Loading...
HomeMy WebLinkAbout1998-11-18 PACKET 04.F.�EC�uESr o� ci� cou�ci� ac�rao� cauNCi� ����Da MEETING ITEIVI # DATE 11 /18/98 � , . PREPARED BY P!abiic Works Les Burshten ORIGINATING DEPARTMEfJT STAFF AUTHOR c,e x a a,a c a s c,o- « m m x a r.� ct ,s a& n a+ a+ e a e t a� a�< a+ r� rt a c� a� a+ COUNCIL ACTION f2EQUEST Approve change order #2 on SOth Street Reconstruction project to Tower Asphalt for $174,354.87 BUDGET IMPLICATION: $ $ BUDGETED AMOUNT ACTUAL AMOUNT FUNDING SOURCE ADVISORY COMMISSlON ACTION DATE REVIEWED ❑ ❑ ❑ ❑ ❑ ❑ ❑ APPROVED ❑ ❑ ❑ ❑ ❑ ❑ ❑ DENIED ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ PLANNING ❑ PUBLIC SAFETY ❑ PUBLIC WORKS ❑ PARKS AND RECREATION ❑ HUMAN SERVICESlRIGHTS ❑ ECONOMIC DEV. AUTHORITY ❑ SUPPORTING DOCUMEIVTS ❑ MEMO/�ETTER: ❑ RESOLUTION: ❑ ORDINANCE: ❑ ENGINEERING RECOMMENDATION: ❑ LEGAL RECOMN1EtJDATBON: � OT�E€2: uhsnge ord2r ADMIiVISTRA`fORS COMMEtVTS /I City Administrafior Date ��.�.�.«���...t����*�d�.tr�.�.�������,�������*�,�.�� �ou�coL �crio� �ra��� ❑ ��r��ov�c� ❑ ���vi�� ❑ c�r��� Mef110 ,/�' eonesiroo r_r pp�ne � ° Anderiik 6 /4ssociates Engmeers 6 Mmn«os Project Name: 80"' Street Reconstruction Project C/ienf: Cottage Grove To: Les Burshten From: Eric A. Johnson File No: 48372 Date: October 30, 1998 Re: Change Order #2 Remarks: Attached is change order number 2. This change order refiect several items that are not MSA participating and in some cases are �at invoiving the 80` Street project. Below is a more detailed description of each of the change orders: 1. This cost is for Peoples Electric to remove the existing, and install a new signai controlier a�d cabinet at the East Point Douglas Road and 80"' Street location. The controlier and cabinet are provided by Public �Vorks. This work is being done at the request of Public Works due to the age of the controlier. To accommodate the modem controller and its apparatuses the repiacement of the cabinet was more cost effective rather that retrofitting. 2. This change order is for instailing water main between Homell and Hynes Avenues. This work was performed at the request of staff to address recent water main breaks and the concems with piaci�g a new roadway surface and landscaping above the main. This work was performed under the direction of time and material as per the contract. The costs associated in this change order refiect all materials to compiete the work. The time that is included in the total cost for the work has not yet been confirmed and agreed upon with invnices in which Tower Asphait has submitted. Towers invoices inelude an additional $7800.00 above which is already i�cluded in this change order for there costs which they claim to be $12570.00. Tower is in the process of providing information to substantiate the remaining portion of their costs. 3. This work is for paving the parking lots at Pubiic Works. A 2" bituminous wear coarse mat far the staff parking area, and a 2" bituminous base coarse mat was placed behind the Pubiic Works building. This change order also includes tolerancing the Ciass 5-gravei base. This change order does not include the finai wearing coarse which is suspected to be placed next year or the tack coat materiai. .a. This work is for removing the concrete median surfacing between Hwy, 61 and East Point Douglas Rd. The surFace area will be replaced with exposed aggregate concrete surfacing with the exception of an area to be landscaped. The landscaped area shall inciude a coiored concrete perimeter that will be 4 feet wide and be sloped one foot. This work wili be performed in the spring of 1999. 6nnvctrnn. Rncana. Anrlavtik and Accnr.iatac . ,/�, Bonestroo o Rosene � Anderiik & Associates Englneers b ArtM1reecv 5. This item is for patching miscellaneous potholes and over Iaying an existing patch along 80` Street. The potholes deveioped in the fatigued existing mat, because of the concentration of traffic to two lanes during construction. The patch overlaying was the December 1997 water main break patch on 8p` street. This patch was constructed with cold mix asphalt patching material due to the time of year in which it was constructed. As the summer temperatures softened the material, and due to the traffic volumes concentrated over this location the patch became rough and to some extent, impassable. The contractor was then directed to overlay and patch these locations as directed by staff. Bana_shnn. Rnsane. AnrferOfk and Accnr.fatac CIIANGE ORDER NO. 2 80TH STREET RECONSTRUCTION MSA 180-102-1> File 48-98-372 Description of Work I) Work consists of removing the evsting signal cabinet and controller and installing a new city supplied cabinet and conffoller in its place. This work shall be completed prior to December 1, 1998. 2) Work consists of installing 300 mm PVC water main between Horwell and Hynes Avenue on 80th Street. This work is in response to water main bral:es, suspected to be caused by corrosion. 3) Tolerance the Class � gravel base and pave the pazking lots at Public Works. 4) Remove the concrete surfacing in the center median and replace the concrete with 4" of exposed aggregate testured concrete. This work shall be completed by June 1�, 1999. 5) Patch pot holes and overlay an e�isting bituminous patch, which was wash boazding and rough. This work is as directed bv the Pubiic Works staff. No. Item Unit Quanfitv Price Amount_ Change Order No. 2 1 Change out controller and cabinet at East PointDouglasRoad LS 1 $1,622.50 $1,622.50 2 Replaeewaterrnain LS I $01,839.02 $6i,839.02 3 Tolerance Class 5 base SY 20000 $03� $7 Type 32B non-weaz T'N 1�50 $24.10 $37,355.00 Type 42B weaz "I"N 543 $25.45 $13,81935 Tack coat material GAL 250 $ I.00 $250.00 4 Remove concrete sidewallc m2 900 $3.60 $3,240.00 100 mm conerete sidewall: exposed aggegate fmish m2 1350 $29.10 $39,285.00 100 mm concrete walk - colored surface m2 210 $41.40 $8,694.00 5 Patch potholes and water main trench LS 1 �1,250.00 $1,250.00 Totai Change Order No. 2 $174,354.87 I:k18N8372�CHNGEOR2.W B2 Original Contract Amount Previous Change Orders This Change Order Revised Contract Amovnt (including this change order) , Recommended for Approval by: BONESTROO, ROSENE, ANDERLIK & ASSOCIATES, INC. date: Approved by Contractor: Approved by Owner: TOWER ASPHAI,T, INC. $2,863,033.48 $6,522.1 I $174,354.87 $3.043.910.46 CITY OF COTTAGE GROVE cc: Owner Contractor Bonding Company Bonestroo & Assoc. C WBW8372lCHNGEOR2. W 82