February 15 meeting. Economic Development Authority Development Update January 10, 2023 Page 5 of 6 Proposed Site Plan February 27, 2023, Planning Commission Meeting The following applications have been received for the February 27, 2023, Planning Commission meeting: Rocket Car Wash – SP2023-004, CUP2023-004, PUD2023-004: Rocket Car Wash, LLC has applied for a site plan review of a proposed car wash to be located at 8647 and 8649 East Point Douglas Road South (former Big O Tires); a conditional use permit for the drive-through car wash; and Planned Unit Development (PUD) to allow for parking lot setback and deciduous tree flexibility. Proposed Site Plan Economic Development Authority Development Update January 10, 2023 Page 6 of 6 Lake Flora 2nd Addition – PP2023-006: The City of Cottage Grove has applied for a preliminary plat for Lake Flora 2nd Addition, which will create 2 industrial lots and 8 outlots on property located east of Jamaica Avenue, north of 100th Street, and south of the Soo Line Railroad tracks.