HomeMy WebLinkAbout2024-08-26 PACKET 06.A. (LOT SPLIT AT 9016 KIMBRO)STAFF REPORT CASE: MS2024-016 & V2024-016
ITEM: 6.1
PUBLIC MEETING DATE: 8/26/24 TENTATIVE COUNCIL REVIEW DATE: 9/4/24
APPLICATION
APPLICANT: Al Stewart
REQUEST: A minor subdivision to subdivide a 6.45-acre parcel of land into two lots,
a 3.1-acre parcel with the existing house and structures and a 3.35-acre
buildable parcel, and a variance from the minimum 180-foot lot width at
the road.
SITE DATA
LOCATION:
ZONING:
GUIDED LAND USE:
9016 Kimbro Avenue South
R-1, Rural Residential
Rural Residential
LAND USE OF ADJACENT PROPERTIES
NORTH:
EAST:
SOUTH:
WEST:
SIZE:
DENSITY:
6.45 acres
RECOMMENDATION
rlIRRFNT
Park/Open Space
Agricultural
Rural Residential
Park/Open Space
GUIDED
Park/Open Space
Agricultural
Rural Residential
Park/Open Space
Approval, based on the findings of fact and subject to the conditions
stipulated in this staff report.
10Cottage COTTAGE GROVE PLANNING DIVISION
`�?�'�` j Grove
kh�+e Price .n,P,p5perity Meet
Planning Staff Contact: Riley Rooney, Associate Planner; 651-458-2834; rriley(o-)_cottagegrove mn.qov
Application Accepted: 8/1/2024 60-Day Review Deadline: 9/30/2024
City of Cottage Grove Planning Division e 12800 Ravine Parkway South e Cottage Grove, MN 55016
Planning Staff Report
9016 Kimbro — Minor Subdivision
Planning Case No. MS2024-016 & V2024-016
August 26, 2024
Proposal
Al Stewart has submitted an application for a minor subdivision and a variance to subdivide a
6.45-acre parcel located at 9016 Kimbro Avenue South into two separate parcels- a 3.10-acre
parcel that would include the existing house and accessory structures, and a 3.35-acre buildable
parcel with a proposed reduced lot width at the front property line requiring a variance.
Location Map
Review Schedule
Application Received- August 1, 2024
Acceptance of Completed Application- August 1, 2024
Planning Commission Meeting- August 26, 2024
60-Day Review Deadline- September 30, 2024
Tentative City Council Meeting- September 4, 2024
Planning Staff Report — Case No. MS2024-16 & V2024-016
9016 Kimbro Avenue Minor Subdivision
August 26, 2024
Page 2 of 6
Planning Considerations
Property Characteristics
The parcel located at 9016 Kimbro Avenue currently contains a single-family residence as well as
two accessory structures, which will remain after the proposed land subdivision. The parcel bor-
ders Cottage Grove Ravine Regional Park to the north and west and a rural residential (R-1)
property to the south. Current access to the parcel is off Kimbro Avenue. The south and west
property lines are densely wooded, and the property owner would like to maintain much of those
areas.
�i`�
�y
caCaPtleA ,f F (-� IOEAI� ' 9y545fiY N
seem•' .i l e+�t .�,�_.i
J wnefr+Wm luar.m Am
1 _
r✓ _ RtiBSLM
1- - J-L caeea,saew
wVIM bno re
.A
I
• . `� W '�n_.�" :; Y �I.rl_ I �. f __r� F y } •f - � I f1J
`4 J _L � I
lCBe m.n m � Jw. N+Q ei RaN lBtln. N+Q.
1Mhr� IMIN6d1E 1065E _ � � - 8�b�6MY"96i�. _ I
lHei49E. th51 it �JI,� _ , iI �I ''}jj'''}JJJ i
/// K I B�wd{M.pra.l lkeimM.. ' i4]41TE �I
2024 Proposed Site Survey
Variance
The proposed survey creates a new parcel with a frontage width of 60 feet while the minimum
width permitted by the zoning code is 180 feet. The septic tank sites on the current parcel are
located central to the existing lot; by locating the frontage for the proposed new parcel (Parcel A)
to the north of the existing house and structures (Parcel B), Parcel A will not impede the integrity
of the established septic tank locations. By utilizing frontage on the north side of the lot, separation
of the existing accessory structures from the existing house on Parcel B will be alleviated allowing
the home to continue its use of these structures. The proposed location of Parcel A allows Parcel
B to maintain the setbacks for the existing structures for the proposed newly created property line.
Planning Staff Report — Case No. MS2024-16 & V2024-016
9016 Kimbro Avenue Minor Subdivision
August 26, 2024
Page 3 of 6
March — April 2024 Photo
Findings
The findings of fact for a favorable recommendation that were considered during the review are
identified as follows:
A. Expanding the frontage width of Parcel A to meet code standards would impede the existing
home and accessory structures on Parcel B by creating a parcel with accessory structures
and no principal structure.
B. Utilizing frontage on the north side of the existing structures would avoid constructing the
access over the existing drain field and septic tank.
Land Use
The future land use for this property is designated as Rural Residential per the 2040 Comprehen-
sive Plan. The East Ravine Master Plan identifies that this area and the areas to the north and
south along Kimbro Avenue should allow the existing natural open spaces and features to guide
placement of residential growth. These areas would continue to have access to the existing park
and open space via an extensive trail system throughout the East Ravine. The East Ravine Master
Plan also indicates future lots sizes would be flexible depending on the existing topography. The
proposed request is consistent with the land use plan designation.
Zoning
The property is zoned R-1, Rural Residential, which has a minimum lot size of three acres. The
proposed request is consistent with the zoning classification creating two parcels greater than
three acres: 3.35 acres and 3.10 acres. The proposed property lines for the future buildable lot
meet the required setbacks from existing structures, including 25 feet from side property lines and
50 feet from rear property lines. Any new structure proposed on the 3.35-acre parcel (Parcel A)
Planning Staff Report — Case No. MS2024-16 & V2024-016
9016 Kimbro Avenue Minor Subdivision
August 26, 2024
Page 4 of 6
would be required to meet all appropriate setbacks as well and would be reviewed as a part of
the building permit process. No new accessory structures would be permitted on the existing lot
as Parcel B has reached the maximum square footage and number of allowed accessory
structures per City Code Title 11-3-5.
Transportation Access and Right -of -Way
Kimbro Avenue is designated as a Major Collector Roadway in the 2040 Comprehensive Plan.
The existing parcel currently has access off Kimbro Avenue to the north and south end of the
property. Resolution 2017-015 states that no additional drives shall be permitted on Kimbro Ave-
nue. With no additional access points permitted off Kimbro Avenue, the property owner has pro-
posed moving the north -most existing access to the proposed new lot to allow for Parcel A to have
frontage on Kimbro Avenue. The existing lot, Parcel B, will continue to utilize the southern access
drive. For the time being, the applicant plans to retain both existing drives in their current location
until such time a building permit for a new home is requested on the newly created buildable lot.
At that time, the current property owner will construct a new driveway to allow Parcel A access off
Kimbro Avenue. The required 40 foot right -of way for Kimbro Avenue was obtained previously,
therefore no additional ROW dedication is required.
Parcel A — Adjusted Future Access Location
Utilities and Stormwater Management
The subject property is not located within the Metropolitan Urban Service Area (MUSA) and no
public utilities are available for connection. The existing residence is currently served by a private
well and septic system. A newly constructed residence on the 3.35-acre parcel would also be
served by a private well and an individual sanitary treatment system (ISTS); therefore, no water
or sanitary area charges are required as a part of this lot minor subdivision. Primary and alternate
ISTS sites would be required to be identified on the proposed 3.35-acre site prior to the issuance
of a building permit; however, a soil observation test collected earlier this summer indicated the
native soils were conducive for onsite drainfields. The minimum acreage for property having an
ISTS is 1.5 acres.
Planning Staff Report — Case No. MS2024-16 & V2024-016
9016 Kimbro Avenue Minor Subdivision
August 26, 2024
Page 5 of 6
The proposed lot split has been evaluated for division to evaluate any drainage issues that should
be addressed. No grading is proposed as a part of the subdivision, although at such time a new
home building permit is proposed, a grading plan and grading permit would be required. Existing
surface water drainage patterns are not proposed to be impacted.
Park Dedication and Stormwater Area Charges
State Statute and the City's Subdivision Ordinance allow the City the ability to require the dedica-
tion of land up to 10 percent of the property for public parkland purposes. If no land dedication is
required, a cash payment in lieu of land dedication is required.
The applicant is not proposing to dedicate land in lieu of the 2024 park dedication fee, which is
$4,600, therefore, one lot fee is required to be paid prior to the issuance of a building permit.
Number of lots
Total due prior to building permit approval
Park dedication fee (per lot) —
1
$4,600.00
$4,600.00
Payment of the storm water facility charge for the 3.35-acre parcel is required. The 2024 storm
water facility area charge rate is $7,730.00 per acre. This rate would be collected prior to the
recording of any deeds finalizing the lot split and is calculated based on the City's Rural Friendly
approach.
Acres
Total due prior to recording of any deeds
Storm Sewer Area Charge —
3.35
$25,895.50
$7,730.00 per acre
Public Hearing Notices
The public hearing notice was mailed to 7 property owners within 500 feet of the proposed minor
subdivision and published in the St. Paul Pioneer Press on August 14, 2024.
Recommendation
That the Planning Commission recommends that the City Council approve a minor subdivision sub-
dividing a 6.45-acre parcel of land (PIN 2302721120005) into one 3.10-acre parcel and one 3.35-
acre parcel and a variance to the minimum front width of a new parcel, based on the findings of
fact and subject to the conditions listed below:
1) Any lawn irrigation placed within the Kimbro Avenue public right-of-way shall be the home-
owners' responsibility if repair or maintenance is required.
2) Stormwater area charges in the amount of $25,895.50 shall be paid to the City of Cottage
Grove prior to recording the deeds creating the lots with Washington County.
3) The park dedication fee in lieu of land dedication amounting to the annual rate applicable
at the time of building permit (currently $4,600.00/unit) shall be paid to the City for Parcel
A prior to the release of a building permit.
Planning Staff Report — Case No. MS2024-16 & V2024-016
9016 Kimbro Avenue Minor Subdivision
August 26, 2024
Page 6 of 6
4) All applicable permits (i.e.; building, electrical, grading, and mechanical) for the construction
of a house on the parcel(s) must be completed, submitted, and approved by the City before
any construction activities begin. Detailed construction plans must be reviewed and ap-
proved by the Building Official and Fire Marshal.
5) The northernmost existing access off Kimbro Avenue shall be moved from Parcel B to
Parcel A prior to the approval of a building permit on Parcel A. No additional access drives
are permitted.
6) The moved access onto Parcel A shall comply with the minimum setbacks for accessory
structures per City Code Title 11-3-5.
7) The minimum setbacks for the principal structure shall be those found in the R-1 zoning
criteria.
8) A certificate of survey is required with the building permit for Parcel A.
9) An as -built survey shall be required prior to a certificate of occupancy of a new house for
Parcel A.
10) Grading and erosion control measures meeting City standards and grading permit shall be
utilized during construction on Parcel A.
11) Prior to the issuance of a certificate of occupancy for Parcel A, all disturbed areas shall be
sodded or have ground cover established to the satisfaction of the City Engineer.
12) If the City Engineer determines that any additional drainage easements are necessary to
direct off -site runoff onto or across the subject property, the property owner is required to
dedicate such easements without cost to the City as recommended by the City Engineer.
Prepared by:
Riley Rooney
Associate Planner
Aftnrhmant-
Exhibit A — Survey
d
L
0
d�
� N
C C m
J
p is
J'� R o- J
z
J > Of
tea; �o
Of
o o >o
L O N Of
o
W G: N 07 ry R m
r
in in w
^"yv0" A,— ---
-__ - - --- --_,- ___---=�_-___----- - _ --
_ q -- ---------- - --
�Uve
�-1
01,
V`v vvvvv v �' /e a•� A--
vim- �
vv v vA\----------- -- - - ------
- -- - - -- ---- - - ------ --
- - - -
- _---- - -_- ---- -___--
- --
- - - - -
- - - - -- - - - - - -
---\
\ N- - - - - - -
-
��
,'ice z