HomeMy WebLinkAbout1998-06-24 PACKET 08.B.REQUEST OF CITY COUNCIL ACTION COUNCIL AGENDA
MEETING ITEM # p2
DATE 6/24/98 [���
PREPARED �Y Administration Ryan Schroeder
�F2{GENATWG CE°ARTMENT STAFF AUTHOR
��..��.�...� « �«���4.�.�..�k,.�a......�.�.=x��.tr.
COUNCIL ACTION REQUEST
Approve re-evaluation from Washington County regarding cost sharing for Caunty State Aid
Flighway 39 (CSAH 39).
BUDGET IMPLICATION: $None $41,483.51
BUDGETED AMOUNT ACTUAL AMOUNT FUNDING SOURCE
SUPPORTING DOCUMENTS
� MEMO/LETI'ER: Ryan R. Schroeder, City Administrator, 6/18/98
❑ RESOLUTION:
❑ ORDINANCE:
❑ ENGINEERING RECOMMENDATION:
❑ LEGRL RECOMMENDATION:
� OTHER: Donald Wisniewski, Wash. Co., 6/12/98
ADMINISTRATORS COIVIMENTS
Project funding can be made availa e ug ��eit �r 1 8 and 1999 line items.
� , ,,��, , � �'� � 1
�� _ City Administrator Date
R& tr k'R It !* k 4 R C Yt C## t* A! R}r ! R x 4 R#!#'k tr R fe d k 1` R fi R 4 R! R k!'k R
COUNCIL ACTION TAKEN: ❑ APPROVED ❑ DENIED ❑ OTHER
� �
To: Mayor and City Councii Members
From: Ryan R. Schroeder, City Administrator
Date: June 18, 1998
Re: CSAH 39 Paving
On June 3, 1998, Washington County, represented by Commissioner Myra
Peterson, County Engineer pon Tiesen, and Project Engineer Brian Gage presented
a proposal to the City to provide for reconstruction of County State Aid Highway 39
(Hadley Avenue}. Their proposal, attached, resulted in Cottage Grove providing an
estimated $130,415 toward the $1,799,720 County project. St. Paui Park was
projected to contribute $79,126.
At their meeting of June 3, Council expressed concems with how the County funding
formula for a County project impacted the locai municipal budget. Council also
expressed the observation that the bulk of the project appeared to be in St. Paul Park
with the bulk of the local participation derived from Cottage Grove. Commissioner
Peterson and Engineer Tiesen agreed to review the Council issues and respond with
a re-evaluation.
Enclosed please find a letter irom Don Wisniewski, Washington County Public
Works, with a response to Council concerns. You wili note that the project budget
has been reduced siightiy to $1,796,220. You will also note that the participation
levels from St. Paui Park and Cottage Grove have been reduced fairly dramaticaliy to
$47,388 and $41,484 respectively. The County will be picking up an additional
$117,170 as a resuit of the re-evaluation. The City will be sharing in the cost of storm
sewer, curb, and driveway aprons.
i believe the above is more in keeping with Council's understanding of reasonable
cost participation on County projects such as this one. Commissioner Peterson
assures me that this meets the intent of County policy and is a cost sharing which
she supports as equitabie.
• Page 1
CSAH 39 COST PARTICIPATION
CSAH 39 (NASTINGS AVE) COST PARTICIPATION
CSAH 39 COST BREAKOUT St Paul Park Cottage Washington TOTAL NOTES
June3,'1998 Park Grove County
PRORATE�ITEMS
MOBILIZATION $ 2,222.98 $ 3,382.98 $ 44,394.04 $ 50,D0�.00 1
�fIELDOFFICETVPED S 133.38 5 202.98 S 2,663.64 S 3,000.00 7
TRAFFIC CONTROI S 1,33379 $ 2,029.79 4 26,636.43 $ 30,000.00 7
BALECHECK $ 36279 S 552.70 S 7,245.11 S 8,160.00 7
SIIT FENCE, TYPE HEAW DUTY MNNTAMED S 425.34 S 647.30 S 8,49d.3G S 9,567.00 1
CONSTRUCTION SIGNSSPECIAi. $ 0.44 $ 0.68 S 8.88 S 10.00 1
PRORATED ITEMS SUBTOTAI S 4.478.72 f 6,615.83 S 89,442.45 S 100,737.00
CONSTRUCTION ITEMS
AGGREGATE BASE (C� CLASS 6 S 6,290.00 S 18,190.OQ S 83,946,00 S 108,426.00 3
NPE HV 4 WERRING COURSE MIXTURE 5 4,920.00 S 12,960.00 $ 69,912.00 $ 81,792.00 2
NPE NV 3 NON-WEARING COURSE MIXTURE S 4,920.00 S 12,960.00 S 69,972.00 S 87,792.00 ]
TYPE MV 3 NON-WEARING COURSE MIXTURE S 9,954.50 $ 26,722.50 S 134,891.00 $ 170,968.00 2
BITUMINOUS MATERIAL FOR TACK COAT $ 29D.40 $ 762.90 S 4,221.60 S 5,274.90 2
CONCRETE CURB 8 GUTTER DESIGN B618 S 72,586.00 S 27,022.00 S &7,677.00 $ 128,225.00 0
750 mm RC PIPE APRON 3 - $ - $ 1,500.00 S 1,500.00 �
300 mm RC PIPE SEVJER DES 3006 $ - S . - S 1,/7�.00 $ 1,770.00 4
375 mm RC PIPE SEV✓ER DES 3006 S - S - S 62,090.00 $ 62,D90.00 d
450 mm RC PIPE SEW ER DES 3006 $ - S - $ 70,686.00 $ 70,686.00 4
600 mm RC PIPE SEW ER DES 3006 $ - S - S 34,200.00 S 34,200.0� 1
750 mm RC PIPE SEWER �ES 3006 S - $ - S 93,285.00 ffi 93,285.00 4
CONST DRAINAGE STRUCTURE $ - S - S 93,750.00 $ 93,750.00 4
CASTING ASSEMBLV $ - $ - S 29,900.00 S 29,900.00 4
RANDOM RIPRAP CLASS III S - S - $ 2,890.00 $ 2,890.00 4
CONCRETE DRIVEWAV APRON OPTION (RESIDENTIAL) S 70,710.00 $ 8,050.00 $ - $ 18,760.00 7
CONCRE7E DRNEVJAY APRON OPTION (COMMERCIAL) $ 6,084.00 $ - 5 - $ 6,084.00 7
OTHERITEMS $ $ 1 47Q/90.OD $ 476,190,C0
CONSTRUCTION ITEMS SUBTOTAL $ 65,754.90 S 100,067.40 $ 1,313,160.60 S 1,478,982.90
PRORATEO ITEMS SUBTOTAI S 4,47B.72 S 6,8'15.83 $ B9,442.45 $ 100,737.00
CONSTRUCTION TOTAL $ 70,233.62 $ 706,88323 $ 7,402,603.05 $ 1,579,779.90
ENGINEERING� �S s.es7.s7 $ 13,531.92 S �77,576.i7 S 300,000.ao 5
RIGHT OF WAY estimated s S io,000.00 S 10,000.0o S 20,000.0o s
� GRANDTOTAL S 79,125.53 $� 130,415.15 S'1,590,179.22 S� '1,799,T19.90
PERCENTAGE OF TOTAL 4.4°!0 7.2% 68.4°/ 100.0%
NOTES
1 PRORATED ITEMS based on city's share of construction items:
COTTAGE GROVE: $100,067.40($1,478,982.90 = 6.77%.
ST PAUL PARK: $65,754.90/$1,478,982.90 = 4.45°h.
2 SURFACING ITEMS:
COTTAGE GROVE: 50°h of parking lanes and 100 % of side streets.
ST PAUL PARK: 100°,G of side streets.
1 CURB & GUTTER:
COTfAGE GftOVE: 50 h of curb 8 gutter within city limits.
5T PAUL PARK: 25°h of curt & gutter within city limits.
s STORM SEWER ITEMS based on ciry's storm water runotf contribution to total system:
COTTAGE GROVE: 0°h
ST PAUL PARK: 0%
WASHINGTON CO: 100°,4
5 ENGINEERING based on city's share of construction items:
COTTAGE GROVE: $100,067.40/$1,478,982.90 = 6.77°6.
ST PAUL PARK: $65,754.9�/$1,478,982.90 = 4.45°.6.
6 RIGHT OF WAY:
COTfAGE GROVE: 100°h
ST PAUL PARK: 0°b
7 CONCRETE DRIVEWAYS:
COTTAGE GROVE: 100%
ST PAUL PARK: 100 %
BASED ON WASHINGTON COUNTY DEPT OF PUBLIC WDRKS PoLICIES FOR COST PARTICIPATION BETWEEN WASHINGTON
COUNTYAND OTHER AGENpES FOR COOPERATIVE HIGHWAY iMPROVEMENT PRQIECTS ADOPTED 9595.
- COTTAGE GROVE- qTY OVER 5�0 POPULAitON
- ST PAUL PARK- CITY UNDER 5000 PoPULATION
6/3198
Est39may.ws
Page 1
WASHINGTON COUNTY
DEPARTMENT OF PUBLIC WORKS
PARKS . HiGHWAYS • PACIIITIES
t 1660 MYERON ROAD NORTH • STILLWATER, MINNESOTA 55082-9573
672-430-4300 Facsimile Machine 672-430-4350
�
�I(}'I JUN 16 �9$
June 12, 1998 ( �
Mr. Ryan Schroeder City Administrator
City of Cottage Grove
7516 80"' Street South
Cottage Grove, MN 55016
County State Aid Highway 39 (CSAH 39) Cost Sharing
Dear Mr. Schroeder:
�onaltl C. Wisniewski, P.E.
Director Public Works/Counry Engineer
John P. Perkovich, Oeputy Director
Operations Division
Donaitl J. Theisen, P.E., Depvty Director
Technical & Adminis[rative Division
Sandra K. Culien, P.E.
Trafficlfransponation Engineer
Marvin E. Erickson,
Facilities Manager
We appreciate the time the City Council, Mayor, and yourseif took to meet with us
June 4"' to discuss the CSAH 39 (Hadley Avenue) project. Staff informed me of the City
concems with our Cost Participation Poiicy and its implications for the City.
We discussed this issue with Commissioner Peterson to develop a proposal that is fair,
reasonable, and meets the parameters of our policy. When this project was first placed
into our Capital Improvement Program, the project scope was to miil and overlay the road
surface. These projects are 100% paid for by the County. Subsequent analysis lead to the
increased scope of reconstruction. We also considered that the current road width is not
being improved; we are basicalty replacing the existing pavement. The elements being
measurabley improved are the storm sewer, curb, and driveway aprons. We feel it is
appropriate to request participation in these improvements.
We are proposing City participation in the concrete curb and gutter costs, driveway apron
costs, right of way, engineering, and miscellaneous items prorated based on total
construction costs. We wili pay 100% of the road and storm sewer costs. The attached
cost participation sheet shows that this reduces your City contribution to 541,483.51.
Actual costs will be known when bids are opened. This same proposal changes the City of
St. Paui Park costs to 547,387.55.
We believe that this is a fair and reasonable contribution for the City. Washington County
will be committing 51,700,000 to this project, approximately 95% of the project costs.
We will work to improve communications with you and the City Council on these Capital
Improvements. We face the same budget constraints and recognize that planning is
needed in order to fund large projects. We do believe that working together on projects
with regional and local benefits allows us to build better projects.
Mr. Ryan Schroeder, City Administrator
City of Cottage Grove
June 12, 1998
Page 2
I appreciate your review of this proposal and any comments you may have. If acceptable
to the City Council, we will process agreements for your approvai. Based on the time this
process takes, we can make a determination on a project schedule.
Please feei free to contact me at 430-4370 with a�y questions.
Si ereiy,
� „� c4�— �V..o-.�
Donald C. Wisniewski
Director of Public Works/County Engineer
c: Barry Sittlow, City Administrator St. Paul Park
Myra Peterson, County Commissioner
Jim Schug, County Administrator
_ \MGNOItA\W%OJi�RYAN
CSAH 39 COST PARTICIPATION
CSAH 39 {HASTINGS AVE} COST PARTICIPATION
CSAH 39 COST BPEAKOUT St Paul Park Cottage Wastiington TOTAL NOTES
Juoe 15, 7998 Psrk Grove Cou�ty
� PRORATEDITEMS
MOBICIZATION $ 1,331.32 $ 982.84 $ 4],68684 $ 50,OW.00 1
FIELD OFFICE TYPE D $ �9.88 $ 58.9� $ 2,86L15 $ 3,000.00 1
'RAFFlCCONTROL $ ]98J9 $ 589]0 $ 28,61151 $ 30,00000 1
BAL'cCHECK $ 21Z27 $ i6G.40 $ ],]82.33 $ 8,160.00 1
S;L:TFENCE,TYPEHEAVYDUTYMAIMAIRED $ 254]3 $ 188,�6 b G,�24,21 $ 9,56]AO i
CONSIPOCTION SIGN&SPECIAL E 02] $ 020 $ 9.54 $ ?0.00 1
PRORATED ITEMS SUBTOTAI S 2.68226 S 1,980,Y6 S 96.G74.57 S 100,737.00
CONSTAUCTIONITEM:
AGGP.EGATE BASE(CVJ CLASS 6 S � $ - E 108,426.00 $ 108,42E.00 2
TVPEHV4WEARWGCOURSEMIXTGRE $ � $ � $ 8],79200 $ 87�92.00 2
?ypEHV3NCN-WEARINGCOUR�EMIX'URE $ - $ - $ 87,�92.00 $ e],7920Q 2
7VPE N�V 3 NON-`NEARING COURSE MIXTUFe $ - S - R 1]0,968.00 S '�0,9E8.00 2
51NMINOUgMq'(ERIALFORiACi(COAT S - $ - $ 5,274.90 $ 52]4.90 2
CONCFE?E CURB & GUTTER DESIGN B610 $ 22,SBE.00 R 21,022.G0 $ Ba,6II.00 £ !28,225AC 3
]50 mm RC PIPE APRON 4 - $ � $ 1,500.00 $ 1,SOO.GG 4
300m*r�RGPIPc'SEWERDE63006 $ - S - $ 1,"��O.G6 $ 1,Y%C.00 a
3�5 mm RC °IPE SEWeR vEC 30i6 $ - $ - $ 62,C90.00 $ 62 4
450 mm RC P:PE SEWcP CeS 30G6 R - S � 8 �0,686D0 $ 10,686 00 4
6�G mm RC PIPE SEWEP DES 3009 S� � $ - $ 34,200D3 S 34,200.00 4
]50 mm RC PIPE SEiNER DES 30G6 $ - 8 - S 93,286A0 $ 93,285,00 4
CONSTDRAIkAG`cSTRUCTURE $ - S � $ 93,]50.00 5 93,�50D0 4
CASiINGASSEMBLY 4 - $ � T 29,9000G $ 29,90000 4
AANDOMPIFRAPCLASSIii $ - $ � S 2080.00 5 2,86Q00 4
GONC9ETflpRNEWAVAPRONOPT10N(RC$IOENT4AL1 S 10,113G0 $ A,050�+0 $ � A �BJ60.00 �
CONCRE'EDPIVEWAYAP�ONOPTiON(COMMEPCIAI�� $ 6,L84b0 $ � 8 - S c.GP4AC 7
OTHERITEMS S S S 4�6,iB0.00 $ a16,1B0.00
CONSTRUCTION ITEMS SUBTOTAL $ 39,380.00 $ 29,072.00 $ 7,410,530.90 �$ 7,478,982.90
PRORATED ITEMS SUBTOTAL S 2,682.26 S t,980.t6 $ 96,07G.57 S 500.737.60
CONSTRUCTIONTOTAL S aa,°�ze 4 �,ase�e s� ..;..:esa� x ��.?.so
ENGINEERING & 5,e25.n s e,3a� ,� 5 ��c,�,��a�a� :P G_,=_. _ 5
� FIGHTOFWAY estimated S � s'oco > ����.00 s � - e
GRAND TOTAL $ 47,387.55 $ 41,483.61 $ 1,707,348.84 $ 7,798,2Y9,90
PERCENTAGE OF TOTAL 2.6% 2.3% 95.1 % 100.0%
NOTES
i PRORATED ITEMS based on city's sbare of conshuction items:
COTTAGE GROVE $29,072.00i$1,4�8,982.90 = 1.97%.
STPAULPARK: $39,380.00/$1,478,982.90=266%.
x SURFACING ITEMS:
COTTAGE GROVE:O%
ST PAUL PARK, 0!
a CURB &GUTTER:
C6TTAGE GROVE 50 % of curb & gutter within ctity Iimits.
ST PAUL PARK: 25% of curb & gutter within ciry limits.
a STOflM SEW ER ITEMS based on ciry's storm water runoff contri6ution to total system:
COTfAGE GROVE: 0 %
ST PAUL PARK: 0%
WASHWGTONCO: t00%
e ENGINEERING based on city's share of construc6on iBems�, .
COTTAGE GROVE: $700,067.40/$7,4�8,982.90 = 6.77 % .
ST PAUL PARK: $65,754.90/$1,478,982.90= 4.45%.
s RIGHT OF WAY:
CATfAGE GROVE:1001
ST PAUI PARK, 0 %
� CONCRETE DRNEWAYS�,
GOTTAGE GROVE: 700 %
ST PAUL PARK: 100%
BASEO ON WASH/NGTON COUNTY DEP7OF PUBGC WORKS POLICIES FCACOST PAATICIPqT/ON BETINEEN WASHINGTON
COUN7Y AND OTHER AGENC/ES PoF COOPERl1TlVE NIGHWAY 1MPAO�EMENT PAOJEC7S ADOPTED 9/5/95.
� C077AGE GROVe � C1TY OVEA50C0 POPULATION
- S7 PAUL PARX -Cl7Y UKDER5000 POPUfAZION
6116/98
Est39jun.xls
Page i