HomeMy WebLinkAbout1998-11-18 PACKET 04.E.REQUEST OF CITY COUNCIL ACTIO�J COUIVCIL AGENDA
Pv1EETiNG ITEPVI #
DATE 11/18/98 �
PREPARED BY PubPic Works Les Burshten
ORIGINATING DEPARTi�hENT STAFF AUTHOFt
��.,�».,,���.�«�..����..,.�������...��..���«.,�.���
COUNCIL ACTION REQUEST
Approve Change Order #2 to Tower Asphalt for $9,155.65 on the East Point Douglas Road
"Menards" Project.
BUDGET IMP�ICATION: $
BUDGETED AMOUNT
ADVISORY COMMISSION ACTION
❑ PLANNING
❑ PUBLIC SAFETY
❑ PUBLIC WORKS
❑ PARKS AND RECREATION
❑ HUMAN SERVICES/RIGHTS
❑ ECONOMIC DEV. AUTHORITY
❑
SUPPORTING DOCUMENTS
DATE
■, •' .
�• • •
� _ �.
� ' � �' �:
■ � . / 1� � ..
�! ' . s-• �'
��, �� �� �.
$
ACTUAL AMOUNT FUNDING SOURCE
REVIEWEd
❑
❑
❑
❑
❑
❑
❑
APPROVED
❑
❑
❑
❑
❑
❑
❑
DENIED
❑
❑
❑
❑
❑
❑
❑
_/� /`
GBt�
.��.�.� .�,�,o-+�,�����,+,�,�..���««>.� �,�a�,���.:��,�...����
cc�u�ciL A�r�o� �r����. a����av�� ❑ c���c�n �� oT�a��
.
� Bonestroo
v Rosene
� Mderlil<&
Associates
Enqlneerz 6 Ar[hlte[G
Project Name: East Point Dougias Road
"Menards"
To: Les Burshten
From: Eric A. Johnson
Client: Cottage Grove
File No: 48365
Date: November 2, 1998
Re: Change Order #2
Remarks: The attached change order is for improvements that occurred adjacent to the Hampton Bank
and Target Strip Mail. The installation of the concrete sidewalk was as directed by planning staff after the
project was bid. The sidewalk location is perpendicular to, and connecting East Point Dougias Fioad to the
Strip Mall directly adjacent to the Hampton Bank Location. The cost for the instailation of the sidewalk also
includes all grading and excavation that was completed to improve site distance. The other items inciuded
herein are the costs for installing concrete pedestrian ramps and the associated remove and replace
curbing for the instaliation of the pedestrian ramps.
/i �3>:',�
� /��^ �
C��C���C�
�
Bonestroo, Rosene, Anderlik and Associates
2335 West Hiahwav 36 ■ St. Paul. MN 55113 ■ Pho�e: 651-636-4600 ■ Fax: 651-636-1311
CHANGE ORDER NO. 2
EAST POINT DOUGLAS ROAD
File No.48365
M.S.A.P. No. 180-112-06
Description of Work
Atl work included in this Change Order was for sidewalk, pathway, and site distance
improvements on East Point Douglas Road adjacent to Hamton Bank - Tazget - siripmall.
The work included:
i. Site grading and common excavation for the pathway, sidewaik, and
improving site distance.
2. Installation of concrete ped ramps and the associated removals and replacement
of the curbing to accomodate the zamps.
3. Installatiqn of the concrete sidewalk in front of Hampton Bank from East Point
Douglas Road to the stripmall.
No.
1
2
3
4
Item
Install concrete sidewalk
Patch along curb and ped ramps
Removg and replace curb and gutter
Pedestrian ramp
Unit
LS
LS
LF
SF
Contract
1
1
198
369
Uni[ Tofal
Price Amount
$3,345.00 $3,345.00
$170.80 $170.80
$18.70 $3,702.60
5.25 $1,93'I.25
$9,155.65
as�s�w.wot
Original Contract Amount
Previous Change Orders
This Change Order No. 2
Revised Contract Amount (including this change order)
Recommended for Approval by:
BONESTROO, ROSENE, ANDERLIK & ASSOCIATES, INC.
_�
Approve by Contractor:
cc: Owner
Contrector
Bonding Company
Bonestroo & Assoc.
date:
$430,792.50
$0.00
$9,155.65
$439,948.15
Approved by Owner:
CITY OF COTTAGE GROVE
A93657co.wbt
TOWER ASPEiALT, INC.
Rosene i Owner: Cirv af
�� z Contractor: Tower �
r,s�Rnneas Bond Co.
tl.fff:i�iS,
• :.
MN 5501 Date Julv 29. 1996
MN 55043
c�tvcE oxnEx rro. z
EAST POPVT DOliGLAS ROAD
File No.48365
M.S.A.P. No. 180-112-06
Description of Work
All work included in this Change Order was for sidewalk, pathway, and site distance
improvemenu on East Point Douglas Road adjacent to Hamton Bank - Target - stripmall.
The work included:
1. Site grading and common excavation for the pathway, sidewalk, and
improving site distance.
2. Installation of concrete ped ramps and the associated removais and replacement
of the curbing to accomodate the ramps.
3. dnstalla6on of the concrete sidewalk in front of Hampton Bank from East Point
Douglas Road to the stripmall.
No.
1
2
3
4
Item
Install concrete sidewalk
Patch along curb and ped ramps
Remove and replace curb and gutter
Pedestrian ramp
Contract Unit Total
Unit Quanrity Price Amount
LS I $3,345.00 $3,345.00
LS 1 $170.80 $170.80
LF 198 $18.70 $3,702.60
SF 369 5.25 $1,937.25
$9,155.6>
463s5/co.wbl
Original Contract Amount
Previous Change Orders
This Change Order No. 2
Revised Contraci Amount (including this change order)
Recommended for Approval by:
BONESTROO, ROSENE, ANDERLIK & ASSOCIATES, INC.
/�
l��� �
Approved by Contractor:
TOWER ASPHALT, INC.
\_�� `
cc: Owner
Contractor
Bonding Company
Bonestroo 8 Assoc.
date:
$430,792.50
$0.00
$9,155.65
$439,948.15
Approved by Owner:
CITY OF COTTAGE GROVE
48365lco.wbt
CHANGE ORDER NO. 2
EAST POINT DOUGLAS ROAD
File No.48365
M.S.A.P. No. I80-! 12-06
Description of Work
All work included in this Change Order was for sidewalk, pa2hway, and site distance
improvements on East Point Douglas Road adjacent to Hamton Bank - Tazget - stripmall.
The work included:
i. Site grading and common excavation for the pathway, sidewalk, and
unproving site distance.
2. Installation of concrete ped ramps and the associated removals and replacement
of the curbing to accomodate the ramps.
3. Installaiion of the concrete sidewaIk in front of Hampton Bank from East Point
Dougias Road to the stripmall.
No.
1
2
3
4
Item
Instali concrete sidewalk
Patch along curb and ped ramps
Remove and replace curb and gutter
Pedestrian ramp
Unit
LS
LS
LF
SF
Contract
1
1
198
369
Unit Total
Price Amount
$3,345.00 $3,345.00
$170.80 $170.80
$18.70 $3,7Q2.60
5.25 $1,937.25
$9,155.65
4s3s5/co.wtl
Original Contract Amount
Previous Change Orders
This Change Order No. 2
Revised Contract Amount (including this change order)
Recommended for Approval by:
BONESTROO, R03ENE, ANDERLIK & ASSOCIATES, INC.
<< , ( �
Approv d by Contractor:
TOWER ASPHALT, INC.
_i
cc: Owner
Contractor
Bonding Company
Bonestroo & Assoc.
date:
5430,792.50
$0.00
$9,155.65
$439,948.15
Approved by Owner:
CITY OF COTTAGE GROVE
�83s5/co.wt�
CIiANGE ORDER NO. 2
EAST POINT DOUGLAS ROAD
File No.48365
M.S.A.P. No. 180-112-06
Description of Work
All work included in this Change Order was for sidewalk, pathway, and site distance
improvements on East Point Douglas Road adjacent to Hamton Bank - Tazget - s�ipmall.
T'he work included:
1. Site grading and common excavation for the pathway, sidewalk, and
improving site disiance.
2. Installation of concrete ped ramps and the associated removals and replacement
of the curbing to accomodate the ramps.
3. Installation of the concrete sidewalk in front of Hampton Bank from East Point
Douglas Road to the stripmall.
No.
1
2
�
4
Item
Install concrete sidewalk
Patch along curb and ped ramps
Remove and replace curb and gutter
Pedestrian raznp
Unit
LS
LS
LF
SF
ContraM Unit
Quantity Price
1 $3,345.00
r �i�o.so
148 $18.70
369 5.25
Total
Amount
$3,345.00
� 1 �o.so
$3
$1,93 �.25
$9,15�.65
48365/co.wbt
Original Contract Amount
Previous Change Orders
This Change Order No. 2
Revised Contract Amount (including this change order}
Recommended for Approval by:
BONESTROO, ROSENE, ANDERLIK & ASSOCIATES, INC.
,r ` l %z�-,..�..�-�--�_
Approved by Contractor:
TOWER ASPHALT, INC.
C_� ._._. __.._
cc: Owner
Contractor
Bonding Company
BonesVoo 8 Assoc.
date:
$430,�92.50
$0.00
$9,155.65
$439,948.15
Approved by Owner:
CTTY OF COTTAGE GROVE
+e3ss��o.wb�
CHANGE ORDER NO. 2
EAST POINT DOUGLAS ROAD
File No.48365
M.S.A.P. No. 180-112-06
Description of Work
All work included in this Change Order was for sidewalk, pathway, and site distance
improvemenu on East Point Douglas Road adjacent to Hamton Bank - Tazget - stripmall.
The work included:
l. Site grading and common excavation for the pathway, sidewaik, and
improving site distance.
2. Installa6on of concrete ped ramps and the associated removals and replacement
of the curbing to accomodate the ramps.
3. Installation of the concrete sidewalk in front of Hampton Bank from East Point
Douglas Road to the stripmall.
Contract Unit Total
No. Item Unit Quantity Price Amount
1 Install concrete sidewalk LS 1$3,345.00 $3,345.00
2 Patch along curb and ped ramps LS 1 $170.80 $170.80
3 Remove and replace curb and gutter
4 Pedestrian ramp
LF 198
SF 369
$18.70
3.�5
$3,702.60
51,9��.25
$9,155.65
��c��.��
Original Contract Amount
Previous Change Orders
This Change Order No. 2
Revised Contract Amount (including this change order)
Recommended for Approval by:
BONESTROO, ROSENE, ANDERLIK & ASSOCIATES, INC.
-fr � �
Approve by Contractor:
TOWER ASPFIALT, INC.
C= �
�_
cc: Owner
Contractor
Bonding Company
Bonestroo 8 Assoc.
date:
$430,792.50
$0.00
$9,155.65
$439,948.15
Approved by Owner:
CTfY OF COTTAGE GROVE
AE365/eo.wbt