Loading...
HomeMy WebLinkAbout1998-10-07 PACKET 04.N.REQUEST OF CITY COUNCIL ACTION COUNCIL AGENDA MEETING ITEM DATE 10/07/98 PREPARED BY: Administration Ryan Schroeder ORIGINATING DEPARTMENT STAFF AUTHOR R # t k * k ! # k * 4 :Y k Y: k * * rt * * k * * k * * i * * * * t * * * * * * * k * * Y * * * * * COUNCIL ACTION REQUEST Approve Change Order Number 1 to Erickson Construction, Inc. for $47,275.00 on the West Draw Trunk Utility Project. BUDGET IMPLICATION BUDGETED AMOUNT ACTUAL AMOUNT FUNDING SOURCE SUPPORTING DOCUMENTS � MEMO/LETTER: Memo from Angela Popenhagen dated 9/30/98 ❑ RESOLUTION: ❑ ORDINANCE: ❑ ENGINEERING RECOMMENDATION: ❑ �EGAL RECOMMENDATION: � OTHER: Change Order ADMINISTRATORS COMMENTS r � �.� ' � ,� .- � � .,r�.� iG - z -��, City Administrator Date # * * * k * * * i * * * M * * t t + Y' * �' * i * Y t 'I' * 1 * f * :± i.' # * !: i * 'F * * i y * t ± COUNCIL ACTION TAKEN: ❑,4PPROVEd ❑ DENIED ❑ OTHER � TO: Honorabie Mayor and City Council FROM: Angela Popenhagen DATE: September 30, 1998 SUBJECT: West Draw Trunk Utility Project Our File No. 48-98-402 INTRODUCTION Attached is Change Order No. 1 for the West Draw Trunk Utility Project for Counci!'s consideration and approval. The change order consists of design changes that are necessary to mitigate adverse soil conditions. These changes reduce the cost of the project without adversely affecting the project feasibility. DISCUSSION Adverse soii conditions were encountered along the 70` Street right of way. These soil conditions made it impossible to perform the "directionai boring" and portions of the open trench work. To mitigate these problems, the installation procedure was modified ard the sewer was redesigned to avoid the difficulty. RECOMMENDATlON We recommend Council approve this change order. � Bonestroo 0 R05¢11C � Mderlik & Associates Engineers 6 Arthitects CHANGE ORDER NO. 1 WEST DRAW TRUNK Li'I'II.JWD MEADOWS 1ST ADD f I' • •• •1 Descrintion of Work This Change Order is for design modifications necessary to expedite Yhe conswction process. These modifications become evident when extraordinary soil conditons were encountered. This change in work will eliminate or reduce quan6ties in the contract along with creaung the following new line items. Contract Unit Total No. Item Unit Quantity Price Amount Deduct 34 8" PVC sanitary sewer, SDR 26, 16'-18' dee{ LF -355 $1710 ($6,070.50) 35 8" PVC sanitary sewer, SDR 26, 18'-20' deeF LF -285 $19.10 ($5,443.50) 36 8" PVC sanitary sewer, SDR?b, 20'-22' deeE LP -65 $21.10 ($1,371.50) 37 8" PVC sanitary sewer, SDR 26, 22'-24' dee� LF -85 $23.10 ($1,463.50) 38 8" PVC sanitary sewer, SDR 26, ?A'-26' deeF LF -67 $2610 ($1,748.70) 45 10" sanitary sewer directional drilled LF -400 $59.00 ($23,600.00) 46 8-in. sanitary sewer, jacked, incl. 24" carrier pipe LF -118 $230.00 ($27,140.00) SO Pump sewage GAL -9000 $015 ($1,350.00) 56 18" water main directional drilled LF -400 $123.00 ($49,200.00) 57 Tracer wire, No. 12Insulated LF -400 $0.4Q ($160.00) 58 Connect 18" ADPE w 18" DIP, incl. fittings EA -2 $2,105.00 ($4,210.00) 62 1" corporation EA -I $35.00 ($35.00) 63 1" curb stop and boz EA -1 $97.00 ($97.00) 64 I" Type "K" copper water service LF -10 $1230 ($123.00) 74 Remove barbed wire fence LF -400 $I.50 ($600.00) 84 Remove and reinstali 84" RCP culvert LF -14 $30.00 ($420.00) Total Deduct ($123,53290) Addition 53 18" DIf' water main, CI. 52, w/8-mil poly wrap 78 Bituminous W ear Course, Pathway, Type 41 A 89 Tr�c controt 172 ;0° C-40Q PdC sanicary sewer, 8'-EO' deep 193 18' ` water main, jacked, incL ?A° carrier pipe 174 Box work, removing, replacing, slope, reshaping slope 175 Improved pipe founda[ion 176 8" PVC sanitary sewer, SDR 26, 10'-12' dee{ 177 8" PVC sanitazy sewer, SDR 26, 12'-14' deeE Total Additlon Total Deduct Total Addition Total Change Order No. i LF T7V LS LF LF � LF LF LF 400 65 1 406 180 I 3000 572 270 $39.60 $15,840.00 $3030 $1,969.56 $300.OQ $300.00 $73.45 55,580.6G $138.00 $24,84Q.00 $14,000.00 $14,000.00 $1.00 $3�000.00 $1210 $6,921.20 $14.10 $3,807.00 $76,257.70 -$123,532.70 $76,257.70 ($47,2�5.00) chengeorderl.xls Original Contract Amount Previous Change Orders This Change Ordet Revised Contract Amount (including Uils change order) Recommended for Approval by: $1,003,30635 $0.00 ($47,275.00) $956,03135 BONESTROO, ROSENE, ANDERLII{ & ASSOCIATES, INC. Dater Approved by Contractor: Approved by Owner: ERICKSON CONSTRUCTION INC CITY OF COTTAGE GROVE cc: Ow`wr Contractor Bonding Company Bonestroo & Assce. changemderi.xis