HomeMy WebLinkAboutCIP 2024-2028CITY OF COTTAGE GROVE, MN
ENGINEERING AND FINANCE DEPARTMENT
12800 Ravine Parkway S, Cottage Grove, MN 55016 | 651-458-2800 | CottageGroveMN.gov
Capital Improvement Plan
2024 - 2028
City of Cottage Grove
Capital Improvements Plan
2024-2028
Table of Contents
Page No. Introduction 1-5 Projects by Program Category 6-7
Funding Summary by Year 9 Facilities and Park Projects Summary 11 Facilities and Park Projects Detail 12-33
Street, Road Improvements & Public Works Projects Summary 35 Street, Road Improvements & Public Works Projects Detail 36-60 Projects by Year (with Maps) 2024 Annual Summary 62-63
2025 Annual Summary 64-65 2026 Annual Summary 66-67 2027 Annual Summary 68-69 2028 Annual Summary 70-71 Projected Financial Position Statements
Roadway and Trailway Maintenance Fund 72 Ice Arena Capital Fund 73 Storm Water Utility Fund 74 Water Utility Fund 75 Sanitary Sewer Utility Fund 76 Street Light Utility Fund 77
Park Improvement Fund 78 Park Trust Fund 79 Public Landscape Initiative Fund 80 Municipal Building Fund 81 ED Trust Fund 82 MSA Construction Fund 83 Pavement Management Fund 84 Water Area Fund 85 Sanitary Sewer Area Fund 86 Storm Water Area Fund 87 3M Settlement/MPCA Fund 88
-This Page Intentionally left Blank -
City of Cottage Grove
Capital Improvements Plan
2024-2028
Introduction
The Capital Improvement Plan (CIP) is a planning device to schedule proposed public capital
improvements and purchases over a five-year period. The CIP matches proposed expenditures
and revenues by project. A capital improvement is defined as a capital expenditure that is greater
than $15,000 with a life expectancy of five years or longer. Capital improvements are projects,
which require acquisition, construction, or replacement of various public facilities, public buildings,
infrastructure, utilities, and parks in the community.
Every effort has been made to draft the document as conservatively and realistically as possible
while maintaining the integrity of the funds. The concept of fund integrity includes accounting for
certain project costs in particular designated funds that are only used for those purposes for which
they are collected. These major funding sources include the operating funds (the General Fund
and Enterprise Funds), the development fees and charges (including the Area and Park Trust
Funds), as well as identifying larger general projects that are expected to be financed with the
issuance of general obligation bonds to be repaid with future property tax levies.
A Ten-Year Financial Management Plan (FMP) was completed in 2023. The Plan incorporated
the projects included in this CIP document with bonds, future operating budgets including
equipment replacement needs, and tax capacity changes (including growth). Projects in this CIP
were included in the preparation of the FMP.
This CIP shows a total capital investment of $78.9 million for 2024 of which $28 million is related
to the construction of the Low Zone Water Treatment Plant and Well 13 (under the 3M Settlement
financing plan), $14 million is for the construction of the utilities building, and $7 million is related
to the100th Street extension project.
This document covers the period from 2024 to 2028 and is organized by the funding sources of
the improvement project. Over the next five years $459.1 million in projected improvements have
been identified. 65% of these projects ($300.8 million) will be funded by other entities and other
governmental entities. The remaining dollars come from other identified sources.
Summary of Improvements
Road and Trailway Maintenance Fund
The Road and Trailway Maintenance Fund was created in 2007 to provide for the costs of
activities related to mill & overlaying and crack sealing City streets, replacement and seal
coating of trails, as well as replacing damaged concrete curb & gutter and sidewalk. These
funds partially support the City’s ongoing ADA transition plan. Funding for these activities
comes from franchise fees charged to property owners on their electric and natural gas
utility bills.
1
2023-2027 CIP Introduction
2024 includes another mill and overlay project in the amount of $924,000. The area to receive the mill and overlay is a portion of East Point Douglas Road from Carlson Auto to Menards, and
Phase 3 of the Thompson Grove neighborhood.
Ice Arena Capital Fund
The naming rights revenue from NorthPoint is the primary source of revenue for the Ice
Arena Capital Fund. 2024 projects include the installation of solar panels and a water
treatment system.
Enterprise Funds
The projects included in the Enterprise Fund section are those projects, which will be paid with funds from the Storm Water, Water, Sanitary Sewer, and Street Light Utility Funds. Each of the Enterprise Funds is supported by user fees charged for the services provided.
Storm Water Utility Fund The Storm Water Utility Fund projects include various drainage improvements and maintenance of the storm water utility system.
The Storm Water Utility Fund was initiated with the 2002 budget year. CIP projects identified and prioritized by staff cannot exceed the financial constraints of the Fund. The 2024 projects
identified include storm water maintenance related to the 2024 Pavement Management project. Commitments of the Fund for the next five years are for various storm water activities throughout the City. Revenue increases of 3% have been included in accordance with the
storm water rate study that was completed in 2021.
Water Utility Fund
The Water Utility Fund includes the construction of a utilities building in 2023 and 2024 in the amount of $14 million. Other capital projects in the Fund include the water costs for the annual Pavement Management Program, and the upgrade to the SCADA system. 3% rate increases have been included in this Fund based on a utility rate study that was completed in 2022.
Sanitary Sewer Utility Fund The Sanitary Sewer Utility Fund includes a $1 million project in 2024 and 2025 to line the trunk sanitary sewer from Jamaica and East Point Douglas down through the dog park. Sewer costs related to the annual Pavement Management Program, and street reconstruction projects are included in the next five years. 5% rate increases have been included in this Fund based on a utility rate study that was completed in 2022.
Street Light Enterprise Fund The improvements scheduled for the Street Light Utility Fund are traffic signals and system
improvements. New traffic signals identified in the next five years are a signal at Hardwood Avenue and Hardwood Court in 2024, 80th Street and Jamaica Avenue in 2025, and Keats and Indian Boulevard in 2025. Due to increased operating costs for street light activities and
increased costs for traffic signals, an 8% increase in rates has been included for 2024 and 3% increases in later years.
2
2023-2027 CIP Introduction
Park Improvement Capital Project Fund
In 2013, the City Council directed that revenues derived from leasing space on the City’s Water
Towers/Reservoirs for cell phone antennas should be allocated to the purpose of renovation of
existing parks and replacement of playground equipment. This revenue source will fund a total
of $3 million in park and playground renovations over the next five years. Expenditures in 2024
include play equipment at West Draw, Granada and Nina Park. The FMP identified a need to
fund park improvements beyond the capacity of the cell phone antenna revenues. Therefore, a
property tax levy has been included in the Fund beginning in 2026 in the amount of $190,000.
Park Trust Fund
Improvements scheduled in the Park Trust Fund include the purchase of additional parkland,
planning and development of parks and trails, and installing playground equipment in new parks.
Revenues coming into the Park Trust Fund have been calculated to reflect the anticipated housing
growth and a greater dedication of park land instead of park dedication fees.
The new park building at Glacial Valley Park is included in this Fund for $4.2 million. Bonds were
issued for this building in 2023.
The goal is to maintain a minimum year end cash balance of approximately $100,000. Future
projects will need to be delayed unless future revenues are available or new revenue sources are
identified since the proposed projects in the next five years will bring the Fund to a negative $3.9
million.
Municipal Building Fund
This Fund derives its revenue from accumulated transfers from the General Fund pursuant to the
Fund Balance policy, as well as several years of dedicated tax levy dollars. The current property
tax levy of $300,000 will increase to $350,000 in 2024 to be used for municipal building expenses.
MSA Construction Fund
The construction of new streets and other street reconstruction projects make up the vast majority
of capital improvement projects in the MSA Construction Fund. Funding for these projects come
from Municipal State Aid (MSA), other intergovernmental revenue, developer charges and special
assessments.
Streets included on the “state aid” system are eligible to receive state aid for a portion of the
projects. The MSA annual construction allotment for 2023 was almost $2 million. Advanced MSA
funds were requested and received in 2023 for partial funding for the two-year Jamaica and East
Point Douglas Road Project. The projects noted below and, in the CIP, will depend on
development, the timing of which will vary due to factors including the economy and available
land.
2024 projects included the second year of the Jamaica and East Point Douglas Road Project
The projects identified with their anticipated MSA funding over the next 5 years include:
Year Project Description Project Cost
MSA
Funding
2024 E Pt Douglas & Jamaica 2nd Year -Reconfiguration $4,607,000 $800,000
2023-2027 Ravine Parkway Ravine Parkway Extension 10,000,000 5,000,000
2026 80th Street (Ideal to Hwy 61) Reconstruction $10,000,000 3,000,000
2026 80th Street (80th /Keats) Roundabout Construction 1,000,000 1,000,000
Total $85,615,000 $9,800,000
3
2023-2027 CIP Introduction
Besides MSA revenue, these projects will be funded with other revenue sources including
Federal, State, and County funds, developer fees, and bonded debt.
Other projects that have been included in the MSA Fund that have funding sources other than
MSA revenue include:
•CSAH 19 and TH 61 including 100th Street extension starting in 2024. (Primary funding
sources-County and Federal funds)
•Jamacia Avenue from 80th to 90th in 2024. (Funding-bonded debt)
•EPD and Ravine Parkway-Shoppes at Cottage View starting in 2025. (Funding sources-
federal funds for $3 million, area funds, and bonded debt)
•River Oaks/TH 61 Restricted Crossing U-Turn in 2024. (Funding sources-grant funds,
and EDA loan)
•Harkness Avenue in 2027. (Funding sources-area funds, developer fees, and bonded
debt)
•Jamaica Avenue from 70th to Military in 2028. (Funding source-bonded debt)
•103rd Street Bridge in 2028. (Funding sources-federal and state funds)
Details of these projects and funding sources are included in the detail of the projects located on
pages 35-43.
Pavement Management Fund
Pavement Management Program projects are reflected in this listing. The summary sheet
identifies other funding sources when available, but for most projects it will be necessary to issue
debt to be repaid with a property tax levy to finance the project. The continuation of the Pavement
Management Program depends on assessments for a portion of each project to be used to repay
a portion of the debt.
The Pavement Management projects included in the next five years total $23.1 million, of which
$10.4 million would be assessed to benefiting property owners and $20 million would be bonded.
Future property taxes levies would repay these bonds.
Funding
Location Total Assessments Debt Other
2024 Prestige Estates, Thompson Grove Estates
1&8, EPD (Hyde to CDS) $6,156,000 $2,770,200 $5,364,000 $700,000
2025 Thompson Grove Estates 2nd, EPD
(Jamaica to Hyde), Kingsborough Trail 4,745,000 2,135,000 3,965,000 517,000
2026 Woodridge Park (E of Jamaica), Cottage
Grove Estates, Meadow Acres, Pine Glen 5,436,000 2,446,200 4,736,000 618,000
2027 Thompson Grove 11&12, Woodridge Park
Add (W of Jamaica) 4,021,000 1,809,450 3,504,000 442,575
2028 Thompson Grove Estates, Pinegrove 2,770,200 1,246,590 2,413,800 356,400
Area Funds
The Water, Storm Sewer and Sanitary Sewer Area Funds are capital project funds that provide
the resources to construct general infrastructure. Projects totaling $9 million are expected to be
funded from the Area Funds over the next 5 years. The funding sources for these Funds are area
charges against developing properties. The area charges are based on rates established by the
City Council. Before these projects can be completed, the funds available in each of the Area
Funds need to be considered. It may be necessary to postpone projects if the revenue sources
are not available to complete the project.
4
2023-2027 CIP Introduction
Water Area Fund
2024 projects include the water portion of the South District Street and Utility project.
Construction of a water tower in the Industrial Park is proposed to be constructed in 2025 in
the amount of $7.5 million. It is proposed to fund $1 million of this construction with water
conservation fee revenue from the Water Utility Fund, $4 million with bond proceeds, and the
remaining portion with the Water Area Fund.
Sanitary Sewer Area Fund
Funding for projects identified in the Sanitary Sewer Area Fund includes construction of
utilities as part of the South District Street and Utilities Project to be completed in 2023 and
2024.
Storm Water Area Fund
Funding for projects identified in the Storm Water Area Fund also includes the construction of
utilities as part of the South District Street and Utilities Project.
Other Funds
3M Settlement/MPCA Fund
3M settlement implementation funds will be used to construct the Low Zone Water Treatment
Plant and Well #13 in 2024 and 2025, the Intermediate Zone Water Treatment Plant in 2025
and 2026, and decommissioning of Well #1, Well #2, and the Temporary Treatment Plant in
2027. 3M settlement funds will be received to fund these projects totaling $122 million.
Conclusion
City staff has prepared this document in conjunction with those projects and capital items that are
known and for which costs can be reasonably estimated. The CIP should be considered a
planning tool and the projects included for 2024 and 2025 serve as a work plan for staff. This
“work plan” means that these are the projects that staff will bring to Council for authorization
before proceeding with a feasibility study, acquisition, or construction. All projects detailed in this
document will be included in their respective budgets if the need is established at that time.
5
PROGRAM CATEGORY 2024 2025 2026 2027 2028
General Public Buildings
Utilities Division Building 13,250,000
PW shop and wash bay modifications 500,000
General Public Buildings total 13,250,000 500,000 - - -
Parks & Recreation Facilities
Hamlet Park-LOST Funds 17,000,000 Mississippi Dunes-LOST Funds 13,000,000
River Oaks-LOST Funds 6,000,000 Matching grant funds 10,000 10,000 10,000 10,000 10,000
Public Landscape initiative 170,000 120,000 80,000 100,000 120,000
Parks - design & planning 15,000 15,000 15,000 15,000 15,000
Parks-Automatic locks on buildings 35,000 35,000 35,000 35,000 35,000
Archery Range Shelter and Trail Work 70,000 Belden Park Backstop Repair and Curbing 30,000
Bike Park-Track Improvements 50,000 Dog Park-Small Area Enrichment&drainage
Glacial Valley Park-Park Building
Hamlet Park Skate Park replace/shelter replace.100,000 50,000
Hardwood and Belden play equipment 140,000
Hearthside Park: Park Improvements 100,000 Hillside/Jergen Trail 75,000
Highlands Park Tennis Court Replacement 100,000 Kingston Park Building Replacement and Additional Power 600,000
Lamar Park Shade Shelter replacement (2)80,000 Lamar Park Roof 10,000
Neighborhood Park Development 700,000 1,000,000 500,000 500,000 500,000
Oltman Middle School Lacrosse complex & Parking 700,000 2,300,000
Peter Thompson, Pine tree Pond, Ideal park play equipment 115,000
Pine Coulee-Court Replacement 20,000 Pine Glen -Picnic Shelter 40,000
West draw, Granada & Nina Park play equipment 210,000 Woodridge Park Rink Boards 50,000
Outdoor Fitness EquipmentSports Lighting Improvements 113,000 65,000 355,000 350,000 35,000
Ice Arena Improvements 680,000 35,000 10,000 120,000 200,000
Parks & Recreation Facilities 2,813,000 21,440,000 14,230,000 7,210,000 1,200,000
Public Utilities Facilities
Spot replacement/slip lining - Sewer 550,000 550,000 50,000 50,000 50,000
System improvements - Streetlights 100,000 100,000 100,000 100,000 100,000
Storm water maintenance 200,000 200,000 200,000 200,000 200,000
Trunk Utility Oversizing 20,000 20,000 20,000 20,000 20,000
Upper Ravine district infrastructure 50,000 50,000 50,000 50,000 50,000
Pull well - annual maintenance 70,000 70,000 70,000 70,000 70,000
SCADA upgrades 1,035,000
Water Tower Painting/Rehab 700,000
Industrial Park Water Tower 7,500,000
Traffic Signals, Traffic Improvements 700,000 1,400,000
3M Settlement Implementation 28,174,000 63,477,000 26,250,000 5,000,000 Water Softening 100,000,000
Pedestrian Crossings 250,000
Public Utilities Facilities total 30,899,000 73,367,000 26,740,000 6,190,000 100,740,000
City of Cottage Grove, MN
Capital Improvement Plan 2024-2028
PROJECTS BY PROGRAM CATEGORY
NOTE: This recap includes the total project cost. See the individual project page for funding sources
6
PROGRAM CATEGORY 2024 2025 2026 2027 2028
City of Cottage Grove, MN
Capital Improvement Plan 2024-2028
PROJECTS BY PROGRAM CATEGORY
NOTE: This recap includes the total project cost. See the individual project page for funding sources
Trail Improvement Projects
CR 74 Trail 271,000
Trail Improvement projects total 271,000 - - - -
Street & Road Improvement Projects
Roadway Maintenance 1,794,000 1,884,000 1,979,000 2,078,000 2,183,000 South District Street & Utility Project 5,250,000
E Pt Douglas & Jamaica 4,907,000 800,000
CSAH 19 and TH 61 7,000,000 3,000,000 16,500,000 16,500,000 22,900,000
Jamaica Avenue 3,380,000 3,000,000
Ravine parkway Shoppes at Cottage View 5,325,000 4,021,000 1,253,000 Ravine parkway 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000
80th Street (CSAH19 to TH 61) Reconstruction 10,000,000 80th Street (80th/Keats roundabout cost share)1,000,000
River Oaks Hwy 61 RCUT 1,210,000 Harkness Ave Reconstruction 3,162,000
103rd Street Bridge 8,000,000
Subtotal before PM 25,541,000 13,009,000 35,500,000 24,993,000 38,083,000
PM 2024 6,156,000
PM 2025 4,745,000 PM 2026 5,436,000
PM 2027 4,021,000 PM 2028 2,770,200
Road & Street Improvement projects total 31,697,000 17,754,000 40,936,000 29,014,000 40,853,200
GRAND TOTAL 78,930,000$ 113,061,000$ 81,906,000$ 42,414,000$ 142,793,200$
7
-This Page Intentionally left Blank -
8
City of Cottage Grove
CIP 2024-2028
Funding Summary by Year
2024 2025 2026 2027 2028 Total '24 to '28
Funding Source
Bonds for Utility Building 9,750,000 9,750,000
Bonds for Street Projects 6,360,000 1,000,000 5,021,000 3,191,000 3,000,000 18,572,000
Bonds for Pavement Mgmt 5,556,000 4,228,000 4,893,000 3,578,425 2,483,800 20,739,225
Bonds for Water Tower 4,000,000 4,000,000
Bonds for LOST 17,000,000 13,000,000 6,000,000 36,000,000
Park Improvement 448,000 970,000 550,000 475,000 295,000 2,738,000
Public Landscape Initiative 100,000 120,000 80,000 100,000 120,000 520,000
Park Trust 1,065,000 3,315,000 515,000 515,000 515,000 5,925,000
Ice Arena Capital Fund 515,000 35,000 10,000 120,000 200,000 880,000
Municipal Building 500,000 500,000
Franchise Fees 2,094,000 1,884,000 1,979,000 2,078,000 2,183,000 10,218,000
MSA 867,000 1,800,000 5,000,000 1,000,000 3,000,000 11,667,000 Developer Asmts/Fees 2,225,000 1,350,000 1,000,000 1,768,000 1,717,000 8,060,000
Other Governments 10,122,000 6,350,000 19,500,000 14,500,000 128,183,000 178,655,000
3M Settlement 27,400,000 63,477,000 26,250,000 5,000,000 122,127,000
Utilities 7,769,000 2,137,000 3,038,000 1,562,575 1,026,400 15,532,975
Area Funds 530,000 4,895,000 1,070,000 2,526,000 70,000 9,091,000
ED Trust 3,225,000 3,225,000
Other funding 904,000 904,000 78,930,000 113,061,000 81,906,000 42,414,000 142,793,200 459,104,200
9
-This Page Intentionally left Blank -
10
FACILITIES AND PARK PROJECTS
Funding Sources 2024 2025 2026 2027 2028
Tax Levy -$ -$ -$ -$ -$
Bonded Debt 9,850,000$ -$ 75,000$ -$ 70,000$
State/Other Government Units 595,000$ -$ -$ -$ -$
Park Improvement Fund 448,000$ 970,000$ 550,000$ 475,000$ 295,000$
Park Trust Fund 1,065,000$ 3,315,000$ 515,000$ 515,000$ 515,000$
Landscape Initiative 90,000$ 120,000$ 80,000$ 100,000$ 120,000$
Municipal Building Fund -$ 500,000$ -$ -$ -$
Other:4,015,000$ 17,035,000$ 13,010,000$ 6,120,000$ 200,000$
TOTAL 16,063,000 21,940,000 14,230,000 7,210,000 1,200,000
Project Expenses 2024 2025 2026 2027 2028
Land/Easements 272,000$ -$ -$ -$ -$
Engineering/Architect 1,443,000$ 5,245,000$ 3,265,000$ 1,515,000$ 15,000$
Admin/Legal -$ -$ -$ -$ -$
Construction 14,168,000$ 16,565,000$ 10,875,000$ 5,585,000$ 1,055,000$
Maintenance -$ -$ -$ -$ -$
Other 180,000$ 130,000$ 90,000$ 110,000$ 130,000$
TOTAL 16,063,000 21,940,000 14,230,000 7,210,000 1,200,000
Project Balance -$ -$ -$ -$ -$
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2024-2028 CAPITAL IMPROVEMENT PROGRAM
11
Project Title Project Description
PW & Parks Facility
Department
Public Works
Funding Sources 2024 2025 2026 2027 2028
Tax Levy
Bonded Debt 9,750,000
State/Other Government Units
Park Improvement Fund
Park Trust Fund
Landscape Initiative
Municipal Building 500,000
Other: Utility Fund 3,500,000
TOTAL 13,250,000 500,000 0 0 0
Project Expenses 2024 2025 2026 2027 2028
Land/Easements 272,000
Engineering/Architect 1,328,000 80,000
Admin/Legal
Construction 11,650,000 420,000
Maintenance
Other
TOTAL 13,250,000 500,000 0 0 0
Project Balance -$ -$ -$ -$ -$
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2024-2028 CAPITAL IMPROVEMENT PROGRAM
2024 - Utilities Division Building Construction ($13,250,000), Expended $750,000 in 2023
2025 - Shop and Wash Bay Modifications ($500,000)
12
Project Title Project Description
Matching Funds Program
Department
Parks
Funding Sources 2024 2025 2026 2027 2028
Tax Levy
Bonded Debt
State/Other Government Units
Park Improvement Fund 10,000 10,000 10,000 10,000 10,000
Park Trust Fund
Landscape Initiative
Municipal Building
Other:
TOTAL 10,000 10,000 10,000 10,000 10,000
Project Expenses 2024 2025 2026 2027 2028
Land/Easements
Engineering/Architect
Admin/Legal
Construction
Maintenance
Other 10,000 10,000 10,000 10,000 10,000
TOTAL 10,000 10,000 10,000 10,000 10,000
Project Balance -$ -$ -$ -$ -$
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Funds used to match donations from outside organizations on specific park projects
13
Project Title Project Description
Public Landscape Initiative
Department
Parks
Funding Sources 2024 2025 2026 2027 2028
Tax Levy
Bonded Debt
State/Other Government Units 80,000
Park Improvement Fund
Park Trust Fund
Landscape Initiative 90,000 120,000 80,000 100,000 120,000
Municipal Building
Other:
TOTAL 170,000 120,000 80,000 100,000 120,000
Project Expenses 2024 2025 2026 2027 2028
Land/Easements
Engineering/Architect
Admin/Legal
Construction
Maintenance
Other 170,000 120,000 80,000 100,000 120,000
TOTAL 170,000 120,000 80,000 100,000 120,000
Project Balance -$ -$ -$ -$ -$
2027 - Future ROW Beautification ($50,000), Woodridge Park Woodland Restoration ($30,000),
Annual Commercial EAB Replacement ($10,000), Arbor Day Tree Planting ($10,000)2028 - Future ROW Beautification ($50,000), Pine Tree Valley & Pine Tree Pond Park Open Space
Restoration Grant Match ($50,000), Annual Commercial EAB Replacement ($10,000), Arbor Day Tree
Planting ($10,000)
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2024-2028 CAPITAL IMPROVEMENT PROGRAM
2024 - Jamaica Ave 100th to HWY Ramps ($50,000), Cottage Grove Trailway Corridor Restoration
($20,000, grant match $80,000), Annual Commercial EAB Replacement ($10,000), Arbor Day Tree
Planting ($10,000)
2025 - Oakwood Park ($50,000), Future ROW Beautification ($50,000), Annual Commercial EAB
Replacement ($10,000), Arbor Day Tree Planting ($10,000)
2026 - 80th St HWY 61 to Ideal ($50,000), Public Facility Beautification ($10,000), Annual
Commercial EAB Replacement ($10,000), Arbor Day Tree Planting ($10,000)
14
Project Title Project Description
Park Design and Planning Funding for design and planning of parks as development occurs.
Department
Parks
Funding Sources 2024 2025 2026 2027 2028
Tax Levy
Bonded Debt
State/Other Government Units
Park Improvement Fund
Park Trust Fund 15,000 15,000 15,000 15,000 15,000
Landscape Initiative
Municipal Building
Other:
TOTAL 15,000 15,000 15,000 15,000 15,000
Project Expenses 2024 2025 2026 2027 2028
Land/Easements
Engineering/Architect 15,000 15,000 15,000 15,000 15,000
Admin/Legal
Construction
Maintenance
Other
TOTAL 15,000 15,000 15,000 15,000 15,000
Project Balance -$ -$ -$ -$ -$
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2024-2028 CAPITAL IMPROVEMENT PROGRAM
15
Project Title Project descriptionBuilding Locks
2024 - Woodridge
Department 2025 - Highlands
Parks 2026 - Kingston
2027 - Hamlet
2028 - Peter Thompson
Funding Sources 2024 2025 2026 2027 2028
Tax Levy
Bonded Debt
State/Other Government Units
Park Improvement Fund 35,000 35,000 35,000 35,000 35,000
Park Trust Fund
Landscape Initiative
Municipal Building
Other:
TOTAL 35,000 35,000 35,000 35,000 35,000
Project Expenses 2024 2025 2026 2027 2028
Land/Easements
Engineering/Architect
Admin/Legal
Construction 35,000 35,000 35,000 35,000 35,000
Maintenance
Other
TOTAL 35,000 35,000 35,000 35,000 35,000
Project Balance -$ -$ -$ -$ -$
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Annual addition of automatic locks for various park building restrooms throughout the community
16
Project Title Project Description
2024 - Woodridge Park Tennis, Basketball, Ice Rink
2025 - Hearthside Ice Rink
2026 - Hamlet Football/Soccer, Courts and Ice RinkDepartment2027 - Lamar Park LED & Poles
Parks 2028 - Old CG Park Sports Lighting Replacement
Funding Sources 2024 2025 2026 2027 2028
Tax Levy
Bonded Debt
State/Other Government Units
Park Improvement Fund 113,000 65,000 355,000 350,000 35,000
Park Trust Fund
Landscape Initiative
Municipal Building
Other:
TOTAL 113,000 65,000 355,000 350,000 35,000
Project Expenses 2024 2025 2026 2027 2028
Land/Easements
Engineering/Architect
Admin/Legal
Construction 113,000 65,000 355,000 350,000 35,000
Maintenance
Other
TOTAL 113,000 65,000 355,000 350,000 35,000
Project Balance -$ -$ -$ -$ -$
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Sports Lighting
Improvements
17
Project Title Project DescriptionReplace Playground equipment 2024 - West Draw, Granada, Nina - $210,000
2025 - Hardwood and Belden Parks - $140,000
Department
Parks
Funding Sources 2024 2025 2026 2027 2028
Tax Levy
Bonded Debt
State/Other Government Units
Park Improvement Fund 210,000 140,000
Park Trust Fund
Landscape Initiative
Municipal Building
Other:
TOTAL 210,000 140,000 0 0 0
Project Expenses 2024 2025 2026 2027 2028
Land/Easements
Engineering/Architect
Admin/Legal
Construction 210,000 140,000
Maintenance
Other
TOTAL 210,000 140,000 0 0 0
Project Balance -$ -$ -$ -$ -$
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2024-2028 CAPITAL IMPROVEMENT PROGRAM
18
Project Title Project description
Pavement Management 2024 - Hearthside Park Improvements
2026 - Hillside/Jergen Trail (1,600lf)
2028 - Archery Range Shelter ($50,000) and trail work ($20,000)
Department
Parks
Funding Sources 2024 2025 2026 2027 2028
Tax Levy
Bonded Debt 100,000 75,000 70,000
State/Other Government Units
Park Improvement Fund
Park Trust Fund
Landscape Initiative
Municipal Building
Other: Donations
TOTAL 100,000 0 75,000 0 70,000
Project Expenses 2024 2025 2026 2027 2028
Land/Easements
Engineering/Architect
Admin/Legal
Construction 100,000 75,000 70,000
Maintenance
Other
TOTAL 100,000 0 75,000 0 70,000
Project Balance -$ -$ -$ -$ -$
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2024-2028 CAPITAL IMPROVEMENT PROGRAM
19
Project Title Project description
2025 - Still Ponds ($500,000) & Roberts Lake Neighborhood Development ($500,000)
2026 - East Ravine Neighborhood or 100th Street Park Development (development driven)
Department 2027 - East Ravine Neighborhood or 100th Street Park Development (development driven)
Parks
Funding Sources 2024 2025 2026 2027 2028
Tax Levy
Bonded Debt
State/Other Government Units
Park Improvement Fund
Park Trust Fund 700,000 1,000,000 500,000 500,000 500,000
Landscape Initiative
Municipal Building
Other:
TOTAL 700,000 1,000,000 500,000 500,000 500,000
Project Expenses 2024 2025 2026 2027 2028
Land/Easements
Engineering/Architect
Admin/Legal
Construction 700,000 1,000,000 500,000 500,000 500,000
Maintenance
Other
TOTAL 700,000 1,000,000 500,000 500,000 500,000
Project Balance -$ -$ -$ -$ -$
2028 - East Ravine Neighborhood or 100th Street Park Development (development driven)
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Neighborhood Park
Development
2024 - Jack and Marlys Denzer Park ($500,000), Military Trailhead ($200,000)
20
Project Title Project DescriptionBelden Park 2024 Backstop Repair and Curbing
Department
Parks
Funding Sources 2024 2025 2026 2027 2028
Tax Levy
Bonded Debt
State/Other Government Units
Park Improvement Fund 30,000
Park Trust Fund
Landscape Initiative
Municipal Building
Other:
TOTAL 30,000 0 0 0 0
Project Expenses 2024 2025 2026 2027 2028
Land/Easements
Engineering/Architect
Admin/Legal
Construction 30,000
Maintenance
Other
TOTAL 30,000 0 0 0 0
Project Balance -$ -$ -$ -$ -$
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2024-2028 CAPITAL IMPROVEMENT PROGRAM
21
Project Title Project description
Bike Park 2024 - Track Improvements
Department
Parks
Funding Sources 2024 2025 2026 2027 2028
Tax Levy
Bonded Debt
State/Other Government Units
Park Improvement Fund 50,000
Park Trust Fund
Landscape Initiative
Municipal Building
Other:
TOTAL 50,000 0 0 0 0
Project Expenses 2024 2025 2026 2027 2028
Land/Easements
Engineering/Architect
Admin/Legal
Construction 50,000
Maintenance
Other
TOTAL 50,000 0 0 0 0
Project Balance -$ -$ -$ -$ -$
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2024-2028 CAPITAL IMPROVEMENT PROGRAM
22
Project Title Project Description
Hamlet Park 2026 - Skate Park Surface Replacement
2027 - Shelter Replacement
Department
Parks
Funding Sources 2024 2025 2026 2027 2028
Tax Levy
Bonded Debt
State/Other Government Units
Park Improvement Fund 100,000 50,000
Park Trust Fund
Landscape Initiative
Municipal Building
Other:
TOTAL - - 100,000 50,000 -
Project Expenses 2024 2025 2026 2027 2028
Land/Easements
Engineering/Architect
Admin/Legal
Construction 100,000 50,000
Maintenance
Other
TOTAL - - 100,000 50,000 -
Project Balance -$ -$ -$ -$ -$
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2024-2028 CAPITAL IMPROVEMENT PROGRAM
23
Project Title Project Description
Highlands Park Tennis Court Replacement
Department
Facilities
Funding Sources 2024 2025 2026 2027 2028
Tax Levy
Bonded Debt
State/Other Government Units
Park Improvement Fund 100,000
Park Trust Fund
Landscape Initiative
Municipal Building
Other: Project Description
TOTAL - - - - 100,000
Project Expenses 2024 2025 2026 2027 2028
Land/Easements
Engineering/Architect
Admin/Legal
Construction 100,000
Maintenance
Other
TOTAL - - - - 100,000
Project Balance -$ -$ -$ -$ -$
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2024-2028 CAPITAL IMPROVEMENT PROGRAM
24
Project Title Project Description
Kingston Park Building Replacement and Additional Power Supply
Department
Parks
Funding Sources 2024 2025 2026 2027 2028
Tax Levy
Bonded Debt
State/Other Government Units
Park Improvement Fund 600,000
Park Trust Fund
Landscape Initiative
Municipal Building
Other:
TOTAL 0 600,000 0 0 0
Project Expenses 2024 2025 2026 2027 2028
Land/Easements
Engineering/Architect 100,000
Admin/Legal
Construction 500,000
Maintenance
Other
TOTAL 0 600,000 0 0 0
Project Balance -$ -$ -$ -$ -$
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2024-2028 CAPITAL IMPROVEMENT PROGRAM
25
Project Title Project Description
Lamar Park 2025 - Lamar Park Shade Shelter Replacement (2)
2027 - Roof Replacement
Department
Facilities
Funding Sources 2024 2025 2026 2027 2028
Tax Levy
Bonded Debt
State/Other Government Units
Park Improvement Fund 80,000 10,000
Park Trust Fund
Landscape Initiative
Municipal Building
Other:
TOTAL 0 80,000 0 10,000 0
Project Expenses 2024 2025 2026 2027 2028
Land/Easements
Engineering/Architect
Admin/Legal
Construction 80,000 10,000
Maintenance
Other
TOTAL 0 80,000 0 10,000 0
Project Balance -$ -$ -$ -$ -$
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2024-2028 CAPITAL IMPROVEMENT PROGRAM
26
Project Title Project Description
Oltman Middle School Lacrosse Complex and Parking Lot Construction
Department
Parks
Funding Sources 2024 2025 2026 2027 2028
Tax Levy
Bonded Debt
State/Other Government Units 350,000
Park Improvement Fund
Park Trust Fund 350,000 2,300,000
Landscape Initiative
Municipal Building
Other:
TOTAL 700,000 2,300,000 - - -
Project Expenses 2024 2025 2026 2027 2028
Land/Easements
Engineering/Architect 100,000 800,000
Admin/Legal
Construction 600,000 1,500,000
Maintenance
Other
TOTAL 700,000 2,300,000 - - -
Project Balance -$ -$ -$ -$ -$
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2024-2028 CAPITAL IMPROVEMENT PROGRAM
27
Project Title Project Description
Pine Coulee 2027 - Court Replacement
Department
Parks
Funding Sources 2024 2025 2026 2027 2028
Tax Levy
Bonded Debt
State/Other Government Units
Park Improvement Fund 20,000
Park Trust Fund
Landscape Initiative
Municipal Building
Other: Land Sale
TOTAL 0 0 0 20,000 0
Project Expenses 2024 2025 2026 2027 2028
Land/Easements
Engineering/Architect
Admin/Legal
Construction 20,000
Maintenance
Other
TOTAL 0 0 0 20,000 0
Project Balance -$ -$ -$ -$ -$
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2024-2028 CAPITAL IMPROVEMENT PROGRAM
28
Project Title Project description
Pine Glen Park
Department
Parks
Funding Sources 2024 2025 2026 2027 2028
Tax Levy
Bonded Debt
State/Other Government Units
Park Improvement Fund 40,000
Park Trust Fund
Landscape Initiative
Municipal Building
Other:
TOTAL 0 40,000 0 0 0
Project Expenses 2024 2025 2026 2027 2028
Land/Easements
Engineering/Architect
Admin/Legal
Construction 40,000
Maintenance
Other
TOTAL 0 40,000 0 0 0
Project Balance -$ -$ -$ -$ -$
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2024-2028 CAPITAL IMPROVEMENT PROGRAM
2025 - Picnic Shelter
29
Project Title Project Description
Peter Thompson Park
Department
Parks
Funding Sources 2024 2025 2026 2027 2028
Tax Levy
Bonded Debt
State/Other Government Units
Park Improvement fund 115,000
Park Trust Fund
Landscape Initiative
Municipal Building
Other:
TOTAL 0 0 0 0 115,000
Project Expenses 2024 2025 2026 2027 2028
Land/Easements
Engineering/Architect
Admin/Legal
Construction 115,000
Maintenance
Other
TOTAL 0 0 0 0 115,000
Project Balance -$ -$ -$ -$ -$
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2024-2028 CAPITAL IMPROVEMENT PROGRAM
2028 Peter Thompson Park Upgrades: Roof Reshingle ($15,000), Rink Board Replacement ($100,000)
30
Project Title Project description
Woodridge
Department
Parks
Funding Sources 2024 2025 2026 2027 2028
Tax Levy
Bonded Debt
State/Other Government Units
Park Improvement Fund 50,000
Park Trust Fund
Landscape Initiative
Municipal Building
Other:
TOTAL 0 0 50,000 0 0
Project Expenses 2024 2025 2026 2027 2028
Land/Easements
Engineering/Architect
Admin/Legal
Construction 50,000
Maintenance
Other
TOTAL 0 0 50,000 0 0
Project Balance -$ -$ -$ -$ -$
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2024-2028 CAPITAL IMPROVEMENT PROGRAM
2026 - Hockey Rink Boards Replacement
31
Project Title Project Description
Ice Arena Capital Projects
2025 - West Rink Bleacher Radiant Heat ($35,000)Department 2026 - Locker Room 5/6/7 Furnace ($10,000)
Parks 2027 - Zamboni 545 Replacement ($120,000)2028 - Dehumidifier Replacement North Rink ($200,000)
Funding Sources 2024 2025 2026 2027 2028
Tax Levy
Bonded Debt
State/Other Government Units 165,000
Park Improvement Fund
Park Trust Fund
Landscape Initiative
Municipal Building
Other: North Point Naming Righ 515,000 35,000 10,000 120,000 200,000
TOTAL 680,000 35,000 10,000 120,000 200,000
Project Expenses 2024 2025 2026 2027 2028
Land/Easements
Engineering/Architect
Admin/Legal
Construction 680,000 35,000 10,000 120,000 200,000
Maintenance
Other
TOTAL 680,000 35,000 10,000 120,000 200,000
Project Balance -$ -$ -$ -$ -$
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2024-2028 CAPITAL IMPROVEMENT PROGRAM
2024 - Party Lights for Public Sessions North Rink ($30,000), Water Treatment System for Ice Making ($100,000), Solar Panels ($550,000)-solar panels 2023/2024
32
Project Title Project Description
LOST Projects 2025 - Hamlet Park
2026 - Mississippi Dunes
2027 - River Oaks
Department
Parks
Funding Sources 2024 2025 2026 2027 2028
Tax Levy
Bonded Debt
State/Other Government Units
Park Improvement Fund
Park Trust Fund
Landscape Initiative
Municipal Building
Other: LOST 17,000,000 13,000,000 6,000,000
TOTAL 0 17,000,000 13,000,000 6,000,000 0
Project Expenses 2024 2025 2026 2027 2028
Land/Easements
Engineering/Architect 4,250,000 3,250,000 1,500,000
Admin/Legal
Construction 12,750,000 9,750,000 4,500,000
Maintenance
Other
TOTAL 0 17,000,000 13,000,000 6,000,000 0
Project Balance -$ -$ -$ -$ -$
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2024-2028 CAPITAL IMPROVEMENT PROGRAM
33
-This Page Intentionally left Blank -
34
ALL TRANSPORTATION AND PUBLIC WORKS PROJECTS
Funding Sources 2024 2025 2026 2027 2028
Tax Levy -$ -$ -$ -$ -$
Bonded Debt 11,683,000$ 9,228,000$ 9,839,000$ 6,769,425$ 5,413,800$
State of Minnesota/MSA 1,000,000$ 1,800,000$ 5,000,000$ 1,000,000$ 3,000,000$
Washington County 7,014,000$ 3,350,000$ 2,000,000$ 2,000,000$ 8,150,000$
Federal/Grant Funding 2,513,000$ 3,000,000$ 17,500,000$ 12,500,000$ 120,033,000$
Area Funds 530,000$ 3,895,000$ 1,070,000$ 2,526,000$ 70,000$
Utility Funds 4,269,000$ 3,137,000$ 3,038,000$ 1,562,575$ 976,400$
Assessments/Developer Fees 2,225,000$ 1,350,000$ 1,000,000$ 1,768,000$ 1,717,000$
Other:33,633,000$ 65,361,000$ 28,229,000$ 7,078,000$ 2,233,000$
TOTAL 62,867,000 91,121,000 67,676,000 35,204,000 141,593,200
Project Expenses 2024 2025 2026 2027 2028
Land/Easements/Utility Relocation 750,000$ 750,000$ -$ 250,000$ -$
Engineering/Architect 6,768,000$ 15,744,000$ 12,395,000$ 7,700,000$ 33,734,500$
Admin/Legal 50,000$ 50,000$ -$ 104,000$ -$
Construction 51,835,000$ 71,931,000$ 53,048,000$ 24,826,000$ 105,438,700$
Maintenance 2,540,000$ 1,676,000$ 1,214,000$ 1,254,000$ 1,296,000$
Other 924,000$ 970,000$ 1,019,000$ 1,070,000$ 1,124,000$
TOTAL 62,867,000 91,121,000 67,676,000 35,204,000 141,593,200
Project Balance -$ -$ -$ -$ -$
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2024-2028 CAPITAL IMPROVEMENT PROGRAM
35
Project Title Project Description
Roadway Maintenance Annual maintenance including:
4 miles of mill & overlay
Concrete removal & replacement (2% per year)Department 6 miles trail maintenance (crack seal/fog seal)Public Works 2 miles trail reconstruction
Funding Sources 2024 2025 2026 2027 2028
Tax Levy
Bonded Debt
State of Minnesota/MSA
Washington County
Federal/Grant Funding
Area Funds
Utility Funds
Assessments/Developer Fees
Other: Maintenance Fund 1,794,000 1,884,000 1,979,000 2,078,000 2,183,000
TOTAL 1,794,000 1,884,000 1,979,000 2,078,000 2,183,000
Project Expenses 2024 2025 2026 2027 2028
Land/Easements/Utility Relocation
Engineering/Architect 150,000 158,000 166,000 174,000 183,000
Admin/Legal
Sealcoating Contract/Rock
Maintenance 720,000 756,000 794,000 834,000 876,000
Other: Mill and Overlay 924,000 970,000 1,019,000 1,070,000 1,124,000
TOTAL 1,794,000 1,884,000 1,979,000 2,078,000 2,183,000
Project Balance -$ -$ -$ -$ -$
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2024-2028 CAPITAL IMPROVEMENT PROGRAM
36
Project Title Project Description
Pavement Management
(includes ADA improvements)
Department
Public Works
Funding Sources 2024 2025 2026 2027 2028
Tax Levy
Bonded Debt 5,456,000 4,228,000 4,818,000 3,578,425 2,413,800
State of Minnesota/MSA
Washington County
Federal/Grant Funding
Area Funds
Utility Funds 700,000 517,000 618,000 442,575 356,400
Assessments/Developer Fees ….
Other:
TOTAL 6,156,000 4,745,000 5,436,000 4,021,000 2,770,200
Project Expenses 2024 2025 2026 2027 2028
Land/Easements/Utility Relocation
Engineering/Architect 1,282,000 1,356,000 1,554,000 1,148,000 791,500
Admin/Legal
Construction 4,874,000 3,389,000 3,882,000 2,873,000 1,978,700
Maintenance
Other
TOTAL 6,156,000 4,745,000 5,436,000 4,021,000 2,770,200
Project Balance -$ -$ -$ -$ -$
2028 - Thompson Grove Estates, Pinegrove
2026 - Woodridge Park (E of Jamaica), Cottage Grove Estates, Meadow Acres, Pine Glen, see 80th
Street
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2024-2028 CAPITAL IMPROVEMENT PROGRAM
2024 - Prestige Estates, Thompson Grove Estates 1&8, EPD (Hyde to CDS), see Jamaica Ave
2025 - Thompson Grove Estates 2nd, EPD (Jamaica to Hyde), Kingsborough Trail
2027 - Thompson Grove Estates 11&12, Woodridge Park Add (W of Jamaica)
37
Project Title Project Description
2024 - Realignment of 100th Street and Hadley Avenue (Year 3)
Department
Public Works
Funding Sources 2024 2025 2026 2027 2028
Tax Levy
Bonded Debt
State of Minnesota/MSA
Washington County
Federal/Grant Funding
Area Funds
Utility Funds 800,000
Assessments/Developer Fees 1,225,000
Other: ED Trust/Park Trust ($130k)3,225,000
TOTAL 5,250,000 - - - -
Project Expenses 2024 2025 2026 2027 2028
Land/Easements/Utility Relocation
Engineering/Architect 250,000
Admin/Legal
Construction 5,000,000
Maintenance
Other
TOTAL 5,250,000 - - - -
Project Balance -$ -$ -$ -$ -$
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2024-2028 CAPITAL IMPROVEMENT PROGRAM
South District Street and Utility
Project
38
Project Title Project DescriptionEast Pt. Douglas & Jamaica Reconstruction & realignment of the East Point Douglas Road intersections at Jamaica Ave
and the Cub/Target entrances.
Department
Public Works
Funding Sources 2024 2025 2026 2027 2028
Tax Levy
Bonded Debt 2,847,000
State of Minnesota/MSA 800,000
Washington County
Federal/Grant Funding 1,250,000
Area Funds
Utility Funds 500,000
Assessments/Developer Fees
Other: Public Landscape Initiative
($10k)/Roadway Maintenance
($300,000) 310,000
TOTAL 4,907,000 800,000 - - -
Project Expenses 2024 2025 2026 2027 2028
Land/Easements/Utility Relocation 750,000 750,000
Engineering/Architect 450,000
Admin/Legal 50,000 50,000
Construction 3,657,000
Maintenance
Other
TOTAL 4,907,000 800,000 - - -
Project Balance -$ -$ -$ -$ -$
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2024-2028 CAPITAL IMPROVEMENT PROGRAM
39
Project Title Project Description
CSAH 19 and TH 61 2024 - Design/Construction for 100th Street Extension - PROTECT
2025 - Design/Construction for 100th Street Extension - CPF Grant
2026 - 100th St Extension Construction
Department 2027 - 100th St Extension Construction
Public Works
Funding Sources 2024 2025 2026 2027 2028
Tax Levy
Bonded Debt 1,000,000 1,000,000
State of Minnesota/MSA
Washington County 7,000,000 3,000,000 2,000,000 2,000,000 8,150,000
Federal/Grant Funding 12,500,000 12,500,000 14,033,000
Area Funds 1,000,000 1,000,000
Utility Funds
Assessments/Developer Fees 717,000
Other:
TOTAL 7,000,000 3,000,000 16,500,000 16,500,000 22,900,000
Project Expenses 2024 2025 2026 2027 2028
Land/Easements/Utility Relocation
Engineering/Architect 1,250,000 1,250,000 3,750,000 3,750,000
Admin/Legal
Construction 5,750,000 1,750,000 12,750,000 12,750,000 22,900,000
Maintenance
Other
TOTAL 7,000,000 3,000,000 16,500,000 16,500,000 22,900,000
Project Balance -$ -$ -$ -$ -$
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2024-2028 CAPITAL IMPROVEMENT PROGRAM
2028 - Reconstruction/realignment of bridge/overpass over highway 61 at County Rd 19 (Innovation
Road) - $4Million in Grant Funding
40
Project Title Project Description
Department
Public Works
Funding Sources 2024 2025 2026 2027 2028
Tax Levy
Bonded Debt 1,000,000 4,021,000 1,253,000
State of Minnesota/MSA
Washington County
Federal/Grant Funding 3,000,000
Area Funds 1,325,000
Utility Funds
Assessments/Developer Fees
Other:
TOTAL - 5,325,000 4,021,000 1,253,000 -
Project Expenses 2024 2025 2026 2027 2028
Land/Easements/Utility Relocation
Engineering/Architect 1,300,000 1,000,000 500,000
Admin/Legal
Construction 4,025,000 3,021,000 753,000
Maintenance
Other
TOTAL - 5,325,000 4,021,000 1,253,000 -
Project Balance -$ -$ -$ -$ -$
2027 - Construction of roadway and infrastructure to support the retail/commercial development
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Ravine Parkway - Shoppes at
Cottage View
2025 - Phase 1 Construction of roadway and infrastructure to support the retail/commercial
2026 - Construction of roadway and infrastructure to support the retail/commercial development
41
Project Title Project Description
Ravine Parkway 2024 - Wolterstorff
2025 - Kemp
2026 - Geis
Department 2027 - Tank
Public Works 2028 - Tank
Funding Sources 2024 2025 2026 2027 2028
Tax Levy
Bonded Debt
State of Minnesota/MSA 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000
Washington County
Federal/Grant Funding
Area Funds
Utility Funds
Assessments/Developer Fees 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000
Other:
TOTAL 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000
Project Expenses 2024 2025 2026 2027 2028
Land/Easements/Utility Relocation
Engineering/Architect 300,000 300,000 300,000 300,000 300,000
Admin/Legal
Construction 1,700,000 1,700,000 1,700,000 1,700,000 1,700,000
Maintenance
Other
TOTAL 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000
Project Balance -$ -$ -$ -$ -$
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2024-2028 CAPITAL IMPROVEMENT PROGRAM
42
Project Title Project Description
80th Street Reconstruction
Department
Public Works
Funding Sources 2024 2025 2026 2027 2028
Tax Levy
Bonded Debt
State of Minnesota/MSA 4,000,000
Washington County
Federal/Grant Funding 5,000,000
Area Funds
Utility Funds 2,000,000
Assessments/Developer Fees
Other:
TOTAL 0 0 11,000,000 0 0
Project Expenses 2024 2025 2026 2027 2028
Land/Easements/Utility Relocation
Engineering/Architect 3,000,000
Admin/Legal
Construction 8,000,000
Maintenance
Other
TOTAL 0 0 11,000,000 0 0
Project Balance -$ -$ -$ -$ -$
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2024-2028 CAPITAL IMPROVEMENT PROGRAM
2026 - Ideal to Hwy 61 - Includes reconstruction, spot curb replacement, ADA improvements,
landscaping, and trail replacement; 80th/Keats Roundabout Cost Share ($1,000,000 MSA)
43
Project Title Project Description
River Oaks Hwy 61 RCUT 2024 - Conversion of River Oaks access into a reduced conflict U-Turn intersection
Department
Public Works
Funding Sources 2024 2025 2026 2027 2028
Tax Levy
Bonded Debt
State of Minnesota/MSA
Washington County
Federal/Grant Funding 1,010,000
Area Funds
Utility Funds
Assessments/Developer Fees
Other: EDA Interfund Loan 200,000
TOTAL 1,210,000 - - - -
Project Expenses 2024 2025 2026 2027 2028
Land/Easements/Utility Relocation
Engineering/Architect 363,000
Admin/Legal
Construction 847,000
Maintenance
Other
TOTAL 1,210,000 - - - -
Project Balance -$ -$ -$ -$ -$
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2024-2028 CAPITAL IMPROVEMENT PROGRAM
44
Project Title Project description
Reconstruct Harkness Avenue to an urban section with utilities, from Oakwood
Park to the north Hardwood Ave intersection.
Department
Public Works
Funding Sources 2024 2025 2026 2027 2028
Tax Levy
Bonded Debt 938,000
State of Minnesota/MSA
Washington County
Federal/Grant Funding
Area Funds 1,456,000
Utility Funds
Assessments/Developer Fees 768,000
Other:
TOTAL 0 0 0 3,162,000 0
Project Expenses 2024 2025 2026 2027 2028
Land/Easements/Utility Relocation 250,000
Engineering/Architect 728,000
Admin/Legal 104,000
Construction 2,080,000
Maintenance
Other
TOTAL 0 0 0 3,162,000 0
Project Balance -$ -$ -$ -$ -$
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Harkness Ave Reconstruction
45
Project Title Project Description
Jamaica Ave 2024 - 80th to 90th
Department
Public Works
Funding Sources 2024 2025 2026 2027 2028
Tax Levy
Bonded Debt 3,380,000 3,000,000
State of Minnesota/MSA
Washington County
Federal/Grant Funding
Area Funds
Utility Funds
Assessments/Developer Fees
Other:
TOTAL 3,380,000 0 0 0 3,000,000
Project Expenses 2024 2025 2026 2027 2028
Land/Easements/Utility Relocation
Engineering/Architect 680,000
Admin/Legal
Construction 2,700,000 3,000,000
Maintenance
Other
TOTAL 3,380,000 0 0 0 3,000,000
Project Balance -$ -$ -$ -$ -$
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2024-2028 CAPITAL IMPROVEMENT PROGRAM
2028 - Reconstruction of Jamaica Ave from Rose of Sharon Church to Military Road to the urban
four lane section roadway.
46
Project Title Project Description
103rd St Railroad Bridge 2028 - Reconstruct 103rd Street railroad bridge
Department
Public Works
Funding Sources 2024 2025 2026 2027 2028
Tax Levy
Bonded Debt
State of Minnesota/MSA 2,000,000
Washington County
Federal/Grant Funding 6,000,000
Area Funds
Utility Funds
Assessments/Developer Fees
Other:
TOTAL 0 0 0 0 8,000,000
Project Expenses 2024 2025 2026 2027 2028
Land/Easements/Utility Relocation
Engineering/Architect 2,400,000
Admin/Legal
Construction 5,600,000
Maintenance
Other
TOTAL 0 0 0 0 8,000,000
Project Balance -$ -$ -$ -$ -$
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2024-2028 CAPITAL IMPROVEMENT PROGRAM
47
Project Title Project Description
Traffic Signals 2024 - Hardwood Ave/Hardwood Ct
2025 - 80th/Jamaica, Keats/Indian Blvd
Department
Public Works
Funding Sources 2024 2025 2026 2027 2028
Tax Levy
Bonded Debt
State of Minnesota/MSA
Washington County 350,000
Federal/Grant Funding
Area Funds
Utility Funds 700,000
Assessments/Developer Fees 350,000
Other: 1-12 TIF District 700,000
TOTAL 700,000 1,400,000 0 0 0
Project Expenses 2024 2025 2026 2027 2028
Land/Easements/Utility Relocation
Engineering/Architect 140,000 280,000
Admin/Legal
Construction 560,000 1,120,000
Maintenance
Other
TOTAL 700,000 1,400,000 0 0 0
Project Balance -$ -$ -$ -$ -$
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2024-2028 CAPITAL IMPROVEMENT PROGRAM
48
Project Title Project Description
East Ravine District
Department
Public Works
Funding Sources 2024 2025 2026 2027 2028
Tax Levy
Bonded Debt
State of Minnesota/MSA
Washington County
Federal/Grant Funding
Area Funds 50,000 50,000 50,000 50,000 50,000
Utility Funds
Assessments/Developer Fees
Other:
TOTAL 50,000 50,000 50,000 50,000 50,000
Project Expenses 2024 2025 2026 2027 2028
Land/Easements/Utility Relocation
Engineering/Architect
Admin/Legal
Construction 50,000 50,000 50,000 50,000 50,000
Maintenance
Other
TOTAL 50,000 50,000 50,000 50,000 50,000
Project Balance -$ -$ -$ -$ -$
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2024-2028 CAPITAL IMPROVEMENT PROGRAM
As residential development occurs in the East Ravine, various infrastructure will be constructed to
support the new housing. This infrastructure will be paid for by developers either through City
financed construction supported by assessments or by Developer constructed of same.
49
Project Title Project Description
CR 74 Trail
Department
Funding Sources 2024 2025 2026 2027 2028
Tax Levy
Bonded Debt
State of Minnesota/MSA
Washington County 14,000
Federal/Grant Funding 253,000
Area Funds
Utility Funds
Assessments/Developer Fees
Other: Roadway Maintenance 4,000
TOTAL 271,000 0 0 0 0
Project Expenses 2024 2025 2026 2027 2028
Land/Easements/Utility Relocation
Engineering/Architect
Admin/Legal
Construction 271,000
Maintenance
Other
TOTAL 271,000 0 0 0 0
Project Balance -$ -$ -$ -$ -$
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2024-2028 CAPITAL IMPROVEMENT PROGRAM
2024 - Cost Share with County for addition of trail along south side of CR 74 (65th Street) from
Meadowgrass to Hadley; Safe Routes to School grant ($253,000)
50
Project Title Project description
Industrial Park Water Tower Construct water tower on City property north of the South East Industrial Park.
Department
Public Works
Funding Sources 2024 2025 2026 2027 2028
Tax Levy
Bonded Debt 4,000,000
State of Minnesota/MSA
Washington County
Federal/Grant Funding
Area Funds 2,500,000
Utility Funds 1,000,000
Assessments/Developer Fees
Other:
TOTAL 0 7,500,000 0 0 0
Project Expenses 2024 2025 2026 2027 2028
Land/Easements/Utility Relocation
Engineering/Architect 500,000
Admin/Legal
Construction 7,000,000
Maintenance
Other
TOTAL 0 7,500,000 0 0 0
Project Balance -$ -$ -$ -$ -$
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2024-2028 CAPITAL IMPROVEMENT PROGRAM
51
Project Title Project Description
Department
Public Works
Funding Sources 2024 2025 2026 2027 2028
Tax Levy
Bonded Debt
State of Minnesota/MSA
Washington County
Federal/Grant Funding
Area Funds
Utility Funds 700,000
Assessments/Developer Fees
Other: Newport
TOTAL - - - 700,000 -
Project Expenses 2024 2025 2026 2027 2028
Land/Easements/Utility Relocation
Engineering/Architect 100,000
Admin/Legal
Construction 600,000
Maintenance
Other
TOTAL - - - 700,000 -
Project Balance -$ -$ -$ -$ -$
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2024-2028 CAPITAL IMPROVEMENT PROGRAM
2027 - Pine Hill Water TowerWater Tower Painting/Rehab
52
Project Title Project Description
Annual well maintenance Each year a well is 'pulled' for inspection and repair of the pump and other vital parts.
Department
Public Works
Funding Sources 2024 2025 2026 2027 2028
Tax Levy
Bonded Debt
State of Minnesota/MSA
Washington County
Federal/Grant Funding
Area Funds
Utility Funds 70,000 70,000 70,000 70,000 70,000
Assessments/Developer Fees
Other:
TOTAL 70,000 70,000 70,000 70,000 70,000
Project Expenses 2024 2025 2026 2027 2028
Land/Easements/Utility Relocation
Engineering/Architect
Admin/Legal
Construction
Maintenance 70,000 70,000 70,000 70,000 70,000
Other
TOTAL 70,000 70,000 70,000 70,000 70,000
Project Balance -$ -$ -$ -$ -$
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2024-2028 CAPITAL IMPROVEMENT PROGRAM
53
Project Title Project description
Water System 2024 - SCADA Upgrades
2028 - Water Softening ($70,000,000 Intermediate Plant; $30,000,000 Low Plant)
Department
Public Works
Funding Sources 2024 2025 2026 2027 2028
Tax Levy
Bonded Debt
State of Minnesota/MSA
Washington County
Federal/Grant Funding 100,000,000
Area Funds
Utility Funds 1,035,000
Assessments/Developer Fees
Other:
TOTAL 1,035,000 0 0 0 100,000,000
Project Expenses 2024 2025 2026 2027 2028
Land/Easements/Utility Relocation
Engineering/Architect 135,000 30,000,000
Admin/Legal
Construction 70,000,000
Maintenance 900,000
Other
TOTAL 1,035,000 0 0 0 100,000,000
Project Balance -$ -$ -$ -$ -$
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2024-2028 CAPITAL IMPROVEMENT PROGRAM
54
Project Title Project Description
3M Settlement Implementation 2024-2025 - Low Zone Water Treatment Plant and Well 13
2025-2026 - Intermediate Zone Water Treatment Plant
2027 - Well 1, Well 2, and Temp Treatment Plant Decommissioning
Department
Public Works
Funding Sources 2024 2025 2026 2027 2028
Tax Levy
Bonded Debt
State of Minnesota/MSA
Washington County
Federal/Grant Funding
Area Funds 460,000
Utility Funds 314,000
Assessments/Developer Fees
Other: 3M Settlement 27,400,000 63,477,000 26,250,000 5,000,000
TOTAL 28,174,000 63,477,000 26,250,000 5,000,000 0
Project Expenses 2024 2025 2026 2027 2028
Land/Easements/Utility Relocation
Engineering/Architect 1,768,000 10,600,000 2,625,000 1,000,000
Admin/Legal
Construction 26,406,000 52,877,000 23,625,000 4,000,000
Maintenance
Other
TOTAL 28,174,000 63,477,000 26,250,000 5,000,000 0
Project Balance -$ -$ -$ -$ -$
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2024-2028 CAPITAL IMPROVEMENT PROGRAM
55
Project Title Project Description
Trunk Utility Oversizing Trunk oversizing of water and sewer facilities as part of development projects
Department
Public Works
Funding Sources 2024 2025 2026 2027 2028
Tax Levy
Bonded Debt
State of Minnesota/MSA
Washington County
Federal/Grant Funding
Area Funds 20,000 20,000 20,000 20,000 20,000
Utility Funds
Assessments/Developer Fees
Other:
TOTAL 20,000 20,000 20,000 20,000 20,000
Project Expenses 2024 2025 2026 2027 2028
Land/Easements/Utility Relocation
Engineering/Architect
Admin/Legal
Construction 20,000 20,000 20,000 20,000 20,000
Maintenance
Other
TOTAL 20,000 20,000 20,000 20,000 20,000
Project Balance -$ -$ -$ -$ -$
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2024-2028 CAPITAL IMPROVEMENT PROGRAM
56
Project Title Project Description
Stormwater maintenance Annual costs of pond and structure maintenance for City Stormwater system.
Department
Public Works
Funding Sources 2024 2025 2026 2027 2028
Tax Levy
Bonded Debt
State of Minnesota/MSA
Washington County
Federal/Grant Funding
Area Funds
Utility Funds 200,000 200,000 200,000 200,000 200,000
Assessments/Developer Fees
Other:
TOTAL 200,000 200,000 200,000 200,000 200,000
Project Expenses 2024 2025 2026 2027 2028
Land/Easements/Utility Relocation
Engineering/Architect
Admin/Legal
Construction
Maintenance 200,000 200,000 200,000 200,000 200,000
Other
TOTAL 200,000 200,000 200,000 200,000 200,000
Project Balance -$ -$ -$ -$ -$
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2024-2028 CAPITAL IMPROVEMENT PROGRAM
57
Project Title Project Description
2024/2025 - Lining trunk sewer from Jamaica and East Point down through the dog park
Department
Public Works
Funding Sources 2024 2025 2026 2027 2028
Tax Levy
Bonded Debt
State of Minnesota/MSA
Washington County
Federal/Grant Funding
Area Funds
Utility Funds 550,000 550,000 50,000 50,000 50,000
Assessments/Developer Fees
Other:
TOTAL 550,000 550,000 50,000 50,000 50,000
Project Expenses 2024 2025 2026 2027 2028
Land/Easements/Utility Relocation
Engineering/Architect
Admin/Legal
Construction
Maintenance 550,000 550,000 50,000 50,000 50,000
Other
TOTAL 550,000 550,000 50,000 50,000 50,000
Project Balance -$ -$ -$ -$ -$
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2024-2028 CAPITAL IMPROVEMENT PROGRAM
Annual sewer line
maintenance/spot sliplining
58
Project Title Project Description
Streetlight system improvements Annual cost to refurbish and upgrade the City Streetlight infrastructure.
Department
Public Works
Funding Sources 2024 2025 2026 2027 2028
Tax Levy
Bonded Debt
State of Minnesota/MSA
Washington County
Federal/Grant Funding
Area Funds
Utility Funds 100,000 100,000 100,000 100,000 100,000
Assessments/Developer Fees
Other:
TOTAL 100,000 100,000 100,000 100,000 100,000
Project Expenses 2024 2025 2026 2027 2028
Land/Easements/Utility Relocation
Engineering/Architect
Admin/Legal
Construction
Maintenance 100,000 100,000 100,000 100,000 100,000
Other
TOTAL 100,000 100,000 100,000 100,000 100,000
Project Balance -$ -$ -$ -$ -$
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2024-2028 CAPITAL IMPROVEMENT PROGRAM
59
Project Title Project description
Pedestrian Crossings
Department
Public Works
Funding Sources 2024 2025 2026 2027 2028
Tax Levy
Bonded Debt
State of Minnesota/MSA
Washington County
Federal/Grant Funding
Area Funds
Utility Funds 200,000
Assessments/Developer Fees
Other: School District 50,000
TOTAL 0 0 0 0 250,000
Project Expenses 2024 2025 2026 2027 2028
Land/Easements/Utility Relocation
Engineering/Architect 60,000
Admin/Legal
Construction 190,000
Maintenance
Other
TOTAL 0 0 0 0 250,000
Project Balance -$ -$ -$ -$ -$
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2024-2027 CAPITAL IMPROVEMENT PROGRAM
Install Pedestrian Crossing Infrastructure, including Rectangular Rapid Flashing Beacon and marked
crosswalk: 80th Street at Pinetree Valley Park and Pinetree Pond Park ($200,000), and Hadley
Avenue at 92nd Street ($50,000)
60
-This Page Intentionally left Blank -
61
Current
Year CIP
Last
Year CIP points Location Description map Maintenance Replace New Total
2024 2024 Utility Division Building FA1 13,250,000 13,250,000
2024 2024 Parks Matching funds 10,000 10,000
2024 2024 Public Landscape initiative 170,000 170,000
2024 2024 Parks Park design & master planning 15,000 15,000
2024 2024 Parks Annual addition of auto. locks on park buildings 35,000 35,000
2024 2022 Belden Park Backstop repair and curbing PR1 30,000 30,000
2024 2024 Bike Park Track improvements PR2 50,000 50,000
2024 2024 Hearthside Park Park improvements as part of pavement mgmt.PR3 100,000 100,000
2024 2024 Military Trailhead Neighborhood park development PR4 200,000 200,000
2024 2024 John and Marlys Denzer Park Neighborhood park development PR5 500,000 500,000
2024 2024 Oltman Middle School Lacrosse complex and parking lot construction PR6 700,000 700,000
2024 2024 West Draw, Granada, Nina Playground equipment PR7 210,000 210,000
2024 2024 Woodridge Park Sports lighting improvements PR8 113,000 113,000
2024 2024 Ice Arena PR9 100,000 580,000 680,000
2024 2024 CR 74 Trail Cost share with County PW1 271,000 271,000
2024 2024 Roadway & trail maintenance Streets, sidewalk/curb replacement, & trails 1,794,000 1,794,000
2024 2024 Pavement Management Prestige estates, and others (see Project Sheet)PW2 6,156,000 6,156,000
2024 2023 100th Street & Hadley Realignment Phase 3-South District Street & Utility Project PW3 5,250,000 5,250,000
2024 2024 511 CSAH 19 and TH 61 Design for 100th Street Extension PW4 7,000,000 7,000,000
2024 2024 East Point Douglas & Jamaica Reconstruction and Realignment PW5 4,907,000 4,907,000
2024 New Jamaica 80th to 90th PW2 3,380,000 3,380,000
2024 2022 Ravine Parkway Wolterstorff PW6 2,000,000 2,000,000
2024 2024 River Oaks Hwy 61 RCUT Reduced conflict U-turn intersection PW7 1,210,000 1,210,000
2024 2023 3M Settlement Implementation Low Zone Water Treatment plant & Well 13 PW8 28,174,000 28,174,000
2024 2023 Traffic Signal Hardwood Ave/Hardwood Ct PW9 700,000 700,000
2024 2024 East Ravine District City share of development infrastructure 50,000 50,000
2024 New SCADA upgrade 1,035,000 1,035,000
2024 2024 Trunk oversizing utilities 20,000 20,000
2024 2023 Jamaica & EPD through the dog park Spot replacement/slip lining 550,000 550,000
2024 2024 various stormwater Storm water maintenance 200,000 200,000
2024 2024 various streetlights System improvements 100,000 100,000
2024 2024 Well Maintenance Pull well 70,000 70,000
2,714,000 16,081,000 60,135,000 78,930,000
62
2024 CIP Project Locations
Cottage Grove, MN
Date: 8/9/2023
±INWOOD AVE100TH ST LAMAR AVEINNOVATION RDLEHIGH
RD
80TH ST
KIMBRO AVE70TH ST
(C.S.A.H.22)
85TH ST
65TH ST(CR 74)
100TH ST
103RD ST
80TH ST80TH ST
HILLSIDE
TRAILHADLEY AVEHINTON AVEJAMAICAAVEHADLEY AVEJAMAICA AVEIDEAL AVE77TH ST
JAMAICA AVE85TH ST
E
P
T
DO
U
G
L
A
S
R
D
E P
T
D
O
U
G
L
A
S
R
DKEATS AVENUE S(C.S.A.H. 19)HARKNESSAVE90TH ST
GRE
Y
C
L
O
U
D
T
R
L JAMAICAAVEINDIAN
BLVD
W
P
T
D
O
U
G
L
A
S
R
D
ST
A
T
E
H
W
Y
6
1KEATS AVE(C.S.A.H 19.)110TH ST
90TH STHARDWOODAVES
T
A
T
E
H
W
Y
6
1
95TH ST
ST
A
T
E
H
W
Y
6
1
70TH ST (CSAH 20)MANNINGAVE (STATEHWY 95)PW4
FA1
PW8
PW3
PW5
PW9
PW6
PR6
PR2/7
PR4
PR7
PR3
PW2
PR8
PW7
PR7
PR5
PR1
PR9
PW1
PW2
PW2
0 1 20.5 Miles
Facilities
Parks and Recreation
Public Works
CIP Projects
63
Current
Year CIP
Last
Year CIP points Location Description map Maintenance Replace New Total
2025 2025 PW & Parks Facility Internal office remodel FA2 500,000 500,000
2025 2025 Parks Matching funds 10,000 10,000
2025 2025 Public Landscape initiative 120,000 120,000
2025 2025 Parks Park design & master planning 15,000 15,000
2025 2025 Parks Annual addition of auto. locks on park buildings 35,000 35,000
2025 New Hamlet Park PR10 17,000,000 17,000,000
2025 2025 Hardwood & Belden Parks Playground equipment PR11 140,000 140,000
2025 2025 Hearthside Park Sports lighting improvements-ice rink PR3 65,000 65,000
2025 2025 Ice Arena PR9 35,000 35,000
2025 2025 Kingston Park Building replacement & additional power PR12 600,000 600,000
2025 2025 Lamar Park Shade structure replacement PR13 80,000 80,000
2025 2024 Oltman Middle School Lacrosse complex and parking lot construction PR6 2,300,000 2,300,000
2025 2025 Pine Glen Park Picnic shelter PR14 40,000 40,000
2025 2024 Roberts Lake Development Neighborhood park development PR15 500,000 500,000
2025 2023 Still Ponds Neighborhood park development 500,000 500,000
2025 2025 Roadway & trail maintenance Streets, sidewalk/curb replacement, & trails 1,884,000 1,884,000
2025 2025 Pavement Management Thompson Grove Estates 2nd, EPD (Jamaica to Hyde) Kingsborough Trail PW10 4,745,000 4,745,000
2025 2025 511 CSAH 19 and TH 61 100th Street Extension PW4 3,000,000 3,000,000
2025 2025 East Point Douglas & Jamaica Reconstruction and Realignment 800,000 800,000
2025 2024 Ravine Parkway Kemp property PW11 2,000,000 2,000,000
2025 2024 Ravine Parkway-Shoppes at CV Phase 1 Construction-roadway & infrastructure PW12 5,325,000 5,325,000
2025 2025 East Ravine District City share of development infrastructure 50,000 50,000
2024 2024 3M Settlement Implementation Intermediate zone water treatment plant PW13 63,477,000 63,477,000
2025 2023 Industrial Park Water Tower Construct Water Tower PW14 7,500,000 7,500,000
2025 2025 Traffic Signal 80th & Jamaica PW15 700,000 700,000
2025 2025 Traffic Improvement CSAH 19 & Indian Blvd.PW16 700,000 700,000
2025 2025 Trunk oversizing Utilities 20,000 20,000
2025 2023 Jamaica & EPD through the dog park Spot replacement/slip lining 550,000 550,000
2025 2025 various stormwater Storm water maintenance 200,000 200,000
2025 2025 various streetlights System improvements 100,000 100,000
2025 2025 Well Maintenance Pull well 70,000 70,000
2,804,000 7,005,000 103,252,000 113,061,000
64
2025 CIP Project Locations
Cottage Grove, MN
Date: 8/9/2023
±INWOOD AVE100TH ST LAMAR AVEINNOVATION RDLEHIGH
RD
80TH ST
KIMBRO AVE70TH ST
(C.S.A.H.22)
85TH ST
65TH ST(CR 74)
100TH ST
103RD ST
80TH ST80TH ST
HILLSIDE TRAILHADLEY AVEHINTON AVEJAMAICA AVEHADLEY AVEJAMAICA AVEIDEAL AVE77TH ST
JAMAICA AVE85TH ST
E
P
T
DO
U
G
L
A
S
R
D
E P
T
D
O
U
G
L
A
S
R
DKEATS AVENUE S(C.S.A.H. 19)HARKNESS AVE90TH ST
GRE
Y
C
L
O
U
D
T
R
L JAMAICA AVEINDIAN
BLVD
W
P
T
D
O
U
G
L
A
S
R
D
ST
A
T
E
H
W
Y
6
1KEATS AVE(C.S.A.H 19.)110TH ST
90TH STHARDWOODAVES
T
A
T
E
H
W
Y
6
1
95TH ST
ST
A
T
E
H
W
Y
6
1
70TH ST(CSAH 20)MANNINGAVE (STATEHWY 95)PR13
PW12
PW4
PW14
PR6 PR15PW11
PW13PR3
FA2
PR11
PR12
PR11
PW10
PR14
PW10
PW15
PW16
PR9
PR10
0 1 20.5 Miles
Facilities
Parks and Recreation
Public Works
CIP Projects
65
Current
Year CIP
Last
Year CIP points Location Description map Maintenance Replace New Total
2026 2026 Parks matching funds 10,000 10,000
2026 2026 Public Landscape initiative 80,000 80,000
2026 2026 Parks Park design & master planning 15,000 15,000
2026 2026 Parks Annual addition of auto. locks on park buildings 35,000 35,000
2026 2026 East Ravine or 110th Street Park Neighborhood park development PR16 500,000 500,000
2026 2026 Hamlet Park Skate park surface replacement PR10 100,000 100,000
2026 2026 Hamlet Park Sports lighting improvements PR10 355,000 355,000
2026 New Mississippi Dunes PR17 13,000,000 13,000,000
2026 New Parks Hillside/Jergen Trail as part of pavement mgmt. PR18 75,000 75,000
2026 2026 Woodridge Park Hockey rink boards replacement PR8 50,000 50,000
2026 New Ice Arena PR9 10,000 10,000
2026 2026 Roadway & trail maintenance Streets, sidewalk/curb replacement, & trails 1,979,000 1,979,000
2026 2025 511 CSAH 19 and TH 61 100th Street Extension PW4 16,500,000 16,500,000
2026 2026 Ravine Parkway-Shoppes at CV Phase 2 Construction-roadway & infrastructure PW12 4,021,000 4,021,000
2026 2026 Pavement Management
Woodridge Park (E of Jamaica) CG Estates, Meadow
Acres, Pine Glen PW17 5,436,000 5,436,000
2026 2024 80th Street Ideal to Hwy 61 (see Project Sheet)PW18 10,000,000 10,000,000
2026 2026 80th Street Roundabout at Keats Ave (cost share)PW19 1,000,000 1,000,000
2026 2025 Ravine Parkway Geis PW20 2,000,000 2,000,000
2026 New 3M Settlement Implementation Intermediate zone water treatment plant 26,250,000 26,250,000
2026 2026 East Ravine District City share of development infrastructure 50,000 50,000
2026 2026 Trunk oversizing Utilities 20,000 20,000
2026 2026 Various sewer Spot replacement/slip lining 50,000 50,000
2026 2026 various stormwater Storm water maintenance 200,000 200,000
2026 2026 various streetlights System improvements 100,000 100,000
2026 2026 Well Maintenance Pull well 70,000 70,000
2,399,000 17,026,000 62,481,000 81,906,000
66
2026 CIP Project Locations
Cottage Grove, MN
Date: 8/9/2023
±INWOOD AVE100TH ST LAMARAVEINNOVATION RDLEHIGH
RD
80TH ST
KIMBRO AVE70TH ST(C.S.A.H.22)
85TH ST
65TH ST(CR 74)
100TH ST
103RD ST
80TH ST80TH ST
HILLSIDE TRAILHADLEY AVEHINTON AVEJAMAICA AVEHADLEY AVEJAMAICA AVEIDEAL AVE77TH ST
JAMAICA AVE85TH STE
P
T
DO
U
G
L
A
S
R
D
E P
T
D
O
U
G
L
A
S
R
DKEATS AVENUE S(C.S.A.H. 19)HARKNESS AVE90TH ST
GRE
Y
C
L
O
U
D
T
R
L JAMAICA AVEINDIANBLVD
W
P
T
DO
U
G
L
A
S
R
D
ST
A
T
E
H
W
Y
6
1KEATS AVE(C.S.A.H 19.)110THST
90TH STHARDWOODAVEST
A
T
E
H
W
Y
6
1
95TH ST
ST
A
T
E
H
W
Y
6
1
70TH ST (CSAH 20)MANNINGAVE (STATEHWY 95)PR16
PR10
PR16
PW12
PW4
PW18
PR8
PW20
PW19
PW17
PR9
PR18
PR17
0 1 20.5 Miles
CIP Projects
Parks and Rec
Public Works
67
Current
Year CIP
Last
Year CIP points Location Description map Maintenance Replace New Total
2027 2027 Parks matching funds 10,000 10,000
2027 2027 Public Landscape initiative 100,000 100,000
2027 2027 Parks Park design & master planning 15,000 15,000
2027 2027 Parks Annual addition of auto. locks on park buildings 35,000 35,000
2027 2027 East Ravine or 110th Street Park Neighborhood park development PR16 500,000 500,000
2027 2027 Hamlet Park Shelter replacement PR10 50,000 50,000
2027 2027 Lamar Park Roof replacement PR13 10,000 10,000
2027 2027 Lamar Park Sports lighting improvements PR13 350,000 350,000
2027 2027 Pine Coulee Court replacement PR19 20,000 20,000
2027 New Ice Arena PR9 120,000 120,000
2026 New River Oaks PR20 6,000,000 6,000,000
2027 2027 Roadway & trail maintenance Streets, sidewalk/curb replacement, & trails 2,078,000 2,078,000
2027 2027 Pavement Management
Thompson Grove 11&12, Woodridge Park Add (W of
Jamaica)PW21 4,021,000 4,021,000
2027 2027 Ravine Parkway-Shoppes at CV Phase 3 Construction-roadway & infrastructure PW12 1,253,000 1,253,000
2027 2027 511 CSAH 19 and TH 61 Realignment of bridge (see project sheet)PW4 16,500,000 16,500,000
2027 2025
Harkness Ave - Hardwood to
Woodridge Reconstruct roadway PW22 3,162,000 3,162,000
2027 2026 Ravine Parkway Tank PW23 2,000,000 2,000,000
2027 2026 3M Settlement Implementation Well 1 & 2 and Temp Treatment Plant decommission 5,000,000 5,000,000
2027 2025 Pine Hill Water tower painting 700,000 700,000
2027 2027 East Ravine District City share of development infrastructure 50,000 50,000
2027 2027 Trunk oversizing Utilities 20,000 20,000
2027 2027 Various sewer Spot replacement/slip lining 50,000 50,000
2027 2027 various stormwater Storm water maintenance 200,000 200,000
2027 2027 various streetlights System improvements 100,000 100,000
2027 2027 Well Maintenance Pull well 70,000 70,000
3,198,000 12,733,000 26,483,000 42,414,000
68
2028 CIP Project Locations
Cottage Grove, MN ±
Date: 10/12/2023INWOOD AVE100TH ST LAMAR AVELEH
IGH
RD
80TH ST
INNOVATION RDKIMBRO AVE70TH ST
(C.S.A.H.22)
85TH ST
65TH ST (CR 74)
100TH ST
103RD ST
80TH ST80TH ST
HILLSIDE TRAILHINTON AVEJAMAICA AVEHADLEY AVEJAMAICA AVEIDEAL AVE77TH ST
JAMAICA AVE85TH STHADLEY AVEE
P
T
DO
U
G
L
A
S
R
DKEATS AVENUE S(C.S.A.H. 19)HARKNESS AVE90TH ST
GRE
Y
C
L
O
U
D
T
R
L JAMAICA AVEINDIAN
BLVD
W
P
T
D
O
U
G
L
A
S
R
D
ST
A
T
E
H
W
Y
6
1KEATS AVE(C.S.A.H 19.)110THST
90TH STHARDWOODAVEST
A
T
E
H
W
Y
6
1
ST
A
T
E
H
W
Y
6
1
95TH ST
70TH ST (CSAH 20)MANNINGAVE (STATEHWY 95)PW27
PR16
PW24
PR16
PW23
PR9
PR22
PR23
PR24
PR21PW25
PW26
PW28
PW28
Public Works
Parks and Recreation
CIP Projects
0 1 20.5 Miles
69
Current
Year CIP
Last
Year CIP points Location Description map Maintenance Replace New Total
2028 Parks matching funds 10,000 10,000
2028 Public Landscape initiative 120,000 120,000
2028 Parks Park design & master planning 15,000 15,000
2028 Parks Annual addition of auto. locks on park buildings 35,000 35,000
2028 Archery Range Shelter and trail work as part of pavement mgmt.PR21 70,000 70,000
2028 East Ravine or 110th Street Park Neighborhood park development PR16 500,000 500,000
2028 Highlands Park Tennis court replacement PR22 100,000 100,000
2028 Old Cottage Grove Park Sports lighting replacement PR23 35,000 35,000
2028 Peter Thompson Park Upgrades, roof reshingle, rink board replacement PR24 115,000 115,000
2027 New Ice Arena PR9 200,000 200,000
2028 Roadway & trail maintenance Streets, sidewalk/curb replacement, & trails 2,183,000 2,183,000
2028 Pavement Management Thompson Grove Estates, Pinegrove PW25 2,770,200 2,770,200
2028 511 CSAH 19 and TH 61 Realignment of bridge (see project sheet)PW26 22,900,000 22,900,000
2028 Jamaica 70th to Military PW27 3,000,000 3,000,000
2028 2027 Ravine Parkway Tank PW23 2,000,000 2,000,000
2028 2027 103rd Street Railroad Budget reconstruction of 103rd street railroad bridge PW24 8,000,000 8,000,000
2028 East Ravine District City share of development infrastructure 50,000 50,000
2028 Trunk oversizing Utilities 20,000 20,000
2028 Water softening Federal/Grant Funding 100,000,000 100,000,000
2028 Various sewer Spot replacement/slip lining 50,000 50,000
2028 various stormwater Storm water maintenance 200,000 200,000
2028 various streetlights System improvements 100,000 100,000
2028 80th St at PV Park & PT Pond Park pedestrian crossings PW28 200,000 200,000
2028 Hadley at 92nd Street pedestrian crossings PW28 50,000 50,000
2028 Well Maintenance Pull well 70,000 70,000
2,603,000 11,220,200 128,970,000 142,793,200
70
2028 CIP Project Locations
Cottage Grove, MN ±
Date: 10/12/2023INWOOD AVE100TH ST LAMAR AVELEH
IGH
RD
80TH ST
INNOVATION RDKIMBRO AVE70TH ST
(C.S.A.H.22)
85TH ST
65TH ST (CR 74)
100TH ST
103RD ST
80TH ST80TH ST
HILLSIDE TRAILHINTON AVEJAMAICA AVEHADLEY AVEJAMAICA AVEIDEAL AVE77TH ST
JAMAICA AVE85TH STHADLEY AVEE
P
T
DO
U
G
L
A
S
R
DKEATS AVENUE S(C.S.A.H. 19)HARKNESS AVE90TH ST
GRE
Y
C
L
O
U
D
T
R
L JAMAICA AVEINDIAN
BLVD
W
P
T
D
O
U
G
L
A
S
R
D
ST
A
T
E
H
W
Y
6
1KEATS AVE(C.S.A.H 19.)110THST
90TH STHARDWOODAVEST
A
T
E
H
W
Y
6
1
ST
A
T
E
H
W
Y
6
1
95TH ST
70TH ST (CSAH 20)MANNINGAVE (STATEHWY 95)PW27
PR16
PW24
PR16
PW23
PR9
PR22
PR23
PR24
PR21PW25
PW26
PW28
PW28
Public Works
Parks and Recreation
CIP Projects
0 1 20.5 Miles
71
2021 2022 2023 2024 2025 2026 2027 2028
ACTUAL ACTUAL ESTIMATED ESTIMATED ESTIMATED ESTIMATED ESTIMATED ESTIMATED
REVENUES
Aggregate tax 23,467$ 33,044$ 22,000$ 22,000$ 22,000$ 22,000$ 22,000$ 22,000$
Grant Funds 267,000$
Franchise fees 615,326 642,584 643,000 1,905,600 1,994,400 2,086,900 2,183,100 2,283,200
Investment Interest (5,207) (31,816) 10,000 10,000 10,000 10,000 10,000 10,000
Charges for services 30,766 27,829 - - - - - -
Developer charges 104,157 26,081 - - - - - -
Total Revenue 768,509 697,722 675,000 2,204,600 2,026,400 2,118,900 2,215,100 2,315,200
EXPENDITURES
Commodities 31,134 35,021 36,800
Trail fog seal, crack seal and sidewalk/curb repair 240,000 252,000 264,800 278,300 292,500
CR 74 trail 271,000
Mill and Overlay 551,756 1,159,043 924,000 970,000 1,019,000 1,070,000 1,124,000
Trail replacement 480,000 504,000 529,200 555,700 583,500
Engineering for M&O and Trail replacement 150,000 158,000 166,000 174,000 183,000
Contractual services 256,639 269,333 607,920
Total Expenditures 839,529 1,463,397 644,720 2,065,000 1,884,000 1,979,000 2,078,000 2,183,000
Other Financing Sources (uses)
- - - - - - - -
Total transfers - - - - - - - -
Increase (decrease) in fund balance (71,020) (765,675) 30,280 139,600 142,400 139,900 137,100 132,200
FB Balance beginning of year 1,067,414 996,394 230,719 260,999 400,599 542,999 682,899 819,999
FB Balance end of year 996,394 230,719 260,999 400,599 542,999 682,899 819,999 952,199
City of Cottage Grove, MN
Capital Improvement Plan 2024-2028
Road and Trailway Maintenance Fund (235)
Projected Financial Position
72
2021 2022 2023 2024 2025 2026 2027 2028
ACTUAL ACTUAL ESTIMATED ESTIMATED ESTIMATED ESTIMATED ESTIMATED ESTIMATED
REVENUES
Donation 400,000 400,000
Grant 165,000 Interest 4,000
Miscellaneous
Total Revenue - - 404,000 565,000 - - - -
EXPENDITURES
Solar Panels 550,000
North Rink-party lights 30,000
Water treatment system 100,000
West Rink-bleacher heat 35,000
Locker 5/6/7-furnace 10,000
Zamboni replacement 120,000
North Rink-dehumidifier 200,000
Total Expenditures - - - 680,000 35,000 10,000 120,000 200,000
Other Financing Sources (uses)
Transfer in from Ice Operating 100,000 100,000
Total other sources - - - - - - 100,000 100,000
Increase (decrease) in fund balance - - 404,000 (115,000) (35,000) (10,000) (20,000) (100,000)
FB Beginning balance - - - 404,000 289,000 254,000 244,000 224,000
FB Ending balance - - 404,000 289,000 254,000 244,000 224,000 124,000
City of Cottage Grove, MN
Capital Improvement Plan 2024-2028
Ice Arena Capital Fund (526)
Projected Financial Position
73
2021 2022 2023 2024 2025 2026 2027 2028ACTUALACTUALESTIMATEDESTIMATEDESTIMATEDESTIMATEDESTIMATEDESTIMATED
REVENUES
Charges for Services*1,020,513$ 1,083,689$ 1,146,550$ 1,198,400$ 1,251,100$ 1,288,600$ 1,327,300$ 1,367,100$
Intergovernmental - County/State 204,395 186,844
Interest (12,076) (98,612) 10,000 10,000 10,000 10,000 10,000 10,000
Miscellaneous 95,000
Total Revenue 1,307,832 1,171,921 1,156,550 1,208,400 1,261,100 1,298,600 1,337,300 1,377,100
EXPENDITURES
Operating expenses 567,711 820,953 667,270 516,905 618,310 636,859 655,965 675,644
Pavement Management 178,935 127,700 236,000 174,000 208,000 154,000 154,000
Annual maintenance projects 244,426 200,000 200,000 200,000 200,000 200,000 200,000
Developer pass thru 187,482
80th Street
Glacial Valley
Capital Outlay 33,181 55,000
Total Expenditures 967,309 1,065,379 1,049,970 952,905 992,310 1,044,859 1,009,965 1,029,644
OTHER FINANCING SOURCES (USES)
Transfers in
Transfers out (42,540) (394,046) (45,100) (46,500) (50,000) (50,000) (50,000) (50,000)
Total other sources (42,540) (394,046) (45,100) (46,500) (50,000) (50,000) (50,000) (50,000)
Increase (decrease) in fund balance 297,983 (287,504) 61,480 208,995 218,790 203,741 277,335 297,456
FB Beginning balance 2,049,769 2,347,752 2,060,248 2,121,728 2,330,723 2,549,513 2,753,254 3,030,589
FB Ending balance 2,347,752 2,060,248 2,121,728 2,330,723 2,549,513 2,753,254 3,030,589 3,328,045
* Revenue for 2024-2026 from 2022 Stormwater Rate Study
City of Cottage Grove, MN
Capital Improvement Plan 2024-2028
Storm Water Utility Fund (230)
Projected Financial Position
74
2021 2022 2023 2024 2025 2026 2027 2028
ACTUAL ACTUAL ESTIMATED ESTIMATED ESTIMATED ESTIMATED ESTIMATED ESTIMATED
REVENUES
Charges for Services*3,382,209$ 3,447,474$ 3,428,830$ 3,606,910$ 3,808,660$ 3,922,920$ 4,040,607$ 4,161,826$ Intergovernmental - County/State 34,711 34,538 100,000 100,000,000 Interest (46,384) (346,706) 50,000 50,000 50,000 50,000 50,000 50,000 Miscellaneous 267,091 177,004 32,000 34,000 34,000 34,000 34,000 34,000 Total Revenue 3,637,627 3,312,310 3,510,830 3,790,910 3,892,660 4,006,920 4,124,607 104,245,826
EXPENDITURES
Operating expenses 2,018,904 2,436,194 2,217,620 2,653,125 2,762,750 2,845,633 2,931,001 3,018,932
Water meter replacement project
Water conservation projects 100,000 305,200 305,200 305,200 305,200 305,200
Well maintenance 70,000 70,000 70,000 70,000 70,000 70,000
Water tower painting 700,000 Water tower 1,000,000 SCADA Upgrades 1,035,000 Utilities Building 750,000 13,250,000 Water Softening 100,000,000
Pavement management 113,500 216,000 160,000 191,000 132,000 132,000
80th Street 660,000
EPD & Jamaica 357,000 250,000
Capital Equipment 110,000 150,000
Glacial Valley
Total Expenditures 2,018,904 2,436,194 3,718,120 17,929,325 4,297,950 4,071,833 4,138,201 103,526,132
OTHER FINANCING SOURCES (USES)
Bond issuance 9,750,000 Interfund loan 27,500 - - - - - - Changes in assets and liabilities (34,036) Transfers inTransfers out (245,601) (467,138) (197,800) (203,740) (209,850) (216,100) (222,600) (229,300) Total other sources (218,101) (501,174) (197,800) 9,546,260 (209,850) (216,100) (222,600) (229,300)
Increase (decrease) in fund balance 1,400,622 374,942 (405,090) (4,592,155) (615,140) (281,013) (236,194) 490,394
Unrestricted FB Beginning balance 6,599,743 8,000,365 8,375,307 7,970,217 3,378,062 2,762,922 2,481,909 2,245,715
Unrestricted FB Ending balance 8,000,365 8,375,307 7,970,217 3,378,062 2,762,922 2,481,909 2,245,715 2,736,109
*Revenue from 2022 Rate Study
City of Cottage Grove, MNCapital Improvement Plan 2024-2028
Water Utility Fund (610)Projected Financial Position
75
2021 2022 2023 2024 2025 2026 2027 2028ACTUALACTUALESTIMATEDESTIMATEDESTIMATEDESTIMATEDESTIMATEDESTIMATED
REVENUES
Charges for Service*3,336,966$ 3,567,096$ 3,784,550$ 4,164,700$ 4,542,100$ 4,769,200$ 5,007,700$ 5,258,100$
Interest 10,012 (115,511) 56,000 56,000 56,000 56,000 56,000 56,000
Grant-Met Council
Miscellaneous 16,028 96,757 2,500 2,500 2,500 2,500 2,500 2,500
Total Revenue 3,363,006 3,548,342 3,843,050 4,223,200 4,600,600 4,827,700 5,066,200 5,316,600
EXPENDITURES
Operating Expenses 2,959,164 3,331,355 3,585,155 3,822,070 3,976,825 4,096,130 4,219,014 4,345,584
Pavement Management 251,000 248,000 183,000 219,000 150,000 150,000
Vac Truck 350,000
SCADA Upgrades 103,500
Sewer slip lining - spot replacement 550,000 550,000 50,000 50,000 50,000 EPD & Jamaica 357,500 250,000
80th Street 660,000
Glacial Valley -
Total Expenditures 2,959,164 3,331,355 4,193,655 4,973,570 5,059,825 5,025,130 4,419,014 4,545,584
OTHER FINANCING SOURCES (USES)
Transfers in
Transfers out (243,412) (418,313) (197,800) (203,740) (209,850) (216,100) (222,600) (229,300)
Total other sources (243,412) (418,313) (197,800) (203,740) (209,850) (216,100) (222,600) (229,300)
Increase (decrease) in fund balance 160,430 (201,326) (548,405) (954,110) (669,075) (413,530) 424,586 541,716
Unrestricted FB Beginning balance 5,883,429 6,043,859 5,842,533 5,294,128 4,340,018 3,670,943 3,257,413 3,682,000
Unrestricted FB Ending balance 6,043,859 5,842,533 5,294,128 4,340,018 3,670,943 3,257,413 3,682,000 4,223,716
*Revenue from 2022 Rate Study
Capital Improvement Plan 2024-2028
City of Cottage Grove, MN
Sewer Utility Fund (620)
Projected Financial Position
76
2021 2022 2023 2024 2025 2026 2027 2028
ACTUAL ACTUAL ESTIMATED ESTIMATED ESTIMATED ESTIMATED ESTIMATED ESTIMATED
REVENUES
Charges for Services 747,974$ 871,602$ 945,500$ 1,020,000$ 1,071,000$ 1,103,100$ 1,158,300$ 1,216,200$
City Supplied Poles 294,300$ 114,510$ 175,000$ 167,000$ 172,000$
Intergovernmental - County/State 350,000 50,000
Development Charge 350,000
Interest (3,293) (22,309) 10,000
Miscellaneous 73,237 52,098 20,000 20,000 20,000 20,000 20,000 20,000 Total Revenue 1,112,218 1,015,901 1,150,500 1,207,000 1,963,000 1,123,100 1,178,300 1,286,200
EXPENDITURES
Operating expenses 1,045,259 875,964 842,745 954,420 987,877 1,007,635 1,027,787 1,048,343
Pavement management 81,000
Replace/install Signal lights
Traffic Signal-Hardwood Ave/Hardwood Ct*700,000
Traffic Signal-80th/Jamaica 700,000 Traffic Improvement-Keats/Indian Blvd 700,000
80th Street-Ideal to Hwy 61 680,000
Annual system improvements 100,000 100,000 100,000 100,000 100,000 100,000
Pedestrian Crossings 250,000
Total Expenditures 1,045,259 875,964 1,023,745 1,754,420 2,487,877 1,787,635 1,127,787 1,398,343
OTHER FINANCING SOURCES (USES)
Transfers in 700,000 Transfers out (48,650) (217,960) (51,500) (53,000) (56,000) (50,000) (50,000) (50,000)
Total other sources (48,650) (217,960) (51,500) 647,000 (56,000) (50,000) (50,000) (50,000)
Increase (decrease) in fund balance 18,309 (78,023) 75,255 99,580 (580,877) (714,535) 513 (162,143)
Unrestricted FB Beginning balance 434,523 452,832 374,809 450,064 549,644 (31,233) (745,768) (745,255)
Unrestricted FB Ending balance 452,832 374,809 450,064 549,644 (31,233) (745,768) (745,255) (907,398)
*Signals will be funded with TIF 1-12 funds.
City of Cottage Grove, MN
Capital Improvement Plan 2024-2028
Street Light Utility Fund (630)
Projected Financial Position
77
2021 2022 2023 2024 2025 2026 2027 2028
ACTUAL ACTUAL ESTIMATED ESTIMATED ESTIMATED ESTIMATED ESTIMATED ESTIMATED REVENUES
Cell Tower Leases 359,409 618,847 500,000 500,000 500,000 450,000 400,000 400,000 Property Tax Levy 190,000 190,000 190,000
Interest (10,461) (67,918) 10,000 10,000 11,203 6,615 7,581 8,807 other (including donations)12,500 80,000 Total Revenue 361,448 550,929 510,000 590,000 511,203 646,615 597,581 598,807
EXPENDITURES
Arbor Meadows - playground 100,000 Archery Range Shelter & trail works as part of PM 70,000 Belden playground equipment 70,000
Belden-backstop repair & curbing 30,000 Bike park - picnic shelter & track paving 40,000 50,000
Community Center planning for referendum 56,046 Donations - matching funding 10,000 10,000 10,000 10,000 10,000 10,000 Dog Park-small area enrichment & drainage 20,000
Hamlet skatepark 100,000 Hamlet-shelter replacement 50,000
Hamlet 367,445 279,651 Hamlet-Court Reconstruction 100,000 Hardwood playground equipment 70,000
Hearthside basketball courts & playground 4,480 92,246 Hearthside Park Improvements as part of PM 100,000
Hidden valley playground 53,931 Highland playground equipment 12,829 150,000 Highland rink lighting 58,884
Highlands-Fence repair 31,834 Highlands-Tennis court replacement 100,000
Hillside/Jergen Trail as part of PM 75,000 Ideal playground equipment 65,000 Kingston Park -Building replacement & power supply 600,000
Kingston Park-Fitness Equipment 36,825 Lamar Park-shade shelter replace. & roof replace.80,000 10,000
Sport Lighting Improvements 65,000 113,000 65,000 355,000 350,000 35,000 Meadowgrass play equip 51,562 Peter Thompson play equipment 140,000
Peter Thompson Upgrades 115,000 Pine Coulee-Court Replacement 20,000
Pine Glen-Picnic shelter 40,000 Pinetree Pond Play equipment 65,000 Woodridge shelter/hockey boards replacement 50,000
West Draw, Granada & Nina Park play equipment 210,000 Automatic locks on park buildings 35,000 35,000 35,000 35,000 35,000 35,000
Credit card machine rent 6,348 miscellaneous 1,465 115,005
Total Expenditures 580,447 688,104 690,000 548,000 970,000 625,000 475,000 365,000
OTHER FINANCING SOURCES (USES)Transfer (to) from pavement management 100,000 75,000 70,000 Total other sources - - - 100,000 - 75,000 - 70,000
Increase (decrease) in fund balance (218,999) (137,175) (180,000) 142,000 (458,797) 96,615 122,581 303,807
FB Beginning balance 1,514,440 1,295,441 1,158,266 978,266 1,120,266 661,469 758,083 880,664
FB Ending balance 1,295,441 1,158,266 978,266 1,120,266 661,469 758,083 880,664 1,184,471
City of Cottage Grove, MN
Capital Improvement Plan 2024-2028
Park Improvement Fund (515)Projected Financial Position
78
2021 2022 2023 2024 2025 2026 2027 2028
ACTUAL ACTUAL ESTIMATED ESTIMATED ESTIMATED ESTIMATED ESTIMATED ESTIMATED
REVENUES
Intergovernmental 461,900$ 1,000,000$ 350,000$ -$ -$ -$ -$
Park Dedication Fees 1,986,872 1,144,364 348,000 200,000 200,000 200,000 200,000 200,000
special assessments - Interest (13,627) (71,668) Land saleMiscellaneous - Refunds & Reimbursements 19,909 52,683 Total Revenue 1,993,154 1,587,279 1,348,000 550,000 200,000 200,000 200,000 200,000
EXPENDITURES
Miscellaneous 1,612 40,734
Camel's Hump Park - develop & trails
East Ravine Neighborhood 500,000 500,000 500,000
Glacial Valley Park 17,400 2,504,690 4,200,000
Hamlet Park Expansion 919,327 58,006
Mississippi Dunes 9,500 10,149 1,000,000
Michaels Pointe Park Military Trailhead 200,000 Neighborhood parksJack and Marlys Denzer Park 500,000 Oakwood Park 786,237 331,225 Parks - master planning 6,437 15,000 15,000 15,000 15,000 15,000 15,000
Oltman Middle School 700,000 2,300,000
Roberts Lake Neighborhood development 500,000
Settlers Island landing/picnic pad
Still Ponds park development 500,000
Strawberry Fields (Swanlund)265,587
Woodridge Trail
Total Expenditures 2,006,100 2,944,804 5,215,000 1,415,000 3,315,000 515,000 515,000 515,000
OTHER FINANCING SOURCES (USES)Bonded Debt 4,880,000 Transfer from EDA
Transfer from Utilities -
Transfer from (to) park improvement & ED Trust - (130,000) - - - -
Total other sources - - 4,750,000 - - - - -
Increase (decrease) in fund balance (12,946) (1,357,525) 883,000 (865,000) (3,115,000) (315,000) (315,000) (315,000)
FB Beginning balance 1,518,129 1,505,183 147,658 1,030,658 165,658 (2,949,342) (3,264,342) (3,579,342)
FB Ending balance 1,505,183 147,658 1,030,658 165,658 (2,949,342) (3,264,342) (3,579,342) (3,894,342)
City of Cottage Grove, MN
Capital Improvement Plan 2024-2028
Park Trust Fund (570)
Projected Financial Position
79
2021 2022 2023 2024 2025 2026 2027 2028
ACTUAL ACTUAL ESTIMATED ESTIMATED ESTIMATED ESTIMATED ESTIMATED ESTIMATED
REVENUES
Grants 76,051 80,000
Tree Mitigation-6489 279,914 50,000 40,000 40,000 40,000 40,000 40,000 Total Revenue 279,914 76,051 50,000 120,000 40,000 40,000 40,000 40,000
EXPENDITURES
Landscape Initiative 116,770 92,889 180,000 170,000 120,000 80,000 100,000 120,000
Ravine Parkway Landscaping
EPD and Jamaica Landscaping
Total Expenditures 116,770 92,889 180,000 170,000 120,000 80,000 100,000 120,000
Other Financing Sources (uses)
Transfer In
Transfer Out-EPD & Jamaica (30,000) (10,000)
Total other sources - - (30,000) (10,000) - - - -
Increase (decrease) in fund balance 163,144 (16,838) (160,000) (60,000) (80,000) (40,000) (60,000) (80,000)
FB Beginning balance 540,802 703,946 687,108 527,108 467,108 387,108 347,108 287,108
FB Ending balance 703,946 687,108 527,108 467,108 387,108 347,108 287,108 207,108
Capital Improvement Plan 2024-2028
City of Cottage Grove, MN
Landscape Initiative-in Fund 510
Projected Financial Position
80
2021 2022 2023 2024 2025 2026 2027 2028
ACTUAL ACTUAL ESTIMATED ESTIMATED ESTIMATED ESTIMATED ESTIMATED ESTIMATED
REVENUES
Property taxes 249,975 249,846 250,000 300,000 300,000 300,000 300,000 300,000
intergovernmental -
tower rental - PW Tower 59,431 92,034 61,000 61,000 61,000 61,000 61,000 61,000 Investment interest (665) (5,252)
Miscellaneous
Total Revenue 308,741 336,628 311,000 361,000 361,000 361,000 361,000 361,000
EXPENDITURES
Municipal building expenses 419 12,576 131,211
Shop & Wash Bay Modifications - 500,000 City Hall-Water Heater& Carpet 120,000
Central Fire-Water Pumps - 20,000
Public Works-Water Heater 12,000
Public Works-Garage doors&flooring - 85,000
Public Works-Roof replacement 1,000,000
Total Expenditures 419 12,576 131,211 - 500,000 12,000 120,000 1,105,000
Other Financing Sources (uses)
Interfund loan interest (27,551) (25,450)
Interfund loan payment (250,000) (250,000) (250,000) (250,000) (250,000) (250,000) (250,000) Transfer from General Fund 46,449
Total other sources 18,898 (275,450) (250,000) (250,000) (250,000) (250,000) (250,000) (250,000)
Increase (decrease) in fund balance 327,220 48,602 (70,211) 111,000 (389,000) 99,000 (9,000) (994,000)
FB Beginning balance (2,910,591) (2,583,371) (2,284,769) (2,104,980) (1,743,980) (1,882,980) (1,533,980) (1,292,980)
FB Ending balance (2,583,371) (2,284,769) (2,104,980) (1,743,980) (1,882,980) (1,533,980) (1,292,980) (2,036,980)
Cash Balance at year-end 68,281 124,719 54,508 165,508 (223,492) (124,492) (133,492) (1,127,492)
Interfund Payable at year-end 2,650,000 2,400,000 2,150,000 1,900,000 1,650,000 1,400,000 1,150,000 900,000
City of Cottage Grove, MN
Municipal Building Fund (525)
Projected Financial Position
Capital Improvement Plan 2024-2028
81
2021 2022 2023 2024 2025 2026 2027 2028
ACTUAL ACTUAL ESTIMATED ESTIMATED ESTIMATED ESTIMATED ESTIMATED ESTIMATED
REVENUES
Land sales 1,638,020 Donation 150,000 150,000
Interest (2,153) (159,225) 150,000
South District Assessments 981,536 3,051,546
Miscellaneous 210 210
Total Revenue 148,057 1,629,005 1,131,536 - 3,051,546 - - -
EXPENDITURES
Professional Services 31,300 52,379 60,000 60,000 60,000 60,000 60,000 60,000 Land Write-down 204,928
South District Street & Utility - 303,295 460,097 5,250,000
Total Expenditures 236,228 355,674 520,097 5,310,000 60,000 60,000 60,000 60,000
Other Financing Sources (uses)
Interfund loan interest
Interfund loan payment
Transfer in for South District
Transfer to Golf for liquor license (51,200)
Transfer to EDA Fund (75,000) (100,000) (100,000) (100,000) (100,000) (100,000) (100,000) (100,000)
Total other sources (126,200) (100,000) (100,000) (100,000) (100,000) (100,000) (100,000) (100,000)
Increase (decrease) in fund balance (214,371) 1,173,331 511,439 (5,410,000) 2,891,546 (160,000) (160,000) (160,000)
FB Beginning balance 4,899,284 4,684,913 5,858,244 6,369,683 959,683 3,851,229 3,691,229 3,531,229
FB Ending balance 4,684,913 5,858,244 6,369,683 959,683 3,851,229 3,691,229 3,531,229 3,371,229
Goal 5,000,000 5,000,000 5,000,000 5,000,000 5,000,000 5,000,000 5,000,000 5,000,000
Cash Balance 3,849,993 4,888,727 4,120,601 (1,743,399) 3,023,147 2,888,147 2,753,147 2,618,147
Anticipates that bonds are issued for golf course irrigation in 2025 allowing interfund loan to be paid in full to ED Trust
City of Cottage Grove, MN
Capital Improvement Plan 2024-2028
ED Trust Fund (286)
Projected Financial Position
82
2021 2022 2023 2024 2025 2026 2027 2028ACTUALACTUALESTIMATEDESTIMATEDESTIMATEDESTIMATEDESTIMATEDESTIMATED
REVENUES
Municipal State Aid Construction funds 1,739,345$ 1,884,787$ 5,985,250$ 1,000,000$ 1,800,000$ 5,000,000$ 1,000,000$ 1,000,000$ LRIP 750,000$ 500,000$ Special assessments 624,882 70,881
Intergovernmental - Federal funding Shoppes at CV 3,000,000 Intergovernmental - Federal funding 80th Street 5,000,000
Intergovernmental - Federal funding 19 & 61 12,500,000 12,500,000 14,033,000 Intergovernmental - Federal funding Intergovernmental - State 1,010,000 8,000,000
Intergovernmental - County 19 & 61 7,000,000 3,000,000 2,000,000 2,000,000 8,150,000 Assessment/Development Fees 239,255 692 1,000,000 1,000,000 1,000,000 1,768,000 1,717,000
InterestMiscellaneous - Total Revenue 2,603,482 1,956,360 6,735,250 10,510,000 8,800,000 25,500,000 17,268,000 32,900,000
EXPENDITURES
Professional services-miscellaneous 2,093 9,650 103rd Street Bridge 8,000,000 70th Street (in three phases)8,968
80th Street (CSAH19 to TH 61) Reclamation 32,503 13,776 - 80th Street (Ideal to Hwy 61) 10,000,000
80th Street (80th/Keats roundabout)1,000,000 CSAH 19 and TH 61 7,000,000 3,000,000 16,500,000 16,500,000 22,900,000 East Point Douglas - Jamaica intersection 341,738 976,496 8,015,000 4,607,000 800,000
EPD & Ravine Pkwy - Shoppes at Cottage View 5,325,000 4,021,000 1,253,000 Harkness Ave Reconstruction 3,162,000
Jamaica Ave - 80th to 90th 3,380,000 Jamaica Ave - 70th to Military 3,000,000 Ravine Parkway 126,249 252 500,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000
River Oaks Hwy 61 RCUT 607 1,210,000 Total Expenditures 511,551 1,000,781 8,515,000 18,197,000 11,125,000 33,521,000 22,915,000 35,900,000
OTHER FINANCING SOURCES (USES)Bond Proceeds 6,227,000 1,000,000 5,021,000 3,191,000 3,000,000
Transfers in 1,837,342 1,065,000 1,053,000 1,325,000 3,000,000 2,456,000 Transfers out - PM (168,982) (745,616)
Total other sources (168,982) 1,091,726 1,065,000 7,280,000 2,325,000 8,021,000 5,647,000 3,000,000
Increase (decrease) in fund balance 1,922,949 2,047,305 (714,750) (407,000) - - - -
Beginning balance, FB (3,538,824) (1,615,875) 431,430 (283,320) (690,320) (690,320) (690,320) (690,320)
Ending balance, FB (1,615,875) 431,430 (283,320) (690,320) (690,320) (690,320) (690,320) (690,320)
MSA Beginning Balance (2,474,853) (735,508) 1,195,043 (3,705,538) (2,546,538) (2,050,238) (4,662,538) (3,219,938)
Allocation 1,739,345 2,013,095 1,968,470 2,159,000 2,296,300 2,387,700 2,442,600 2,442,600 Disbursements - (82,544) (6,869,051) (1,000,000) (1,800,000) (5,000,000) (1,000,000) (1,000,000) MSA Ending Balance (735,508) 1,195,043 (3,705,538) (2,546,538) (2,050,238) (4,662,538) (3,219,938) (1,777,338)
Not included in revenue is Transportation Advancement Account (TAA) that will begin in 2024. This is anticipated to be $150,000 per year.
City of Cottage Grove, MNCapital Improvement Plan 2024-2028
MSA Construction Fund (520)Projected Financial Position
83
2021 2022 2023 2024 2025 2026 2027 2028
ACTUAL ACTUAL ESTIMATED ESTIMATED ESTIMATED ESTIMATED ESTIMATED ESTIMATED
$$$$$$$$
REVENUES
special assessments 62,919 30 70,000 70,000 70,000 70,000 70,000 70,000
Interest (18,685) (123,494) 15,000 15,000 15,000 15,000 15,000 15,000
Miscellaneous Total Revenue 44,234 (123,464) 85,000 85,000 85,000 85,000 85,000 85,000
EXPENDITURES
Prof Svcs - assmt fees 1,772 637
PM 2015 - F2, 90th, Grey Cloud Tr
PM 2016 - F3, F5
PM 2017 - B1PM 2019-2020 WPD refurbPM 2021 - F5, B1, E1 & River Oaks Parking 3,432,765 102,503
Jamaica Avenue
PM 2023- Thompson Grove Estates 7&8 137,347 3,675,000
6,156,000
PM 2025-Thompson Grove Estates 2nd, EDP (Jamaica to Hyde) Kingsborough Trail 4,745,000
PM 2026-Woodridge Parks (E of Jamaica), Cottage Grove Estates, Meadow Acres, Pine Glen 5,436,000
PM 2027-Thompson Grove 11&12, Woodridge Park Add (W of Jamaica)4,021,000
PM 2028-Thompson Grove Estates, Pinegrove 2,770,200
Total Expenditures 3,434,537 240,487 3,675,000 6,156,000 4,745,000 5,436,000 4,021,000 2,770,200
Revenue over Expenditures (3,390,303) (363,951) (3,590,000) (6,071,000) (4,660,000) (5,351,000) (3,936,000) (2,685,200)
Other Financing Sources (uses)
Bond proceeds 3,979,126 3,050,339 5,916,000 3,268,000 4,818,000 3,578,425 2,413,800 Transfers from MSA fundTransfer from general fund 30,966
Transfers from utility funds 389,948 - 574,350 700,000 517,000 618,000 442,575 356,400
Total other sources 4,400,040 - 3,624,689 6,616,000 3,785,000 5,436,000 4,021,000 2,770,200
Increase (decrease) in fund balance 1,009,737 (363,951) 34,689 545,000 (875,000) 85,000 85,000 85,000
FB Beginning balance 1,738,354 2,748,091 2,384,140 2,418,829 2,963,829 2,088,829 2,173,829 2,258,829
FB Ending balance 2,748,091 2,384,140 2,418,829 2,963,829 2,088,829 2,173,829 2,258,829 2,343,829
Goal (35% of next 5-year avg capital spend)1,417,674 1,682,310 1,618,974 1,391,664 1,273,304 1,117,264 1,071,497 1,125,072
PM 2024 - Prestige Estates, See 80th Street Project, Thompson Grove Estate
City of Cottage Grove, MN
Capital Improvement Plan 2024-2028
Pavement Management Fund (560)
Projected Financial Position
84
2021 2022 2023 2024 2025 2026 2027 2028
ACTUAL ACTUAL ESTIMATED ESTIMATED ESTIMATED ESTIMATED ESTIMATED ESTIMATED
REVENUES
Developer fees 1,916,355$ 1,378,851$ 470,000$ 470,000$ 470,000$ 470,000$ 470,000$ 470,000$
Special AssessmentsIntergovernmental - County/State
3M Settlement funds 2,954,885
Interest (19,461) (166,902) 60,000 Miscellaneous 27,930
Total Revenue 4,879,709 1,211,949 530,000 470,000 470,000 470,000 470,000 470,000
EXPENDITURES
East Ravine infrastructure development 25,000 25,000 25,000 25,000 25,000 25,000 Interim Water Treatment project 784,269
Miscellaneous 14,202 3,910 Water Comp Plan 64,494 PFAS Study 308,355
water main oversizing 391,143 134,313 10,000 10,000 10,000 10,000 10,000 10,000 South District Street & Utilities 450,084 334,100 800,000
EPD & Ravine Pkwy - Shoppes at Cottage View 722,000
CSAH 19 & TH 61 750,000 750,000 Ravine Parkway I & II
Intermediate & low zone water treatment facilities 10,636
River Acres watermain extension 612,282 Granada watermain extension 16,919
Well 7&8 treatment 557,988 Industrial Park Water Tower 96,851 7,500,000 100th St watermain
95th & JamaicaWell #12 Total Expenditures 2,685,158 760,288 369,100 835,000 8,257,000 785,000 785,000 35,000
OTHER FINANCING SOURCES (USES)
Bond Proceeds 4,000,000
Transfers in 1,000,000 Transfers out (102,330)
Total other sources - (102,330) - - 5,000,000 - - -
Increase (decrease) in fund balance 2,194,551 349,331 160,900 (365,000) (2,787,000) (315,000) (315,000) 435,000
FB Beginning balance 1,461,833 3,656,384 4,005,715 4,166,615 3,801,615 1,014,615 699,615 384,615
FB Ending balance 3,656,384 4,005,715 4,166,615 3,801,615 1,014,615 699,615 384,615 819,615
City of Cottage Grove, MN
Capital Improvement Plan 2024-2028
Water Area Fund (575)
Projected Financial Position
85
2021 2022 2023 2024 2025 2026 2027ACTUALACTUALESTIMATEDESTIMATEDESTIMATEDESTIMATEDESTIMATED
REVENUES
Developer fees 1,498,054 976,022$ 470,000$ 470,000$ 470,000$ 470,000$ 470,000$
Special Assessments
Intergovernmental - County/State/Federal 1,953,445 1,986,135
Interest (17,149) (31,171) 1,650
Miscellaneous Total Revenue 3,434,350 2,930,986 471,650 470,000 470,000 470,000 470,000
EXPENDITURES
East Ravine infrastructure development 25,000 25,000 25,000 25,000 25,000 Hy-Vee
Miscellaneous 15,349
Comp Plan 66,687 South District Street & Utilities 1,317,320 792,710
95th & Jamaica
EPD & Ravine Pkwy - Shoppes at Cottage View 469,000
CSAH 19 & TH 61 250,000 250,000
Harkness Avenue 485,400
Trunk sewer extension - Met council 3,950,107 747,070
Trunk Fund Oversizing 10,000 10,000 10,000 10,000 10,000 Sanitary Sewer Plan 80,184
Total Expenditures 4,045,640 2,131,077 827,710 35,000 504,000 285,000 770,400
OTHER FINANCING SOURCES (USES)
Debt Service - principal & interest - - - - - - -
Transfers in
Transfers out (239,818)
Total other sources - (239,818) - - - - -
Increase (decrease) in fund balance (611,290) 560,091 (356,060) 435,000 (34,000) 185,000 (300,400)
FB Beginning balance 647,379 36,089 596,180 240,120 675,120 641,120 826,120
FB Ending balance 36,089 596,180 240,120 675,120 641,120 826,120 525,720
City of Cottage Grove, MN
Capital Improvement Plan 2024-2028
Sewer Area Fund (580)
Projected Financial Position
86
2021 2022 2023 2024 2025 2026 2027 2028ACTUALACTUALESTIMATEDESTIMATEDESTIMATEDESTIMATEDESTIMATEDESTIMATED
REVENUES
Developer fees 1,878,690$ 1,756,069$ 400,000$ 500,000$ 500,000$ 500,000$ 500,000$ 500,000$
Special Assessments
Intergovernmental - County/State
Interest (28,776) (222,394)
Miscellaneous Total Revenue 1,849,914 1,533,675 400,000 500,000 500,000 500,000 500,000 500,000
EXPENDITURES
95th & Jamaica Improvements
Business park pond & grading 1,046
River acres water main project
TG-14 147,439 1,231,184
L-P3 Pond Improvements 72,992 East Ravine infrastructure & AUAR 38,474
Anderson
Miscellaneous 38,774 14,449
South District Trunk Storm Sewer 3,111,573
South District Street & Utilities 294,334 1,042,570
CSAH 19 & TH 61
EPD & Ravine Pkwy - Shoppes at Cottage View - 134,000
Harkness Avenue 970,600
oversizing 348,966 167,083 Lake Robert 210,817 6,725
West draw modeling
Total Expenditures 747,042 4,936,814 1,042,570 - 134,000 - 970,600 -
OTHER FINANCING SOURCES (USES)
Transfers in - 95th &Jamaica
Transfers in (out)(319,059)
Total other sources - (319,059) - - - - - -
Increase (decrease) in fund balance 1,102,872 (3,722,198) (642,570) 500,000 366,000 500,000 (470,600) 500,000
FB Beginning balance 3,618,607 4,721,479 999,281 356,711 856,711 1,222,711 1,722,711 1,252,111
FB Ending balance 4,721,479 999,281 356,711 856,711 1,222,711 1,722,711 1,252,111 1,752,111
City of Cottage Grove, MN
Capital Improvement Plan 2024-2028
Storm Water Area Fund (585)
Projected Financial Position
87
2021 2022 2023 2024 2025 2026 2027 2028
ACTUAL ACTUAL ESTIMATED ESTIMATED ESTIMATED ESTIMATED ESTIMATED ESTIMATED
REVENUES
3M Settlement funds 2,631,697$ 9,224,361$ 15,981,373$ 27,400,000$ 63,477,000$ 26,250,000$ 5,000,000$ -$ Interest
Miscellaneous
Total Revenue 2,631,697 9,224,361 15,981,373 27,400,000 63,477,000 26,250,000 5,000,000 -
EXPENDITURES
Land Purchase
Prior Year Projects 2,642,882 9,334,549 See Project Sheets 15,860,000 27,400,000 63,477,000 26,250,000
Well 1, Well 2, & Temp Treatment Plant decomm.5,000,000
Total Expenditures 2,642,882 9,334,549 15,860,000 27,400,000 63,477,000 26,250,000 5,000,000 -
OTHER FINANCING SOURCES (USES)
Bond Proceeds
Transfers in
Transfers out Total other sources - - - - - - - -
Increase (decrease) in fund balance (11,185) (110,188) 121,373 - - - - -
FB Beginning balance - (11,185) (121,373) - - - - -
FB Ending balance (11,185) (121,373) - - - - - -
3M Settlement/MPCA Fund 455
Projected Financial Position
City of Cottage Grove, MN
Capital Improvement Plan 2024-2028
88