HomeMy WebLinkAbout2025-02-24 PACKET 08.B (JAMAICA FROM 70TH TO MILITARY)
TO: Planning Commission
FROM: Crystal Raleigh, Assistant City Engineer
DATE: February 20, 2025
RE: Response to Planning Commission Inquiry Jamaica Avenue between 70th Street
and Military Road
Background
On the January 27, 2024, Planning Commission meeting, questions were asked of staff regarding
Jamaica Avenue and the plan for this corridor through the future.
Discussion
The County currently has a Request for Proposals out to study the Jamaica Avenue (CSAH 20)
corridor between 70th Street and Military Road. The roadway was reconstructed by the City in
2015 due to development at that time. It was anticipated that the County would eventually take
over the roadway due to increases in traffic from future Woodbury and Cottage Grove develop-
ments along the corridor. Development of the Wolterstorff property is needed to obtain the ade-
quate right-of-way for the County to take over the roadway and reconstruct the intersection with
Military Road. Now that this development is coming to fruition, the County has initiated the study
and is planning to reconstruct the road in 2028. The 2025 study will look at the scenario in which
Woodbury and Cottage Grove are fully developed in accordance with their future land-use plans.
The study will evaluate and make recommendations on the following:
Lane configuration for the future CSAH 20. Two, three, and four-lane configurations will be
considered.
Intersections and turn lanes for cross streets such as 67th Street Court/Jasmine Avenue.
Intersection design for the Military Road intersection. The study will evaluate whether a
roundabout is appropriate in this location.
Pedestrian facilities along the corridor.
Other transportation considerations specific to anticipated traffic along this route.
Cottage Grove and Woodbury will be contributors to this study. Upon completion of the 2025
planning process, a conceptual plan will be developed, and the project will move into the design
phase. The County will construct the recommended improvements in 2028.
Jamaica Avenue became a County roadway in 2018. It will remain under County jurisdiction for
the foreseeable future. The City is not anticipated to retake jurisdiction after the 2028
reconstruction.