Loading...
HomeMy WebLinkAbout1998-11-18 PACKET 04.E.REQUEST OF CITY COUNCIL ACTIO�J COUIVCIL AGENDA Pv1EETiNG ITEPVI # DATE 11/18/98 � PREPARED BY PubPic Works Les Burshten ORIGINATING DEPARTi�hENT STAFF AUTHOFt ��.,�».,,���.�«�..����..,.�������...��..���«.,�.��� COUNCIL ACTION REQUEST Approve Change Order #2 to Tower Asphalt for $9,155.65 on the East Point Douglas Road "Menards" Project. BUDGET IMP�ICATION: $ BUDGETED AMOUNT ADVISORY COMMISSION ACTION ❑ PLANNING ❑ PUBLIC SAFETY ❑ PUBLIC WORKS ❑ PARKS AND RECREATION ❑ HUMAN SERVICES/RIGHTS ❑ ECONOMIC DEV. AUTHORITY ❑ SUPPORTING DOCUMENTS DATE ■, •' . �• • • � _ �. � ' � �' �: ■ � . / 1� � .. �! ' . s-• �' ��, �� �� �. $ ACTUAL AMOUNT FUNDING SOURCE REVIEWEd ❑ ❑ ❑ ❑ ❑ ❑ ❑ APPROVED ❑ ❑ ❑ ❑ ❑ ❑ ❑ DENIED ❑ ❑ ❑ ❑ ❑ ❑ ❑ _/� /` GBt� .��.�.� .�,�,o-+�,�����,+,�,�..���««>.� �,�a�,���.:��,�...���� cc�u�ciL A�r�o� �r����. a����av�� ❑ c���c�n �� oT�a�� . � Bonestroo v Rosene � Mderlil<& Associates Enqlneerz 6 Ar[hlte[G Project Name: East Point Dougias Road "Menards" To: Les Burshten From: Eric A. Johnson Client: Cottage Grove File No: 48365 Date: November 2, 1998 Re: Change Order #2 Remarks: The attached change order is for improvements that occurred adjacent to the Hampton Bank and Target Strip Mail. The installation of the concrete sidewalk was as directed by planning staff after the project was bid. The sidewalk location is perpendicular to, and connecting East Point Dougias Fioad to the Strip Mall directly adjacent to the Hampton Bank Location. The cost for the instailation of the sidewalk also includes all grading and excavation that was completed to improve site distance. The other items inciuded herein are the costs for installing concrete pedestrian ramps and the associated remove and replace curbing for the instaliation of the pedestrian ramps. /i �3>:',� � /��^ � C��C���C� � Bonestroo, Rosene, Anderlik and Associates 2335 West Hiahwav 36 ■ St. Paul. MN 55113 ■ Pho�e: 651-636-4600 ■ Fax: 651-636-1311 CHANGE ORDER NO. 2 EAST POINT DOUGLAS ROAD File No.48365 M.S.A.P. No. 180-112-06 Description of Work Atl work included in this Change Order was for sidewalk, pathway, and site distance improvements on East Point Douglas Road adjacent to Hamton Bank - Tazget - siripmall. The work included: i. Site grading and common excavation for the pathway, sidewaik, and improving site distance. 2. Installation of concrete ped ramps and the associated removals and replacement of the curbing to accomodate the zamps. 3. Installatiqn of the concrete sidewalk in front of Hampton Bank from East Point Douglas Road to the stripmall. No. 1 2 3 4 Item Install concrete sidewalk Patch along curb and ped ramps Removg and replace curb and gutter Pedestrian ramp Unit LS LS LF SF Contract 1 1 198 369 Uni[ Tofal Price Amount $3,345.00 $3,345.00 $170.80 $170.80 $18.70 $3,702.60 5.25 $1,93'I.25 $9,155.65 as�s�w.wot Original Contract Amount Previous Change Orders This Change Order No. 2 Revised Contract Amount (including this change order) Recommended for Approval by: BONESTROO, ROSENE, ANDERLIK & ASSOCIATES, INC. _� Approve by Contractor: cc: Owner Contrector Bonding Company Bonestroo & Assoc. date: $430,792.50 $0.00 $9,155.65 $439,948.15 Approved by Owner: CITY OF COTTAGE GROVE A93657co.wbt TOWER ASPEiALT, INC. Rosene i Owner: Cirv af �� z Contractor: Tower � r,s�Rnneas Bond Co. tl.fff:i�iS, • :. MN 5501 Date Julv 29. 1996 MN 55043 c�tvcE oxnEx rro. z EAST POPVT DOliGLAS ROAD File No.48365 M.S.A.P. No. 180-112-06 Description of Work All work included in this Change Order was for sidewalk, pathway, and site distance improvemenu on East Point Douglas Road adjacent to Hamton Bank - Target - stripmall. The work included: 1. Site grading and common excavation for the pathway, sidewalk, and improving site distance. 2. Installation of concrete ped ramps and the associated removais and replacement of the curbing to accomodate the ramps. 3. dnstalla6on of the concrete sidewalk in front of Hampton Bank from East Point Douglas Road to the stripmall. No. 1 2 3 4 Item Install concrete sidewalk Patch along curb and ped ramps Remove and replace curb and gutter Pedestrian ramp Contract Unit Total Unit Quanrity Price Amount LS I $3,345.00 $3,345.00 LS 1 $170.80 $170.80 LF 198 $18.70 $3,702.60 SF 369 5.25 $1,937.25 $9,155.6> 463s5/co.wbl Original Contract Amount Previous Change Orders This Change Order No. 2 Revised Contraci Amount (including this change order) Recommended for Approval by: BONESTROO, ROSENE, ANDERLIK & ASSOCIATES, INC. /� l��� � Approved by Contractor: TOWER ASPHALT, INC. \_�� ` cc: Owner Contractor Bonding Company Bonestroo 8 Assoc. date: $430,792.50 $0.00 $9,155.65 $439,948.15 Approved by Owner: CITY OF COTTAGE GROVE 48365lco.wbt CHANGE ORDER NO. 2 EAST POINT DOUGLAS ROAD File No.48365 M.S.A.P. No. I80-! 12-06 Description of Work All work included in this Change Order was for sidewalk, pa2hway, and site distance improvements on East Point Douglas Road adjacent to Hamton Bank - Tazget - stripmall. The work included: i. Site grading and common excavation for the pathway, sidewalk, and unproving site distance. 2. Installation of concrete ped ramps and the associated removals and replacement of the curbing to accomodate the ramps. 3. Installaiion of the concrete sidewaIk in front of Hampton Bank from East Point Dougias Road to the stripmall. No. 1 2 3 4 Item Instali concrete sidewalk Patch along curb and ped ramps Remove and replace curb and gutter Pedestrian ramp Unit LS LS LF SF Contract 1 1 198 369 Unit Total Price Amount $3,345.00 $3,345.00 $170.80 $170.80 $18.70 $3,7Q2.60 5.25 $1,937.25 $9,155.65 4s3s5/co.wtl Original Contract Amount Previous Change Orders This Change Order No. 2 Revised Contract Amount (including this change order) Recommended for Approval by: BONESTROO, R03ENE, ANDERLIK & ASSOCIATES, INC. << , ( � Approv d by Contractor: TOWER ASPHALT, INC. _i cc: Owner Contractor Bonding Company Bonestroo & Assoc. date: 5430,792.50 $0.00 $9,155.65 $439,948.15 Approved by Owner: CITY OF COTTAGE GROVE �83s5/co.wt� CIiANGE ORDER NO. 2 EAST POINT DOUGLAS ROAD File No.48365 M.S.A.P. No. 180-112-06 Description of Work All work included in this Change Order was for sidewalk, pathway, and site distance improvements on East Point Douglas Road adjacent to Hamton Bank - Tazget - s�ipmall. T'he work included: 1. Site grading and common excavation for the pathway, sidewalk, and improving site disiance. 2. Installation of concrete ped ramps and the associated removals and replacement of the curbing to accomodate the ramps. 3. Installation of the concrete sidewalk in front of Hampton Bank from East Point Douglas Road to the stripmall. No. 1 2 � 4 Item Install concrete sidewalk Patch along curb and ped ramps Remove and replace curb and gutter Pedestrian raznp Unit LS LS LF SF ContraM Unit Quantity Price 1 $3,345.00 r �i�o.so 148 $18.70 369 5.25 Total Amount $3,345.00 � 1 �o.so $3 $1,93 �.25 $9,15�.65 48365/co.wbt Original Contract Amount Previous Change Orders This Change Order No. 2 Revised Contract Amount (including this change order} Recommended for Approval by: BONESTROO, ROSENE, ANDERLIK & ASSOCIATES, INC. ,r ` l %z�-,..�..�-�--�_ Approved by Contractor: TOWER ASPHALT, INC. C_� ._._. __.._ cc: Owner Contractor Bonding Company BonesVoo 8 Assoc. date: $430,�92.50 $0.00 $9,155.65 $439,948.15 Approved by Owner: CTTY OF COTTAGE GROVE +e3ss��o.wb� CHANGE ORDER NO. 2 EAST POINT DOUGLAS ROAD File No.48365 M.S.A.P. No. 180-112-06 Description of Work All work included in this Change Order was for sidewalk, pathway, and site distance improvemenu on East Point Douglas Road adjacent to Hamton Bank - Tazget - stripmall. The work included: l. Site grading and common excavation for the pathway, sidewaik, and improving site distance. 2. Installa6on of concrete ped ramps and the associated removals and replacement of the curbing to accomodate the ramps. 3. Installation of the concrete sidewalk in front of Hampton Bank from East Point Douglas Road to the stripmall. Contract Unit Total No. Item Unit Quantity Price Amount 1 Install concrete sidewalk LS 1$3,345.00 $3,345.00 2 Patch along curb and ped ramps LS 1 $170.80 $170.80 3 Remove and replace curb and gutter 4 Pedestrian ramp LF 198 SF 369 $18.70 3.�5 $3,702.60 51,9��.25 $9,155.65 ��c��.�� Original Contract Amount Previous Change Orders This Change Order No. 2 Revised Contract Amount (including this change order) Recommended for Approval by: BONESTROO, ROSENE, ANDERLIK & ASSOCIATES, INC. -fr � � Approve by Contractor: TOWER ASPFIALT, INC. C= � �_ cc: Owner Contractor Bonding Company Bonestroo 8 Assoc. date: $430,792.50 $0.00 $9,155.65 $439,948.15 Approved by Owner: CTfY OF COTTAGE GROVE AE365/eo.wbt