Approve change order number 36 to Swansan Plumbing and Heating for $20,042.81 on the
Public Works Facility Expanson project
BUDGET IMPLICATION: $ $
BUDGETED AMOUNT ACTUAL AMOUNT FUNDlNG SOURCE
ADVISORY COMMISSION ACTION
DATE
REVIEWED
❑
❑
❑
❑
❑
❑
❑
APPROVED
❑
❑
❑
❑
❑
❑
❑
DENIED
❑
❑
❑
❑
❑
❑
❑
❑ P�ANNING
❑ PUBLIC SAFETY
❑ PUBLIC WORKS
❑ PARKS AND RECREATION
❑ HUMAN SERVICES/RIGHTS
❑ ECONOMIC DEV. AUTHORITY
❑
SUPPORTING DOCUMENTS
❑ MEMO/LE7"fER:
❑ RESOLUTION:
❑ ORDINANCE:
❑ ENGINEERING RECOMMENDATION:
❑ LEGAL RECOMMENDATION:
� OTHER: change order
ADMINISTRATOF2S COMMENTS
� . � ,-�>
City Administratar Date
4 4 * R k 'k # k fk k 'A"k * rt & # * * * 4 $ * dt * * R :k @ 4 * * R R * 'k� 4 * 3[ d R %' S4 # * # * 4 *
cou��i� acrio� �ra���: ❑ �p��av�a ❑ D��i�� ❑ oTN��z
� Adolfsan
e � & Peterson
Construction
6701 West 23rd Street • Minneapolis, Minnesota 55426 •(612) 544-1561 • FAX (612) 525-2333 CONSTRUCTION
MANAGERS
Ms. Caron Stransky
City of Cottage Grove
8635 West Point Douglas Road
Cottage Grove, MN 55016
Dear Caron:
Please find enclosed Change Orders number 30 and 36. Please review and submit
to the Council for acceptance and signatures. Upon acceptance and signature,
please return to Adolfson and Peterson Const.
Change Order 30 concems an Add of $392.00 in order to fiunish and install
A.D.A acceptable faucets in the Kingston Pazk shelter. The specified faucets that
were provided under contract were not acceptable.
Original Contract Sum .............................................$ 289,500.00
Previous Change Orders ...........................................$ 5,425.72
Change Order increase .............................................$ 392.00
New Contract Sum ..................................................$ 295,317.72
Change Order 36 concerns eight different issues as detailed below.
1. Addition of 4 fire dampers, as per code and regulation, not detailed in
drawings, and the change of piping materials specified in the drawings to
galvanized steel as per Building Inspector request.
$847.00
2. Addition of 2 floar drains in locker room azea. $380.00
3. Fumish and install drinking fountain in employee area.(Omitted on original
documents). $100434
4. Relocate eackiaust duct in Maintenance garage to facilitate installation of future
over-head bridge crane as per Owner request. $454.00
5. Fumish and install Locker Room in-wall eachaust fan, 2 grills, fire dampers,
not in original documents. $961.00
MemUer of Construction Manaqement Association ot America Q e i s' Y/-i /-1
6. Cost associated with vehicle eachaust system upgrade in New Maintenance
gazage. (Extend system} Original system was not adequate for transfer to new
gazage.
$5,700.00
7. Work associated as outlined in drawings M6 and M7 and Request for Change
Order Proposals. $8,096.00
8. Furnish and install 1 additional Bradley wash fountain to replace existing as
per Owner Request. $2,600.00
Original Contract amount ..........................................$ 289,500.00
Previous Change Orders ...........................................$ 5, 817. 72
Change Order increase .............................................$ 20,042.81
New Contract Sum ..................................................$ 315, 360. 53
Please review and submit to Council.
Sincerely;
C�� ^' � �E'-�-� �^�
Christopher Denkinger
�„y.r� vrSUCn
CONSTRUCTION MANAGER-ADVISER EDITION
AIA DOCUMENT G701/CMa �
(Instrnctions on reverse side)
PROJECT:
(A'an1�• aud addre...)
TO CONTRACTOR:
(,\'ame miA udAress)
COTTAGE GROVE PUBLIC WORKS
8635 West Point Douglas Road South
Cottage Grove, MN 55016
S WANSON PLLIMBING .� HEATING, INC.
3550 Vamillion St
Hastings, MN 55033
O\W'NER
CONS7'RUCTION MANAGER
ARCHITECT
CONTRACTOR
FIELD
OTHER
0
❑
❑
❑
❑
❑
CHANGE ORDER NO.: C0.36-BC.15A-#7
INITIATION DATE:
PROJECT NOS.:
COIv'TRACT FOR:
CONTRACT DATE:
The Contract is changed as follows:
Costs to add 4&re dampers, requested by U�e Owner, and to revise plumbing pipmg.
Cost to acld 2 Josam flaor drains.
Installation of driokmg fountain, not shown on plans.
Relocate exhaust duct in Maintenance Garage, per Owner's request.
Fumish and install I.ocker Room exhaust fan in wall, 2 gilles, fue damper, etc.
Cost to reinstall velilcle eachaust system m new Maintenaace fiarage.
Work associated as outlined on drawings M6 and M7.
F�snish and 'mstall 1 additionai Bradley wash fountain,
��
•��
��
��
��
..
��
;►�
8/5/98
48397 - #4103
Bid Category #15A
ans��
S 847.47
S 380.00
51,00434
S 454.00
S 961.00
as,�oo.00
58,096.00
52,600.00
TOTAL ADD 520,042.81
Not vaiid until signed by the Owner, Construction Manager, Architect and Contractor.
The original (Concract Sum) ( , ) was . . . . .. . . . . ... . . . . .. . .. .. . . . .
Ne[ change by pre�•iousl�� authorized Change Orders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
The (Con[raet Sum} ( , � ) prior to this Cha�ge Otder was . . . .. . . .. . . .
The (Contract Sum) ( � ) will be (inereased) {deerra�tl) (�hert�ed) b�•
chis Change Order ................................................................
The nea• (Conttact Sum) (Guaran[eed Maximum Price) induding this Change Order will be ....
The Contrac[ Time will be Cfttc�eaaai) (ek??r�� (unchanged) bv . . . . . . . . . . . . . . . . . . . . . . . . .
The da[e of Substan[iai Comple[ion as of 2he dare of [hie Change Order [hecefore is .. ........
$ 289,500.00
� 5,817.72
� 295,317.72
S 20,042.81
s 315,360.53
( � ) daas
NOTE: 7his summarc does noi reflen cha�ges in the Convact Sum, Convatt Time or Guara�teed Maximum Price o,�hich have been authorized
b�� Construction Change Directive.
ADOLFSON & PETERSON, INC.
CO'�STRPCTIOti h1ANAGER
6701 WEST 23RD ST MPLS, MN
ADDRESS
BY
DATE
. � . � �• � , i , 1
� e � � ai•��'�1 • �� '�, � t
��' / � �
������„ ' I�.
c � � �
�
BONESTROO ROSENE ANDERLIK & ASSOC.
ARCHITEC7
2335 WEST HWY 36, ROSEVII,LE, MN
ADDRE55
BY
DATE
COTTAGE GROVE PUBLIC WORKS
°� �b W. PT DOUGLAS RD, COTTAGE GRV, MN
ADDRESS
gy
DATE
i CAUTION: You should use an original AIA documen4 which has this caution printed in red.
An original assures that changes witl not be obscured as may occur when documents are reproduced.
AIA DOCUMENT G707/CMe � CHANGE ORDER • CONSTRCCI'ION M.ANAGER�.4D\'ItiER FDITION a ��c�? EDiTIOti • AIA�
Cl`77? • TAE A�18RICAN INSTITl'TL OF ARCH7TECTS, I'}5 NE\C 1'ORt: A\'F1�Cf., NU'.. �ti:4ti7IiNGTON. DC. 2lHAK�-5?`72
.: WARNING: Uniicensed photocpp�ing violePes U.S. copyright Isws antl wlll sub�ect the vblator W Iegal pmsecutlon. C,e7��((;�8-'19Q2
:�