Authorize preparation of pians and specifications, set bid date and authorize advertising for
bids for ice arena renovations.
BUDGET IMPLICATIOIV $
BUDGETED AMOUNT
ADVISORY CONIMISSION ACTION:
❑ PLANNING
❑ PUB�IC SAFETY
❑ PUBLIC WORKS
❑ PARKS AND RECREATION
❑ HUMAN SERVICES/RIGHTS
❑ ECONOMIC DEV. AUTHORITY
❑
SUPPORTING DOCUMENTS
�_
$
ACTUAL AMOUNT FUNDING SOURCE
REVIEWED
❑
❑
❑
❑
❑
❑
❑
APPROVED
❑
❑
❑
❑
❑
0
❑
DENIED
❑
❑
❑
❑
❑
❑
❑
� MEMO/LETTER: Gary Kristofitz, 12/4/98
❑ RESOLUTION:
❑ ORDINANCE:
❑ ER�GINFERING REGOt�MENDATIC�N:
❑ LEGAL RECOMMENDATION:
❑ �THER:
�� �, �, *, � �
� __
-, —�
� .�
� )
/ /
c l , .-����? - - ------- / d-L 9 _
`' City Administratar Date
# A 4�k X w* t k a R# @# H:� d*# R#�k k# **# A h*#* X k f k t k s.i� # rt Y * rt# rt
cc�u�crL ac rso� Ta�c��: ❑�,pp�ov�D ❑ D��vi� � ❑ o�rr��r�
� Bonestroo
0 ROSt'Cfe
� Anderiik �
Associ�tes
Engtneers & Archltects
Deccmbe� 7, 194$
Ciry of Cottage Grove
751b 80` Strcet South
Cottagt Grovc, MN 55106
Re: Ice Arena Renovations
BRA File No. 48-98-$0�
Bn,•ns..na xprcne.b�Jr.uv n�v�uo.�,n.� �n, q nnmr,nnn.caibnn.E9��a
+. �hw f> Buneinim. PE . �mep^ i nnWnu�. Mt . marv�n L So.vam. v( .
Nimartl 6� To��v. ^E � G�rn� P C�ot, �C • Ropvt 3 SCnY��t�t i'E. � Jnry A Bnu�rlOn. VE �
P09en'L Qwc^c I! .mOSv,.x'�M CDe*n.. � Pn '.rmortryn�u�F�n;)
nfluUnre Prmm�pwr� Hnwup 4 SaNmd PE . lerrn �[Va.yon +f. . rto�ert R. Pfe�fenp ✓E •
FKY�A�d W. GoIItr. PE . tlnrW') 19fY4tn. �1C . Ruherz :, RuKC+. n 1 �. e Mn�1 A. H.n+.vnn. Yf •
M¢�+a0 T RN�mann. FE • 1!0 r FlYIQ. YF • Ke^+�etn F An�totnn. R( . Md�k R. Rnlf t>i. •
liO�lY / W�Ilrpm�pn. ✓b. l S•�4Gl�t 4 KoWrntn . A�p�wf M YT�1 . M�C��tl p RA4 PE �
n�I,m rt�u S.�+rmw.?F
lJrFCR Si s�ur �pftle4t� Wdlm.v nnlf lt f�e�qp. MN. Ntlwe Wt
,��U.,,�� ...w�a,�K«,�,,.��
Dear Mayor and Members of the Council:
Our firm was recently asked by Staff inembers to submit a proposal for aervices related tv re-
bidding ice arena renovatiun work which had previously been b+d in June of this year, along with
revisio�s and additioas ro the work original bid as described betow. We undcrstand the scope of
the work is as ful{owe:
o Repiacement of Studio Ice Rink Floor — Includes the partial demolition of khe existing
ice floor and the construction of a new sand surface, direct reFrigtrated rink floor at
the same loeation.
o Repiacament of existing freon pumper timer controls wiih ncw float controls. This
work was originally bid as Alternste No. 3, but will now bc included in the Lump
Sum Base Bid.
o Provide neaded impravements and repairs to various refrigeratioa system
eomponents. This work was originally bid as Altemato No. 4, but will now be
included in the Lump Sum Base Bid.
❑ F�epiacement of She existing evagosativt condenser +vith a ntw laager sasiit. This work
was not includod in the pxevious desi,gn.
o The work prcviousiy included in Aitarnatc Bids 1 and 2(compressor repairs and
ventilation improvements) has been completed and will therefore not bc ro-bid.
Our proposed compensation for the neeessazy design eevisions, preparution of construction
documents, and bidding services is $1,900.00, which includes onc trip to the site to meot with
Staff and to t:ilce field measurements retated to the condenser reptacement. Services during
construction woutd be provided on an hourly basis and ate estimated at approximately $3,500.00.
The proposcd construction services wouid include:
❑ Shop drawing roview
u Constructiaa observation
o Preparation of payment requests, change ordars, end fietd repuns
2335 West Hiqhway 36 � St. Paul. MN SSti3 � 612-636•460� • Paz: 612-636-13f1
BONESTR00 ROSENE ANDERLIK
December4, l998
Page ?
� 6126361311 12J08/98 11:33 � :03/03 N0:455
Based on can�ersation with City Staff, the following project schedule is proposed:
Decamber 16, t99& Council authori2es prepazation of plans and specifrcatioas, sets bid
date, and anthorizes advertising for bids.
December 30, t998 Advertise for bids; pians and sgecifications complete and available
for Gouncil rtview.
lanuary 26, 1999
February 3, 1999
Mazch i 5, 1999
$id opening
Councii awards contract
Coastruction stazt date
Apri! 5-May 3l, 1999 Ntw condensa installed
August 27, 1999 Construction comptctian dttte
Thank you for this oppottunity to propose our serviees. We hope to continue working with you
to meet all your ice arena nceds. Pleasc feel fiee to ca11 me directiy ae 651-60A-4877 or Jim
Maland dicectly at 4S i-b04-4759, with ar�y queskiotu you may have. We await your direction.
Sincercly,
SONESTRpO, ROSENE, ANDERLIK & ASSOCIATES, TNC.
J� ��iLW.i� I���
G 'stofitz, P.E.
Recreats nal Facilities Group
Cc: 7ohn FTedrickson, Recreation Director
Les Burshtrn, Public Wodcs Dircctor
Dean Mulso, Arena Manager
Jerry $ourdan
Jiin Maland