STAFF REPORT CASE: CUP2025-007
ITEM: 6.1
PUBLIC MEETING DATE: 2/24/25 TENTATIVE COUNCIL REVIEW DATE: 3/19/25
APPLICATION
APPLICANT: Northpoint BGO Cottage Grove Logistics Park, LLC
REQUEST: A Conditional Use Permit (CUP) to allow for the outdoor storage of
materials incidental to the principal use. The materials will be fully
screened by a 10-foot-tall privacy fence that will enclose 54,500 square
feet of the western parking area to be used for material storage by the
.
SITE DATA
LOCATION: 7701 100th Street South
ZONING: I-1, General Industry
GUIDED LAND USE: Industrial
LAND USE OF ADJACENT PROPERTIES: CURRENT GUIDED
NORTH: Industrial Industrial
EAST: Agricultural Industrial
SOUTH: Agricultural Industrial
WEST: Industrial Industrial
SIZE: N/A
DENSITY: N/A
RECOMMENDATION
Approval, subject to the conditions stipulated in this staff report.
COTTAGE GROVE PLANNING DIVISION
Planning Staff Contact: Max Erickson, Planner; 651-458-2868; merickson@cottagegrovemn.gov
Application Accepted: 1/29/2025 60-Day Review Deadline: 3/30/2025
City of Cottage Grove Planning Division 12800 Ravine Parkway South Cottage Grove, MN 55016
Planning Staff Report
Northpoint Outdoor Storage
Planning Case No. CUP2025-007
February 24, 2025
Proposal
Northpoint BGO Cottage Grove Logistics Park, LLC (Property Owner) has applied for a Condi-
tional Use Permit (CUP) to allow for the outdoor storage of materials incidental to the principal
use at 7701 100th Street South. The materials will be fully screened by a 10-foot-tall privacy fence
that will enclose 54,500 square feet of the western parking area to be used for material storage
.
Site Location
Review Schedule
Application Received: January 29, 2025
Application Accepted: January 29, 2025
Planning Commission Meeting: February 24, 2025
Tentative City Council Meeting: March 19, 2025
60-Day Review Deadline: March 30, 2025
Planning Commission Staff Report Northpoint Exterior Storage
Planning Case No. CUP2025-007
February 24, 2025
Page 2 of 7
Background
The subject site is located within the Master Site Plan for the Cottage Grove Logistics Park, which
was approved by the City Council at their December 8, 2021, meeting and included approximately
252 total acres of land. In 2022, NorthPoint Development submitted an application for a Site Plan
Review that was approved for the Phase 1 development, which allowed for the construction of
two buildings (approximately 700,000 square feet) for warehouse, manufacturing, distribution, and
office space.
The applicant and property owner, Northpoint, has applied on behalf of the future tenant
Lumber is a building materials distributor that is headquartered in Grand
Rapids, Michigan, and is currently occupying the western portion of space at 7601 100th Street
South. In 2023, obtained CUP approval (CUP2023-021) to utilize a portion of the
southern parking lot at 7601 100th St South as storage and staging areas for their business. An
Administrative CUP (ACUP 2024-001) was later granted to expand the original proposed staging
area that follows the conditions of Resolution 2024-004. The additional area had an increased
fence height from 6 feet to 10 feet. is currently working with Northpoint on expand-
ing into the western half of 7701 100th Street South. The tenant space (approximately 249,949
square feet) will be utilized for material storage and office space. In addition to the interior space,
the Applicant is proposing to fence in an exterior area (approximately 54,500 square feet) for the
outdoor storage of materials. The range of materials to be stored in the exterior area includes
composite and PVC decking, engineered wood siding and trim, PVC trim, asphalt shingles, and
various exterior sheathing products.
Current Site Layout
Planning Commission Staff Report Northpoint Exterior Storage
Planning Case No. CUP2025-007
February 24, 2025
Page 3 of 7
Existing Site Conditions
Planning Considerations
Land Use and Zoning
The subject site is currently zoned I-1, General Industrial, and is guided as Industrial in the 2040
Comprehensive Plan. The proposed use of the property is consistent with permitted and condi-
tional uses allowed within this zoning district.
Conditional Use Permit
City Code Title 11-9-2 requires a CUP for any outdoor storage areas incidental to the principal
use exceeding 5,000 square feet and that the area be fully screened. The Applicant is proposing
to construct a 10-foot-tall privacy fence to enclose approximately 54,500 square feet of the south-
west parking area to be used for outdoor storage. The criteria for issuance of a CUP are as follows:
1. Compliance with and effect upon the Comprehensive Plan, including public facilities and
capital improvement plans.
2. The establishment, maintenance, or operation of the conditional use will promote and
enhance the general public welfare and will not be detrimental to or endanger the public
health, safety, morals, or comfort.
3. The conditional use will not be injurious to the use and enjoyment of other property in the
immediate vicinity for the purposes already permitted, nor substantially diminish and impair
property values within the neighborhood.
4. The establishment of the conditional use will not impede the normal and orderly develop-
ment and improvement of surrounding property for uses permitted in the district.
5. Adequate public facilities and services are available or can be reasonably provided to
accommodate the use which is proposed.
6. The conditional use shall, in all other respects, conform to the applicable regulations of the
district in which it is located.
Planning Commission Staff Report Northpoint Exterior Storage
Planning Case No. CUP2025-007
February 24, 2025
Page 4 of 7
7. The conditional use complies with the general and specific performance standards as
specified by the Zoning Code.
Upon review, the proposal meets the forementioned criteria.
Fence Detail
The Applicant is proposing to erect a 10-foot-tall cedar plank fence to enclose approximately
54,500 square feet of space to be used for the outdoor storage of materials that are incidental to
the principal use. City Code Title 11-3-6 allows for fences in industrial districts to be a maximum
of 10 feet in height. The fence is proposed to be constructed entirely within the west trailer parking
area. There will be one sliding gate on the north end and one swing gate on the south end of
the storage area. Both gates open to the east. The proposed fence as constructed may not im-
pede on the approved drainage patterns within the site, and the storm sewer infrastructure within
the enclosure must be protected from any stored materials washing into the storm sewer system.
Site Plan
The proposed fence will be comprised of cedar boards that will match the same materials and
design of the previously approved fence. A condition of approval will require that the exterior stor-
age of materials not be permitted outside of the approved area, that no materials be visible from
public view, and that no materials exceed the height of the fence. In addition, a condition will also
require that the exterior surface of the fence be maintained in sound and good condition, and that
exterior wood surfaces shall be protected from the elements and decay by paint or other
treatment.
Planning Commission Staff Report Northpoint Exterior Storage
Planning Case No. CUP2025-007
February 24, 2025
Page 5 of 7
Proposed Fence Detail
Visual Rendering from Public Path West of Proposed Site
Planning Commission Staff Report Northpoint Exterior Storage
Planning Case No. CUP2025-007
February 24, 2025
Page 6 of 7
Parking
Parking requirements for Phase 1 of the Cottage Grove Logistics Park were satisfied at the time
of Site Plan Review approval by the City Council at their April 6, 2022, meeting. For the subject
building site, the Property Owner proposed 256 total parking stalls when 244 parking stalls were
required. The proposed fence encloses 72 semi-trailer parking stalls that will be unavailable for
trailer storage due to being used for material storage. The Applicant has indicated that the stalls
are not necessary for site operations and the provided onsite parking is sufficient for the proposed
use. Truck and/or truck and trailer parking and idling within the right-of-way of 100th Street, 105th
Street, is prohibited per Condition 15 of Resolution 2021-166. The proposed tenant space and
use meets current parking requirements as the Property Owner intends to allocate 128 parking
spaces to the Applicant. City Code Title 11-3-4 states one parking space is required 2,000 square
feet of storage facilities. The tenant space will consist of approximately 245,720 square feet in
which 7,474 square feet will be office space.
Proposed Use Square Footage Parking Spaces Required
Storage Facility 245,720 123
Public Hearing Notices
The public hearing notice for the February 24, 2025, Planning Commission meeting was published
in the Saint Paul Pioneer Press and mailed on February 12, 2025, to 14 property owners that are
within 500 feet of the proposed project property boundary. Staff has not received any comments
at the time of writing this report.
Recommendation
That the Planning Commission recommend that the City Council approve a Conditional Use Per-
mit to allow for outdoor material storage incidental to the principal use at 7701 100th Street South,
subject to the following conditions:
1. All applicable permits (i.e., building, electrical, grading, mechanical) must be completed,
submitted, and approved by the City prior to the commencement of any construction
activities.
2. The exterior surface of the fence shall be maintained in sound and good condition. Exterior
wood surfaces shall be protected from the elements and decay by paint or other treatment.
Peeling, flaking, chipped, or fading paint and/or stain shall be eliminated and surfaces
repainted/re-stained.
3. The exterior surface of the fence shall complement and be similar in color to the principal
structure and site.
4. The fence shall be 100 percent opaque with boards, if applicable, abutting each other with-
out any gaps.
5. The fence shall not impede drainage patterns as they have been proposed and approved
as part of the original site development, unless otherwise approved by the City Engineer.
6. Signage is not permitted on the fence.
Planning Commission Staff Report Northpoint Exterior Storage
Planning Case No. CUP2025-007
February 24, 2025
Page 7 of 7
7. Exterior storage of materials shall not be permitted outside of the approved area. Material
storage shall not be visible from public view and shall not exceed the height of the fence.
8. The placement, movement, and/or stockpiling of materials in the approved exterior storage
area shall be limited to 6:30 a.m. to 7:30 p.m.
9. No liquids or hazardous substances shall be stockpiled within the enclosed outdoor storage
area.
10. The storm sewer infrastructure encompassed within the enclosure shall be protected from
stored materials being washed into the storm sewer system. Inspections should be com-
pleted by property owner/tenant to ensure stored materials and packaging are in sound
condition and will not wash into the storm sewer system.
11. The standard City and State noise rules shall be applicable to the outdoor storage area. If
the City receives complaints related to noise, the property owner shall bring the noise
onsite into compliance upon notification by the City.
12. Any substantial changes to the fence (i.e., height, material, etc.) shall be reviewed and
approved by planning staff prior to the commencement of any onsite construction. Fences
exceeding 7 feet in height require a building permit per State Building Code. If the proposed
changes substantially alter site operations, planning staff may refer the proposal to the
Planning Commission and City Council for review.
13. If the approved outdoor storage area is unused for material storage for a period of 12
months or more, the fence shall be removed upon notification by the City.
14. Repeat violations related to exterior storage outside of the approved areas, noise, unsight-
liness, or permit criteria will require additional review of the CUP by the City Council, with
possible revocation of the CUP as a remedy.
Prepared by
Max Erickson
Planner
Attachments
A.Applicant & Property Owner Narrative
B.Site Plan
C. Stormwater Layout
D. Rendering Exterior West of Site
E.Proposed Fence Detail
GRADE
OF
51!xfjhiu
DfebsDfebs
SHT
DWG. NO.
SIZE
5#!p/e/
3#!y!5#
2#y7#y6(Xftufso!Sfe!Dfebs
Eph!Fbs
6(!ijhi!cpbset!bsftubdlfe!up!bdijfwf21(!ifjhiuTfbn!jt!dpwfsfe!pouif!pvutjef!xjui!b!2#!y!5#!gbdjb!cpbseOpu!up!tdbmf
JOB SPECIFICATIONS
STANDARDDETAIL
POSTSRAILSBOARDSTOP DESIGNDATE
WOODSPECIESNOTES: COMPLETED BY
COMPONENTS
Facia
Dome Cap
ARCHITECT
CONTRACTORENGINEER
5’5’
Steel Post
Back Rail
TYPICAL ELEVATION
SOLID BOARD FENCE
COMBINATION PIPE / WOOD FRAME
Pvutjef!Tupsbhf!Fyqbotjpo
JOB / PROJECT
8’
16” x 48”
Steel Post Adapter
Mvncfsnfo(t
SUBMITTED TO:
Pickets
10’Njexftu!Gfodf
48”
SUBMITTED BY: