COUNCIL ACTION f2EQUEST
Approve change order #2 on SOth Street Reconstruction project to Tower Asphalt for
$174,354.87
BUDGET IMPLICATION: $ $
BUDGETED AMOUNT ACTUAL AMOUNT FUNDING SOURCE
ADVISORY COMMISSlON ACTION
DATE
REVIEWED
❑
❑
❑
❑
❑
❑
❑
APPROVED
❑
❑
❑
❑
❑
❑
❑
DENIED
❑
❑
❑
❑
❑
❑
❑
❑ PLANNING
❑ PUBLIC SAFETY
❑ PUBLIC WORKS
❑ PARKS AND RECREATION
❑ HUMAN SERVICESlRIGHTS
❑ ECONOMIC DEV. AUTHORITY
❑
SUPPORTING DOCUMEIVTS
❑ MEMO/�ETTER:
❑ RESOLUTION:
❑ ORDINANCE:
❑ ENGINEERING RECOMMENDATION:
❑ LEGAL RECOMN1EtJDATBON:
� OT�E€2: uhsnge ord2r
ADMIiVISTRA`fORS COMMEtVTS
/I
City Administrafior Date
��.�.�.«���...t����*�d�.tr�.�.�������,�������*�,�.��
�ou�coL �crio� �ra��� ❑ ��r��ov�c� ❑ ���vi�� ❑ c�r���
Mef110
,/�' eonesiroo
r_r pp�ne
� ° Anderiik 6
/4ssociates
Engmeers 6 Mmn«os
Project Name: 80"' Street Reconstruction Project
C/ienf: Cottage Grove
To: Les Burshten
From: Eric A. Johnson
File No: 48372
Date: October 30, 1998
Re: Change Order #2
Remarks: Attached is change order number 2. This change order refiect several items that are not MSA
participating and in some cases are �at invoiving the 80` Street project. Below is a more detailed
description of each of the change orders:
1. This cost is for Peoples Electric to remove the existing, and install a new signai controlier a�d cabinet at
the East Point Douglas Road and 80"' Street location. The controlier and cabinet are provided by Public
�Vorks. This work is being done at the request of Public Works due to the age of the controlier. To
accommodate the modem controller and its apparatuses the repiacement of the cabinet was more cost
effective rather that retrofitting.
2. This change order is for instailing water main between Homell and Hynes Avenues. This work was
performed at the request of staff to address recent water main breaks and the concems with piaci�g a
new roadway surface and landscaping above the main. This work was performed under the direction of
time and material as per the contract. The costs associated in this change order refiect all materials to
compiete the work. The time that is included in the total cost for the work has not yet been confirmed
and agreed upon with invnices in which Tower Asphait has submitted. Towers invoices inelude an
additional $7800.00 above which is already i�cluded in this change order for there costs which they
claim to be $12570.00. Tower is in the process of providing information to substantiate the remaining
portion of their costs.
3. This work is for paving the parking lots at Pubiic Works. A 2" bituminous wear coarse mat far the staff
parking area, and a 2" bituminous base coarse mat was placed behind the Pubiic Works building. This
change order also includes tolerancing the Ciass 5-gravei base. This change order does not include the
finai wearing coarse which is suspected to be placed next year or the tack coat materiai.
.a. This work is for removing the concrete median surfacing between Hwy, 61 and East Point Douglas Rd.
The surFace area will be replaced with exposed aggregate concrete surfacing with the exception of an
area to be landscaped. The landscaped area shall inciude a coiored concrete perimeter that will be 4
feet wide and be sloped one foot. This work wili be performed in the spring of 1999.
6nnvctrnn. Rncana. Anrlavtik and Accnr.iatac
.
,/�, Bonestroo
o Rosene
� Anderiik &
Associates
Englneers b ArtM1reecv
5. This item is for patching miscellaneous potholes and over Iaying an existing patch along 80` Street.
The potholes deveioped in the fatigued existing mat, because of the concentration of traffic to two lanes
during construction. The patch overlaying was the December 1997 water main break patch on 8p`
street. This patch was constructed with cold mix asphalt patching material due to the time of year in
which it was constructed. As the summer temperatures softened the material, and due to the traffic
volumes concentrated over this location the patch became rough and to some extent, impassable. The
contractor was then directed to overlay and patch these locations as directed by staff.
Bana_shnn. Rnsane. AnrferOfk and Accnr.fatac
CIIANGE ORDER NO. 2
80TH STREET RECONSTRUCTION
MSA 180-102-1>
File 48-98-372
Description of Work
I) Work consists of removing the evsting signal cabinet and controller and installing a new city supplied cabinet and
conffoller in its place. This work shall be completed prior to December 1, 1998.
2) Work consists of installing 300 mm PVC water main between Horwell and Hynes Avenue on 80th Street. This
work is in response to water main bral:es, suspected to be caused by corrosion.
3) Tolerance the Class � gravel base and pave the pazking lots at Public Works.
4) Remove the concrete surfacing in the center median and replace the concrete with 4" of exposed aggregate
testured concrete. This work shall be completed by June 1�, 1999.
5) Patch pot holes and overlay an e�isting bituminous patch, which was wash boazding and rough. This work is
as directed bv the Pubiic Works staff.
No. Item Unit Quanfitv Price Amount_
Change Order No. 2
1 Change out controller and cabinet at East
PointDouglasRoad LS 1 $1,622.50 $1,622.50
2 Replaeewaterrnain LS I $01,839.02 $6i,839.02
3 Tolerance Class 5 base SY 20000 $03� $7
Type 32B non-weaz T'N 1�50 $24.10 $37,355.00
Type 42B weaz "I"N 543 $25.45 $13,81935
Tack coat material GAL 250 $ I.00 $250.00
4 Remove concrete sidewallc m2 900 $3.60 $3,240.00
100 mm conerete sidewall: exposed aggegate
fmish m2 1350 $29.10 $39,285.00
100 mm concrete walk - colored surface m2 210 $41.40 $8,694.00
5 Patch potholes and water main trench LS 1 �1,250.00 $1,250.00
Totai Change Order No. 2 $174,354.87
I:k18N8372�CHNGEOR2.W B2
Original Contract Amount
Previous Change Orders
This Change Order
Revised Contract Amovnt (including this change order) ,
Recommended for Approval by:
BONESTROO, ROSENE, ANDERLIK & ASSOCIATES, INC.
date:
Approved by Contractor: Approved by Owner:
TOWER ASPHAI,T, INC.
$2,863,033.48
$6,522.1 I
$174,354.87
$3.043.910.46
CITY OF COTTAGE GROVE